Вы находитесь на странице: 1из 5

PT.

Jakarta Solusi Lestari


T/L Design and Engineering for AMDAL ITF Sunter, WtE Project Draft
Sunter, North Jakarta

TABLE OF CONTENTS

FOREWORD ………………………..……….…………………….………………….............................................. i
EXECUTIVE SUMMARY ………………………..……….…………………….…………………............................. ii
TABLE OF CONTENTS ………………..……………………..……….…………………….…………………............... iv
LIST OF TABLES ………………………...……….…………………….…………………....................................... vi
LIST OF FIGURES …………………..…...……….…………………….…………………....................................... vii
ABBREVIATION ………………..……………………..……….…………………….…………………........................ viii
UNIT OF MEASUREMENTS …………………..…………………..……….………..………………...................... x

Chapter 1 : INTRODUCTION ………………………………………..……….…………………….………………..... 1-1


1.1 Study Background ……………………………………………………………………………………….. 1-1
1.2 Objectives …………………………………………………………………………………………………… 1-1
1.3 Scope of Work …………………………………………………………………………………………….. 1-1
1.4 Report Organization ……………………………………………………………………………………. 1-1
Chapter 2 : SITE IDENTIFICATION AND ALTERNATIVE UNDERGROUND CABLE ROUTES … 2-1
2.1 Existing Condition Along ITF WtE Sunter to Kemayoran Substation ……………… 2-2
2.1.1 Road …………………………………………………………………………………………………… 2-2
2.1.2 River ………………………………………………………………………………………………….. 2-4
2.1.3 Existing Underground Utilities ……………………………………………………………… 2-5
2.2 Underground Cable Routes …………………………………………………………………………… 2-9
Chapter 3 : UNDERGROUND CABLE ROUTE SELECTION ……………….….…………..………………….. 3-1
3.1 Underground Cable Alternative Route ……………………………….……………………..… 3-1
3.1.1 UGC Route Alternative 1a …………………………………………………………………… 3-1
3.1.2 UGC Route Alternative 2 ……………………………………………………………………… 3-7
3.1.3 UGC Route Alternative 2 …………………………………………………………………….. 3-8
3.2 General Technical Requirement ……………………………………….…………………………… 3-11
3.2.1 General Technical Requirement for UGC Installation …………………………… 3-11
3.2.2 General Technical Requirement for Joint Pit Location ………………………… 3-13
3.3 Selection of Underground Cable Route ………………………………………….……………….3-14
3.4 Discussion …………………………………………….………..……………………………………………. 3-15
Chapter 4 : UNDERGROUND CABLE INSTALLATION METHOD …………………………………...……. 4-1
4.1 General ………………..………………………..……………………………………………………………… 4-1
4.2 Installation Method Sequence …………………………………………..…………………………. 4-1
4.2.1 Permit …………………………………………………………………………………………………. 4-2
4.2.2 Site Survey …………………………………………………………………………………………. 4-2
4.2.3 Detail Engineering Design ……………………………………………………………………..4-2
4.2.4 Construction Work ……………………………………………………………………………… 4-2
4.2.5 Testing and Commissioning ………………………………………………………………… 4-3
4.3 Horizontal Direction Drilling ……………….………………………………………………………… 4-3
4.3.1 Preparation …………………………………………………………………………………………. 4-4
4.3.2 Drilling ………………………………………………………………………………………………… 4-5
4.3.3 Finishing ……………………………………………………………………………………………… 4-5
4.4 Joint Pit Construction …………………..………………………………………………………………… 4-5
4.5 Pulling and Jointing Cable ……………….……….…………………………………………………… 4-7
4.5.1 Pulling Cable ….…………………………………………………………………………………… 4-7
4.5.2 Cable Jointing ……………………………………………………………………………………….4-9
Chapter 5 : EXTENTION OF EXISTING KEMAYORAN SUBSTATION …………………………..…….. 5-1

Table of Contents iv
PT. Jakarta Solusi Lestari
T/L Design and Engineering for AMDAL ITF Sunter, WtE Project Draft
Sunter, North Jakarta

