Pile Group & Pile cap design by bending theory to BS 8110 Part 1

by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 236­238 (P3)

1 Input Data

Axial Load Pa = 1905  KN


Number of piles N = 3 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 750 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 0
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 0

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= 0 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 0 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
236 0 680 0 680 0.00E+0
237 570 ­340 570 -340 3.25E+5
238 ­570 ­340 -570 -340 3.25E+5

Total 0 0 0 0 649800
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
4.62E+5 0 0.0009804 635 0.00 0.00
1.16E+5 0.0008772 -0.0004902 635 0.00 0.00
1.16E+5 -0.0008772 -0.0004902 635 0.00 0.00

693600 0 0 1905 0 0
13
Pile Load

635
635
635

1905
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 236­238 (P3A)

1 Input Data

Axial Load Pa = 1905  KN


Number of piles N = 3 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 750 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = -19.05
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 0

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= 0 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 10 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
236 0 530 0 520 0.00E+0
237 450 ­250 450 -260 2.03E+5
238 ­450 ­250 -450 -260 2.03E+5

Total 0 30 0 0 405000
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
2.70E+5 0 0.0012821 635 -24.42 0.00
6.76E+4 0.0011111 -0.000641 635 12.21 0.00
6.76E+4 -0.0011111 -0.000641 635 12.21 0.00

405600 0 0 1905 0 0
13
Pile Load

611
647
647

1905
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 101­104 (P4)

1 Input Data

Axial Load Pa = 3422  KN


Number of piles N = 4 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = -168.5335
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 101.8045

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -30 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 49 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
128 ­587 636 -557.25 586.75 3.11E+5
129 523 602 552.75 552.75 3.06E+5
130 544 ­540 573.75 -589.25 3.29E+5
131 ­599 ­501 -569.25 -550.25 3.24E+5
Total -119 197 0 0 1269294.75
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
3.44E+5 -0.000439 0.0004514 855.5 -76.08 -44.69
3.06E+5 0.0004355 0.0004253 855.5 -71.67 44.33
3.47E+5 0.000452 -0.0004533 855.5 76.40 46.02
3.03E+5 -0.0004485 -0.0004233 855.5 71.35 -45.66
1299798.75 0 0 3422 0 0
13
Pile Load

735
828
978
881
3422
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 101­104 (P4A)

1 Input Data

Axial Load Pa = 2823  KN


Number of piles N = 4 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 750 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = -23.9955
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 88.21875

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -31 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 9 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
101 ­480 498 -448.75 489.5 2.01E+5
102 382 453 413.25 444.5 1.71E+5
103 403 ­447 434.25 -455.5 1.89E+5
104 ­430 ­470 -398.75 -478.5 1.59E+5
Total -125 34 0 0 719726.75
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
2.40E+5 -0.0006235 0.0005603 705.75 -13.44 -55.00
1.98E+5 0.0005742 0.0005088 705.75 -12.21 50.65
2.07E+5 0.0006034 -0.0005214 705.75 12.51 53.23
2.29E+5 -0.000554 -0.0005477 705.75 13.14 -48.88
873633 0 0 2823 0 0
13
Pile Load

637
744
771
670
2823
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 113­117 (P5)

1 Input Data

Axial Load Pa = 4459  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 54.3998
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 237.2188

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -53 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -12 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
113 ­823 716 -769.8 728.2 5.93E+5
114 695 717 748.2 729.2 5.60E+5
115 ­35 ­7 18.2 5.2 3.31E+2
116 702 ­760 755.2 -747.8 5.70E+5
117 ­805 ­727 -751.8 -714.8 5.65E+5
Total -266 -61 0 0 2288256.8
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.30E+5 -0.0003364 0.0003415 891.8 18.58 -79.80
5.32E+5 0.000327 0.000342 891.8 18.60 77.56
2.70E+1 7.9537E-06 2.4388E-06 891.8 0.13 1.89
5.59E+5 0.00033 -0.0003507 891.8 -19.08 78.29
5.11E+5 -0.0003285 -0.0003352 891.8 -18.24 -77.94
2132178.8 0 0 4459 0 0
13
Pile Load

831
988
894
951
796
4459
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 107­112 (P6)

1 Input Data

Axial Load Pa = 5450  KN


Number of piles N = 6 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 600 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = -35.425
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 143.516667

