Public-Private Partnership Projects Approved by the Investment Coordination Committee (ICC) and Confirmed by the NEDA Board (NB)

(June 2010 to September 2018)


A. Projects Approved from June 2016 to September 2018
Project Title Description Cost (PhP M) Region ICC/NB Action
Bases Conversion and Development Authority
1 Clark International Airport The project has a design capacity of 8 million passengers per annum 15,354.48 III 12 September 2017 - The NEDA Board confirmed the ICC approval of the BCDA proposal to
Expansion Project and 82,600 square meters terminal building floor area. (including shift the mode of procurement for the construction of the project from GPRA to Build-Transfer
PhP12,550 million (BT) under the BOT Law.
funding from
BCDA) 5 September 2017 - The ICC-CC approved the Project with the Engineering, Procurement and
Construction Contract to be implemented via the Build-Transfer Scheme under the BOT Law.

17 May 2017 - The ICC-CC reaffirmed its previouse approval of the project on April 23, 2015.

27 June 2017 - The NEDA Board re-affirmed ICC approval of project with BCDA as the
implementing and budgeting agency.

1 June 2017 - The Joint ICC-CC and TB reaffirmed its approval on 23 April 2015 of the project,
with BCDA as the implementing and budgeting agency for the remaining investment
requirement of PhP 12, 550 million.

4 September 2015 - The NEDA Board conditionally approved the project.

23 April 2015 - The Joint ICC-TB and CC approved the project.


2 Clark International Airport The O&M undertaking involves the competitive procurement of a 5,612.41 III 25 April 2018 - The NEDA Board confirmed the ICC approval of the project subject to certain
Expansion Project (O&M technical qualified investor/operator to undertake all the necessary (estimated capital conditions.
Undertaking) internal fit-out, and provision of the necessary equipment and systems expense)
to complete, commission, operate and maintain the new CIA terminal. 9 February 2018 - The ICC-CC approved the project.
The concession will also include the turnover of the operations and
management of the existing terminal to the same qualified 8 February 2018 - The ICC-TB endorsed the project.
concessionaire.
26 January 2018 - The ICC-CC noted the presentation of BCDA on the project and instructed
BCDA to submit the complete ICC documentary requirements.

Page 1 of 12
Department of Transportation
1 Ninoy Aquino International Airport The project aims to: 74,557.00 NCR 25 April 2018 - The NEDA Board deferred delisting the project from the Matrix of ICC/NEDA
PPP Project a. Improve (refurbish or add) assets for air traffic and land side Board-Approved Projects and ICC Project Appraisal Monitor and instructed the Secretariat to
management, and for passenger services; coordinate with the proponent agency for further review of the project in consideration of other
b. Operate and maintain the airport (both airside and landside) proposals.
according to international standards (International Civil Aviation
Organization, Federal Aviation Administration, etc). 6 December 2017 - The ICC-CC noted the PPP Center's update on delisting the project from
the PPP pipeline.

28 November 2017 - The ICC-TB noted DOTr's representation that the project has been
delisted from the priority projects of DOTr.

14 September 2016 – The NEDA Board confirmed the ICC approval of the Project.

16 December 2015 - The NEDA Board deferred the project

4 September 2015 – The NEDA Board deferred the project

2 August 2015 – The ICC-CC noted updates on the Project.

20 July 2015 – The ICC-CC conditionally approved the Project.

2 New Bohol Airport Development Involves the structuring and implementation of a PPP arrangement for 2,335.20 VII 17 May 2017 - The ICC-CC approved the shift in the implementation mode of the capital
and Operations/Maintenance the O&M of the New Bohol Airport at Panglao Island, wherein: requirements of the Regional Airports Project from PPP to GAA and retain the PPP financing
Project a. The Concessionaire will share with DOTC the revenues generated for the operations and maintenance requirements subject to the submission of the ICC-CC
by the facility; requisite documents for the validation and subsequent confirmation of the viability indicators
b. The Concessionaire will also be required to undertake capital by the ICC-CC.
investments which will have to be operational at the earlier of the
following events: 14 November 2016 - The NEDA Board provided flexibility of packaging singly or in bundles the
i. When the traffic hits 1.7 million passengers per annum; or five NEDA Board approved airport project.
ii. Before the end of the 10th year of the Concession Agreement.
19 June 2014 - The NEDA Board confirmed the ICC-CC approval of the project with further
instructions to DOTC.