5.1 General ………………..………………………………………………………………………….............. 5-1


5.2 Construction Method Sequence ………………………………………………………………….. 5-2
5.2.1 Site Survey ………………………………………………………………………………………….. 5-2
5.2.2 Detail Engineering Design …………………………………………………………………… 5-2
5.3 Civil Works ………………………………………………………………………………………………….. 5-2
5.3.1 Land Preparation………………………………………………………………………………… 5-3
5.3.2 Backfill Work …………………………………………………………………………………..…. 5-3
5.3.3 Demolition of Existing Fence ………………………………………………………………. 5-3
5.3.4 Foundation Work ……………………………………………………………………………….. 5-5
5.4 Electrical-Mechanical Work …………………………………………………………………………… 5-5
5.4.1 Gantry Erection …………………………………………………………………………………. 5-5
5.4.2 Stringing and Wiring at Kemayoran S/S …………………………………………………5-6
5.4.2.1 150 kV Switchgear …………………………………………………………………. 5-6
5.4.2.2 Control Building …………………………………………………………………….. 5-7
5.4.3 Sealing End …………….……………………………………………………………………………..5-7
5.4.3.1 Outdoor Sealing End ………………………………………………………………. 5-7
5.4.3.2 GIS Sealing End ……………………………………………………………………… 5-8
5.4.4 Test and Commisioning ……………….……………………………………………………… 5-9
5.4.4.1 Routine Test at The Factory ………………………………………………….. 5-9
5.4.4.2 Sample Test at Manufacturer ……………………………………………….. 5-10
5.4.4.3 XLPE Cables Type Approval Test Requirement ……………………….. 5-10
5.4.4.4 Site Test ……………………………………………………………………………………5-10
5.5 Discussion ……………….…………………………………………………………………………………… 5-x
Chapter 6 : PROJECT SCHEDULE ……………………………………………………………………………..….. 6-1
6.1 General ………………………………………………………………………………………….……………. 6-1
6.2 Project Schedule …………………………..…………………………………………………………….. 6-1
Chapter 7 : CONCLUSION AND RECOMMENDATION …………………………………………………….. 7-1
7.1 Conclusion ……………………..….………………………………………………………………………… 7-1
7.2 Recommendation …………………….…………………………………………………………………… 7-1

ATTACHMENT – 1 EXISTING UNDERGROUND UTILITIES MAPS

Table of Contents v
PT. Jakarta Solusi Lestari
T/L Design and Engineering for AMDAL ITF Sunter, WtE Project Draft
Sunter, North Jakarta

LIST OF TABLES

Table 2.1 Existing underground Utilities ………………………………………….……………………………. 2-5


Table 3.1 Evaluation of UGC Alternative Routes ................................................................ 3-14
Table 4.1 Estimated Major Equipment and Material for each JP …………………………………… 4-7
Table 4.2 Estimated Major Equipment and Material for each JP …………………………………… 4-8
Table 4.3 Bending Radius of cable power ……………………………………………………………………… 4-8

List of Tables vi
PT. Jakarta Solusi Lestari
T/L Design and Engineering for AMDAL ITF Sunter, WtE Project Draft
Sunter, North Jakarta

LIST OF FIGURES

Figure 2.1 Location of ITF Sunter Site and Kemayoran Substation ………………………………………… 2-1
Figure 2.2 The area where road section is changed from 4 in to 2 section (view to the South) 2-2
Figure 2.3 Available space between Danau Sunter Barat road to Sentiong River embankment 2-3
nearby the intersection road of Danau Sunter Barat and Griya Utama Road (view to the
North)
Figure 2.4 General condition of Griya Utama Road (view to the East) …………………………........... 2-3
Figure 2.5 General condition of Griya Sejahtera Road (view to the West) …………………………….. 2-4
Figure 2.6 General condition of Griya Utama Road (view to the North) ………………………………… 2-4
Figure 2.7 Concrete sheet pile along Pademangan Timur and Sentiong River ……………………….. 2-5
Figure 2.8 Existing 150 kV Transmission Line in front of Kemayoran Substation ……………………. 2-6
Figure 2.9 Existing 20 kV Distribution Line in front of Kemayoran Substation ……………………….. 2-6
Figure 2.10 Pulling Cable for 20 kV Distribution Line in front of Kemayoran Substation ………… 2-7
Figure 2.11 Cable bridge for 20 kV Distribution Line crossing Sentiong River ………………………… 2-7
Figure 2.12 Cable bridge for 20 kV Distribution Line crossing Pademangan River (Griya
Utama Road) ………………………………………………………………………………………………………………………… 2-7
Figure 2.13 Underground Telecommunication Optical Cable FMI in Griya Utama road ………… 2-8
Figure 2.14 Underground Telecommunication Optical Cable Moratelindo in Griya Utama
Road ……………………………………………………………………………………………………………………………………… 2-8
Figure 2.15 Underground pit for Telecommunication Optical Cable in Danau Sunter Barat
road ……………………………………………………………………………………………………………………………………… 2-8
Figure 2.16 Underground water pipe TPJ (Thames Pam Jaya) in Danau Sunter Barat road ……. 2-9
Figure 2.17 Above ground water pipe crossing Sentiong River ……………………………………………… 2-9
Figure 2.18 Above Ground gas pipe in Danau Sunter Barat Road (nearby the intersection
with Griya Utama Road) ……………………………………………………………………………………………………….. 2-9
Figure 2.19 Underground Cable (UGC) route for Alternative 1a and 1b ………………………………… 2-10
Figure 2.20 Underground Cable (UGC) route for Alternative 2 ................................................. 2-10
Figure 3.1 Underground Cable (UGC) Route for Alternative 1a …………………………………………….. 3-2
Figure 3.2 General condition in the area of JP 1 (view to the South) …………………………………….. 3-2
Figure 3.3 Existing utilities nearby JP 1 based on visual survey (telecommunication cable,
water pipe and 20 kV line) ……………………………………………………………………………………………………. 3-3
Figure 3.4 Identification of existing underground utility by using GPR in area JP1 ………………... 3-3
Figure 3.5 General condition in the area of JP 2 (view to the South) …………………………………….. 3-4
Figure 3.6 Existing utilities nearby JP 2 based on visual survey (20 kV line and
Telecommunication cable) ……………………………………………………………………………………………………. 3-4
Figure 3.7 Identification of existing underground utility by using GPR in area JP2 ………………… 3-4
Figure 3.8 General condition in the area of JP 3 (view to the South) …………………………………….. 3-5
Figure 3.9 Existing utilities nearby JP 3 based on visual survey (Telecommunication cables
and gas pipe) ………………………………………………………………………………………………………………………… 3-5

