Equipment Handling Checklist/ Permit (Standard & Medium Lift load < 30 MT)
Part - A - Requisite Detail: Crane, Hydra, Trailer
Plant Department Permit No & Date:
High / Medium /
Priority Name of Engg. in-charge
Normal
Equipment reqd: Contact Ph. / Mobile
Date from / To Time : From / To
Part - B - Description of the Job & Tag No. :..................................................................:..........
..................................................................:...........................................................................
..................................................................:...........................................................................
Weight of job in MT : Size of Job : LBH / Dia
Part - C - Equipment Handling Checklist for Crane & Hydra: (Standard / Medium Lift <30 MT)
Crane Option : 50/ 100/ 150 or______MT. Hydra - 14 MT (Capacity 2 .12t at 85% loading)
Net Load = Load + Hook + Rope + Sling etc. + + + =
Lift Radius Boom Length
SWL as per load chart .(Capacity) % of loading
Tools & Tackles D - Shackles Capacity :
Sling Capacity :
Chain Block Capacity :
Ensure Test Certificate of tools :
Ground preparation Use of sleepers underjack as required
& Hard Stand Use of MSplate, sand, Steel Mats etc. as required
Part:D Rigging plan
Elevation of :
:
Mtr. Hook in Mtr. :
n
gt hi
Load in
len Wt. : Mtr:
om
Bo
�
Radius of Load in Mtr. :
Part - E - TBRA - Control Measures for Crane User - (Site specific requirement to be added)
1. Ensure barrication of counter weight & load swing radius.
2. Ensure ground level, crane level & Full extension of outriggers.
3. Ensure lifting tools, lugs, hook etc. for lifting capacity, healthiness, color code of the year.
4. Ensure protection of belt/sling from sharp edge & avoid side loading / pulling.
5. Ensure all crew members are trained & competent for skill & communication .
6. Confirm weight of the load from name plate, by weighing, or by calculation . Do not guess.
7. Ensure sufficient clearance from piping, structure and equipments.
8. Ensure Safe Load Indicator condition before use of crane
9. Ensure trial lift ( for trial lift object may be lifted at about 6" from Ground Level for about 1 min)
Part - F - Approvals Plant-Engineer Incharge Plant Maintenance Incharge
Name :
Sign :
load < 30 MT)
<30 MT)
MT
Hook in Mtr. :
% loading :
e year.
t guess.
about 1 min)
ant Maintenance Incharge
Annexure-B
ROUTINE CRANE INSPECTION CHECKLIST
OPaL, DAHEJ
Crane Identification / reg. No: DATE :-
Crane Type: Tyre mounted telescopic boom Crane Capacity: ___ MT
Placed at :
Parking area near DM plant
Owner Dept. of OPaL:: CES
Name of Supplier:
WORK DESCRIPTION:
_____________________
Name , Signature with Designation
Annexure-C
ROUTINE HYDRA INSPECTION CHECKLIST
OPaL, DAHEJ
Crane Identification / reg. No: DATE :-
Crane Type: Tyre mounted telescopic boom Hydra Capacity: ____MT
Placed at :
Parking area near DM plant
Owner Dept. of OPaL:: CES
Name of Supplier:
WORK DESCRIPTION:
_____________________
Signed By :
Engineer In charge
)
han those covered under existing ARC for Crane/Hydra for OPaL
ST
STATUS REMARKS
Yes/No
Yes/No /NA
Yes/No
Yes/No
Yes/No /NA
Yes/No /NA
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
of risk or a separate
Project Cordinator