CÁLCULO DE PENDIENTE

ITEM DESCRIPCION UND CANT. TOTAL REND Tu C T TIPO DE PU (S/.) TN CN REND C PU TF CF ΔT ΔC S


UNIT ACTIVIDAD (OP) (OP) (OP)
CONSTRUCCIÓN Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION LA
0 0 UNIVERSIDAD NACIONAL DEL ALTIPLANO
1 1 INICIO
2 2 OBRAS PROVISIONALES
3 2.1 COLOCACIÓN DEL CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M Und 1 1 1.0 1 1.00 Normal 250.00 1.0 250 1 1.00 400.00 1.00 400.00 0.00 150.00 -
4 2.2 INSTALACION DE OFICINA, ALMACEN Y CASETA DE GUARDIANIA PROVISIONALES m2 68 35 1.9 1 2.00 Crítica 32.8224 2.0 2,232 44 1.00 52.5158 2.00 3,571.08 0.00 1,339.15 -
5 3 TRABAJOS PRELIMINARES
6 3.1 LIMPIEZA DEL TERRENO m2 368 100 3.7 2 2.00 Crítica 1.003 2.0 369 125 2.00 1.6048 1.00 590.00 1.00 221.25 221
7 3.2 TALA Y RETIRO DE ARBOLES Und 5 17 0.3 5 1.00 Normal 80.31 1.0 402 21 5.00 128.496 0.00 642.48 1.00 240.93 241
8 3.3 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 368 500 0.7 1 1.00 Crítica 2.63 1.0 967 625 1.00 4.208 1.00 1,547.07 0.00 580.15 -
9 3.4 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m2 368 500 0.7 1 1.00 Normal 4.1031 1.0 1,509 625 1.00 6.56496 1.00 2,413.61 0.00 905.10 -
10 4 MOVIMIENTO DE TIERRAS
11 4.1 BOMBEO DE AGUA m3 36 60 0.6 1 1.00 Normal 2.91 1.0 105 75 1.00 4.656 0.00 167.62 1.00 62.86 63
12 4.2 EXCAVACION DE ZANJAS PARA PLATEA DE CIMENTACION (Terreno Normal) m3 489 350 1.4 1 2.00 Crítica 5.75 2.0 2,812 438 1.00 9.2 1.00 4,498.80 1.00 1,687.05 1,687
13 4.3 PERFILADO MANUAL (Terreno Normal) m2 60 3 19.9 2 10.00 Normal 21.4306 10.0 1,283 4 2.00 34.289 8.00 2,052.06 2.00 769.52 385
14 4.4 RELLENO Y COMPACTACIÓN DE FUNDACIONES CON MATERIAL DE PRESTAMO m3 752 7 107.5 4 27.00 Normal 29.79 27.0 22,410 9 4.00 47.664 21.00 35,856.20 6.00 13,446.07 2,241
15 4.5 ACARREO DE MATERIAL PROVENIENTE DE EXCAVACIONES, D=30m m3 597 6 99.6 4 25.00 Normal 8.929 25.0 5,334 8 4.00 14.2864 20.00 8,535.12 5.00 3,200.67 640
16 4.6 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES m3 597 180 3.3 2 2.00 Normal 6.4729 2.0 3,867 225 2.00 10.3566 1.00 6,187.37 1.00 2,320.26 2,320
17 5 OBRAS DE CONCRETO SIMPLE
18 5.1 PLATEA DE CIMENTACION
19 5.1.1 VACIADO DE MEZCLA, C:H, 1:10, E=3" EN SOLADO PARA PLATEA DE CIMENTACION m2 368 100 3.7 2 2.00 Crítica 16.1572 2.0 5,940 125 2.00 25.8515 1.00 9,504.31 1.00 3,564.12 3,564
20 5.2 CIMIENTOS CORRIDOS
21 5.2.1 ENCOFRADO Y DESENCOFRADO DE CIMIENTO CORRIDO m2 458 13 35.2 3 12.00 Crítica 38.5677 12.0 17,671 16 3.00 61.7083 9.00 28,273.52 3.00 10,602.57 3,534
22 5.2.2 VACIADO DE MEZCLA 1:10 + 30%PG EN CIMIENTO CORRIDO m3 124 25 5.0 2 3.00 Normal 132.22 3.0 16,446 31 2.00 211.552 2.00 26,312.84 1.00 9,867.31 9,867
23 5.3 SOBRECIMIENTOS
24 5.3.1 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 110 12 9.2 3 4.00 Normal 39.7841 4.0 4,381 15 3.00 63.6546 2.00 7,009.64 2.00 2,628.62 1,314 La reducción
25 5.3.2 VACIADO DE MEZCLA DE CONCRETO 1:8 (C:H) + 25% PM EN SOBRECIMIENTOS m3 11 8 1.4 2 1.00 Normal 200.1384 1.0 2,252 10 2.00 320.221 1.00 3,602.49 0.00 1,350.93 - modifica la ruta
crítica
26 5.4 VACIADO DE MEZCLA 1:8 (C:H) EN FALSO PISO DE 4" m3 192 100 1.9 2 1.00 Normal 22.3043 1.0 4,282 125 2.00 35.6869 1.00 6,851.17 0.00 2,569.19 -
27 5.5 VEREDAS
28 5.5.1 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 11 11 1.0 1 1.00 Normal 19.5545 1.0 207 14 1.00 31.2872 1.00 331.96 0.00 124.48 -
29 5.5.2 VACIADO DE CONCRETO F'C=210 KG/CM2 EN VEREDAS m3 80 90 0.9 1 1.00 Normal 32.23 1.0 2,566 113 1.00 51.568 1.00 4,104.81 0.00 1,539.30 -
30 6 OBRAS DE CONCRETO ARMADO
31 6.1 PLATEA DE CIMENTACION
32 6.1.1 PLATEA DE CIMENTACION: ACERO FY=4200 KG/CM2 kg 8,738 250 35.0 3 12.00 Normal 4.3744 12.0 38,222 313 3.00 6.99904 9.00 61,155.79 3.00 22,933.42 7,644
33 6.1.2 VACIADO DE CONCRETO F'C=210 KG/CM2 EN PLATEA DE CIMENTACION m3 165 22 7.5 4 2.00 Normal 265.128 2.0 43,863 28 4.00 424.205 2.00 70,180.44 0.00 26,317.67 -
34 6.2 COLUMNAS
35 6.2.1 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 761 10 76.1 6 13.00 Crítica 42.06 13.0 32,027 13 6.00 67.296 10.00 51,243.21 3.00 19,216.20 6,405