List of Figures vii


PT. Jakarta Solusi Lestari
T/L Design and Engineering for AMDAL ITF Sunter, WtE Project Draft
Sunter, North Jakarta

Figure 3.10 Identification of existing underground utility by using GPR in area JP3 ………………. 3-5
Figure 3.11 General condition in the area of JP 4 (view to the North) …………………………………… 3-6
Figure 3.12 Existing utilities nearby JP 4 based on visual survey (20 kV and 150 kV UGC line) . 3-6
Figure 3.13 Identification of existing underground utility by using GPR in area JP4 ……….……… 3-6
Figure 3.14 Underground Cable (UGC) Route for Alternative 1b …………………………………………… 3-8
Figure 3.15 Underground Cable (UGC) Route for Alternative 2 …………………………………………….. 3-10
Figure 3.16 General condition in the area of JP 2 (view to the South) …………………………………… 3-10
Figure 3.17 General condition in the area of JP 3 (view to the North) …………………………………… 3-11
Figure 3.18 General condition in the area of JP 4 (view to the North) …………………………………… 3-11
Figure 3.19 Existing PGN pipe line along Danau Sunter Barat road up to ITF Sunter WtE Plant 3-12
Figure 3.20 Bending Radius Cable …………………………………………………………………………………………. 3-13
Figure 4.1 General Process of HDD works …………………………………………………………………………….. 4-4
Figure 4.2 Typical General Section of Joint Pit ………………………………………………………………………. 4-6
Figure 4.3 Cable power pulling mechanism …………………………………………………………………………… 4-9
Figure 4.4 Bending radius and pulling forces ……………………………………………………………………...... 4-9
Figure 4.5 Straight joint HV power cable ………………………………………………………………………………. 4-10
Figure 5.1 Configuration and required area for additional bay in Kemayoran Substation ........ 5-1
Figure 5.2 The topography map of the additional bay area …………………………………………………… 5-3
Figure 5.3 Bird view of existing Kemayoran Substation and the additional bay …………………….. 5-4
Figure 5.4 Conceptual design for retaining wall and fence foundation for extension area ……. 5-4
Figure 5.5 Busbar Configuration at Kemayoran S/S ………………………………………………………………. 5-5
Figure 5.6 Typical cross section of the New Bay Extension of Kemayoran Substation to ITF
Sunter WtE …………………………………………………………………………………………………………………………… 5-6
Figure 5.7 Outdoor Sealing End with Porcelain Insulator ………………………………………………………. 5-7
Figure 5.8 Outdoor Sealing End with Synthetic Insulator ………………………………………………………. 5-8
Figure 6.1 Underground Cable Implementation schedule …………………………………………………….. 6-2
Figure 7.1 Propose alternative Joint Pits arrangement for selected UGC route …………………….. 7-2

List of Figures viii

Вам также может понравиться