16 December 2013 - The ICC-CC approved the project.

10 December 2013 - The ICC-TB moved forward to present the project to the ICC-CC.

Page 2 of 12
3 Laguindingan Airport Involves the O&M of the airport, with the development of infrastructure 14,615.40 X 17 May 2017 - The ICC-CC approved the shift in the implementation mode of the capital
Development, Operations and and facilities, and the installation of all required equipment, to improve requirements of the Regional Airports Project from PPP to GAA and retain the PPP financing
Maintenance Project the capacity of the Laguindingan Airport and replace the Cagayan de for the operations and maintenance requirements subject to the submission of the ICC-CC
Oro (Lumbia) Airport, which served as large catchment area of Northern requisite documents for the validation and subsequent confirmation of the viability indicators
Mindanao. It will be implemented under a PPP arrangement and will be by the ICC-CC.
located in Barangay Moog, Municipality of Laguindingan, Misamis
Oriental, covering a total land area of 3.9 million square meters. 14 November 2016 - The NEDA Board provided flexibility of packaging singly or in bundles the
five NEDA Board approved airport project.

19 June 2014 - The NEDA Board confirmed the ICC-CC approval of the project subject to
certain conditions.

16 December 2013 - The ICC - CC approved the project subject DOTC submission of ICC
requisite documents.

27 November 2013 - The ICC-TB endorsed the project.

4 Iloilo, Bacolod, and Davao Airport The projects will involve the provision of additional facilities and other 91,230 VI; XI 17 May 2017 - The ICC-CC approved the shift in the implementation mode of the capital
Development, Operations and necessary improvements to enhance safety, security, access, and requirements of the Regional Airports Project from PPP to GAA and retain the PPP financing
Maintenance Projects operational efficiency, excluding Air Navigation Control, Air Navigation for the operations and maintenance requirements subject to the submission of the ICC-CC
Services and their associated services. requisite documents for the validation and subsequent confirmation of the viability indicators
by the ICC-CC.

14 November 2016 - The NEDA Board provided flexibility of packaging singly or in bundles the
five NEDA Board approved airport project.

17 October 2014 - NEDA Board confirmed the ICC-CC's approval of the project.

30 June 2014 - The ICC-CC approved the project.

5 Unsolicited Proposal on the It involves the construction, operation and maintenance of the New 735,634.00 III 25 April 2018 - The NEDA Board confirmed the ICC approval of the project subject to certain
Bulacan International Airport Manila International Airport located in Bulacan, Bulacan, including an conditions.
8.4 kilometer tollway that will connect NMIA to North Luzon Expressway
in Marilao, Bulacan. It consists of 4 parallel runways, with provision for 28 March 2018 - The ICC-CC approved the project with further instructions to DOTr.
additional 2 parallel runways and a passenger capacity of 200 million
passengers per year with an opening year capacity of 100 million 8 February 2018 - The ICC-TB endorsed DOTr's repsonse to the concerns raised by trhe ICC-
passengers. CC.

26 January 2018 - The ICC-CC noted the updates on the project. DOTr was also instructed to
submit its repsonse to the concerns raised by the ICC-CC.

11 January 2018 - The ICC-TB decided to elevate the project to the ICC-CC subject to certain
instructions to DOTr.

28 November 2017 - The ICC-TB deferred action on the project with further instruction to
DOTr.

Page 3 of 12
Department of Tourism
1 New Nayong Pilipino The NNPEC Project will involve the design, construction, operation and 1,473.00 NCR 25 April 2018 - The NEDA Board deferred delisting the project from the Matrix of ICC/NEDA
Entertainment City Project maintenance of a 9.5 has. cultural theme park at Entertainment City Board-Approved Projects and ICC Project Appraisal Monitor and instructed the Secretariat to
with six components: 1) themed zones; 2) historical and cultural coordinate with the proponent agency for further review of the project in consideration of other
attractions; 3) recreational attractions; 4) retail attractions; 5) site proposals.
support facilities and administration; and 6) parking facilities. The
Project endeavors to be a world-class showcase and celebration of 6 December 2017 - The ICC-CC noted the updates on the Project and instructed DOT to
Philippine traditional and developing cultural and natural heritage. confirm whether the project will be pursued, through PPP or other modalities.