36 6.2.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN COLUMNAS Kg 9,877 250 39.5 3 14.00 Normal 4.3744 14.0 43,204 313 3.00 6.99904 11.00 69,126.58 3.00 25,922.47 8,641
37 6.2.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3 69 12 5.8 2 3.00 Normal 324.2117 3.0 22,461 15 2.00 518.739 2.00 35,938.22 1.00 13,476.83 13,477
38 6.3 COLUMNAS DE ARRIOSTRE
39 6.3.1 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE ARRIOSTRE m2 60 10 6.0 2 3.00 Normal 44.3891 3.0 2,662 13 2.00 71.0226 2.00 4,259.93 1.00 1,597.47 1,597
40 6.3.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN COLUMNAS DE ARRIOSTRE Kg 165 250 0.7 1 1.00 Normal 4.3744 1.0 721 313 1.00 6.99904 1.00 1,154.35 0.00 432.88 -
41 6.3.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN COLUMNAS DE ARRIOSTRE m3 5 10 0.5 1 1.00 Normal 296.5412 1.0 1,483 13 1.00 474.466 0.00 2,372.33 1.00 889.62 890
42 6.4 PLACAS
43 6.4.1 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 55 10 5.5 2 3.00 Normal 46 3.0 2,531 13 2.00 73.6 2.00 4,049.47 1.00 1,518.55 1,519
44 6.4.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN PLACAS Kg 897 250 3.6 2 2.00 Normal 4.3744 2.0 3,924 313 2.00 6.99904 1.00 6,278.98 1.00 2,354.62 2,355
45 6.4.3 PLACAS: CONCRETO F'C=210 KG/CM2 m3 6 9 0.7 1 1.00 Normal 327.45 1.0 1,978 11 1.00 523.92 1.00 3,164.48 0.00 1,186.68 -
46 6.5 VIGAS
47 6.5.1 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 1,327 8.5 156.1 4 40.00 Crítica 52.1818 40.0 69,220 11 4.00 83.4909 31.00 110,752.32 9.00 41,532.12 4,615
48 6.5.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN VIGAS Kg 8,999 250 36.0 3 12.00 Normal 4.3744 12.0 39,366 313 3.00 6.99904 10.00 62,986.04 2.00 23,619.77 11,810
49 6.5.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN VIGAS m3 215 19 11.3 4 3.00 Normal 283.5326 3.0 60,911 24 4.00 453.652 2.00 97,458.09 1.00 36,546.79 36,547
50 6.6 LOSAS ALIGERADAS
51 6.6.1 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA HORIZONTAL m2 925 10 92.5 4 24.00 Crítica 39.1252 24.0 36,173 13 4.00 62.6003 18.00 57,877.13 6.00 21,703.92 3,617
52 6.6.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN LOSAS ALIGERADAS m2 5,433 250 21.7 3 8.00 Normal 4.3744 8.0 23,768 313 3.00 6.99904 6.00 38,029.21 2.00 14,260.96 7,130
53 6.6.3 COLOCACIÓN DE LADRILLO HUECO 30x30x15 cm EN LOSAS ALIGERADAS Und 8,321 1500 5.5 1 6.00 Crítica 2.8777 6.0 23,945 1,875 1.00 4.60432 4.00 38,312.18 2.00 14,367.07 7,184
54 6.6.4 VACIADO DE CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA HORIZONTAL m3 74.96 25 3.0 1 3.00 Crítica 279.0814 3.0 20,920 31 1.00 446.53 2.00 33,471.91 1.00 12,551.97 12,552
55 6.7 ESCALERAS
56 6.7.1 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 44.22 6 7.4 2.5 3.00 Normal 54.663 3.0 2,417 8 2.50 87.4608 2.00 3,867.52 1.00 1,450.32 1,450
57 6.7.2 COLOCACION DE ACERO FY=4200 KG/CM2 EN ESCALERAS Kg 649.31 250 2.6 1 3.00 Normal 4.3744 3.0 2,840 313 1.00 6.99904 2.00 4,544.55 1.00 1,704.20 1,704
58 6.7.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN ESCALERAS m3 5.62 10 0.6 1 1.00 Normal 329.8726 1.0 1,854 13 1.00 527.796 0.00 2,966.21 1.00 1,112.33 1,112
59 7 ESTRUCTURAS METALICAS Y COBERTURAS #DIV/0! #DIV/0!
60 7.1 INSTALACIÓN DE VIGA VM-1, L= 3.05 Pza 10 7 1.4 2 1.00 Normal 77.14 1.0 771 9 2.00 123.424 1.00 1,234.24 0.00 462.84 -
61 7.2 INSTALACIÓN DE VIGA VM-2, L= 1.65 Pza 21 7 3.0 1 3.00 Normal 51.51 3.0 1,082 9 1.00 82.416 2.00 1,730.74 1.00 649.03 649
62 7.3 INSTALACIÓN DE VIGA VM-3 Pza 77.4 8 9.7 1 10.00 Normal 40.9101 10.0 3,166 10 1.00 65.4562 8.00 5,066.31 2.00 1,899.87 950
63 7.4 INSTALACIÓN DE COBERTURA DE POLICARBONATO GOLD E=8 mm m2 62.79 40 1.6 2 1.00 Normal 102.839 1.0 6,457 50 2.00 164.542 1.00 10,331.62 0.00 3,874.36 -
64 8 VARIOS
65 8.1 PRUEBAS DE CONTROL DE CALIDAD Glb 1 1 1.0 1 1.00 Normal 3055 1.0 3,055 1 1.00 4888 1.00 4,888.00 0.00 1,833.00 -
66 8.2 TRANSPORTE INTERNO DE MATERIALES Glb 1 0.15 6.7 1 7.00 Normal 1291.5921 7.0 1,292 0 1.00 2066.55 5.00 2,066.55 2.00 774.96 387
67 9 MUROS Y TABIQUES DE ALBAÑILERIA
