Академический Документы
Профессиональный Документы
Культура Документы
Production Operator
antonyarulrogger@gmail.com
9487318390
OBJECTIVE
EDUCATIONAL QUALIFICATION
PROFESSIONAL EXPERIENCE
CERTIFICATION/COURSES DONE
JOB DESCRIPTION
Inject High Pressure Dehydrated Gas into well reservoir (314 Kg/Cm2),
Operation and maintenance of Multistage compressors scrubbers, inter
coolers, After coolers, Separated Start-up, and Shut-down operation of
compressors at gas Injection unit, the plant receiving medium and low
pressure gas from respective separators, compress and send to GNFC,
operation and control of the compressor, start-up shout-down, operations,
Maintain High pressure scrubbers, inter coolers and after coolers, drainage
pump operation, cooling fan operation.
Service and maintenance of ESD, FSD, PSHL, MOV. Smoke, Fire auto
detection system, Fire water pump operation, F&G alarm panel. If pressure
is low, bring up the pressure to a consistent take-up by Haskell pump and
opening the SSV, SSSV valves with the half of startup pressure.
SAFETY SYSTEM
PERSONAL DETAILS
DECLARATION
Date :
Place : ANTONY ARUL
ROGER