28 November 2017 - The ICC-TB noted the updates provided by PPP Center on the project.

14 November 2016 – The NEDA Board confirmed the ICC-CC approval of the project.

18 December 2015 – The ICC-CC approved the project.

14 October 2015 – The ICC-CC deferred approval of the project.

National Development Company


1 Davao Food Complex Joint Joint venture between the NDC with private sector partner to develop, 1,086.17 XI 25 April 2018 - The NEDA Board confirmed the ICC approval of the project.
Venture Project market, manage and lease out the 20-Ha. NDC Property in Toril, Davao
City, in accordance with the Master Plan for an Agri-Industrial Complex. 28 March 2018 - The ICC-CC approved the project.

28 February 2018 - The ICC-TB endorsed the project.

Page 4 of 12
B. Projects Approved from June 2010 to May 2016
Project Title Description Cost (PhP M) Region ICC/NB Action
Department of Transportation
1 LRT Line 1 South Extension The project will extend LRT Line 1 by approximately 11.7 km from 64,915.43 IV-A and 18 November 2016 – The ICC-TB noted the updates provided by DOTr on the Right-of-Way
Project Baclaran Station through the cities of Parañaque and Las Piñas, up to NCR (ROW) acquisition for the LRT Line 1 South Extension Project.
the municipality of Bacoor, Cavite. The project involves civil works,
electro-mechanical works, rolling stock, and operation and 19 June 2014 - The NEDA Board approved the award to the lone bidder of the project.
maintenance.
6 June 2014 - The ICC-CC confirmed the equity IRR of the project to be a reasonable rate of
return.

21 November 2013 - The NEDA Board confirmed the ICC-CC's approval of the proposed
changes to the project subject to DOTC submission of revised project parameters.

04 October 2013 - The Joint ICC-CC and TB discussed the DOTC-proposed changes on the
project.

22 March 2012 - The NEDA Board confirmed the ICC approval of the project to be
implemented through a hybrid PPP arrangement where the private sector undertakes civil
works and electromechanical works, while Government provides for the rolling stock and depot
through ODA from the Japan International Cooperation Agency (JICA). The approval is with
the understanding that DOTC will commit to resolve the remaining issues as discussed with
the ICC.

21 March 2012 - The ICC-CC conditionally approved the project.

2 LRT Line 2 Operations and The project involves the operations and maintenance concession 16,520 NCR 27May
29 February
2014 2012
- The -NEDA
The ICC-TB
Board endorsed
confirmedthe
theproject
ICC-CC'swithapproval
conditions.
of the project, subject to
Maintenance Project contract of the following components for (a) the existing LRT Line 2 (Estimated 10- certain conditions.
System, and (b) any expansion of the existing Line 2 System, and (b) Year
including, but not llimited to, any extension to be constructed by the O&M Cost) 21 February 2014 - The ICC-CC approved the project
government, such as the Masinag Extension.
3 Mactan Cebu International Airport The project involves the construction of a new passenger terminal and 17,520.72 VII 21 November 2013 - The NEDA Board confirmed the ICC-CC approval of the proposed
Development Project apron, along with associated infrastructure and facilities, among others. changes to the project subject to certain conditions.

04 October 2013- The Joint ICC TB and CC approved the DOTC-proposed revisions to the
project.

5 August 2013 -The ICC-CC approved the proposed changes by DOTC on the project as
presented by DOTC during the meeting. The approval of the proposed changes by the DOTC
is also with the understanding that there will be no reduction in the economic and financial
viability indicators for the project as presented by DOTC.

29 November 2012 - The NEDA Board confirmed ICC approval of the project with the
agreement that DOTC will incorporate in the project the suggestion of DTI Secretary to include
aesthetic improvements in the architectural design of the airport.

