This document is a checklist for a main geotechnical consultant for a project. It requests details about the property, proposed structure, soil investigation conducted, proposed foundation system which includes a raft foundation, and lateral load analysis. It also requests information on uplift capacity, shoring arrangement, retaining walls, and submission of the final report. The checklist ensures the geotechnical consultant provides all necessary information and analyses for evaluating the foundation design and soil conditions of the site.
This document is a checklist for a main geotechnical consultant for a project. It requests details about the property, proposed structure, soil investigation conducted, proposed foundation system which includes a raft foundation, and lateral load analysis. It also requests information on uplift capacity, shoring arrangement, retaining walls, and submission of the final report. The checklist ensures the geotechnical consultant provides all necessary information and analyses for evaluating the foundation design and soil conditions of the site.
This document is a checklist for a main geotechnical consultant for a project. It requests details about the property, proposed structure, soil investigation conducted, proposed foundation system which includes a raft foundation, and lateral load analysis. It also requests information on uplift capacity, shoring arrangement, retaining walls, and submission of the final report. The checklist ensures the geotechnical consultant provides all necessary information and analyses for evaluating the foundation design and soil conditions of the site.
S Item References r. 1.N Property Details To be Filled by Client o.
Project Name To be Filled by Client
Project Address To be Filled by Client
2. Detail of the Structure Includes height abutting the boundries of the
plot North side To be Filled by Client West side To be Filled by Client South Side To be Filled by Client East Side To be Filled by Client No. of Basement To be Filled by Client Height of each basement To be Filled by Client 3. Soil Investigation Details
Boring methods Double tube for boring
No. of Bore holes Total – 12 Boreholes 7 Borehole (BH-1 to BH-7) within Tower Area
Spacing of bore holes Approx. 15m to 25m
Terminated Depth of Boreholes BH-1, BH-4, BH-6, BH-7 - 25.0m Depth BH-2 - 20.0m Depth BH-3 – 21.0m Depth BH-5 – 25.5m Depth GWL (m) Approx. 5.8m to 6.5m Below Ground Testing Laboratory Not NABL Accredited 4. Foundation Type of proposed foundation Solid Raft
Depth of Footing /raft
pile termination Raft Depth = 2500 mm + 500mm (pedestal)
Load Calculation / Maximum Pressure from SAFE outputs - 164
Uniform /Differential settlement <L/400, Within permissible settlement
4.1 Raft Foundation Bottom level of raft -17.45m from Ground level --- For Tower area.
-15.95m from Ground level --- For Non-
Tower area.
Minimum clearance between
outermost basement retaining To be filled by Client wall and compound wall Size 106m X 48m Thickness 2500 mm + 500mm (pedestal) -- For Tower Area
1000mm ---- For Non Tower Area
Depth To be filled by structural consultant Modulus of Subgrade Reaction Zoned Spring Constant Based on FE analysis Modelling of Soil for raft foundation Yes
Anchors details Rock anchors of 45Ton capacity will be
provided at 2.0m c/c. 4.2 Pile Raft NA Sharing of load by raft and piles NA Pile cap rest on strata NA
Pile raft design NA
Foundation settlement and NA pressure measurement 4.3 Pile Foundation NA Type, diameter, spacing NA Socket depth NA Foundation settlement and NA pressure measurement 4.4 Lateral load analysis NA Pile load test NA Initial Routine Any other Field test / conducted / recommended 4.5 Uplift capacity of foundation Based on wind pressure No uplift pressure encountered. Refer Maximum & Minimum Base pressure sheet provided as per safe analysis results. Based on GWL Refer calculations provided for Non Tower area. Based on earthquake No uplift pressure encountered. Refer Maximum & Minimum Base pressure sheet provided as per safe analysis results. If rock anchors are used are they To be filled by structural consultant grouted after installation and stressing? Or Passive anchor Whether pressure release pipes To be filled by structural consultant have been used? 5 Shoring Arrangement Has a shoring system been Yes installed Type (touching piles C/C spacing Touching Piles Secent pile / diaphragm wall) Size and Depth 300mm Dia @ 400mm C/C (Micro-Piles) Achors if required Yes
GWL -
7 Retaining wall ( If any) To be filled by structural consultant
8 Submission of final report In advance to authority should reach the minimum 5 days before