68 9.1 ASENTADO DE MURO DE LADRILLO KING KONG MECANIZADO (CABEZA), J=2 cm m2 308.62 6 51.4 3 18.00 Crítica 96.1023 18.0 29,659 8 3.00 153.764 14.00 47,454.55 4.00 17,795.46 4,449
69 9.2 ASENTADO DE MURO DE LADRILLO KING KONG MECANIZADO (SOGA), J=2 cm m2 806.11 9 89.6 3 30.00 Normal 56.677 30.0 45,688 11 3.00 90.6832 24.00 73,100.63 6.00 27,412.74 4,569
70 10 REVOQUES, ENLUCIDOS Y MOLDURAS
71 10.1 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) m2 233.07 13.5 17.3 2.5 7.00 Crítica 10.0403 7.0 2,340 17 2.50 16.0645 6.00 3,744.15 1.00 1,404.06 1,404
72 10.2 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 1158.33 19 61.0 3 21.00 Crítica 9.8727 21.0 11,436 24 3.00 15.7963 16.00 18,297.35 5.00 6,861.51 1,372
73 10.3 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 925.69 10.5 88.2 3 30.00 Normal 13.8448 30.0 12,816 13 3.00 22.1517 24.00 20,505.59 6.00 7,689.60 1,282
74 10.4 TARRAJEO DE COLUMNAS
75 10.4.1 TARRAJEO DE SUPERFICIES ( Mezcla C:A 1:5, E=2cm) EN COLUMNAS Y PLACAS RECTAS m2 497.7 7.2 69.1 3 24.00 Crítica 16.7298 24.0 8,326 9 3.00 26.7677 18.00 13,322.27 6.00 4,995.85 833
76 10.4.2 VESTIDURA DE ARISTAS EN COLUMNAS RECTAS ml 971.87 18 54.0 3 18.00 Normal 4.3818 18.0 4,259 23 3.00 7.01088 14.00 6,813.66 4.00 2,555.12 639
77 10.5 TARRAJEO DE VIGAS
78 10.5.1 TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=2cm) EN VIGAS RECTAS m2 494.6 6 82.4 3 28.00 Crítica 19.29 28.0 9,541 8 3.00 30.864 22.00 15,265.33 6.00 5,724.50 954
79 10.5.2 VESTIDURA DE ARISTAS EN VIGAS RECTAS ml 879.95 16.5 53.3 3 18.00 Normal 5.2618 18.0 4,630 21 3.00 8.41888 14.00 7,408.19 4.00 2,778.07 695
80 10.6 VESTIDURA DE ELEMENTOS DE FACHADA
81 10.6.1 COLOCACIÓN DE VESTIDURA DE ELEMENTOS DE FACHADA (Mezcla C:A 1:5, E=2cm) m2 103.29 6 17.2 3 6.00 Crítica 19.28 6.0 1,991 8 3.00 30.848 5.00 3,186.29 1.00 1,194.86 1,195
82 10.6.2 COLOCACIÓN DE VESTIDURA DE ELEMENTOS DE FACHADA: VESTIDURA DE ARISTAS ml 306.31 17 18.0 3 7.00 Crítica 5.1 7.0 1,562 21 3.00 8.16 5.00 2,499.49 2.00 937.31 469
83 10.6.3 COLOCACIÓN DE VESTIDURA DE DERRAMES (Mezcla C:A 1:5, E=2cm, A=12cm) ml 187.05 18 10.4 3 4.00 Crítica 5.19 4.0 971 23 3.00 8.304 3.00 1,553.26 1.00 582.47 582
84 10.6.4 COLOCACIÓN DE BRUÑAS E=1cm ml 2378.09 25 95.1 4 24.00 Normal 3.1553 24.0 7,504 31 4.00 5.04848 19.00 12,005.74 5.00 4,502.15 900
85 11 CIELORRASOS
86 11.1 INTALACIÓN DE CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=2.5cm) m2 778 8 97.3 4 25.00 Normal 23.64 25.0 18,392 10 4.00 37.824 19.00 29,427.07 6.00 11,035.15 1,839
87 11.2 INTALACIÓN DE CIELO RASO SUSPENDIDO 0.61x0.61x4 mm m2 158 12 13.2 2 7.00 Normal 34.89 7.0 5,513 15 2.00 55.824 5.00 8,820.19 2.00 3,307.57 1,654
88 11.3 TARRAJEO DE SUPERFICIES EN FONDO DE ESCALERAS (Mezcla C:A 1:5, E=1.5cm) m2 24.71 10 2.5 1 3.00 Normal 14.2 3.0 351 13 1.00 22.72 2.00 561.41 1.00 210.53 211
89 11.4 INTALACIÓN DE VESTIDURA DE ARISTAS EN FONDO DE ESCALERAS ml 29.08 15 1.9 2 1.00 Normal 5.7881 1.0 168 19 2.00 9.26096 1.00 269.31 0.00 100.99 -
90 12 PISOS Y PAVIMENTOS
91 12.1 COLOCACIÓN CONTRAPISO DE 40mm (Mezcla C:A, Base 1:5, Acabado 1:2) m2 508.47 85 6.0 2 3.00 Normal 17.8052 3.0 9,053 106 2.00 28.4883 2.00 14,485.46 1.00 5,432.05 5,432
92 12.2 COLOCACIÓN CONTRAPISO DE 48mm (Mezcla C:A, Base 1:5, Acabado 1:2) m2 449.53 80 5.6 2 3.00 Normal 19.9876 3.0 8,985 100 2.00 31.9802 2.00 14,376.04 1.00 5,391.02 5,391
93 12.3 COLOCACIÓN PISO DE CERAMICO ANTIDESLIZANTE 40 x 40 cm. m2 460.39 12 38.4 3 13.00 Normal 41.2555 13.0 18,994 15 3.00 66.0088 10.00 30,389.79 3.00 11,396.17 3,799
94 12.4 COLOCACIÓN PISO DE CERAMICO 30 x 30 cm. m2 52.3 11 4.8 3 2.00 Normal 36.9583 2.0 1,933 14 3.00 59.1333 1.00 3,092.67 1.00 1,159.75 1,160
95 12.5 COLOCACIÓN PISO DE VINILICO E=2.5mm m2 449.53 14 32.1 3 11.00 Normal 39.9752 11.0 17,970 18 3.00 63.9603 9.00 28,752.08 2.00 10,782.03 5,391
96 12.6 COLOCACIÓN PISO DE CEMENTO: ACABADO BRUÑADO E=1" m2 46.5 90 0.5 1 1.00 Normal 12.3 1.0 572 113 1.00 19.68 0.00 915.12 1.00 343.17 343
97 13 VEREDAS
98 13.1 VEREDAS: REVESTIMIENTO CON MEZCLA C:A 1:5 E=2CM m2 79.6 7 11.4 2 6.00 Normal 17.8198 6.0 1,418 9 2.00 28.5117 5.00 2,269.53 1.00 851.07 851