22 November 2012 - The Joint ICC-TB and CC conditionally approved the project.

Page 5 of 12
4 Contactless Automatic Fare The project will implement a contactless and integrated automatic fare 1,721.99 NCR 29 November 2012 - The NEDA Board conditionally approved the ICC-CC approval of the
Collection System (AFCS) collection on existing Light Rail Transit Lines 1 and 2 and the Metrorail proposed project, subject to DOTC/ICC-CC's review of the P1.72 billion total project cost.
Transit (MRT) 3, collectively referred to as the Light Rail Systems.
22 November 2012 - The Joint ICC-TB and CC conditionally approved the project.

5 Development of the Integrated The project envisages the development of two mass transportation 7,747.435 NCR 29 May 2014 -The NEDA Board approved the amendments to the project structure.
Transport System (ITS) Terminals intermodal terminals at the southern outskirts of Metro Manila. The (with cost of land)
at FTI and PRA under Public proposed terminal will be located at (1) FTI property in FTI Compound, 21 November 2013 - The NEDA Board confirmed the ICC-CC approval of the project subject
Private Partnership (PPP) Taguig City along the Southern Luzon Expressway/Skyway, and (2) at 6,112.211 to certain conditions.
PRA property beside Asia world/Uniwide along Coastal Road, (without cost of
Paranaque City along the Manila-Cavite Expressway (R1-Expressway). land) 4 October 2013 - The Joint ICC-TB and CC conditionally approved the DOTC-proposed
The South-SLEX terminal will serve the passengers who are travelling revisions on the project.
to and from Laguna/Batangas side while the South-Coastal Road
terminal will serve the passengers who are travelling to and from the 5 August 2013 - The ICC-CC elevated the project for NEDA Board policy consideration.
Cavite side.
18 July 2013 - The ICC-TB elevated the project for ICC-CC discussion.

8 MRT Line 7 Project The project involves the construction of a 22.8km rail transit system 62,698.02 NCR and III 21 November 2013 - The NEDA Board approved the project.
from North Avenue station in EDSA passing through Commonwealth
Ave., Regalado Ave., and Quirino Highway up to the proposed 26 June 2013- The NEDA Board deferred its decision on the DOTC's request with the
Intermodal Transport Terminal in San Jose del Monte, Bulacan with 14 instruction to DOTC to update its cost analysis to 2013 prices.
stations.
8 April 2013- The Joint ICC-TB and CC noted that the proposal, as resubmitted by the
Department for ICC approval, is economically viable. Given such validation, the ICC is
elevating the Concession Agreement (CA) and Implementation Guidelines for the NEDA
Board’s consideration regarding the issuance of the Performance Undertaking (PU) for the
subject’s effectivity and implementation.

11 LRT Line 6 Project The Project is a 19.0 km rail project from Niyog, Bacoor (the terminus of 64,710.00 NCR 4 September 2015 - The NEDA Board approved the project.
the LRT 1 CAVEX extension) going southward to Dasmariñas City. The
proposed ROW alignment is along the Aguinaldo Highway with 7 28 May 2015 - The Joint ICC TB and CC approved the BT Option for the project
stations, namely: (i) Niyog (transfer station between LRT Line 6 and
LRT Line 1) (ii) Tirona, (iii) Imus, (iv) Daang Hari, (v) Salitran, (vi) 23 April 2015 - The Join ICC -TB and CC conditionally approved the project.
Congressional Avenue, and (vii) Governor’s Drive.

