1.01 Dismantling 201.33 M2 1,000.00
1.02 Excavation 56.74 M3 700
1.03 Backfilling 0.001 M3 175.00
1.04 Earthfilling 0.00 M3 500.00
1.05 Stone Soling 6.86 M3 3,000.00
1.06 CC 1:4:8 5 M3 7,500.00
1.07 CC 1:3:6 0.001 M3 10,000.00
1.08 RCC 1:2:4 0 M3 15,000.00
1.09 P/L DPC 0.00 M2 1,000.00
1.10 P/L Plinth Protection 0.001 M2 1,300.00
1.11 Installation of Deformed Steel Bars 0.001 KG 20.00
1.12 Block/Brick Masonry 0.001 M3 11,000.00
1.13 P/A Plaster 1/2" thick 0.001 M2 500.00
1.14 P/A Plaster 3/4" thick 0.001 M2 600.00
1.15 Roof Water Proofing 0.001 M2 1,500.00
1.16 P/A Enamel Paint 0.001 M2 325.00
1.17 P/A Weather Shield Paint 0.001 M2 420.00
1.18 P/a Plastic Emulsion Paint 0.001 M2 425.00
1.19 Installation of Steel Ladder 0.001 KG 75.00
1.20 UPVC Pipe 0.001 M 700.00
1.21 Aluminium Windows 0.001 M2 13,500.00
1.22 Bitumen PB-4 0.001 M2 375
1.23 Solid Flush Door 0.001 M2 10,000.00
1.24 Steel Chohkat 0.001 M 1,200.00
1.25 Installation of Barbed Wire 0.001 M 200.00
1.26 Installation of Angle Iron 0.001 KG 70.00
1.27 PVC/Vapor barrier polyethene sheet 0.001 M2 200
1.28 Fabrication&Installation of Steel Gate 0.001 KG 100.00
1.29 Termite Proofing 0.001 M2 300.00
1.30 Excavation for Cables 0.001 M3 700.00
1.31 Laying of Cables 0.001 M 100.00
1.32 Backfilling for Cables 0.001 M3 700.00
1.33 Laying of Cable 0.001 M 50.00
1.34 Installation of GI Pipe 0.001 M 200.00
1.35 Installation of DB 0.001 JOB 12,000.00
1.36 Wiring for 5A 3pin Switch Socket 0.00 EA 2,800.00
1.37 P/I 20A TP MCB 5KA 0.001 EA 2,800.00
1.38 Wiring for Single Light Point 0.001 EA 2,000.00
1.39 Wiring from Distribution Board 0.001 EA 2,000.00
1.40 Bracket Fan 18" dia 0.001 EA 15,000.00
1.41 Light 0.001 EA 2,300.00
1.42 Energy Savers 0.001 EA 1,500.00
Sub Total
Add PST 5%
Total
Sub Total
Add PST 6%
Total
Sub Total
Add PST 8%
Total
Material
2 CABLE 4 C-6 sq.mm PVC/PVC 400.00 M 854.50
3 CABLE 1 C-6 sq.mm PVC/PVC 20 M 170.90
4 CONDUIT GI 1"dia (M G) 100 M 256.41
5 Distribution Board 2 SET 64,957.26
6 Deformed Steel Bars 31,100.00 KG 94.02
7 Miscellaneous Steel structure 1,000.00 KG 106.82
8 Miscellaneous Steel structure 2,500.00 KG 106.84
9 Miscellaneous Steel structure 250 KG 106.84
10 Barbed Wire size12SWG 405 M 854.70
Sub Total
Add GST 17%
Total -B
Grand Total
2nd R/Bill Paid
Total
B Services
Payable SST
T.Amount of PO F/Bill Qty Bill Amount
19,096,809.44 12,421,832.27
1,145,808.57 745,309.94 1st C/O Qty
20,242,618.01 13,167,142.21
5,095,049.71 5,048,648.56
407,603.98 403,891.88
5,502,653.69 5,452,540.45
24,487,573.79 17,766,073.54
14,785.73 14,779.64
1,145,808.57 745,309.94
407,603.98 403,891.88
26,055,772.06 18,930,054.99
4,171,579.02 3,698,961.05
709,168.43 628,823.38
4,880,747.45 4,327,784.43
30,936,519.52 17,494,926.64
8,742,064.84
8,752,861.80
30,936.52
866,222.55
Amount excluding Amount Including
GST
GST GST
F/Bill QTY-
QTY- GR Done in Total QTY-
GR to be Balance Qty for GR & GI
last R/Bill GR to be done
done PO Qty
400.00 400.00 - 400.00
20.00 20.00 - 20.00
100.00 100.00 - 100.00
2.00 2.00 - 2.00
29000.00 29,000.00 - 2,100.00 -
862.07 1,000.00 137.93 - 137.93
955.41 202.41 (753.00) 2,297.59 (753.00)
- - 250.00 -
400.00 400.00 - 5.00 -
#REF!
#REF!
9,728,251.14 #REF!
8,742,064.84
986,186.30 7,766,675.50
986186.3
#REF!
#REF!
119,451.63
-90
119,361.63
Reservation #