Advanced – tecnical lines
10-12 October 201

12 October 2016 Seitz-Lackner

Quarter Belvedere Central


QBC

Site Visit - Information

1
Agenda

• Introduction
• Site visit – Information
• Project description
• Questionaire
• Natural Hazards

PPE

Personal protective equipment (PPE)

2
Safety instructions

• Follow instructions of the tour guide


• Stay in the group

Location

Austria

3
Location

Vienna

Location

Cathedral
“Steffl”

4
Location

Big Wheel
of Vienna

Location

Belvedere
Palace

5
Location

QBC

History

Railway – Monarchy – Heart of Europe

6
History

Railway station 1875 – South-East

History

Railway station 1900 – Entrance Hall

7
History

Railway Station – South - East

History

Railway Station – South-East

8
History

Railway station - Demolition 2010

History

2nd World War

9
History

2nd World War

Südbahnhof - Overview

QBC 5 overview
• Type of use: Hotel
• Gross floor area: approx. 27,000 m²
• Scheduled completion: Spring 2017
• AccorHotels Group’s 180,000 employees take care of thousands of guests
in 3,700 hotels in 92 countries every day.

Concept
• Gross floor area: approx. 27,000 m²
• 3-star hotel (Ibis) & 4-star hotel (Novotel) with a total of 577 rooms
• Approximately 1,800 m² event area with a ballroom and conference rooms

10
Project QBC

Project QBC

11
Project QBC

Project QBC

QBC 5 overview
• Type of use: Hotel
• Reinforced concrete
• 19 upper floors, 2 underground floors
• Gross floor area: approx. 27,000 m²
• Scheduled completion: Spring 2017
• AccorHotels Group’s 180,000 employees take care of thousands of guests
in 3,700 hotels in 92 countries every day.

Concept
• Gross floor area: approx. 27,000 m²
• 3-star hotel (Ibis) & 4-star hotel (Novotel) with a total of 577 rooms
• Approximately 1,800 m² event area with a ballroom and conference rooms

12
NatCat

Coordinates
48°11'10.86"N
16°22'44.68"E

191 m.a.s.l.

Lightning

0.57 strikes per km² and year (mainly summer


thunder storms) – average risk

13
Flood

• No flood risk
• Groundwater level below basement

Heavy rainfall / flash flood

Monitored daily maximum of precipitation of station


108118 Botanical Garden Vienna (180 masl): 89.2
mm (May 10, 1951) – average risk

14
Hail

Torro zone 5, an increased frequency and


intensity of hail events has to be expected

Storm

• increased risk for winter storms


• medium exposure to tornadoes

15
Earthquake

Earthquake risk zone II - increased risk


damages to buildings are to be expected at such an intensity

Questionaire

General information - preface


• Short description of the construction project
• Brief information about:
• Construction site (e.g. former use)
• Project progress
• Neighbors
• Overall Facts & Figures

16
Questionaire

Description of the most important risks


• What part of the construction site is identified as the most critical one
• deep construction pit - special foundation engineering, poor subsoil
• special – innovative - new building design - e.g. cantilever
constructions
• evaluation of ignition sources
• hot works (hot work permits)
• site security (arson, burglary, vandalism) – fencing, security guards
• lots of fire loads – e.g. storage of combustible insulation material

Questionaire

Nat Cat exposure


• cranes – storm
• openings in the building, construction pits - flash flood, heavy rain showers
• storage of e.g. windows in the open – hail
• supporting, provisional structures (formwork) – earthquake, storm

17
Questionaire

Safety standards
• Fire extinguishers available
• Fire extinguishing water supply
• Fire prevention officer nominated
• Safety and health protection plan
• Fire safety regulations
• Hot works permit
• General security concept
• Housekeeping

Questionaire

Construction site facilities / structural fire protection


• site containers (distance to the building), description
• canteen, rest rooms
• number of cranes, crane foundation

• Fire compartments (horizontal and vertical)


• Wall sealing's for cables, fire dampers
• Closure of fire doors during the night and on weekends?
• Is it possible to seal finished areas

18
Questionaire

Storage areas
• Inside or outside of the building
• Big amount of combustible material
• Flammable liquids
• Explosive agents (gas bottles)
• Just in time delivery
• Logistics, designated storage areas, approach
• Security (burglary)

Questionaire

Organisation of fire prevention


• Fire warden - fire prevention officer, safety officer
• Fire safety regulations / warning plans / fire prevention check list
• Fire prevention plan for the construction stage
• Staff training - for all?, by whom?
• Fire brigade – location, distance, training on site, equipment
• Authorisation of hot work procedures – hot work permit, any control of
stuff or security guard hours after finishing hot works?
• Smoking ban / Smoking area
• Housekeeping

19
Questionaire

Technical fire prevention measures


Early detection of fires
• Presence of people on site
• Automatic fire detection system
• Alarming of the fire brigade
• Siren alarm for evacuation
• Mobile, provisional fire detection system for vulnerable areas

Questionaire

Hand-held fire extinguishers


• Recommendation: in each floor and at each staircase, as well as in the site
containers
• Labeling
• Riser pipes installed?

Automatic fire extinguishers


• Sprinkler system
• High fog system
• Gas exsinguishing system
• time of activating - is it possible to activate the system for finished parts of
the project?

Explosion prevention
• Storage of gas bottles, ignition sources

20
Questionaire

Securing the construction site –organisational, technical


• Presence of workers on site
• Fencing
• Access - locking
• CCTV Surveillance (who is watching?)
• Security guards, patrols, with dogs, armed
• Identification and registration of workers – porter house
• Checks on persons and vehicles
• Lighting during the night
• Alarm system

Questionaire
Documentation available
• Website
• Project description
• Ground plan
• Layout plan overview
• Time schedule (building shell and finishing work)
• Documentation - statics, architecture
• Documentation - special foundation engineering
• Geo-technical report
• Determination of contaminated sites
• Exploration for explosive ordnance (bombs from 2nd world war – construction site was former
railway station)
• Construction site logistics
• Safety and health protection plan
• Fire safety regulations
• Hot works permit
• Protocol – fire safety tour – (ifbs – external fire safety engineer)
• Signature list – fire safety training
• Nat Cat Report

21
Thank you very much
for your attention!

Discussion …

Risk Consult DDI Hugo Seitz


Risk Engineering GmbH Risk Engineer
Schottenring 35
1010 Wien
Austria
http://www.riskconsult.at
+43 1 7135096 731

Personal Skills:

University Studies in: e-mail: h.seitz@riskconsult.at


Construction Engineering
Risk Engineering & Risk Survey
Hydraulic Engineering (CAR/EAR)

Natural Hazards Risk Experts Academy

Master Builder and Civil Engineer Expert in Natural Hazards

22
Legal Notice

© 2016 Risk Consult GmbH. All rights reserved.


You are not permitted to create any modifications or derivatives of this
presentation or to use it for commercial or other public purposes without the
prior written permission.
Although all the information used was taken from reliable sources, not any
responsibility for the accuracy or comprehensiveness of the details given is
accepted.
All liability for the accuracy and completeness thereof or for any damage
resulting from the use of the information contained in this presentation is
expressly excluded.
Under no circumstances liability for any financial and/or consequential loss
relating to this presentation is borne.

23

Вам также может понравиться