3.1 Check anchor bolts elevation & location Related DWG H W DR DR Inspection Reprot
Related DWG/
3.4 Padding Elevation/ Dimensional Check H W W DR Inspection Report
Erection Manual
4.1 Casing
Check
Ch k bbase lleveling
li before
b f anchor
h b bolt
lt R l t d DWG/
Related
4.1.1 H W DR DR Inspection Report
tightening Erection Manual
Related DWG/
4.1.3 Check column plumbness H W DR DR Inspection Report
Erection Manual
4. Installation
Related DWG/ Visual Inspection
4.1.4 Grouting of Column H W DR DR
Erection Manual (Grouting check list)
Page 1 of 5
Inspection and Test Plan for HRSG Installation
Doc. no AE1166-DD09-07013001-Attachment 7.1 Rev no. E
Inspection & Test Activities
Applicable Code & Verification
Item No Activity Description INCO SAMSUNG FICHTNER AI (ASME STAMP ) Remarks
Documentation Document
A Sign A Sign A Sign A Sign
Related
NDE (PT OR MT) for seal weld & fillet Inspection Report /
4.1.7 DWG/procedure/ H W DR DR
weld 10% Visual Inspection
AWSD1.1
4.2 Module
Check the gap between liner plate and Related DWG/
4.2.1 H W W DR Inspection Report
each bottom header Erection Manual
Page 2 of 5
Inspection and Test Plan for HRSG Installation
Doc. no AE1166-DD09-07013001-Attachment 7.1 Rev no. E
Inspection & Test Activities
Applicable Code & Verification
Item No Activity Description INCO SAMSUNG FICHTNER AI (ASME STAMP ) Remarks
Documentation Document
A Sign A Sign A Sign A Sign
Related DWG/
4.5.4 Check Fit-up H W DR DR Visual Inspection
AWSD1.1/WPS
Related DWG/
4.5.5 Welding Inspection H W W DR Visual Inspection
AWSD1.1/WPS
4.6 Equipment
Related DWG(Inlet
4.6.1 Alignment and leveling of Fuel Skid H W W DR Inspection Report
Duct)
Visual inspection
4.6.2 Grouting of Fuel Skids Related DWG H W DR DR
(Grouting check list)
Page 3 of 5
Inspection and Test Plan for HRSG Installation
Doc. no AE1166-DD09-07013001-Attachment 7.1 Rev no. E
Inspection & Test Activities
Applicable Code & Verification
Item No Activity Description INCO SAMSUNG FICHTNER AI (ASME STAMP ) Remarks
Documentation Document
A Sign A Sign A Sign A Sign
Visual inspection
4.6.4 Grouting of Air blower skids Related DWG H W DR DR
(Grouting check list)
Visual inspection
4.6.6 Grouting of blow down tank Related DWG H W DR DR
(Grouting check list)
4.7 Steel Structure & Plateform (Stair, Galleries, Base frame etc.)
Final
Fi l IInstallation
t ll ti IInspection
ti off operating
ti
4.7.3 Related DWG H W DR DR Visual Inspection
plateforms
5.1 Hydro pressure test (HP, other Lines) ASME I/ ASME B31.1 H W W W Pressure test report
5. Final Inspection &
Hydro test
5.2 Final Painting touh-up Inspection Related DWG H W W DR Inspection Report
Related DWG/
6.3 Check of chipping of grouting area H W DR DR Visual Inspection
Erection Manual
Page 4 of 5
Inspection and Test Plan for HRSG Installation
Doc. no AE1166-DD09-07013001-Attachment 7.1 Rev no. E
Inspection & Test Activities
Applicable Code & Verification
Item No Activity Description INCO SAMSUNG FICHTNER AI (ASME STAMP ) Remarks
Documentation Document
A Sign A Sign A Sign A Sign
Related DWG/
6.4 Check of plumbness of main stack H W DR DR Inspection Report
Erection Manual
Related DWG/
6.9 Check of site insulation works H W DR DR Visual Inspection
Erection Manual
Page 5 of 5