Вы находитесь на странице: 1из 60

BILL NO.

3 TNB SUB STATION

Item Description Qty Unit Rate

Element 1A : Work Below Lowest Floor Finish ( All Provisional )

A Excavate oversite to reduce level average 200mm deep


commencing from formation level, get out, load and cart
away from site including levelling grading and ramming
bottom of excavation 73 M² 4.00

B Excavate pit for footing not exceeding 1.50m deep,


commencing from formation level, get out, part return, fill
in, well rammed and remainder load and cart away from
site 66 M³ 13.20

C Excavate trench for ground beam not exceeding 1.50m


deep, commencing from formation level, get out, part
return, fill in, well rammed and remainder load and cart
away from site 8 M³ 13.20

D Excavate trench for cable trench not exceeding 1.50m


deep, commencing from formation level, get out, part
return, fill in, well rammed and remainder load and cart
away from site 86 M³ 13.20

E Excavate trench for cable trough not exceeding 1.50m


deep, commencing from formation level, get out, part
return, fill in, well rammed and remainder load and cart
away from site 1 M³ 13.20

Hardcore bed as specified

F 150mm Thick under floor slab 73 M² 12.54

G 150mm Thick under cable trench 58 M² 12.54

H 150mm Thick under cable trough 2 M² 12.54

Lean concrete (Grade 15) blinding as specified

J 50mm Thick under footing 34 M² 13.86

K 50mm Thick under ground beam 12 M² 13.86

L 50mm Thick under floor slab 73 M² 13.86

M 50mm Thick under cable trench 58 M² 13.86

N 50mm Thick under cable trough 2 M² 13.86

B3/1A/1
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

To Collection RM

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)

Vibrated reinforced concrete as specified :-

A Footing (Grade 30) 11 M³ 239.80

B Column stump (Grade 30) 1 M³ 239.80

C Ground beam (Grade 25) 6 M³ 228.80

D 125mm Thick floor slab (Grade 25) 73 M² 28.60

E 125mm Thick ramp (Grade 25) 12 M² 28.60

F 150mm Thick cable trench wall (Grade 25) 125 M² 34.32

G 150mm Thick cable trench slab (Grade 25) 58 M² 34.32

H 150mm Thick cable trough wall (Grade 25) 2 M² 34.32

J 150mm Thick cable trough slab (Grade 25) 2 M² 34.32

Mild steel bar reinforcement as specified :-

Footing

K 10mm Diameter bar 144 Kg 3.50

Column Stump

L 10mm Diameter bar 91 Kg 3.50

Ground Beam

M 10mm Diameter bar as links 136 Kg 3.50

High tensile bar reinforcement as specified :-

Footing

N 12mm Diameter bar 401 Kg 3.50

Column Stump

B3/1A/2
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate


P 25mm Diameter bar 367 Kg 3.50

Ground Beam

Q 16mm Diameter bar 73 Kg 3.50

R 20mm Diameter bar 330 Kg 3.50

S 25mm Diameter bar 178 Kg 3.50

To Collection RM

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)

High tensile bar reinforcement as specified :- (Cont'd)

Cable Trench

A 10mm Diameter bar to wall 1,665 Kg 3.50

B 10mm Diameter bar to slab 1,508 Kg 3.50

Cable Trough

C 10mm Diameter bar to wall 77 Kg 3.50

D 10mm Diameter bar to slab 68 Kg 3.50

One layer of fabric reinforcement as described well lapped


at joints and embedded ( measured nett - no allowance for
laps ) to ground slab type

