Вы находитесь на странице: 1из 8

UNIVERSIDAD PERUANA LOS ANDES

FACULTAD DE INGENIERIA
ESCUELA PROFESIONAL DE INGENIERIA CIVIL

CATEDRÁTICO : FLORES ESPINOZ


ESTUDIANTE : PAPUICO POMA CRIS
U.E.C. : CONSTRUCCI

PARTIDA ESPECIFICACIONES UNIDAD

01.01 TRABAJOS PRELIMINARES


01.01.01 LIMPIEZA DE TERRENO
AREA TOTAL m2
01.01.02 TRAZO Y REPLANTEO EN EL TERRENO m2
01.02 MOVIMIENTO DE TIERRAS m3
EXCAVACIÓN DE ZAPATAS
Z-1
Z-2
01.03 EXCAVACIÓN PARA CIMIENTOS m3
EJE A:A ENTRE 1:1 Y 5:5
EJE B:B ENTRE 1:1 Y 5:5
EJE B':B' ENTRE 1:1 Y 5:5
EJE C:C ENTRE 1:1 Y 5:5
EJE 1:1 ENTRE A:A Y C:C
EJE 2:2 ENTRE A:A Y C:C
EJE 3:3 ENTRE A:A Y C:C
EJE 4:4 ENTRE A:A Y C:C
EJE 5:5 ENTRE A:A Y C:C
CORTE 3-3 (VANOS)

PARTIDA ESPECIFICACIONES UNIDAD


02.01 RELLENO Y COMPACTADO m3
EJE A:A ENTRE 1:1 Y 5:5
EJE B:B ENTRE 1:1 Y 5:5
EJE B':B' ENTRE 1:1 Y 5:5
EJE C:C ENTRE 1:1 Y 5:5
EJE 1:1 ENTRE A:A Y C:C
EJE 2:2 ENTRE A:A Y C:C
EJE 3:3 ENTRE A:A Y C:C
EJE 4:4 ENTRE A:A Y C:C
EJE 5:5 ENTRE A:A Y C:C
ZAPATAS Z1
ZAPATAS Z2
ZAPATAS Z3
2.02 ELIMINACIÓN DEL MATERIAL
EXCEDENTE (F.E. = 25%)
V.E. = 23.63 M3

PARTIDA ESPECIFICACIONES UNIDAD


01.01 CONCRETO SIMPLE m3
CIMIENTOS
EJE A:A ENTRE 1:1 Y 5:5
EJE B:B ENTRE 1:1 Y 5:5
EJE B':B' ENTRE 1:1 Y 5:5
EJE C:C ENTRE 1:1 Y 5:5
EJE 1:1 ENTRE A:A Y C:C
EJE 2:2 ENTRE A:A Y C:C
EJE 3:3 ENTRE A:A Y C:C
EJE 4:4 ENTRE A:A Y C:C
EJE 5:5 ENTRE A:A Y C:C
01.02 SOBRECIMIENTOS
EJE A:A ENTRE 1:1 Y 5:5
EJE B:B ENTRE 1:1 Y 5:5
EJE B':B' ENTRE 1:1 Y 5:5
EJE C:C ENTRE 1:1 Y 5:5
EJE 1:1 ENTRE A:A Y C:C
EJE 2:2 ENTRE A:A Y C:C
EJE 3:3 ENTRE A:A Y C:C
EJE 4:4 ENTRE A:A Y C:C
EJE 5:5 ENTRE A:A Y C:C
01.03 ENCOFRADO Y DESENCOFRADOS
EJE A:A ENTRE 1:1 Y 5:5
EJE B:B ENTRE 1:1 Y 5:5
EJE B':B' ENTRE 1:1 Y 5:5
EJE C:C ENTRE 1:1 Y 5:5
EJE 1:1 ENTRE A:A Y C:C
EJE 2:2 ENTRE A:A Y C:C
EJE 3:3 ENTRE A:A Y C:C
EJE 4:4 ENTRE A:A Y C:C
EJE 5:5 ENTRE A:A Y C:C
01.04 ENCOFRADO Y DESENCOFRADOS
TAPA A,C ENTRE 1:1 Y 5:5
EJE B:B ENTRE 1:1 Y 5:5
EJE B':B' ENTRE 1:1 Y 5:5
EJE C:C ENTRE 1:1 Y 5:5
EJE 1:1 ENTRE A:A Y C:C
EJE 2:2 ENTRE A:A Y C:C
EJE 3:3 ENTRE A:A Y C:C
EJE 4:4 ENTRE A:A Y C:C
EJE 5:5 ENTRE A:A Y C:C
VERSIDAD PERUANA LOS ANDES
FACULTAD DE INGENIERIA
A PROFESIONAL DE INGENIERIA CIVIL