Page 6 of 12
12 LRT Line 4 Project The LRT Line 4 Project involves the financing, design, construction, 50,150 NCR 4 September 2015 - The NEDA Board approved the project.
operations and maintenance of an 11 kilometer rail that will run west (original proposal)
from SM City Taytay to the intersection of Ortigas Avenue and EDSA. 20 July 2015 - The ICC-CC approved the project.
The project covers the provision of railway infrastructure, stations, 42.89 billion
depots, rolling stock, signalling, electrification and communication, (the reserve price
automated fare collection system, and other necessary machinery and basis following the
equipment. LRT Line 6 costing
on per / km basis.
The new per/km
cost is 3.83 billion)

13 Puerto Princesa Airport The project aims to provide the province of Palawan with an enhanced 5,228 IV-A 17 October 2014 - NEDA Board confirmed the ICC-CC's approval of the project.
Development, and Operations and international schedule air connections network, acting as catalyst to (exclusive of value
Maintenance Project expand the tourism cluster of Palawan and unlock its economic added tax 22 August 2014 - The ICC-CC discussed the project.
potential as a high value resort and holidays destination. amounting to
584.40) 30 June 2014 - The ICC-CC approved the project.

20 June 2014 - The ICC-CC deferred approval of the project.


Department of Health
1 Modernization of the Philippine The project aims to enhance the delivery of health services by 5,607.79 NCR 21 November 2013 - The NEDA Board confirmed the ICC-CC's confirmation of the
Orthopedic Center (POC) transforming the POC into the country's primary center for bone and reasonableness of the project's internal rate of return.
joints disease that is at par with global standards. It envisions the
development of a new facility intended to be a super-specialty tertiary 4 October 2013- The Joint ICC-CC and TB confirmed the project's IRR.
orthopedic hospital on an 8,000-square meter area within the National
Kidney and Transplant Institute (NKTI) Complex along East Avenue, 5 August 2013 - ICC-CC deferred decision on the project.
Quezon City.
18 July 2013 - ICC-TB elevated the project to ICC-CC.

18 September 2012- The NEDA Board confirmed the ICC approval of the project subject to the
compliance by the DOH with the NB directive.

30 May 2012 - The NEDA Board deferred confirmation of the project.

11 May 2012 - The Joint ICC-CC and TB conditionally approved the project.

Department of Education
1 PPP for School Infrastructure The project aims to address the country's backlog and increasing 9,891.83 I, III, and IV- 19 December 2011 - The NEDA Board confirmed the ICC-CC approval of the project subject
Project- Phase I classroom requirements by supplementing the current initiatives and A to compliance with the following ICC/NB conditions and recommendations: on the bidding
programs of DepEd on classroom construction nationwide. Its initial parameter, assurance on the lease payment, risk allocation; and submission of ICC requisite
implementation involves the construction of one-storey and two-storey documents.
school buildings with a total of 9,623 classrooms in 2,300 elementary
and secondary schools in the three (3) pre-identified regions (I, III and 22 November 2011 - The ICC-CC conditionally approved the project ad referendum.
IV-A).
9 November 2011 - The ICC-TB endorsed the project with conditions.

Page 7 of 12
2 PPP for School Infrastructure The project involves the construction of one-storey and two-storey 13,140.28 I, II, CAR, III, 29 November 2012 - The NEDA Board confirmed the ICC-CC's approval of the proposed
Project- Phase II school buildings with a total of 10,679 classrooms in 5,033 elementary IV-B, V, VI, PSIP-II, with the proviso that DepEd is authorized to undertake negotiations for either of the
and secondary schools in 14 regions nationwide. VII, IX, X, XI, two financing route -- PPP or national government, with the approval going to the lower project
XII, and XIII- cost route; and PMS to coordinate with DepEd in submitting to the President a list of Regional
CARAGA Development Councils which have not yet given endorsements for the project.

22 November 2012 - The Joint ICC-TB and CC conditionally approved the project.

Department of Public Works and Highways


1 Daang Hari-SLEX Link Road The project involves the following: 1,956.04 IV-A 15 July 2015 - The NEDA Board confirmed the ICC approval of the proposed variation on the
Project (8 July 2011 project.
(a) Construction of 4-lane, 4-km at-grade expressway;(b) Construction NEDA Board ad
of 2 rotundas, viaduct with a length of 235 meters, 2-lane bridge referendum) 15 June 2015 - The ICC noted the Variation Order of the project.
crossing SLEX with a total length of 60 meters, and other structures; (c)
Expansion of the Susana Heights toll plaza;(d) Construction of local Additional 50 29 November 2011 - ICC-CC approved the DPWH-proposed amendments on the project.
roads and 2 overpasses;(e) Construction of toll plaza; and(f) million subsidy
Realignment of private road (Linden Wood) to connect at roundabout. (29 November 8 July 2011 -The NEDA Board confirmed ad referendum the ICC approval of the project.
2011 ICC-CC)
17 May 2011 - The NEDA Board discussed the project.
Variation order
amounting to 17 June 2011 and 29 April 2011 - The ICC-CC conditionally approved the project.
223,015,613.32
(15 July 2015 9 June 2011 and 27 April 2011 - The ICC-TB conditionally approved the project.
NEDA Board )

