0) DC Power System Quick Installa tion Guide

Before You Begin


The ZXDUPA WR09(V2.0) supports the following installation modes:
ZXDUPA WR09(V2.0)DC Power System 

Installing an independent power cabinet
Installing an independent battery cabinet
Quick Installation Guide  Installing a stacked cabinet

1. Installing an Independent Power Cabinet


Steps:
ZTE CORPORATION 1. Apply sufficient water-proof glue to the power cabinet and the base.
Tel: 0755-26770800, 800-830-1118 2. Install the base to the power cabinet. See the figure below.
Email: 800@zte.com.cn Document No.: SJ-201 50819 115625-001
Website: http://support.zte.com.cn Release Version: 2018-10-30 (R1.0)

About This Manual 2. Installing an Independent Battery Cabinet


This guide describes how to install the ZXDUPA WR09 (V2.0) DC Power System.
Steps:
1. Apply sufficient water-proof glue to the battery cabinet and the top
cover.
Safety Precautions 2. Install the top cover to the battery cabinet. See the figure below.
Electrical Connection Requirements
 It is prohibited to connect or disconnect cables when the equipment is powered on.
 Remove conductive objects, including watches, bracelets, and rings, before the
operation. You are suggested to wear anti-static gloves.
 Use insulated tools for electrical connection. Bare parts of connection terminals must be
insulated well.
Battery Requirements
 A battery pack must use cascaded batteries of the same brand, model, and 3. Apply water-proof glue to the joint between the base and power cabinet.
manufacturing date. 4. Mark the installation holes according to the dimensions of the installation holes on
 Battery packs must not be short-circuited during the operation. the cabinet bottom.
Cable Requirements
 The cross-sectional area of a cable must match the load capacity.
 Cable color selection must comply with the engineering specification of the local electric Ø14 mm

600 mm
network. In the case of cables with a non-standard color, choose cables in black and
use heat-shrink sleeves or insulation tapes in the corresponding color for clear
identification.
 If a cable is bent, ensure that the bending radius is equal to or greater than 10 times of Front View
the cable diameter to avoid short circuits due to any cable tube damage caused by the
bending radius being too small. After cables are routed, check the connection ends and
bends to ensure that the cables and insulated sleeves are not damaged. 640 mm
 Ensure that the cables are properly connected to avoid short circuit or open circuit.
5. Install the expansion anchors on the installation holes.

Document Acquisition
 You can query and download related documents from http://support.zte.com.cn.
 If your username cannot be registered for document downloading, you can send an
email to doc@zte.com.cn.

Contentions
Danger: indicates an imminently hazardous situation. Failure to comply will result in 6. Place the cabinet in position, and ensure the expansion anchors are in the 3. Apply water-proof glue to the joint between the battery cabinet and the top cover.
death or serious personal injury. installation holes of the cabinet. 4. Mark the installation holes according to the dimensions of the installation holes on
Warning: indicates a potentially hazardous situation. Failure to comply can result in the cabinet bottom.
7. Use a level ruler to ensure that the cabinet is level.
death or serious personal injury.
Caution: indicates a potentially hazardous situation. Failure to comply can result in 8. Install the flat washers, spring washers and nuts, and tighten the nuts.
moderate or minor personal injury.
The horizontal deviation of the cab inet must be less than 3 mm. If th e cabin et is n ot level, add Ø14 mm

600 mm
Notice: indicates equipment or environment safety information. Failure to comply can the U-shape shims und er the cabine t to ensure the ca binet i s level.
result in equipment damage, data loss, equipment performance degradation,
environmental contamination, or other unpredictable results. Front View

Note: provides additional information about a topic.


640 mm

1 2
ZXDUPA WR09 (V2.0) DC Power System Quick Installa tion Guide

5. Install the expansion anchors on the installation holes. 3. Apply water-proof glue to the joint between the battery cabinet and the top cover. 4. (Optional) Installing Anti-Theft Baffles
4. Mark the installation holes according to the dimensions of the installation holes on
the cabinet bottom. Anti-theft baffles are optional parts and need to be installed only if they
are purchased.
Steps:
1. Remove battery baffles from the battery cabinet. See the figure below.
Ø14 mm

600 mm
Front View

6. Place the cabinet in position, and ensure the expansion anchors are in the
installation holes of the cabinet. 640 mm
7. Use a level ruler to ensure that the cabinet is level. 5. Install the expansion anchors on the installation holes.
8. Install the flat washers, spring washers and nuts, and tighten the nuts.

The horizontal deviation of the cab inet must be less than 3 mm. If th e cabin et is n ot level, add
the U-shape shims und er the cabine t to ensure the ca binet i s level.

6. Place the cabinet in position, and ensure the expansion anchors are in the
installation holes of the cabinet. Remove
battery baffles
7. Use a level ruler to ensure that the cabinet is level.
8. Install the flat washers, spring washers and nuts, and tighten the nuts.
2. Install anti-theft baffles inside the battery cabinet and lock the cabinet. See the
The horizontal deviation of the cab inet must be less than 3 mm. If th e cabin et is n ot level, add figure below.
the U-shape shims und er the cabine t to ensure the ca binet i s level.

3. Installing a Stacked Cabinet

Steps:
1. Apply sufficient water-proof glue to the top of the battery cabinet and the bottom of
the power supply cabinet.
2. Install the power supply cabinet above the battery cabinet.

Install anti-theft
baffles inside the
lock the
battery cabinet
cabinet

3 4 5