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -26 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 7 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
107 ­602 1100 -575.66667 1093.5 3.31E+5
108 510 1108 536.33333 1101.5 2.88E+5
109 508 69 534.33333 62.5 2.86E+5
110 ­545 25 -518.66667 18.5 2.69E+5
111 524 ­1134 550.33333 -1140.5 3.03E+5
112 ­553 ­1129 -526.66667 -1135.5 2.77E+5

Total -158 39 0 0 1753817.33


28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
1.20E+6 -0.0003282 0.0002186 908.333333 -7.74 -47.11
1.21E+6 0.0003058 0.0002202 908.333333 -7.80 43.89
3.91E+3 0.0003047 1.2492E-05 908.333333 -0.44 43.73
3.42E+2 -0.0002957 3.6975E-06 908.333333 -0.13 -42.44
1.30E+6 0.0003138 -0.0002279 908.333333 8.07 45.03
1.29E+6 -0.0003003 -0.0002269 908.333333 8.04 -43.10

5003393.5 0 0 5450 0 0
13
Pile Load

853
944
952
866
961
873

5450
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 107­112 (P6) RECTIFIED

1 Input Data

Axial Load Pa = 5450  KN


Number of piles N = 6 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 600 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 487.775
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 101.733333

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -19 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -90 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
107 ­602 1100 -583.33333 1189.5 3.40E+5
108 510 1108 528.66667 1197.5 2.79E+5
109 508 69 526.66667 158.5 2.77E+5
110 ­545 25 -526.33333 114.5 2.77E+5
112 ­553 ­1129 -534.33333 -1039.5 2.86E+5
111A 570 ­1710 588.66667 -1620.5 3.47E+5

Total -112 -537 0 0 1806211.33


28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
1.41E+6 -0.000323 0.0001804 908.333333 87.99 -32.86
1.43E+6 0.0002927 0.0001816 908.333333 88.59 29.78
2.51E+4 0.0002916 2.4038E-05 908.333333 11.73 29.66
1.31E+4 -0.0002914 1.7365E-05 908.333333 8.47 -29.65
1.08E+6 -0.0002958 -0.0001576 908.333333 -76.90 -30.10
2.63E+6 0.0003259 -0.0002458 908.333333 -119.88 33.16

6593729.5 0 0 5450 0 0
13
Pile Load

963
1027
950
887
801
822

5450
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 113­117 (P5)

1 Input Data

Axial Load Pa = 4459  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 54.3998
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 237.2188

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -53 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -12 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
113 ­823 716 -769.8 728.2 5.93E+5
114 695 717 748.2 729.2 5.60E+5
115 ­35 ­7 18.2 5.2 3.31E+2
116 702 ­760 755.2 -747.8 5.70E+5
117 ­805 ­727 -751.8 -714.8 5.65E+5
Total -266 -61 0 0 2288256.8
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.30E+5 -0.0003364 0.0003415 891.8 18.58 -79.80
5.32E+5 0.000327 0.000342 891.8 18.60 77.56
2.70E+1 7.9537E-06 2.4388E-06 891.8 0.13 1.89
5.59E+5 0.00033 -0.0003507 891.8 -19.08 78.29
5.11E+5 -0.0003285 -0.0003352 891.8 -18.24 -77.94
2132178.8 0 0 4459 0 0
13
Pile Load

831
988
894
951
796
4459
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 113­117 (P5) RECTIFIED

1 Input Data

Axial Load Pa = 4459  KN


Number of piles N = 6 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = -269.7695
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 433.266167

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -97 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 61 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
114 695 717 792.16667 656.5 6.28E+5
115 ­35 ­7 62.166667 -67.5 3.86E+3
116 702 ­760 799.16667 -820.5 6.39E+5
117 ­805 ­727 -707.83333 -787.5 5.01E+5
113A ­1900 ­760 -1802.8333 -820.5 3.25E+6
113B 760 1900 857.16667 1839.5 7.35E+5

Total -583 363 0 0 5756030.83


28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
4.31E+5 0.0001376 0.0001135 743.166667 -30.61 59.63
4.56E+3 1.08E-05 -1.167E-05 743.166667 3.15 4.68
6.73E+5 0.0001388 -0.0001418 743.166667 38.26 60.15
6.20E+5 -0.000123 -0.0001361 743.166667 36.72 -53.28
6.73E+5 -0.0003132 -0.0001418 743.166667 38.26 -135.70
3.38E+6 0.0001489 0.0003179 743.166667 -85.77 64.52

5785905.5 0 0 4459 0 0
13
Pile Load

772
751
842
727
646
722

4459
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 123­127 (P5)