2 NAIA Expressway Phase II Project The project aims to provide fast, reliable and safe access to and from 15,860.53 NCR 15 July 2015 - The NEDA Board conditionally confirmed the ICC's approval of the proposed
NAIA Terminals 1, 2 and 3 as well as connect SLEX/Skyway with variation on the the project.
MCTE/Roxas Blvd, Diosdado Macapagal Blvd and the proposed 2,074.04 million
PAGCOR Entertainment City. (additional Cost of 15 June 2015 - The Joint ICC-TB and CC approved the Variation Order of the project.
realignment)
30 May 2012 - The NB confirmed the ICC approval of the proposed NAIAX Project Phase II.

22 May 2012 - The ICC-CC approved ad referendum the project following the discussion of the
project during the 11 May 2012 Joint ICC-TB and CC meeting.

17 June 2011 - The ICC-CC discussed the project.

11 May 2012 - The Joint ICC-TB and CC discussed the project.

Page 8 of 12
3 NLEX-SLEX Connector Road The project aims to decongest Metro Manila traffic and provide better 23,200.00 NCR 16 December 2015 – The NEDA Board confirmed and approved the terms negotiated by the
Project access to Manila ports by connecting the North Luzon Expressway (revised project DPWH with the original proponent.
(NLEX) and the South Luzon Expressway (SLEX). The Connector Road cost based on
will run 13.5 km along the Philippine National Railways' right of way result of 19 August 2015 - The ICC-CC agreed to present to the NEDA Board the results of
(ROW) and medians of Osmeña and Quirino highways. negotiation; negotiations between DPWH and the original proponent.
approved by the
NEDA Board on 20 July 2015 - The ICC-CC deferred the approval of the results of negotiations between the
16 December DPWH and the original proponent for the Project.
2015)
16 February 2015 - The NEDA Board confirmed the ICC-CC re-approval of the project through
25,555.99 an unsolicited mode, subject to Swiss Challenge.
(2013 NEDA
Board Approval) 22 December 2014 - The ICC-CC re-approved the project as an unsolicited proposal subject
to Swiss Challenge.

17 October 2014 - The NEDA Board deferred the approval of the DPWH request for re-
approval of the NEDA Board to proceed with the project under the same terms and conditions
as those contained in the original approval, subject to certain instructions.

11 September 2013- The NEDA Board approved ad referendum the "Amendment to the 18
January 2013 NEDA Board Approval of the North Luzon Expressway (NLEX) - South Luzon
Expressway (SLEX) Connector Road Project".

18 January 2013 - The NEDA Board confirmed the ICC approval of the project with the
agreement that the Department of Finance will submit a brief on the project's weighted
average cost of capital.

10 January 2013 - The ICC-CC approved ad referendum the extension of the 15 December
2012 deadline to 15 February 2013 for the conclusion of the negotiations between MPTDC
and PT CLP.

29 November 2012 -The NEDA Board confirmed the ICC approval of the project with the
instruction for DPWH to validate the cost per kilometer of the project, impose a recovery
period for the ROW cost that is shorter than planned (concession period); submit to the
President a projection of the concessionaire's income returns under the project over the
concession period of 35 years; and for MMDA to provide the President a copy of the study on
fuel savings in EDSA if traffic will be decongested.