99 14 CONTRAZOCALOS
### 14.1 COLOCACIÓN CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (Incluye Rodón) ml 215.28 28 7.7 3 3.00 Normal 19.9313 3.0 4,291 35 3.00 31.8901 2.00 6,865.30 1.00 2,574.49 2,574
### 14.2 COLOCACIÓN CONTRAZOCALO CEMENTO S/COLOREAR H = 15 CM PULIDO ml 19.22 22 0.9 1 1.00 Normal 4.5244 1.0 87 28 1.00 7.23904 1.00 139.13 0.00 52.18 -
### 14.3 COLOCACIÓN CONTRAZOCALO DE CERAMICO 30 x 30 cm. m2 93.05 11 8.5 3 3.00 Normal 41.3083 3.0 3,844 14 3.00 66.0933 2.00 6,149.98 1.00 2,306.24 2,306
### 15 ZOCALOS
### 15.1 COLOCACIÓN DE ZOCALO DE CERAMICO LINEA PLAIN VERDE 30x30 CM. m2 5.37 7 0.8 1 1.00 Normal 45.9076 1.0 247 9 1.00 73.4522 1.00 394.44 0.00 147.91 -
### 15.2 COLOCACIÓN DE ZOCALO DE CERAMICO LINEA PLAIN NARANJA 30x30 CM. m2 6.31 7 0.9 1 1.00 Normal 45.9076 1.0 290 9 1.00 73.4522 1.00 463.48 0.00 173.81 -
### 15.3 COLOCACIÓN DE ZOCALO DE CERAMICO LINEA PLAIN BLANCO 30x30 CM. m2 105.1 7 15.0 3 6.00 Normal 45.9076 6.0 4,825 9 3.00 73.4522 4.00 7,719.82 2.00 2,894.93 1,447
### 15.4 COLOCACIÓN DE TERMINAL PLÁSTICO PARA CERAMICOS m2 89.57 15 6.0 2 3.00 Normal 4.0973 3.0 367 19 2.00 6.55568 2.00 587.19 1.00 220.20 220
### 16 REVESTIMIENTO DE GRADAS Y ESCALERAS
### 16.1 REVESTIMIENTO DE GRADAS Y PELDAÑOS CON CERAMICO LINEA RUSTICA m2 24.92 6 4.2 2 3.00 Normal 47.8857 3.0 1,193 8 2.00 76.6171 2.00 1,909.30 1.00 715.99 716
### 16.2 REVESTIMIENTO DE DESCANSOS CON CERAMICO LINEA RUSTICA m2 9.24 10 0.9 1 1.00 Normal 42.0976 1.0 389 13 1.00 67.3562 1.00 622.37 0.00 233.39 -
### 16.3 COLOCACIÓN DE CANTONERA DE ALUMINIO 2"X11/2" CON ANCLAJE ml 78.87 30 2.6 1.5 2.00 Normal 8.914 2.0 703 38 1.50 14.2624 1.00 1,124.88 1.00 421.83 422
### 17 CARPINTERIA DE MADERA
### 17.1 INSTALACIÓN DE PUERTAS CONTRAPLACADAS m2 23.28 2 11.6 3 4.00 Normal 134.8032 4.0 3,138 3 3.00 215.685 3.00 5,021.15 1.00 1,882.93 1,883
### 17.2 INSTALACIÓN DE PUERTAS DE TABLERO REBAJADO m2 11.04 1.5 7.4 2.5 3.00 Normal 346.9722 3.0 3,831 2 2.50 555.156 2.00 6,128.92 1.00 2,298.34 2,298
### 18 CARPINTERIA METALICA Y HERRERIA
### 18.1 INSTALACIÓN DE TUBO ELECTROSOLDADO 2"x1" ml 421.08 30 14.0 3 5.00 Normal 19.4707 5.0 8,199 38 3.00 31.1531 4.00 13,117.96 1.00 4,919.23 4,919
### 18.2 INSTALACIÓN DE TUBO ELECTROSOLDADO 4"x2" ml 25.5 28 0.9 1 1.00 Normal 21.86 1.0 557 35 1.00 34.976 1.00 891.89 0.00 334.46 -
### 18.3 INSTALACIÓN DE MARCO METALICO P/PUERTAS DE TUBO ELECTROSOLDADO 2"x1" ml 419.98 15 28.0 3 10.00 Normal 20.4 10.0 8,568 19 3.00 32.64 7.00 13,708.15 3.00 5,140.56 1,714
### 18.4 INSTALACIÓN DE PORTAÑUELAS METALICAS m2 6 10 0.6 1 1.00 Normal 20.67 1.0 124 13 1.00 33.072 0.00 198.43 1.00 74.41 74
### 18.5 INSTALACIÓN DE PUERTA DE MELAMINE CON MARCO DE ALUMINIO m2 15.21 7 2.2 2 2.00 Normal 61.589 2.0 937 9 2.00 98.5424 1.00 1,498.83 1.00 562.06 562
### 18.6 INSTALACIÓN DE DIVISION MELAMINE Y ALUMINIO PARA SERVICIOS HIGIENICOS m2 21.77 7 3.1 2 2.00 Normal 56.58 2.0 1,232 9 2.00 90.528 1.00 1,970.79 1.00 739.05 739
### 18.7 INSTALACIÓN DE BARANDA METALICA DE F°G°, D=2 1/2" ml 202.8 15 13.5 3 5.00 Normal 31.67 5.0 6,423 19 3.00 50.672 4.00 10,276.28 1.00 3,853.61 3,854
### 19 CERRAJERIA
### 19.1 INSTALACIÓN DE BISAGRAS CAPUCHINAS ALUMINIZADAS 4" Und 77 40 1.9 2 1.00 Normal 8 1.0 616 50 2.00 12.8 1.00 985.60 0.00 369.60 -
### 19.2 INSTALACIÓN DE BISAGRAS TIPO VAIVEN Und 20 40 0.5 1 1.00 Normal 12 1.0 240 50 1.00 19.2 0.00 384.00 1.00 144.00 144
### 19.3 INSTALACIÓN DE CERRADURA PARA PUERTAS PRINCIPALES 3 GPS Pza 1 8 0.1 1 1.00 Normal 83.8531 1.0 84 10 1.00 134.165 0.00 134.16 1.00 50.31 50
### 19.4 INSTALACIÓN DE CERRADURA PARA PUERTAS INTERIORES 2 GPS Pza 19 10 1.9 2 1.00 Normal 63.7531 1.0 1,211 13 2.00 102.005 1.00 1,938.09 0.00 726.79 -
### 19.5 INSTALACIÓN DE CERRADURA DE BOLA SS.HH. Pza 1 8 0.1 1 1.00 Normal 44.7531 1.0 45 10 1.00 71.605 0.00 71.60 1.00 26.85 27
### 19.6 INSTALACIÓN DE PICAPORTE DE ALUMINIO 6" Pza 1 2 0.5 1 1.00 Normal 21.473 1.0 21 3 1.00 34.3568 0.00 34.36 1.00 12.88 13
### 20 VIDRIOS, CRISTALES Y