1 Input Data

Axial Load Pa = 4752  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 800 mm
Column breadth Byy = 800 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = -1.9008
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 260.4096

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -55 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 0 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
123 ­808 761 -753.2 760.6 5.67E+5
124 686 774 740.8 773.6 5.49E+5
125 ­53 4 1.8 3.6 3.24E+0
126 682 ­767 736.8 -767.4 5.43E+5
127 ­781 ­770 -726.2 -770.4 5.27E+5
Total -274 2 0 0 2186338.8
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.79E+5 -0.0003445 0.0003224 950.4 -0.61 -89.71
5.98E+5 0.0003388 0.0003279 950.4 -0.62 88.23
1.30E+1 8.2329E-07 1.5258E-06 950.4 0.00 0.21
5.89E+5 0.000337 -0.0003253 950.4 0.62 87.76
5.94E+5 -0.0003322 -0.0003265 950.4 0.62 -86.50
2359401.2 0 0 4752 0 0
13
Pile Load

860
1038
951
1039
865
4752
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 123­127 (P5) RECTIFIED

1 Input Data

Axial Load Pa = 4752  KN


Number of piles N = 6 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 800 mm
Column breadth Byy = 800 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = -7.128
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = -74.448

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= 16 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= 2 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
123 ­808 761 -823.66667 759.5 6.78E+5
124 686 774 670.33333 772.5 4.49E+5
125 ­53 4 -68.666667 2.5 4.72E+3
127 ­781 ­770 -796.66667 -771.5 6.35E+5
126A ­850 0 -865.66667 -1.5 7.49E+5
126B 1900 ­760 1884.3333 -761.5 3.55E+6

Total 94 9 0 0 6067257.33
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.77E+5 -0.0001358 0.0003234 792 -2.30 10.11
5.97E+5 0.0001105 0.0003289 792 -2.34 -8.23
6.25E+0 -1.132E-05 1.0644E-06 792 -0.01 0.84
5.95E+5 -0.0001313 -0.0003285 792 2.34 9.78
2.25E+0 -0.0001427 -6.387E-07 792 0.00 10.62
5.80E+5 0.0003106 -0.0003242 792 2.31 -23.12

2348699.5 0 0 4752 0 0
13
Pile Load

800
781
793
804
803
771

4752
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 141­145 (P5)

1 Input Data

Axial Load Pa = 4737  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 125.0568
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 164.8476

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -35 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -26 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
141 ­818 701 -783.2 727.4 6.13E+5
142 698 735 732.8 761.4 5.37E+5
143 ­27 ­65 7.8 -38.6 6.08E+1
144 744 ­802 778.8 -775.6 6.07E+5
145 ­771 ­701 -736.2 -674.6 5.42E+5
Total -174 -132 0 0 2298978.8
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.29E+5 -0.0003407 0.0003357 947.4 41.98 -56.16
5.80E+5 0.0003188 0.0003514 947.4 43.94 52.55
1.49E+3 3.3928E-06 -1.781E-05 947.4 -2.23 0.56
6.02E+5 0.0003388 -0.0003579 947.4 -44.76 55.84
4.55E+5 -0.0003202 -0.0003113 947.4 -38.93 -52.79
2166971.2 0 0 4737 0 0
13
Pile Load

933
1044
946
958
856
4737
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 141­145 (P5) RECTIFIED

1 Input Data

Axial Load Pa = 4737  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 125.0568
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 164.8476

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -35 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -26 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
141 ­818 701 -783.2 727.4 6.13E+5
142 698 735 732.8 761.4 5.37E+5
143 ­27 ­65 7.8 -38.6 6.08E+1
144 744 ­802 778.8 -775.6 6.07E+5
145 ­771 ­701 -736.2 -674.6 5.42E+5
Total -174 -132 0 0 2298978.8
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.29E+5 -0.0003407 0.0003357 947.4 41.98 -56.16
5.80E+5 0.0003188 0.0003514 947.4 43.94 52.55
1.49E+3 3.3928E-06 -1.781E-05 947.4 -2.23 0.56
6.02E+5 0.0003388 -0.0003579 947.4 -44.76 55.84
4.55E+5 -0.0003202 -0.0003113 947.4 -38.93 -52.79
2166971.2 0 0 4737 0 0
13
Pile Load

933
1044
946
958
856
4737
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 157­161 (P5)

1 Input Data

Axial Load Pa = 4737  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 22.7376
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 187.5852