E Reference No. BRC A6 to ground slab 73 M² 12.32

C Reference No. BRC A6 to ramp 12 M² 12.32

Sawn formwork as specified : -

D Sides of footing 25 M² 45.00

E Sides of column stump 13 M² 45.00

F Sides of ground beam 49 M² 45.00

G Sides of cable trench wall 63 M² 45.00

H Sides of cable trough wall 1 M² 45.00

B3/1A/3
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate


J Edge of floor slab exceeding 100mm but not exceeding 200mm 107 M 10.00

L Edge of cable trench slab ditto 100 M 10.00

M Edge of cable trough slab ditto 5 M 10.00


---------------------------------

N Layer of polythene or other equal and approved damp


proof membrane, well lapped at joints and laid on lean
concrete (measured nett-no allowance made for laps) to 73 M² 2.75
ground slab

P Ditto; to ramp 12 M² 2.75

To Collection RM

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)

A 70mm Thick reinforced concrete cover to trenches


including lifting hook, 50mm x 75mm x 6mm thick mild
steel angle and 10mm diameter x 75mm long fishtailed
mild steel bar to cable trenches 16 M² 77.00

B Ditto; to cable trough 2 M² 77.00

C Chequered plate cover including all necessary lifting hook


and accessories 5 M² 320.00

D Compacted sand filling to trenches 60 M³ 55.00

E Laying 'Flinkote' waterproofing to be lay to surfaces as


described 186 M² 33.00

F Anti termite soil treatment to be sprayed to surfaces as


described and to be executed by soil treatment specialist 179 M² 2.75

G 230mm Diameter precast concrete pipe, including all


excavation, get out and part returned,150mm haunching,
laying of pipes, temporary works and other accessories as
required for the completion of the works to S.O.'s approval 8 M 110.00

-----------------------------------------------

B3/1A/4
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate


Soil Investigation

H Allow for mackintosh probe for soil investigation including


preparing test report and endorsed by certified specialist
all to Engineer's approval and Client's satisfaction 10 No 165.00

To Collection RM

Element 1A : Work Below Lowest Floor Finish (All Provisional) (Cont'd)

COLLECTION

B3/1A/1

B3/1A/2

B3/1A/3

B3/1A/4

B3/1A/5
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

To Summary RM

B3/1A/6
TNB SUB STATION

Amount

292.00

871.20

105.60

1,135.20

13.20

915.42

727.32

25.08

471.24

166.32

1,011.78

803.88

27.72

B3/1A/7
TNB SUB STATION

Amount

6,565.96

2,637.80

239.80

1,372.80

2,087.80

343.20

4,290.00

1,990.56

68.64

68.64

504.00

318.50

476.00

1,403.50

B3/1A/8
TNB SUB STATION

Amount
1,284.50

255.50

1,155.00

623.00

19,119.24

5,827.50

5,278.00

269.50

238.00

899.36

147.84

1,125.00

585.00

2,205.00

2,835.00

45.00

B3/1A/9
TNB SUB STATION

Amount
1,070.00

1,000.00

50.00

200.75

33.00

21,808.95

1,232.00

154.00

1,600.00

3,300.00

6,138.00

492.25

880.00

B3/1A/10
TNB SUB STATION

Amount

1,650.00

15,446.25

6,565.96

19,119.24

21,808.95

15,446.25

B3/1A/11
TNB SUB STATION

Amount

62,940.40

B3/1A/12
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 1B : Apron And Perimeter Drain

A Excavate oversite to reduce level average 200mm deep


commencing from formation level, get out, load and cart
away from site including levelling grading and ramming
bottom of excavation 25 M² 4.00

Hardcore as specified

B 100mm Thick under apron slab 25 M² 6.05

Lean concrete (Grade 15) blinding as specified

C 50mm Thick under apron slab 25 M² 13.86

Vibrated reinforced concrete (Grade 25) as specified

D 125mm Thick apron slab, laid to fall 25 M² 28.60


---------------------------------------

E Layer of steel fabric reinforcement reference No. A6 (M.S.