FLORES ESPINOZA, CARLOS


PAPUICO POMA CRISTHIAN KEVIN
CONSTRUCCIONES I

MEDIDAS
N° DE VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

1.00 20.00 6.00 120.00 120.00


1.00 20.00 6.00 120.00 120.00

3.00 1.00 1.00 0.80 2.40 7.52


8.00 1.00 0.80 0.80 5.12

1.00 16.00 0.40 1.05 6.72 27.03


1.00 8.56 0.40 1.05 3.60
1.00 3.32 0.40 1.05 1.39
1.00 16.00 0.40 1.05 6.72
1.00 4.80 0.40 1.05 2.02
1.00 0.85 0.40 1.05 0.36
1.00 4.40 0.40 1.05 1.85
1.00 2.79 0.40 1.05 1.17
1.00 0.68 0.40 1.05 0.29
1.00 6.95 0.40 1.05 2.92

MEDIDAS
N° DE VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

1.00 16.00 0.25 0.10 0.40 3.53


1.00 8.56 0.25 0.10 0.21
1.00 3.32 0.25 0.10 0.08
1.00 16.00 0.25 0.10 0.40
1.00 4.80 0.25 0.10 0.12
1.00 0.85 0.25 0.10 0.02
1.00 4.40 0.25 0.10 0.11
1.00 2.79 0.25 0.10 0.07
1.00 0.68 0.25 0.10 0.02
2.00 AREA: 0.94 0.10 0.75
3.00 AREA: 0.76 0.10 0.61
1.00 AREA: 0.92 0.10 0.74

MEDIDAS
N° DE VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

1.00 16.00 0.40 0.90 5.76 20.66


1.00 8.56 0.40 0.90 3.08
1.00 3.32 0.40 0.90 1.20
1.00 16.00 0.40 0.90 5.76
1.00 4.80 0.40 0.90 1.73
1.00 0.85 0.40 0.90 0.31
1.00 4.40 0.40 0.90 1.58
1.00 2.79 0.40 0.90 1.00
1.00 0.68 0.40 0.90 0.24

1.00 16.00 0.15 0.45 1.08 3.87


1.00 8.56 0.15 0.45 0.58
1.00 3.32 0.15 0.45 0.22
1.00 16.00 0.15 0.45 1.08
1.00 4.80 0.15 0.45 0.32
1.00 0.85 0.15 0.45 0.06
1.00 4.40 0.15 0.45 0.30
1.00 2.79 0.15 0.45 0.19
1.00 0.68 0.15 0.45 0.05

1.00 16.00 0.15 0.45 1.08 3.87


1.00 8.56 0.15 0.45 0.58
1.00 3.32 0.15 0.45 0.22
1.00 16.00 0.15 0.45 1.08
1.00 4.80 0.15 0.45 0.32
1.00 0.85 0.15 0.45 0.06
1.00 4.40 0.15 0.45 0.30
1.00 2.79 0.15 0.45 0.19
1.00 0.68 0.15 0.45 0.05
13.00 16.00 0.45 93.60 96.39
1.00 8.56 0.15 0.45 0.58
1.00 3.32 0.15 0.45 0.22
1.00 16.00 0.15 0.45 1.08
1.00 4.80 0.15 0.45 0.32
1.00 0.85 0.15 0.45 0.06
1.00 4.40 0.15 0.45 0.30
1.00 2.79 0.15 0.45 0.19
1.00 0.68 0.15 0.45 0.05