7 November 2012 - Joint ICC-TB and CC conditionally approved the project.

3 October 2012 - ICC TB elevated the project to the ICC-CC.

Page 9 of 12
4 Laguna Lakeshore Expressway Involves (a) construction of a 47-kilometer (km), six-lane expressway- 122,811.12 IV-A 6 December 2017 - The ICC-CC noted the updates on the Project and instructed the agency to
Dike Project cum-flood control dike, on a mainly off-shore alignment about 500 confirm whether there area material changes that would necessitate resubmission of the
meters from the western shoreline of the lake, including bridges, project to the ICC.
interchanges, access roads, pumping stations and floodgates; (b)
Rawland Reclamation and Horizontal Development (internal roads, 28 November 2017 - The ICC-TB instructed PPP Center to provide updates on the Project,
drainage, water and related facilities) of approximately 700 hectares of and confirmation if the project will be retained in the PPP pipeline.
foreshore and offshore areas in Laguna Lake, about 450 meters wide
and 15.6 kms. long, along the western edge of the expressway-dike and 4 September 2015 - The NEDA Board noted the ICC-CC's approval on the proposed changes
separated from the shoreline by a waterway of about 100-150 meters, for the project.
from Taguig to Muntinlupa.
20 July 2015- ICC-CC noted the Department’s proposed changes for the project.

17 October 2014 - The NEDA Board confirmed the DPWH's request that the project may
proceed under a hybrid contractual arrangement with further instructions to DPWH.

19 June 2014 - The NEDA Board confirmed the ICC-CC approval of the project.

29 May 2014 - The NEDA Board deferred its confirmation of the ICC-CC approval of the
project.

21 April 2014 - The ICC-CC approved the project.

5 Tarlac-Pangasinan-La Union The TPLEX, then referred to as the Tarlac-La Union Toll Expressway 24,303.00 I and III 16 February 2015 - The NEDA Board confirmed the ICC-CC approval of (a) the expansion of
Expressway Project (TPLEX) Project Phase 1, was approved by the ICC-CC on 11 July 2007 with a the project from two lanes to four lanes, and (b) additional government subsidy of PhP 1.986
total project cost of PhP 16.882 billion. The project, as approved by the billion for the project.
ICC, involves the contruction of an 84.50-kilometer two-lane (one lane
per direction) Asphalt Concrete Pavement expressway. 14 January 2015 - Joint ICC-TB and CC approved the proposed expansion of the project.

The project is proposed to have an expansion from the ICC-approved 22 December 2014 - The ICC-CC deferred the approval the proposed expansion of the
two-lanes into four lanes (two lanes per direction) for Section 3 (from project.
Urdaneta City to Rosario, La Union), which will require an additional
subsidy of PhP 1.986 billion. This will result in a total revised project
cost of PhP 24.303 billion for the TPLEX Ultimate Stage from SCTEX
terminus to Rosario, La Union.

Page 10 of 12
6 Cavite - Laguna Expressway The project involves the financing, design and construction of a new 35,425.84 IV-A 16 February 2015 - The NEDA Board confirmed the ICC-CC approval of the project's rebid
Project 47.02 km, four (4) lane expressway from the end of CAVITEX in Kawit, using single-stage qualification, and approval of bid parameter for the project.
Cavite to Mamplasan Interchange of SLEX in Binan, Laguna. The
project is composed of two sections: Cavite and Laguna Sections. 22 December 2014 - The ICC CC approved the rebid of the project.

21 November 2013 - The NEDA Board noted the ICC-CC's approval of the financing of the
project, from ODA and PPP to pure PPP.

5 August 2013 - The ICC-CC approved the change in the mode of financing of the project to
pure PPP.

18 July 2013 - The ICC TB noted that DPWH will implement the project under pure PPP
scheme.

26 June 2013 - The NEDA Board approved the proposed amendment from mixed ODA and
PPP, to pure PPP financing with a condition that existing specifications and requirements for
the project are maintained.

18 January 2013 - The NEDA Board confirmed the ICC approval of the project with the
agreement that DOF will submit details of the project's financial internal rate of return.

