Career Profile
Having almost 3.5 years of working experience in Electrical Project Execution & Maintenance. Good
understanding of Electrical Drawings, Planning of Projects, Erection & Maintenance. Both practical as well as
theoretical knowledge of Different Electrical Instruments.
Technical Qualities
Electrical Projects & Maintenance
Good understanding of Electrical Drawings, Planning of Projects, Erection & Maintenance. Both practical as well as
theoretical knowledge of Different Electrical Instrument’s working so that maximum efficiency and productivity can be
gained in terms of output.

Strategic Planning
In depth study of Customer’s requirement with Ratios and analysis. Planning & scheduling assignments to achieve pre-
set goals within time parameters. Formulating long term/short term strategic plans to enhance operations.
Computer Proficiency
Well versed in Windows XP, Windows 7, Windows 8 and Windows 10. Proficiency in entire AutoCAD, E-Tap, Multisim,
Proteus, Packet Tracer, Xilinx and MS-Office. Good understanding of Internet tools.
Personal Qualities
 Excellent Communication, listening and motivating skills.
 Ability to learn quickly is my forte which helped me in the successful managing of various jobs given.
 Ability to work with a team of dedicated professionals for achieving the deadlines for the execution of work.

Key Projects Handled


Project 1: Baloki 1223MW GC (Gas Chromatograph) Services
Designation: Service Engineer
Responsibilities:
 Troubleshooting of the issue being faced.
 Resolving the issue.
 Calibration of GC.
 In depth analysis of the operating behavior of GC.
 Future recommendations to customer to avoid the issue.
 Submitting detailed report on the work being done.

Project 2: ENGRO Qadirpur TPS Evergreen


Designation: Service Engineer
Responsibilities:
 Technical and commercial support to the customer (as EMERSON’s LBP).
 Building good coordination between customer and EMERSON for effective and reliable site execution.
 Reviewing of proposed drawings and documents based on specification of contract.
 Testing of system hardware.
 System migration from older version to the latest.
 Troubleshooting and rectification of site issues.
Project 3: Muzaffargarh Thermal TPS DCS Upgradation (Ongoing)
Designation: Project Manager
Responsibilities:
 Technical and commercial support to the customer (as EMERSON’s LBP).
 Building good coordination between customer and EMERSON for effective and reliable site execution.
 Reviewing of proposed drawings and documents based on specification of contract.
 Testing of system hardware.
 System migration from older version to the latest.
 Troubleshooting and rectification of site issues.

Project 4: Mangla Refurbishment


Designation: Technical Support Engineer
Responsibilities:
 Cross verification of technical terms mentioned in the bid with purposed.
 Deliver Technical Support to the Different EPCs regarding Customer Requirements in the Tender as per
WAPDA and NEPRA technical compliance and to win the below mentioned Mangla Refurbishment Project
Packages:
 Package IX – Switchyard.
 Package VI+VIII - BOP Electrical & Control Systems.
 Package V - BOP Mechanical.

Project 5: Fauji Foundation - Rawalpindi (Design)


Designation: Application and Design Engineer - Electrical (Instrumentation & Control)
Software: AutoCAD
Responsibilities:
 Handling of electrical design as per requirement.
 Supervision of erection HT & LT transmission line & sub-station (11KV).
 To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
 To provide the entire electrical solutions as per requirement.
 To check the entire work as according to approved drawings.
 To co-ordinate with NTDC & WAPDA for all electrical design approvals.

Project 6: Analysis and Study of Fauji Foundation - Rawalpindi (Design)


Designation: Application and Design Engineer - Electrical (Instrumentation & Control)
Software: E-Tap
Working:
 Long Flow Analysis.
 Short Circuit Analysis.
 Star Sequence of Operation.
 Unbalanced Load Flow Analysis.
 Optimal Power Flow Analysis.
 Reliability Assessment.

