Вы находитесь на странице: 1из 1

GENERAL NOTES :

1- All Dimensions Are In Meters Unless Otherwise State


2- All Diameters Are In Millimeters Unless Otherwise Sta
3- The Service Information Shown On The Drawings Are
Indicative Only And May Not Be Comprehensive.
The Contractor Shall Be Responsible ForLocating All
Services Prior To Excavation And Protecting Them
4- This Drawing Is To Be Read In Conjuction With Other
Utility Drawing.

112.35
RIGHT-OF-WAY LIMITS
30.00 50.85 31.50
30.00 METERS PROPOSED UTILITIES CORRIDORS CONSTRUCTION LIMITS 31.50 METERS PROPOSED UTILITIES CORRIDORS

1.00

1.00
3.00 2.00 3.00 1.00 4.00 4.00 2.00 2.00 3.00 1.501.50 2.00 5.00 13.50 1.5 17.85 8.50 2.00 1.501.00 2.00 2.00 3.00 3.00 3.00 3.00 4.00 4.00
ROADWAY WIDTH

1.00
CLEARENCE ROADWAY WIDTH CLEARENCE

1.00
12.00

R.O.W
MEDIAN
1.00 3.00 3.75 3.75 3.00 3.00 3.75 3.75 3.75 3.60

R.O.W
(3.00) ELECTRICAL TRANSCO
1.00
R.O.W

( 2.00) TELECOM (ETISALAT)

TRAVELED WAY

TRAVELED WAY

TRAVELED WAY

TRAVELED WAY

TRAVELED WAY

(2.00) TELECOM (ETISALAT)

R.O.W
R.O.W

(4.00) POWER TRANSCO

(3.00) ELECTRICAL ADDC

R.O.W
R.O.W

SHOULDER

SHOULDER

SHOULDER

SHOULDER
(3.00) WATER TRANCO

(4.00) WATER TRANCO


(2.00) STORM WATER

R.O.W
(2.00) TELECOM (DU)
R.O.W

(3.00) WATER ADDC

20.00

(2.00) STORM WATER


(4.00) POWER ADDC

(2.00) TELECOM (DU)

(4.00) WATER ADDC


VERGE

OUTER

VERGE
OUTER
(1.00) CLEARANCE

INSIDE

INSIDE

R.O.W
(1.50) IRRIGATION
R.O.W

(3.00) SEWERAGE

(1.00) CLEARANCE
(1.50) IRRIGATION

(3.00) SEWERAGE

R.O.W
(1.50) ITS (DOT)
R.O.W

(1.00) ITS (DOT)

R.O.W
R.O.W

(1.00) F.O.C.

(1.00) F.O.C.

R.O.W
(1.00) GAS
R.O.W

(1.00) GAS

(3.00) TSE

R.O.W
R.O.W

R.O.W
R.O.W

2.0% 2.0% 2.0% 2.0%


1:6

R.O.W
SLOP
R.O.W

SLOPE E 1:6

1.50 M STREET LIGHTING

R.O.W
SW INLET

1.20 M HIGH SECURITY

SW INLET

R.O.W
R.O.W
(MCC FALCON EYE)
PROFILE PROFILE

R.O.W
GRADE GRADE
NORTH SIDE OF E30 ROAD

R.O.W
LINE 2 LINE 1

50mm ASPHALT WEARING COURSE SOUTH SIDE OF E30 ROAD


KEY PLAN
50mm ASPHALT WEARING COURSE
60mm ASPHALT BINDER COURSE 60mm ASPHALT BINDER COURSE WIDENING SIDE
150mm ASPHALT BASE COURSES (upper: 70mm / lower: 80 mm) 150mm ASPHALT BASE COURSES (upper: 70mm / lower: 80 mm)
Qibla

200mm WET MIX (CBR=80%) 200mm WET MIX (CBR=80%)


150mm AGGREGATE SUB-BASE (CBR=60%) 150mm AGGREGATE SUB-BASE (CBR=60%)

16 ROOMS ACCOMMODATION
TYPICAL CROSS SECTION FOR E30 - DUALING
N=2679506.512
E=272105.192

N=2679495.860
E=272107.732

LIMIT OF CONTRACT
Coordinate System
WGS 84
N
W E

D:\D drive\My standards\ADM_Logo_Horizontal_CMYK.jpg

TOWN PLANNING SECTOR


MAIN PLANNING & COORDINATION SECTION

Sector :E30 - AL AIN TRUCK ROAD


Plot : ---
EngineerENGR.
: ADEL SAIED
Drawn ByBHARATH
: Date :15-10-2018
Dwg No.SR-SALFO-73126-2018-SEC
Sheet SCALE
(1/18) A1 N.T.S STATUS:Approval

DWG Path : \\192.168.1.248\02_PROJECTS\0268-E30 DUALING\61_DRAFTS\02_PRELIMINARY DESIGN\02 CAD\01 DWG\04 SKETCH\DWG\2018.10.16_TPD_APPROVED DWGS\QC FILE\73126_20181016_AP_SECTION_ADDITIONAL_ADM.DWG
Eng. Khaled Al Menhali
Acting Director Of Urban Planning Division

Вам также может понравиться