29 November 2012 - The NEDA Board deferred decision on the project

22 November 2012 - The Joint ICC-TB and CC elevated the project for NEDA Board
discussion.

4 September 2012 - The NEDA Board deferred decision on the project.

12 July 2012 - The Joint ICC-TB and CC approved the project.

Metropolitan Waterworks and Sewerage System


1 Rehabilitation, Operation and The project aims to extend the economic life of AU-4 and AU-5 by 1155.18 million III 11 July 2018 - The ICC-TB noted the updates provided by DOE on the project
Maintenance of the Angat Hydro another 30 years; increase energy output and load capacity to 60%
Electric Power Plant (AHEPP) through the replacement of existing runners and electro-mechanical 5 July 2018 - The ICC-TB remanded the project to MWSS noting updates on the project as
Auxiliary Turbines 4 and 5 equipment; and enable MWSS to earn additional revenues through the reported by the ICC Secretariat
Through Public-Private concession payments to be made by the private proponent.
Partnership (PPP) Project 11 August 2016 - The ICC-TB agreed to remand the project to MWSS pending its response to
the concerns raised by the ICC.

19 August 2015 - The Joint ICC CC and TB discussed the requests of MWSS regarding the
project. The ICC agreed that the project will be discussed anew by the ICC upon MWSS
submission of ICC-requested documents.

29 November 2012 - The NEDA Board confirmed the ICC approval of the proposed
rehabilitation, operation and maintenance of the AHEPP auxiliary turbines 4 & 5 through PPP
project.

7 November 2012 - The Joint ICC-TB and CC conditionally approved the project.

Page 11 of 12
2 Bulacan Bulk Water Supply The project is to be implemented under a BOT contractual scheme with 24,435.24 III 29 May 2014 - The NEDA Board approved MWSS' request on the project.
Project a single private entity to finance, design, construct, operate and
maintain 21 November 2013 - The NEDA Board confirmed the ICC-CC approval of the project with the
a) the required infrastructure facilities to deliver 5.5 CMS of raw water understanding that MWSS will address outstanding matters to ensure implementability and
to Phase 1 and 2 municipalities; and b) construct infrastructure facilities viability of the project.
to cater to future demand of Phase 1, 2 and 3 municipalities.
4 October 2013 - Joint ICC CC and TB approved the project with conditions.

Department of Justice
1 Regional Prison Facilities Project The project aims to provide a new prison facility that will accommodate 50,204.19 III 14 June 2018 - The ICC-CC noted the updates on the project.
the transfer of inmates from the National Bilibid Prison and the
Correctional Institution for Women, both of which are scheduled to be 16 December 2015 – The NEDA Board confirmed the ICC-CC approval of the proposed
closed. The project is proposed to be located on a 500-ha site in additional cost for ROW/resettlement with further instructions to DOJ.
General Tinio, Nueva Ecija, within the military reservation of Fort
Magsaysay, about 8 km from the Gapan- Fort Magsaysay road. 4 September 2015 - The NEDA Board deferred its notation of ICC-CC's approval on the
proposed changes on the project.

20 July 2015 - The ICC-CC approved the proposed additional PhP 20 million to the NEDA
Board/ICC-approved project cost of PhP 50,184.19 million to cover the ROW acquisition and
resettlement action costs for the Project.

17 October 2014 - The NEDA Board confirmed the ICC-CC's approval of the proposed project.

5 August 2014 - The ICC-CC approved the project.


Philippine Statistics Authority
1 Civil Registry System Information The project involves the computerization of the PSA's civil registry 1,586.78 Nationwide 28 September 2016 - The ICC-CC noted the report by the Secretariat on the reasonable rate
Technology Project, Phase II (CRS- operations and is designed to collect, store, maintain, and manage civil of return and results of negotiations on the project.
ITP 2) Under Solicited Mode registry, documents, as well as specimen signature of all city and
municipal registrars, using imaging technology. It will also include 02 August 2016 – The ICC-CC approved the request of PSA for confirmation of the project’s
production of vital statistics and make civil registry services available rate of return
nationwide through the CRS outlets and other authorized partners.
18 December 2015 - The ICC-CC approved the request of PSA with regard to securing RDC
endorsements.

15 July 2015- The NEDA Board confirmed the ICC approval of the project with additional
instructions to PSA.

28 May 2015 - The ICC-CC approved the project.

Page 12 of 12