Project 7: University of Lahore - Data Centre Designing (Site Survey)


Designation: Application and Design Engineer - Electrical
Software: AutoCAD, ISX Designer
Responsibilities:
 Handling of electrical design as per requirement.
 Supervision of erection HT & LT transmission line & sub-station (11KV).
 To co-ordinate with Electrical Contractor for Electrification, Execution, Erection Commissioning.
 To provide the entire electrical and cooling solutions as per requirement.
 To check the entire work as according to approved drawings.
 To check the entire design as per standards (Tier1, Tier2 or Tier3).

Project 8: 132KV Grid Station - Mardan (Design)


Designation: Assistant Project Engineer - Electrical
Software: AutoCAD

Responsibilities:
 Handling of electrical design as per requirement.
 Supervision of erection HT & LT transmission line & sub-station (132KV).
 To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
 To provide the entire electrical solutions as per requirement.
 To check the entire work as according to approved drawings.
 To co-ordinate with NTDC & WAPDA for all electrical design approvals.

Project 9: Analysis and Study of 132KV Grid Station - Mardan (Site Survey + Installation &
Commissioning)
Designation: Assistant Project Engineer - Electrical
Software: E-Tap
Working:
 Load Flow Analysis.
 Short Circuit Analysis.
 Star Sequence of Operation.
 Unbalanced Load Flow Analysis.
 Optimal Power Flow Analysis.
 Reliability Assessment.

Project 10: Supervision of Electrical Site


Designation: Junior Electrical Engineer - Electrical (Installation & Commissioning)
Responsibilities:
 Handling of electrical load as per requirement.
 Analysis of electrical consumption & consumed demand.
 Daily maintaining the power consumption report.
 Weekly Format preparation of Preventive Maintenance.

Employers
1. EASTERN Enterprises from 03-Apr-2017 to present
Company Profile:
Deals in the power and cement sector of Pakistan. Participates in the bidding of major Hydro Power projects in
Pakistan. Represents international companies in projects. Local Business Partner to Emerson Process Management
for Power & Water Solutions in Pakistan.
Designated as Service Engineer (Instrumentation & Control).
Assigned to lead the service part of Emerson’s Ovation installed base in Pakistan.

2. INPRO Pakistan (Pvt) Ltd. from 1-Feb-2016 to 1-March-2017


Company Profile:
INPRO Pakistan is the official distributer of Schneider Electric (Low Voltage components & Control Systems) and
APC in UPS and ITB. (Information Technology Business).
Designated as Application Engineer (Data Center Design & Maintenance).

3. Rousing Engineering & Services (Pvt) Ltd. from 28-May-2015 to 31-Jan-2016


Company Profile:
Rousing Engineering and Services is the consulting and contracting firm in EHV Transmissions and Electrical
Switchyards.
Designated as Assistant Project Engineer (Design).

4. Raahim Associates & Electrical Engineers from 16-Dec-2014 to 31-Jan-2015


Company Profile:
Raahim Associates is the MEP design consultant and contractor.
Designated as Junior Electrical Engineer (Installation).
Academia
Bachelor of Engineering in 2014 - (2.77/4 - 69%)
Specialization- Electronics & Telecommunication (Full Time) from Government College University,
Lahore.
Intermediate in 2010 - (901/1100 - A)
From BISE, Lahore
High School in 2008 - (649/850 - A)
From BISE, Lahore
Academic Project
Worked On Surveillance technology for suspicious activity detection Description:
The project was about detecting suspicious activity in a sense that activities other than normal ones are specified.
Detection and simulation was done taking videos from the surveillance cameras and processed them by using Matlab.
Activity was specified and detected by comparing normal environment video with the activity performed video
environment. To keep it simple, we kept the room environment in the same condition to minimize any difficulties in
the beginning and processed and upgraded it accordingly with time and experience.
Extra-Curricular Activities
 Studying about Emerging Technologies.
 Gaming - Cricket, Table Tennis and Basket Ball.
 Watching Movies & TV Series.
Personal Details
Date of Birth: 29th of August, 1991.
Languages Known: English, Urdu & Punjabi.

Вам также может понравиться