SIMILARES
### 20.1 INSTALACIÓN DE VIDRIO TRANSPARENTE DOBLE, E=4mm p2 134.18 60 2.2 2 2.00 Normal 3.7268 2.0 500 75 2.00 5.96288 1.00 800.10 1.00 300.04 300
### 20.2 INSTALACIÓN DE VIDRIO TRANSPARENTE DOBLE, E=6mm p2 577.54 60 9.6 3 4.00 Normal 4.7768 4.0 2,759 75 3.00 7.64288 3.00 4,414.07 1.00 1,655.28 1,655
### 20.3 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS TRANSPARENTE E=6mm p2 119.25 60 2.0 1 2.00 Normal 7.314 2.0 872 75 1.00 11.7024 2.00 1,395.51 0.00 523.32 -
### 20.4 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS TRANSPARENTE PARA PUERTAS E=8mm p2 113.34 60 1.9 1 2.00 Normal 11.114 2.0 1,260 75 1.00 17.7824 2.00 2,015.46 0.00 755.80 -
### 20.5 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO E=4mm p2 40.3 60 0.7 1 1.00 Normal 3.014 1.0 121 75 1.00 4.8224 1.00 194.34 0.00 72.88 -
### 20.6 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO E=6mm p2 880.22 60 14.7 3 5.00 Normal 7.614 5.0 6,702 75 3.00 12.1824 4.00 10,723.19 1.00 4,021.20 4,021
### 20.7 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO E=8mm p2 545.48 60 9.1 2 5.00 Normal 13.114 5.0 7,153 75 2.00 20.9824 4.00 11,445.48 1.00 4,292.05 4,292
### 20.8 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO PARA PUERTAS E=8mm p2 119.47 60 2.0 1 2.00 Normal 13.614 2.0 1,626 75 1.00 21.7824 2.00 2,602.34 0.00 975.88 -
### 20.9 INSTALACIÓN DE SISTEMA ESTRUCTURAL MURO CORTINA E=6mm p2 1703.9 60 28.4 2 15.00 Crítica 13 15.0 22,151 75 2.00 20.8 11.00 35,441.12 4.00 13,290.42 3,323
### 20.1 INSTALACIÓN DE VIDRIO CATEDRAL p2 774.24 60 12.9 3 5.00 Normal 4.4143 5.0 3,418 75 3.00 7.06288 3.00 5,468.36 2.00 2,050.64 1,025
### 20.11 COLOCACION DE ESPEJOS EN SS.HH. p2 65.42 50 1.3 2 1.00 Crítica 4.9337 1.0 323 63 2.00 7.89392 1.00 516.42 0.00 193.66 -
### 21 PINTURA
### 21.1 APLICACIÓN DE PINTURA LATEX EN CIELO RASO HORIZONTAL (Incluye Vigas y Fondo de Escaleras) m2 998.26 45 22.2 2 12.00 Crítica 8.23 12.0 8,216 56 2.00 13.168 9.00 13,145.09 3.00 4,929.41 1,643
### 21.2 APLICACIÓN DE PINTURA EN MUROS INTERIORES (Incluye Columnas y Derrames) m2 1331.02 30 44.4 3 15.00 Crítica 7.5915 15.0 10,104 38 3.00 12.1464 12.00 16,167.10 3.00 6,062.66 2,021
### 21.3 APLICACIÓN DE PINTURA EN MUROS EXTERIORES (Incluye Columnas y Derrames) m2 1050.24 30 35.0 2 18.00 Crítica 10.23 18.0 10,744 38 2.00 16.368 14.00 17,190.33 4.00 6,446.37 1,612
### 21.4 APLICACIÓN DE PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA m2 169.78 60 2.8 1 3.00 Normal 2.5388 3.0 431 75 1.00 4.06208 2.00 689.66 1.00 258.62 259
### 21.5 APLICACIÓN DE PINTURA BARNIZ EN PUERTAS DE MADERA m2 58.64 20 2.9 1 3.00 Normal 9.1012 3.0 534 25 1.00 14.5619 2.00 853.91 1.00 320.22 320
### 21.6 APLICACIÓN DE PINTURA ANTICORROSIVA EN PUERTAS Y ELEMENTOS DE T. ELECTROSOLDADO (Interior) m2 122.92 35 3.5 2 2.00 Normal 9.8132 2.0 1,206 44 2.00 15.7011 1.00 1,929.98 1.00 723.74 724
### 21.7 APLICACIÓN DE PINTURA ANTICORROSIVA EN BARANDAS, PASAMANOS Y MARCOS m2 419.98 100 4.2 2 3.00 Normal 2.9931 3.0 1,257 125 2.00 4.78896 2.00 2,011.27 1.00 754.23 754
### 22 VARIOS, LIMPIEZA Y JARDINERIA
### 22.1 TRANSPORTE INTERNO DE MATERIALES glb 1 0.2 5.0 2 3.00 Normal 1291.5921 3.0 1,292 0 2.00 2066.55 2.00 2,066.55 1.00 774.96 775
### 22.2 LIMPIEZA PERMAMENTE DE OBRA glb 1 0.7 1.4 2 1.00 Normal 143.282 1.0 143 1 2.00 229.251 1.00 229.25 0.00 85.97 -
### 22.3 LIMPIEZA FINAL DE OBRA m2 1661.13 250 6.6 2 4.00 Crítica 0.5015 4.0 833 313 2.00 0.8024 3.00 1,332.89 1.00 499.83 500
23 FIN 285.0 942,776 217.0 1,508,442
Duracion 285 dias Duracion 217 dias Al 50% 34
COMPRESION DE CRONOGRAMA: Al 50% del tiempo factible

Reduciendo 20 dias = 265 dias Reduciendo 34 dias = 251 dias Reduciendo 34 dias = 251 dias

REND TIPO DE REND C PU Actividad Tiempo Costo Actividad Tiempo Costo Actividad Tiempo Costo Duración Costo Directo Costo Costo Total
ID ITEM DESCRIPCION UND CANT. TOTAL Tu C T PU (S/.) TN CN TF CF ΔT ΔC S Directo Directo Directo Indirecto
UNIT ACTIVIDAD (OP) (OP) (OP) (ITEM) (dias) (S/.) (ITEM) (dias) (S/.) (ITEM) (dias) (S/.) (Dias) (S/.) (S/.) (S/.)