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -40 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -5 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
157 ­835 742 -795.4 746.8 6.33E+5
158 735 714 774.6 718.8 6.00E+5
159 ­21 ­16 18.6 -11.2 3.46E+2
160 754 ­736 793.6 -731.2 6.30E+5
161 ­831 ­728 -791.4 -723.2 6.26E+5
Total -198 -24 0 0 2489127.2
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.58E+5 -0.0003195 0.0003503 947.4 7.96 -59.94
5.17E+5 0.0003112 0.0003371 947.4 7.67 58.38
1.25E+2 7.4725E-06 -5.253E-06 947.4 -0.12 1.40
5.35E+5 0.0003188 -0.0003429 947.4 -7.80 59.81
5.23E+5 -0.0003179 -0.0003392 947.4 -7.71 -59.64
2132180.8 0 0 4737 0 0
13
Pile Load

895
1013
949
999
880
4737
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 179­183 (P5)

1 Input Data

Axial Load Pa = 4670  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 16.812
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 198.942

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -43 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -4 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
179 ­796 726 -753.4 729.6 5.68E+5
180 740 740 782.6 743.6 6.12E+5
181 ­48 ­23 -5.4 -19.4 2.92E+1
182 681 ­734 723.6 -730.4 5.24E+5
183 ­790 ­727 -747.4 -723.4 5.59E+5
Total -213 -18 0 0 2262307.2
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.32E+5 -0.000333 0.0003405 934 5.73 -66.25
5.53E+5 0.0003459 0.0003471 934 5.84 68.82
3.76E+2 -2.387E-06 -9.055E-06 934 -0.15 -0.47
5.33E+5 0.0003199 -0.0003409 934 -5.73 63.63
5.23E+5 -0.0003304 -0.0003377 934 -5.68 -65.72
2142425.2 0 0 4670 0 0
13
Pile Load

873
1009
933
992
863
4670
Pile Group & Pile cap design by bending theory to BS 8110 Part 1
by . LOH WOEI CHUNG

Pile spacing from center to center should not exceed 3 times the pile
diameter and BS 8110 Part 1 clause 3.11.4 should applied
Project : MEDAN IDAMAN RETAIL COMPLEX
Pilecap : PILE 179­183 (P5) RECTIFIED

1 Input Data

Axial Load Pa = 4670  KN


Number of piles N = 5 No.

Column Coors. X-col = 0 mm


Column Coors. Y-col = 0 mm
Column length Bxx = 450 mm
Column breadth Byy = 1000 mm

Moment Mxx = 0  KNm


Moment Myy = 0  KNm

Pi = [Pa/N]+[Mxxt X (Yi-Yc)/sum(Yi-Yc)²] +[Myy X (Xi-Xc)/SUM(Xi-Xc)²]


where
Due to eccentricity of column Central Gravity with Pilecap Central Gravity
Mxxt = Mxx + Pa X [Yc-((Yi-Yc)/1000)] = 16.812
Myyt = Myy + Pa X [Xc-((Xi-Xc)/1000)] = 198.942

Pilecap C.G At Coors. Xc = Sum(Xi)/N


= -43 mm
Pilecap C.G At Coors. Yc = Sum(Yi)/N
= -4 mm

1 2 3 4 5 6
Pile i Xi Yi Xi-Xc Yi-Yc (Xi-Xc)²
mm mm
179 ­796 726 -753.4 729.6 5.68E+5
180 740 740 782.6 743.6 6.12E+5
181 ­48 ­23 -5.4 -19.4 2.92E+1
182 681 ­734 723.6 -730.4 5.24E+5
183 ­790 ­727 -747.4 -723.4 5.59E+5
Total -213 -18 0 0 2262307.2
28.5.1999

KNm
KNm

7 8 9 10 11 12
(Yi-Yc)² Xi-Xc Yi-Yc Pa/N Myyt+Pa*C Mxxt+Pa*C
Sum(Xi-Xc)² Sum(Yi-Yc)²
5.32E+5 -0.000333 0.0003405 934 5.73 -66.25
5.53E+5 0.0003459 0.0003471 934 5.84 68.82
3.76E+2 -2.387E-06 -9.055E-06 934 -0.15 -0.47
5.33E+5 0.0003199 -0.0003409 934 -5.73 63.63
5.23E+5 -0.0003304 -0.0003377 934 -5.68 -65.72
2142425.2 0 0 4670 0 0
13
Pile Load

873
1009
933
992
863
4670