Вы находитесь на странице: 1из 8

     

Kitra
by
jennifer
wood
"
Sizes:
Finished bust: 30 (32.5, 35, 38, 41.25, 44.5, 47, 50, 53.25,
56.5, 59.75)". Size 32.5" modeled with 1.5" negative ease.
Materials:
Yarn: Shibui Staccato, 65% superwash merino, 35% silk;
191 yds per 50g skein; color: #2041 Pollen, 5 (5, 6, 6, 7, 7,
8, 8, 9, 10, 10) skeins, 824 (908, 983, 1135, 1226, 1313,
1441, 1503, 1605, 1746, 1814) yds.
Shibui Dune, 50% baby alpaca, 25% baby camel, 25% silk;
142 yds per 50g skein; color #2041 Pollen, 6 (7, 7, 8, 9, 10,
11, 11, 12, 13, 13) skeins, 824 (908, 983, 1135, 1226, 1313,
1441, 1503, 1605, 1746, 1814) yds.
Needles: Size 5/3.75mm 16 & 24" (or longer) circular
needle and set of 4 or 5 double-pointed needles.
Other: Stitch markers, cable needle, waste yarn, tapestry
needle.
Gauge: 20 sts and 26 rnds = 4" in Stockinette Stitch with 1
strand of each yarn held together. 28-st Yoke Chart = 3.75"
wide. 30-st Large Yoke Chart = 4" wide.

Notes:
This rounded yoke pullover is constructed from the top
down in one piece with raglan increases to shape the
bodice. This pullover is designed with negative ease in
the bust. If you desire a looser fit work one size bigger.
There is no body shaping past the armholes until the
bottom cable band where hip room is added. The length
of the body is easily adjusted.
Neck Circumference:If you desire a smaller neckline
CO with a needle 1 or 2 sizes smaller, work the first rnd
of Yoke Chart then switch to the size needed for gauge
of the pattern. Going down 1 needle size should give a
neck circumference of about 18.25" and if you go down
2 sizes if should be about 17.25".
Hold 1 strand of each yarn together throughout pattern.
This cable pattern can seem complicated at first, but if
you think of it as moving around purls stitches it
becomes more clear.