193) well lapped at joints and embedded in apron slab
(measured nett-no allowance made for laps) 25 M² 12.32

Mild steel bar reinforcement as specified :-

8mm Diameter bar 55 Kg 3.50

8mm Diameter bar as starter bar 21 Kg 3.50

High tensile bar reinforcement as specified

F 10mm Diameter bar 94 Kg 3.50

Sawn formwork as specified

G To edge of apron slab, exceeding 100mm and not


exceeding 200mm high 69 M 10.00

----------------------------------------------

H 230mm Diameter half round cast inside concrete drain cast


in 600mm length, laid to fall, bedded, jointed and pointed
in cement and sand (1:3) on and including 50mm thick
lean concrete as blinding, 150mm thick reinforced
concrete (Grade 20) as specified bed reinforced with one
layer of BRC A7(M.S. 193) including all necessary
excavation, formwork, junctions and ends and disposal of
surplus excavated materials from sites 38 M 110.00

J 230mm Diameter precast concrete pipe with 150mm 7 M 110.00


haunching under ramp

B3/1B/13
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate


K Layer of polythene or other equal and approved damp
proof membrane, well lapped at joints and laid on lean
concrete (measured nett-no allowance made for laps) to
ground slab 25 M² 2.75

To Collection RM

Element 1B : Apron And Perimeter Drain


(Cont'd)

Ramp

A Excavate oversite to reduce level average 300mm deep


commencing from formation level, get out, load and cart
away from site including levelling grading and ramming
bottom of excavation 12 M² 4.40

Hardcore as specified

B 100mm Thick under ramp slab 12 M² 6.05

Lean concrete (Grade 15) blinding as specified

C 50mm Thick under ramp slab 12 M² 13.86

Vibrated reinforced concrete (Grade 25) as specified

D 300mm Thick ramp slab, laid to fall 12 M² 68.64

High tensile bar reinforcement as specified

E 10mm Diameter bars 25 Kg 3.50

Sawn formwork as specified

F Edges of ramp slab excceding 200mm and not exceeding


300mm high 17 M 10.00

G Extra For 15mm x 20mm fillet to form groove line 73 M 5.50

----------------------------

H Layer of polythene or other equal and approved damp


proof membrane, well lapped at joints and laid on lean
concrete (measured nett-no allowance made for laps) to
ground slab 12 M² 2.75

B3/1B/14
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

To Collection RM

Element 1B : Apron And Perimeter Drain


(Cont'd)