CONSTRUCCIÓN Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION LA


0 0 UNIVERSIDAD NACIONAL DEL ALTIPLANO
0
0.00 0 0
285.00 S/. 942,776 S/. 2,850 S/. 945,626
1 1 INICIO 1 0.00 1 1 265.00 S/. 993,960 S/. 2,650 S/. 996,610
2 2 OBRAS PROVISIONALES 2 0.00 2 2 253.00 S/. 1,022,401 S/. 2,530 S/. 1,024,931
3 2.1 COLOCACIÓN DEL CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M Und 1 1 1.0 1 1.00 Normal 250.00 1.0 250 1 1.00 400.00 1.00 400.00 0.00 150.00 - 2.1 1.00 250.00 2.1 1.00 250.00 2.1 1.00 250.00 251.00 S/. 1,035,990 S/. 2,530 S/. 1,038,520
4 2.2 INSTALACION DE OFICINA, ALMACEN Y CASETA DE GUARDIANIA PROVISIONALES m2 68 35 1.9 1 2.00 Crítica 32.8224 2.0 2,232 44 1.00 52.5158 2.00 3,571.08 0.00 1,339.15 - 2.2 2.00 2231.92 2.2 2.00 2231.92 2.2 2.00 2231.92
5 3 TRABAJOS PRELIMINARES 3 0.00 0.00 3 0.00 0.00 3 0.00 0.00
6 3.1 LIMPIEZA DEL TERRENO m2 368 100 3.7 2 2.00 Crítica 1.003 2.0 369 125 2.00 1.6048 1.00 590.00 1.00 221.25 221 3.1 1.00 590.00 3.1 1.00 590.00 3.1 1.00 590.00
7 3.2 TALA Y RETIRO DE ARBOLES Und 5 17 0.3 5 1.00 Normal 80.31 1.0 402 21 5.00 128.496 0.00 642.48 1.00 240.93 241 3.2 1.00 401.55 3.2 1.00 401.55 3.2 1.00 401.55
8 3.3 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 368 500 0.7 1 1.00 Crítica 2.63 1.0 967 625 1.00 4.208 1.00 1,547.07 0.00 580.15 - 3.3 1.00 966.92 3.3 1.00 966.92 3.3 1.00 966.92
9 3.4 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m2 368 500 0.7 1 1.00 Normal 4.1031 1.0 1,509 625 1.00 6.56496 1.00 2,413.61 0.00 905.10 - 3.4 1.00 1508.50 3.4 1.00 1508.50 3.4 1.00 1508.50
10 4 MOVIMIENTO DE TIERRAS 4 0.00 0.00 4 0.00 0.00 4 0.00 0.00
11 4.1 BOMBEO DE AGUA m3 36 60 0.6 1 1.00 Normal 2.91 1.0 105 75 1.00 4.656 0.00 167.62 1.00 62.86 63 4.1 1.00 104.76 4.1 1.00 104.76 4.1 1.00 104.76
12 4.2 EXCAVACION DE ZANJAS PARA PLATEA DE CIMENTACION (Terreno Normal) m3 489 350 1.4 1 2.00 Crítica 5.75 2.0 2,812 438 1.00 9.2 1.00 4,498.80 1.00 1,687.05 1,687 4.2 1.00 4498.80 4.2 1.00 4498.80 4.2 1.00 4498.80
13 4.3 PERFILADO MANUAL (Terreno Normal) m2 60 3 19.9 2 10.00 Normal 21.4306 10.0 1,283 4 2.00 34.289 8.00 2,052.06 2.00 769.52 385 4.3 10.00 1282.54 4.3 10.00 1282.54 4.3 10.00 1282.54
14 4.4 RELLENO Y COMPACTACIÓN DE FUNDACIONES CON MATERIAL DE PRESTAMO m3 752 7 107.5 4 27.00 Normal 29.79 27.0 22,410 9 4.00 47.664 21.00 35,856.20 6.00 13,446.07 2,241 4.4 27.00 22410.12 4.4 27.00 22410.12 4.4 27.00 22410.12
15 4.5 ACARREO DE MATERIAL PROVENIENTE DE EXCAVACIONES, D=30m m3 597 6 99.6 4 25.00 Normal 8.929 25.0 5,334 8 4.00 14.2864 20.00 8,535.12 5.00 3,200.67 640 4.5 25.00 5334.45 4.5 25.00 5334.45 4.5 25.00 5334.45
16 4.6 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES m3 597 180 3.3 2 2.00 Normal 6.4729 2.0 3,867 225 2.00 10.3566 1.00 6,187.37 1.00 2,320.26 2,320 4.6 2.00 3867.10 4.6 2.00 3867.10 4.6 2.00 3867.10
17 5 OBRAS DE CONCRETO SIMPLE 5 0.00 0.00 5 0.00 0.00 5 0.00 0.00
18 5.1 PLATEA DE CIMENTACION 5.1 0.00 0.00 5.1 0.00 0.00 5.1 0.00 0.00
19 5.1.1 VACIADO DE MEZCLA, C:H, 1:10, E=3" EN SOLADO PARA PLATEA DE CIMENTACION m2 368 100 3.7 2 2.00 Crítica 16.1572 2.0 5,940 125 2.00 25.8515 1.00 9,504.31 1.00 3,564.12 3,564 5.1.1 1.00 9504.31 5.1.1 1.00 9504.31 5.1.1 1.00 9504.31
20 5.2 CIMIENTOS CORRIDOS 5.2 0.00 0.00 5.2 0.00 0.00 5.2 0.00 0.00
21 5.2.1 ENCOFRADO Y DESENCOFRADO DE CIMIENTO CORRIDO m2 458 13 35.2 3 12.00 Crítica 38.5677 12.0 17,671 16 3.00 61.7083 9.00 28,273.52 3.00 10,602.57 3,534 5.2.1 11.00 21205.14 5.2.1 10.00 24739.33 5.2.1 10.00 24739.33
22 5.2.2 VACIADO DE MEZCLA 1:10 + 30%PG EN CIMIENTO CORRIDO m3 124 25 5.0 2 3.00 Normal 132.22 3.0 16,446 31 2.00 211.552 2.00 26,312.84 1.00 9,867.31 9,867 5.2.2 3.00 16445.52 5.2.2 3.00 16445.52 5.2.2 3.00 16445.52
23 5.3 SOBRECIMIENTOS 5.3 0.00 0.00 5.3 0.00 0.00 5.3 0.00 0.00
24 5.3.1 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 110 12 9.2 3 4.00 Normal 39.7841 4.0 4,381 15 3.00 63.6546 2.00 7,009.64 2.00 2,628.62 1,314 La 5.3.1 4.00 4381.03 5.3.1 4.00 4381.03 5.3.1 4.00 4381.03
25 5.3.2 VACIADO DE MEZCLA DE CONCRETO 1:8 (C:H) + 25% PM EN SOBRECIMIENTOS m3 11 8 1.4 2 1.00 Normal 200.1384 1.0 2,252 10 2.00 320.221 1.00 3,602.49 0.00 1,350.93 - re 5.3.2 1.00 2251.56 5.3.2 1.00 2251.56 5.3.2 1.00 2251.56
d
26 5.4 VACIADO DE MEZCLA 1:8 (C:H) EN FALSO PISO DE 4" m3 192 100 1.9 2 1.00 Normal 22.3043 1.0 4,282 125 2.00 35.6869 1.00 6,851.17 0.00 2,569.19 - uc 5.4 1.00 4281.98 5.4 1.00 4281.98 5.4 1.00 4281.98
27 5.5 VEREDAS ci 5.5 0.00 0.00 5.5 0.00 0.00 5.5 0.00 0.00