woodhouseknits.com © jennifer wood 2015


Stitch Guide: Note: Continue working Sleeve and Front and Back Charts between
M1 Purlwise: Insert LH needle, from front to back, under chart m(s) in pattern as established. The Raglan increases will be
strand of yarn which runs between last st on LH needle and worked now instead of Raglan Chart. When you have worked through
first st on RH needle; purl this st through back loop. Rnd 24 (24, 24, 24, 24, 26, 26, 26, 26, 26, 26) of Sleeve Chart,
"
RLI (Right Lifted Increase): Use the RH needle to pick move Sleeve Chart m(s) in 5 (5, 5, 5, 5, 6, 6, 6, 6, 6, 6) sts on each
up the st below the next st on the LH needle. Place it on the side, 13 sts in between Sleeve Chart m(s). Switch to Sleeve Chart 2
LH needle, then knit this new st. 1 st has been increased. beginning with Rnd 1. When you have worked through Rnd 33 (33,
"
LLI (Left Lifted Increase): Use the LH needle to pick up
33, 33, 33, 35, 35, 35, 35, 35, 35) of Front & Back Chart, work
the back of the st 2 rows below st just knitted, then knit this all Front & Back sts in Stockinette Stitch and remove chart m(s).
new st. 1 st has been increased. Inc Rnd: K1, RLI, [work to next Raglan m, LLI, sl m, k1,
"
Sweater
sl m, RLI] 3 times, work to end, LLI.
Work 1 rnd even in pattern as established.
Yoke Repeat these 2 rnds 6 (9, 11, 13, 15, 15, 16, 15, 15, 14, 12)
With circular needle and a strand from each yarn held more times. 41 (47, 51, 55, 59, 61, 63, 61, 61, 59, 55) sts
together, CO 144 sts. Place marker and join for working in each Sleeve, 69 (75, 79, 83, 87, 91, 93, 91, 91, 89, 85) sts
the rnd, making sure the sts are not twisted. each Front and Back, 4 Raglan sts.
Sizes 30 (32.5, 35, 38, 41.25)" only: "
Note: There are 6 repeats of Yoke Chart. On Rnd 12 of Yoke Chart Sizes 44.5 (47, 50, 53.25, 56.5, 59.75)" only:
work to last 2 sts, removing m work 5-st cable putting m back in Body Inc Rnd: [Work to next Raglan m, sl m, k1, sl m,
place. Continue with Rnd 13 of chart to end. RLI, work to next Raglan m, LLI, sl m] 2 times.
Work Rnds 1-19 of Yoke Chart. 168 sts. Work 1 rnd even in pattern as established.
"
Sizes 44.5 (47, 50, 53.25, 56.5, 59.75)" only:
Repeat these 2 rnds 0 (0, 2, 4, 6, 8) more times. 61 (63, 61,
61, 59, 55) sts each Sleeve, 93 (95, 97, 101, 103, 103) sts
Note: There are 6 repeats of Large Yoke Chart. On Rnd 14 of Yoke each Front and Back, 4 Raglan sts.
Chart work to last 2 sts, removing m work 5-st cable putting m back "
Body
in place. Continue with Rnd 15 of chart to end.
Note: Note which rnd you are on for the Sleeve Chart 2 so you know
Work Rnds 1-21 of Large Yoke Chart. 180 sts.
"
All Sizes:
which rnd to start with when the sleeves are worked. At this point, the
sleeves and body will be divided. The lower body will be worked first,
Work Rnd 20 (20, 20, 20, 20, 22, 22, 22, 22, 22, 22) of then the sleeves.
Chart to last 2 sts.
Note: For sizes 44.5 (47, 50, 53.25, 56.5, 59.75)" use Large
"
Sizes 30 (32.5, 35, 38)" only:
versions of Front and Back Chart and Sleeve Chart. Dividing Rnd: Removing m(s), put Left Sleeve sts and
Set-up Rnd: Work Rnd 1 of Raglan Chart over 5 sts Raglan sts on holder, CO 0 (0, 1, 3) sts, pm for Side Chart,
replacing beg-of-rnd m, pm for Sleeve Chart, work Rnd 1 CO 9 sts, pm, CO 0 (0, 1, 3) sts, work across body sts to
of Sleeve Chart over 23 (23, 23, 23, 23, 25, 25, 25, 25, 25, next Raglan m, removing m(s), put Right Sleeve sts and
25) sts, pm, work Rnd 1 of Raglan Chart, pm for Front and Raglan sts on holder, CO 0 (0, 1, 3) sts, pm for Side Chart,
Back Chart, work Rnd 1 of Front and Back Chart over 51 CO 9 sts, pm, CO 0 (0, 1, 3) sts, work across body sts to
(51, 51, 51, 51, 55, 55, 55, 55, 55, 55) sts, pm, work Rnd 1 Side Chart m, this is the new beginning of rnd. 156 (168,
180, 196) Body sts.
of Raglan Chart, pm for Sleeve Chart, work Rnd 1 of
Sleeve Chart, pm, work Rnd 1 of Raglan Chart, pm for "
Sizes 41.25 (44.5, 47, 50, 53.25, 56.5, 59.75)" only:
Front and Back Chart, work Rnd 1 of Front and Back Dividing Rnd: Remove m, k1, remove m, put Left Sleeve
Chart, pm for Raglan Chart. sts on holder, CO 4 (5, 7, 10, 12, 15, 19) sts, pm for Side
Continue in this manner, working the next rnd of charts Chart, CO 9 sts, pm, CO 4 (5, 7, 10, 12, 15, 19) sts, k1,
between appropriate chart m(s) through Rnd 5 of Raglan remove Raglan m, work across body sts to next Raglan m,
Chart working first Raglan cable of Rnd 5 with last 2 sts of remove m, k1, remove m, put Right Sleeve sts on holder,
Rnd 4.
"
Raglan marker placement
CO 4 (5, 7, 10, 12, 15, 19) sts, pm for Side Chart, CO 9 sts,
pm, CO 4 (5, 7, 10, 12, 15, 19) sts, k1, remove Raglan m,
Next Rnd: [K1, pm, k2 to Sleeve Chart m, work Rnd 6 of work across body sts to Side Chart m, this is the new
appropriate Sleeve chart, sl m, k2, pm for Raglan, k1, pm, beginning of rnd. 212 (228, 240, 256, 272, 288, 304) Body
k2, sl m, work Rnd 6 of appropriate Front and Back Chart, sts.
"
sl m, k2, pm for Raglan] 2 times. 27 (27, 27, 27, 27, 29, 29, All Sizes:
29, 29, 29, 29) sts each Sleeve, 55 (55, 55, 55, 55, 59, 59, Note: When Front and Back Chart is finished remove chart markers
59, 59, 59, 59) sts each Front and Back, 4 Raglan sts.
"
Raglan Shaping
and work Front and Back sts in Stockinette Stitch.
Next Rnd: [Work Rnd 1 of Side Chart, work to next Side
Chart m] 2 times.