COLLECTION

B3/1B/1

B3/1B/2

B3/1B/15
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

To Summary RM

B3/1B/16
TNB SUB STATION

Amount

100.00

151.25

346.50

715.00

308.00

192.50

73.50

329.00

690.00

4,180.00

770.00

B3/1B/17
TNB SUB STATION

Amount

68.75

7,924.50

52.80

72.60

166.32

823.68

87.50

170.00

401.50

33.00

B3/1B/18
TNB SUB STATION

Amount

1,807.40

7,924.50

1,807.40

B3/1B/19
TNB SUB STATION

Amount

9,731.90

B3/1B/20
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 2A : Frame

Vibrated reinforced concrete (Grade 25) as specified

A Column 2 M³ 228.80

B Stiffener 0.18 M³ 228.80

C Roof beam 8 M³ 228.80

Mild steel bar reinforcement as specified

Column

D 10mm Diameter bar 117 Kg 3.50

Stiffener

E 10mm Diameter bar 10 Kg 3.50

Roof beam

F 6mm Diameter bar 47 Kg 3.50

High tensile bar reinforcement as specified

Column

G 25mm Diameter bar 680 Kg 3.50

Stiffener

H 25mm Diameter bar 57 Kg 3.50

Roof beam

J 12mm Diameter bar 91 Kg 3.50

K 16mm Diameter bar 69 Kg 3.50

L 20mm Diameter bar 212 Kg 3.50

M 25mm Diameter bar 169 Kg 3.50

Sawn formwork as specified

O Sides of column 37 M² 40.00

P Sides of stiffener 3 M² 40.00

R Sides and soffit of roof beam 81 M² 40.00

B3/2A/21
To Summary RM

B3/2A/22
TNB SUB STATION

Amount

457.60

41.18

1,830.40

409.50

35.00

164.50

2,380.00

199.50

318.50

241.50

742.00

591.50

1,480.00

120.00

3,240.00

B3/2A/23
12,251.18

B3/2A/24
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 2B : Roof

Vibrated reinforced concrete (Grade 25) as specified

A 115mm Thick Overall size 400mm x 700mm gutter 22 M 60.00

B 115mm Thick roof slab, laid to fall 81 M² 26.62

Mild steel bar reinforcement as specified

C 6mm Diameter bar to gutter 19 Kg 3.50

High tensile bar reinforcement as specified

D 10mm Diameter bar to roof slab 900 Kg 3.50

E 10mm Diameter bar to gutter 362 Kg 3.50

Sawn formwork as specified

F Sides and soffit of roof slab 84 M² 40.00

G Sides and soffit of gutter 107 M² 40.00


-------------------------------------

H Supply and lay 'Flinkote' waterproofing membrane system


with and including 50mm thick concrete topping and
Durafiber at 1.5 lb/cu. td. of concrete and 45 degree angle
mortar coving, all in accordance to Engineer's instructions
and manufacturer's recommendation, laid to fall to roof 81 M² 33.00
slab
J Ditto to gutter 104 M² 33.00

Unplasticised P.V.C. rainwater downpipe with solvent


cement joints in the running lengths elbows, bend,
diminishing piece, plugs and the like

K 75mm Diameter pipe, fixed to brickwall 11 M 27.50

L 75mm Diameter rainwater outlet 4 NO 16.50

M Extra For bend 4 NO 16.50

N Extra For shoe 4 NO 16.50

B3/2B/25
To Summary RM

B3/2B/26
TNB SUB STATION

Amount

1,320.00

2,156.22

66.50

3,150.00

1,267.00

3,360.00

4,280.00

2,673.00

3,432.00

302.50

66.00

66.00

66.00

B3/2B/27
22,205.22

B3/2B/28
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 2C : External Wall

Precast reinforced concrete (Grade 20) lintol, reinforced


with and including 4 Nos. 10mm Diameter high tensile bar
reinforcement and 6mm diameter mild steel stirrups at
150mm centres including all moulds and finished fair on all
exposed surfaces

A 150mm x 250mm lintol 5 M 44.00

Brickwork in common clay bricks in cement and sand (1:3)


mortar with an approved plasticiser reinforced with and
including `EXMET' or approved equivalent expanded fabric
reinforcement at every fourth course as described :-

B 115mm Thick brickwall 90 M² 59.40

Damp proof course as described (measured nett-no


allowance made for laps) laid on brickwall

C 115mm wide 41 M 1.65


---------------------------

D Air vest Brick ( Batu Angin ) with and vermin wire netting
fixed on the outside of windows including all necessary
fixing as per drawing no RB/1389/ENS/1A-17/SL-06 12 M² 55.00

E 6mm Diameter mild steel wall bonding tie, 450mm long,


one end cast in concrete and other end built into joint of
brickwall (provisional) 250 NO 1.10

B3/2C/29
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

To Summary RM

B3/2C/30
TNB SUB STATION

Amount

220.00

5,346.00

67.65

660.00

275.00

B3/2C/31
TNB SUB STATION

Amount

6,568.65

B3/2C/32
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 2D : External Door

External Door

Supply and install the following FRP composite doors with


and including anti vermin wire netting type SWG 23 mesh
10 fixed inside the doors with 100mm x 50mm x 0.5mm
mild steel hot dip composite frames, and including
ironmongery and other accessories for the proper
installation of the works all as per manufacturer's
instruction and recommendation

