Вы находитесь на странице: 1из 6

EHS RISK ASSESSMENT

ACTIVITY: DISTRIBUTION BOARD (DB) & JUNCTION BOX (JB) INSTALLATION


PACKAGE NUMBER: CG-4750

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control
Cons. Prob. Risk Cons. Prob. Risk

 Make sure a clear space where the


Falling of the load is to be placed.
object on the body  Always size up the job and remove
6.1.1 to 6.1.3 ,damage to any obstructions.
3 2 6
property  Ensure to see over the load when
carrying it
 Supervisor / Foreman to conduct
daily crew talks prior to start the
Not wearing
activity 3 2 6
appropriate P.P.E
 Implement close supervision
during the activity
 Examine the load to make sure it is
not too heavy or awkward
 Always get close to the object to
carry.
Back injury to 3 3 9
 Ensure to see over the load when
personnel. Hand
carrying it.
and foot injury
 Use proper Hand gloves and foot
protection

 Maintain proper housekeeping at


all times
Fall, trip and
 Foreman to conduct daily crew talk 3 2 6
slipping hazards.
prior to start the activity
 Implement close supervision
during the activity

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 1 of 6


EHS RISK ASSESSMENT

ACTIVITY: DISTRIBUTION BOARD (DB) & JUNCTION BOX (JB) INSTALLATION


PACKAGE NUMBER: CG-4750

 Operator must pass third party


competency test for crane
operation and secure competency
certificate.
 Operator should attend induction
course for carne operation.
 Crane/Boom truck must have:
1. Valid registration from RTA
Unauthorized to Travel
2. Valid certificate of
6.2.5 operation of
conformity or through 4 3 12
crane / boom
truck crane /boom truck
inspection from approved
certification agencies.
3. Statement of insurance
policy.
4. Supervisor to ensure all
mobile equipments are
duly inspected by EMAL /
SLII with valid load test
certificates

 Crane must be certified by


approved third party certification
agencies and EMAL/SLII..
 Gears, chains, and belts should be
Mechanical Failure inspected, certified and colour 4 3 12
coded to use.
 Avoid overloading of transport
equipment.
 Lift load for its specific load limit or
safe working load

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 2 of 6


EHS RISK ASSESSMENT

ACTIVITY: DISTRIBUTION BOARD (DB) & JUNCTION BOX (JB) INSTALLATION


PACKAGE NUMBER: CG-4750

 Use tag lines or tag ropes to guide


Having no control
the load towards its destination. 3 2 6
of the load
 Assign a certified rigger.
 Activity shall be carried out the
personal supervision of receiving
activity.
 Supervisor to ensure all applicable
PTW to be available prior to
6.2.6 to Unauthorized commencement of the task.
workers at working  Tool box talk to be held at site, this
6.2.11 area may injure shall cover the method statement 3 3 9
due to curiosity. and job safety analysis.
 Only competent and authorized
personnel to be
deployed,supervisor to ensure all
workers involve in the activity
received Big 5 training of emal

Using damaged  Inspect step ladder before use,


step ladder. one man should hold the ladder on
Use of damaged the ground while is in used.
4 3 12
hand power tools.  Competent operator for the use of
Electrocution/fire power tool and inspect before use
ensure valid colour coding.

 Supervisor to inspect the drill


machine and make sure it is in
Using of drill good condition.
machine.  Don’t use excessive force to drill 3 4 12
Electrocution machine during drilling.
 Only competent and authorized
worker for the using if power tools
 Only 110V to be used at site

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 3 of 6


EHS RISK ASSESSMENT

ACTIVITY: DISTRIBUTION BOARD (DB) & JUNCTION BOX (JB) INSTALLATION


PACKAGE NUMBER: CG-4750

Dust while drilling  Provide appropriate safety glass 3 2 6


&dust mask while drilling

Manual handling.  Supervisor to give toolbox


Slip and fall of DB/ regarding proper manual handling. 3 3 9
JB’s while fixing.  Extra care while fixing DB/ JB’s.

Workers may slip,


 Maintain house keeping around the
trip & fall at same
area 3 2 6
ground or from
height  Walkway and gangway to be kept
free of obstruction

 All personnel involve in the


Working without activities must wear proper PPE’s
3 3 9
proper PPE’s (hard hat, appropriate safety glass,
dust mask long sleeve shirt and
reflective vest).

 Only competent and authorized


Unauthorized person to do the inspection, ensure
6.2.13 workers notified the client with all
3 2 6
necessary documents.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 4 of 6


EHS RISK ASSESSMENT

ACTIVITY: DISTRIBUTION BOARD (DB) & JUNCTION BOX (JB) INSTALLATION


PACKAGE NUMBER: CG-4750

 Maintain good housekeeping


Slip / Trip / Fall -
around the area.
same level 3 2 6
 All temporary cable should be
properly organized.

 Wear P.P.E.'s at all times


(hard hat, appropriate safety glass,
safety shoes, hand gloves, dust
3 3 9
Not using P.P.E.'s mask, fire retardant long sleeve
shirt / pants.

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 – 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 5 of 6


EHS RISK ASSESSMENT

ACTIVITY: DISTRIBUTION BOARD (DB) & JUNCTION BOX (JB) INSTALLATION


PACKAGE NUMBER: CG-4750

Risk assessment compiled by :

Risk Assessor:

SACHIN BABU EHS ADVISOR 08-05-2012

Name Designation Signature Date

Risk assessment approved by :

EHS Department:

Name Designation Signature Date

Construction:

Name Designation Signature Date

Management:

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 6 of 6

Вам также может понравиться