28 5.5.1 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 11 11 1.0 1 1.00 Normal 19.5545 1.0 207 14 1.00 31.2872 1.00 331.96 0.00 124.48 - ó 5.5.1 1.00 207.47 5.5.1 1.00 207.47 5.5.1 1.00 207.47
n
29 5.5.2 VACIADO DE CONCRETO F'C=210 KG/CM2 EN VEREDAS m3 80 90 0.9 1 1.00 Normal 32.23 1.0 2,566 113 1.00 51.568 1.00 4,104.81 0.00 1,539.30 - m 5.5.2 1.00 2565.51 5.5.2 1.00 2565.51 5.5.2 1.00 2565.51
30 6 OBRAS DE CONCRETO ARMADO o 6 0.00 0.00 6 0.00 0.00 6 0.00 0.00
di
31 6.1 PLATEA DE CIMENTACION
fic 6.1 0.00 0.00 6.1 0.00 0.00 6.1 0.00 0.00
32 6.1.1 PLATEA DE CIMENTACION: ACERO FY=4200 KG/CM2 kg 8,738 250 35.0 3 12.00 Normal 4.3744 12.0 38,222 313 3.00 6.99904 9.00 61,155.79 3.00 22,933.42 7,644 a 6.1.1 12.00 38222.37 6.1.1 12.00 38222.37 6.1.1 12.00 38222.37
33 6.1.2 VACIADO DE CONCRETO F'C=210 KG/CM2 EN PLATEA DE CIMENTACION m3 165 22 7.5 4 2.00 Normal 265.128 2.0 43,863 28 4.00 424.205 2.00 70,180.44 0.00 26,317.67 - la 6.1.2 2.00 43862.78 6.1.2 2.00 43862.78 6.1.2 2.00 43862.78
ru
34 6.2 COLUMNAS
ta 6.2 0.00 0.00 6.2 0.00 0.00 6.2 0.00 0.00
35 6.2.1 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 761 10 76.1 6 13.00 Crítica 42.06 13.0 32,027 13 6.00 67.296 10.00 51,243.21 3.00 19,216.20 6,405 cr 6.2.1 12.00 38432.41 6.2.1 12.00 38432.41 6.2.1 11.00 44837.81
36 6.2.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN COLUMNAS Kg 9,877 250 39.5 3 14.00 Normal 4.3744 14.0 43,204 313 3.00 6.99904 11.00 69,126.58 3.00 25,922.47 8,641 íti 6.2.2 14.00 43204.11 6.2.2 14.00 43204.11 6.2.2 14.00 43204.11
ca
37 6.2.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3 69 12 5.8 2 3.00 Normal 324.2117 3.0 22,461 15 2.00 518.739 2.00 35,938.22 1.00 13,476.83 13,477 6.2.3 3.00 22461.39 6.2.3 3.00 22461.39 6.2.3 3.00 22461.39
38 6.3 COLUMNAS DE ARRIOSTRE 6.3 0.00 0.00 6.3 0.00 0.00 6.3 0.00 0.00
39 6.3.1 ENCOFRADO Y DESENCOFRADO DE COLUMNAS DE ARRIOSTRE m2 60 10 6.0 2 3.00 Normal 44.3891 3.0 2,662 13 2.00 71.0226 2.00 4,259.93 1.00 1,597.47 1,597 6.3.1 3.00 2662.46 6.3.1 3.00 2662.46 6.3.1 3.00 2662.46
40 6.3.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN COLUMNAS DE ARRIOSTRE Kg 165 250 0.7 1 1.00 Normal 4.3744 1.0 721 313 1.00 6.99904 1.00 1,154.35 0.00 432.88 - 6.3.2 1.00 721.47 6.3.2 1.00 721.47 6.3.2 1.00 721.47
41 6.3.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN COLUMNAS DE ARRIOSTRE m3 5 10 0.5 1 1.00 Normal 296.5412 1.0 1,483 13 1.00 474.466 0.00 2,372.33 1.00 889.62 890 6.3.3 1.00 1482.71 6.3.3 1.00 1482.71 6.3.3 1.00 1482.71
42 6.4 PLACAS 6.4 0.00 0.00 6.4 0.00 0.00 6.4 0.00 0.00
43 6.4.1 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 55 10 5.5 2 3.00 Normal 46 3.0 2,531 13 2.00 73.6 2.00 4,049.47 1.00 1,518.55 1,519 6.4.1 3.00 2530.92 6.4.1 3.00 2530.92 6.4.1 3.00 2530.92
44 6.4.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN PLACAS Kg 897 250 3.6 2 2.00 Normal 4.3744 2.0 3,924 313 2.00 6.99904 1.00 6,278.98 1.00 2,354.62 2,355 6.4.2 2.00 3924.36 6.4.2 2.00 3924.36 6.4.2 2.00 3924.36
45 6.4.3 PLACAS: CONCRETO F'C=210 KG/CM2 m3 6 9 0.7 1 1.00 Normal 327.45 1.0 1,978 11 1.00 523.92 1.00 3,164.48 0.00 1,186.68 - 6.4.3 1.00 1977.80 6.4.3 1.00 1977.80 6.4.3 1.00 1977.80
46 6.5 VIGAS 6.5 0.00 0.00 6.5 0.00 0.00 6.5 0.00 0.00
47 6.5.1 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 1,327 8.5 156.1 4 40.00 Crítica 52.1818 40.0 69,220 11 4.00 83.4909 31.00 110,752.32 9.00 41,532.12 4,615 6.5.1 39.00 73834.88 6.5.1 38.00 78449.56 6.5.1 38.00 78449.56
48 6.5.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN VIGAS Kg 8,999 250 36.0 3 12.00 Normal 4.3744 12.0 39,366 313 3.00 6.99904 10.00 62,986.04 2.00 23,619.77 11,810 6.5.2 12.00 39366.28 6.5.2 12.00 39366.28 6.5.2 12.00 39366.28
49 6.5.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN VIGAS m3 215 19 11.3 4 3.00 Normal 283.5326 3.0 60,911 24 4.00 453.652 2.00 97,458.09 1.00 36,546.79 36,547 6.5.3 3.00 60911.31 6.5.3 3.00 60911.31 6.5.3 3.00 60911.31
50 6.6 LOSAS ALIGERADAS 6.6 0.00 0.00 6.6 0.00 0.00 6.6 0.00 0.00
51 6.6.1 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA HORIZONTAL m2 925 10 92.5 4 24.00 Crítica 39.1252 24.0 36,173 13 4.00 62.6003 18.00 57,877.13 6.00 21,703.92 3,617 6.6.1 23.00 39790.52 6.6.1 22.00 43407.84 6.6.1 22.00 43407.84
52 6.6.2 HABILITACIÓN Y COLOCACIÓN DE ACERO FY=4200 KG/CM2 EN LOSAS ALIGERADAS m2 5,433 250 21.7 3 8.00 Normal 4.3744 8.0 23,768 313 3.00 6.99904 6.00 38,029.21 2.00 14,260.96 7,130 6.6.2 8.00 23768.26 6.6.2 8.00 23768.26 6.6.2 8.00 23768.26