A FRP composite door overall size 1830mm x 2743mm high


consisting of two equally sized leaves 1 NO 2,200.00

B Ditto overall size 2433mm x 2743mm high ditto 2 NO 2,750.00

B3/2D/33
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

To Summary RM

B3/2D/34
TNB SUB STATION

Amount

2,200.00

5,500.00

B3/2D/35
TNB SUB STATION

Amount

7,700.00

B3/2D/36
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 2E : Internal Wall

Brickwork in common clay bricks in cement and sand (1:3)


mortar with an approved plasticiser reinforced with and
including `EXMET' or approved equivalent expanded fabric
reinforcement at every fourth course as described :-

A 115mm Thick brickwall 22 M² 59.40

B 115mm Wide horizontal damp proof course as described


(measured nett-no allowance made for laps) laid on
brickwall 12 M 1.65
----------------------------

C 6mm Diameter mild steel wall bonding tie, 450mm long,


one end cast in concrete and other end built into joint of
brickwall (provisional) 80 NO 1.10

B3/2E/37
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

To Summary RM

B3/2E/38
TNB SUB STATION

Amount

1,306.80

19.80

88.00

B3/2E/39
TNB SUB STATION

Amount

1,414.60

B3/2E/40
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 3A : Wall Finishes

The quantities in these Bills for different types of


colours and finishes are measured nett from the
Drawings in accordance with the Standard Method
of Measurement. The Contractor is to conform to
the specified colours as instructed by the S.O.

INTERNAL WALL FINISHES

Cement and sand (1:6) mixed with an approved plasticiser


internally as described:-

A 19mm Thick plaster to wall and column 171 M² 16.50

Prepare and apply three coats of distemper and two coats


of 'ICI' or approved equivalent paint as described internally
on:-

B Plastered wall and column 171 M² 11.00

EXTERNAL WALL FINISHES

Cement and sand (1:6) mixed with an approved plasticiser


internally as described:-

C 19mm Thick plaster to wall and column 102 M² 16.50


Extraover for grooveline m
Prepare and apply three coats of snowcem, one coat of
driwal and two coats of 'ICI' or approved equivalent paint
as described externally on:-

D Plastered wall and column 102 M² 20.00


----------------------------------------------

E Painting of Tenaga Nasional Berhad's logo as per drawing


no. PAF174/M&E/PE-010 LS

B3/3A/41
To Summary RM

B3/3A/42
TNB SUB STATION

Amount

2,821.50

1,881.00

1,683.00

2,040.00

500.00

B3/3A/43
8,925.50

B3/3A/44
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 3B : Floor Finishes

INTERNAL FLOOR FINISHES

Cement and sand (1:3) screed trowelled hard and smooth


as described:-

A 25mm Thick paving to floor 57 M² 13.20

EXTERNAL FLOOR FINISHES

Cement and sand (1:3) screed trowelled hard and smooth


as described:-

B 25mm Thick to floor laid to fall 52 M² 13.20

B3/3B/45
To Summary RM

B3/3B/46
TNB SUB STATION

Amount

752.40

686.40

B3/3B/47
1,438.80

B3/3B/48
BILL NO. 3 TNB SUB STATION

Item Description Qty Unit Rate

Element 3A : Ceiling Finishes

INTERNAL CEILING FINISHES

Cement based skim coat plaster system, trowelled smooth


internally all accordance with manufacturer's specifications
and instructions :-

A 6mm Thick to soffit of roof slab 94 M² 6.50

Prepare and apply three coats of distemper and two coats


of 'ICI' or approved equivalent paint as described internally
on:-

B Plastered of roof slab 94 M² 11.00

EXTERNAL CEILING FINISHES

Cement based skim coat plaster system, trowelled smooth


internally all accordance with manufacturer's specifications
and instructions :-

C 6mm Thick to soffit of gutter 20 M² 6.50

Prepare and apply three coats of snowcem, one coat of


driwal and two coats of 'ICI' or approved equivalent paint
as described externally on:-