2
Work in pattern as established until sweater measures 12 Work 17 (10, 7, 7, 6, 5, 5, 4, 4, 4, 4) rnds, working the next
(12, 12, 12.5, 12.5, 12.5, 13, 13, 13, 13.5, 13.5)" from rnd of Sleeve Chart between chart m(s) and the rest of the
under CO or until 1.75" short of desired length. sts in Stockinette Stitch.
Cabled Band Dec Rnd: K1, k2tog, work to 2 sts before beginning of rnd
Set-up Rnd: [Work Side Chart, work to next Side Chart m m, ssk.
increasing 21 (22, 23, 22, 28, 27, 35, 34, 40, 39, 45) sts Repeat these 18 (11, 8, 8, 7, 6, 6, 5, 5, 5, 5) rnds 4 (7, 10,
evenly spaced (approximately after every 3rd or 4th st)] 2 11, 13, 15, 15, 17, 19, 18, 20) more times. 42 (42, 42, 48,
times. 198 (212, 226, 240, 268, 282, 310, 324, 352, 366, 48, 48, 54, 54, 54, 60, 60) Sleeve sts.
394) Body sts. Work 3 (5, 5, 3, 1, 3, 7, 13, 3, 16, 6) more rnds or until 1"
Next Rnd: [Work Side Chart, sl m, Work Rnd 1 of Cable short of desired length.
Band Chart working the repeat section 12 (13, 14, 15, 17, Ribbed Cuff
18, 20, 21, 23, 24, 26) times to next Side Chart m] 2 times. Note: If you finish on Rnd 1-6, 19 or 20 use Sleeve Border Chart 1.
224 (240, 256, 272, 304, 320, 352, 368, 400, 416, 448) If you finish on Rnd 9-16 use Sleeve Border Chart 2.
Body sts. If you finish on Rnd 7, 8, 17 or 18 use Sleeve Border Chart 3.
Continue in pattern as established working through Rnd 8 Set-up Rnd: Knit to Sleeve Chart m, work Rnd 1 of
of Cable Band Chart. appropriate Sleeve Border Chart, knit to end. 40 (40, 40,
Next Rnd: [P1, k2tog, k1, p1, k1, ssk, p1, sl m, work Rnd 46, 46, 46, 52, 52, 52, 58, 58) sts.
9 of Cable Band Chart to next Side Chart m] 2 times. Next Rnd: *P1, k2, repeat from * to chart m, work Rnd 2
Next Rnd: [P1, k2, p1, k2, p1, sl m, work Rnd 10 of Cable of appropriate Sleeve Border Chart, **k2, p1, repeat from
Band Chart to next Side Chart m] 2 times. ** to last 2 sts, k2.
BO all sts working the knit sts as purl sts and purl sts as Repeat this rnd 4 more times.
knit sts. BO all sts working the knit sts as purl sts and purl sts as
"Sleeves knit sts.
With dpns, RS facing, and beg at center of underarm, pick
up and knit 5 (5, 6, 8, 9, 10, 12, 15, 17, 20, 24) sts along
CO sts, work across 43 (49, 53, 57, 59, 61, 63, 61, 61, 59,
55) held sleeve sts working the Sleeve Chart in between Abbreviations & Definitions
chart m(s), pick up and knit 4 (4, 5, 7, 8, 9, 11, 14, 16, 19,
23) sts along CO sts to center of underarm, pm and join in
"beg: beginning
the rnd. 52 (58, 64, 72, 76, 80, 86, 90, 94, 98, 102) Sleeve BO: bind off
sts. CO: cast on
dec: decrease
dpn(s): double-pointed needle(s)
inc: increase
k: knit
k2tog: knit two sts together (dec)
LH: left hand
m: marker(s)
p: purl
pm: place marker
RH: right hand
rnd(s): round(s)
RS: right side
sl: slip
ssk: sl 1 knitwise, sl 1 knitwise, k2 sl sts tog tbl
(dec)
st(s): stitch(es)
tbl: through back loop(s)
tog: together
WS: wrong side

"
woodhouseknits.com © jennifer wood 2015
3

woodhouseknits.com © jennifer wood 2015


4
woodhouseknits.com © jennifer wood 2015
5
woodhouseknits.com © jennifer wood 2015
6
7
woodhouseknits.com © jennifer wood 2015

Вам также может понравиться