D Plastered gutter 20 M² 11.00

B3/3C/49
To Summary RM

B3/3C/50
TNB SUB STATION

Amount

611.00

1,034.00

130.00

220.00

B3/3C/51
1,995.00

B3/3C/52
BILL NO. 3

ITEM DESCRIPTION QTY UNIT

ELEMENT 4 - EXTERNAL WORKS (WITHIN BOUNDARY)

ROADWORKS

A Excavate for road commencing from formation level oversite


approximately 425mm deep get out, part return fill in and ram,
deposit and spread in making up levels where directed and remainder
load and cart away 228 m2

B Trim, grade level and consolidate sub-base of tarmac surface with an


8 ton roller 228 m2

C 50mm Thick sand blinding well spread, levelled and consolidated with
an 8 ton roller to receive crusher run 228 m2

D 300mm Thick (consolidated) crusher run aggregate spread, levelled


and consolidated as described 228 m2

E Apply one tack coat of approved bituminious emulsion spread evenly


as described to receive premix macadam surfacing 228 m2

F 75 mm Thick (consolidated) layer of bituminious macadam premix


comprising of 35mm thick binder course and 40mm thick wearing
course spread and levelled to an even gradient and fall well rammed
and consolidated as described 228 m2

FENCING AND GATES

G PVC coated chain fencing 1950mm high comprising of 50mm x 50mm


x 6mm mild steel angle post at 3000mm centres (maximum) or at
shorter spacing to suit site condition with bottom end embedded in
and including 230mm x 230mm x 305mm deep mass concrete
(Grade 20) footing, 50mm diamond mesh (No. 10 SWG) galvanized
chain link fence, three strand of No. 10 SWG galvanized straining wire
at top and bottom, 50mm x 50mm x 6mm mild steel angle corner
struts with bottom end embedded in and including 230mm x 230mm
x 305mm deep mass concrete (Grade 20) footing, split pins, 150mm x
100mm high concrete curb with cement plastered on both sides,
including all excavation, disposal, formwork and painting posts and
struts with one coat metallic primer and two coats aluminium paint all
as per Engineer's Drawing no. RB1389/ENS/1A-17/E/02

76 m

B3/4/1
H Pair mild steel gate overall size 3600mm x 1850mm high in 2 equal
leaves each size 1800mm x 1850mm high, constructed of 100mm x
40mm square hollow mild steel framing to sides and bottom infilled
with 15mm x 30mm square hollow mild steel welded to steel frame
including painting the whole gate with one coat metallic primer and
three coat alkyd resin based paint
1 no

Total Carried To Summary

B3/4/1
TNB SUB STATION

RATE AMOUNT (RM)

5.00 1,140.00

6.50 1,482.00

3.00 684.00

17.00 3,876.00

6.50 1,482.00

30.00 6,840.00

71.50 5,434.00

B3/4/1
2,200.00 2,200.00

RM 23,138.00
#REF!

B3/4/1
BILL NO. 3 Summary TNB SUB STATION

Item Description Qty Unit Rate

Summary

1A Work Below Lowest Floor Finish B3/1A/4

1B Apron And Perimeter Drain B3/1B/3

2A Frame B3/2A/1

2B Roof B3/2B/1

2C External Wall B3/2C/1

2D Window And External Door B3/2D/1

2E Internal Wall B3/2A/1

3A Wall Finishes B3/3A/1

3B Floor Finishes B3/3B/1

3C Ceiling Finishes B3/3C/1

4 External Works (Within Boundary) B3/4/1

B3/57
Summary

TOTAL CARRIED TO FINAL SUMMARY RM

B3/58
TNB SUB STATION Summary

Amount

62,940.40

9,731.90

12,251.18

22,205.22

6,568.65

7,700.00

1,414.60

8,925.50

1,438.80

1,995.00

23,138.00

B3/59
Summary

158,309.25