53 6.6.3 COLOCACIÓN DE LADRILLO HUECO 30x30x15 cm EN LOSAS ALIGERADAS Und 8,321 1500 5.5 1 6.00 Crítica 2.8777 6.0 23,945 1,875 1.00 4.60432 4.00 38,312.18 2.00 14,367.07 7,184 6.6.3 5.00 31128.64 6.6.3 5.00 31128.64 6.6.3 4.00 38312.18
54 6.6.4 VACIADO DE CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA HORIZONTAL m3 74.96 25 3.0 1 3.00 Crítica 279.0814 3.0 20,920 31 1.00 446.53 2.00 33,471.91 1.00 12,551.97 12,552 6.6.4 3.00 20919.94 6.6.4 3.00 20919.94 6.6.4 3.00 20919.94
55 6.7 ESCALERAS 6.7 0.00 0.00 6.7 0.00 0.00 6.7 0.00 0.00
56 6.7.1 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 44.22 6 7.4 2.5 3.00 Normal 54.663 3.0 2,417 8 2.50 87.4608 2.00 3,867.52 1.00 1,450.32 1,450 6.7.1 3.00 2417.20 6.7.1 3.00 2417.20 6.7.1 3.00 2417.20
57 6.7.2 COLOCACION DE ACERO FY=4200 KG/CM2 EN ESCALERAS Kg 649.31 250 2.6 1 3.00 Normal 4.3744 3.0 2,840 313 1.00 6.99904 2.00 4,544.55 1.00 1,704.20 1,704 6.7.2 3.00 2840.34 6.7.2 3.00 2840.34 6.7.2 3.00 2840.34
58 6.7.3 VACIADO DE CONCRETO F'C=210 KG/CM2 EN ESCALERAS m3 5.62 10 0.6 1 1.00 Normal 329.8726 1.0 1,854 13 1.00 527.796 0.00 2,966.21 1.00 1,112.33 1,112 6.7.3 1.00 1853.88 6.7.3 1.00 1853.88 6.7.3 1.00 1853.88
59 7 ESTRUCTURAS METALICAS Y COBERTURAS 7 0.00 7 0.00 0.00 7 0.00 0.00
60 7.1 INSTALACIÓN DE VIGA VM-1, L= 3.05 Pza 10 7 1.4 2 1.00 Normal 77.14 1.0 771 9 2.00 123.424 1.00 1,234.24 0.00 462.84 - 7.1 1.00 771.40 7.1 1.00 771.40 7.1 1.00 771.40
61 7.2 INSTALACIÓN DE VIGA VM-2, L= 1.65 Pza 21 7 3.0 1 3.00 Normal 51.51 3.0 1,082 9 1.00 82.416 2.00 1,730.74 1.00 649.03 649 7.2 3.00 1081.71 7.2 3.00 1081.71 7.2 3.00 1081.71
62 7.3 INSTALACIÓN DE VIGA VM-3 Pza 77.4 8 9.7 1 10.00 Normal 40.9101 10.0 3,166 10 1.00 65.4562 8.00 5,066.31 2.00 1,899.87 950 7.3 10.00 3166.44 7.3 10.00 3166.44 7.3 10.00 3166.44
63 7.4 INSTALACIÓN DE COBERTURA DE POLICARBONATO GOLD E=8 mm m2 62.79 40 1.6 2 1.00 Normal 102.839 1.0 6,457 50 2.00 164.542 1.00 10,331.62 0.00 3,874.36 - 7.4 1.00 6457.26 7.4 1.00 6457.26 7.4 1.00 6457.26
64 8 VARIOS 8 0.00 0.00 8 0.00 0.00 8 0.00 0.00
65 8.1 PRUEBAS DE CONTROL DE CALIDAD Glb 1 1 1.0 1 1.00 Normal 3055 1.0 3,055 1 1.00 4888 1.00 4,888.00 0.00 1,833.00 - 8.1 1.00 3055.00 8.1 1.00 3055.00 8.1 1.00 3055.00
66 8.2 TRANSPORTE INTERNO DE MATERIALES Glb 1 0.15 6.7 1 7.00 Normal 1291.5921 7.0 1,292 0 1.00 2066.55 5.00 2,066.55 2.00 774.96 387 8.2 7.00 1291.59 8.2 7.00 1291.59 8.2 7.00 1291.59
67 9 MUROS Y TABIQUES DE ALBAÑILERIA 9 0.00 0.00 9 0.00 0.00 9 0.00 0.00
68 9.1 ASENTADO DE MURO DE LADRILLO KING KONG MECANIZADO (CABEZA), J=2 cm m2 308.62 6 51.4 3 18.00 Crítica 96.1023 18.0 29,659 8 3.00 153.764 14.00 47,454.55 4.00 17,795.46 4,449 9.1 17.00 34107.96 9.1 16.00 38556.82 9.1 16.00 38556.82
69 9.2 ASENTADO DE MURO DE LADRILLO KING KONG MECANIZADO (SOGA), J=2 cm m2 806.11 9 89.6 3 30.00 Normal 56.677 30.0 45,688 11 3.00 90.6832 24.00 73,100.63 6.00 27,412.74 4,569 9.2 30.00 45687.90 9.2 30.00 45687.90 9.2 30.00 45687.90
70 10 REVOQUES, ENLUCIDOS Y MOLDURAS 10 0.00 0.00 10 0.00 0.00 10 0.00 0.00
71 10.1 TARRAJEO PRIMARIO O RAYADO (Mezcla C:A 1:5, E=1.5cm) m2 233.07 13.5 17.3 2.5 7.00 Crítica 10.0403 7.0 2,340 17 2.50 16.0645 6.00 3,744.15 1.00 1,404.06 1,404 10.1 6.00 3744.15 10.1 6.00 3744.15 10.1 6.00 3744.15
72 10.2 TARRAJEO EN INTERIORES (Mezcla C:A 1:4, E=2cm) m2 1158.33 19 61.0 3 21.00 Crítica 9.8727 21.0 11,436 24 3.00 15.7963 16.00 18,297.35 5.00 6,861.51 1,372 10.2 20.00 12808.15 10.2 19.00 14180.45 10.2 19.00 14180.45
73 10.3 TARRAJEO EN EXTERIORES (Mezcla C:A 1:4, E=2cm) m2 925.69 10.5 88.2 3 30.00 Normal 13.8448 30.0 12,816 13 3.00 22.1517 24.00 20,505.59 6.00 7,689.60 1,282 10.3 30.00 12815.99 10.3 30.00 12815.99 10.3 30.00 12815.99
74 10.4 TARRAJEO DE COLUMNAS 10.4 0.00 0.00 10.4 0.00 0.00 10.4 0.00 0.00
75 10.4.1 TARRAJEO DE SUPERFICIES ( Mezcla C:A 1:5, E=2cm) EN COLUMNAS Y PLACAS RECTAS m2 497.7 7.2 69.1 3 24.00 Crítica 16.7298 24.0 8,326 9 3.00 26.7677 18.00 13,322.27 6.00 4,995.85 833 10.4.1 23.00 9159.06 10.4.1 22.00 9991.71 10.4.1 22.00 9991.71
76 10.4.2 VESTIDURA DE ARISTAS EN COLUMNAS RECTAS ml 971.87 18 54.0 3 18.00 Normal 4.3818 18.0 4,259 23 3.00 7.01088 14.00 6,813.66 4.00 2,555.12 639 10.4.2 18.00 4258.54 10.4.2 18.00 4258.54 10.4.2 18.00 4258.54
77 10.5 TARRAJEO DE VIGAS 10.5 0.00 0.00 10.5 0.00 0.00 10.5 0.00 0.00
78 10.5.1 TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=2cm) EN VIGAS RECTAS m2 494.6 6 82.4 3 28.00 Crítica 19.29 28.0 9,541 8 3.00 30.864 22.00 15,265.33 6.00 5,724.50 954 10.5.1 27.00 10494.92 10.5.1 26.00 11449.00 10.5.1 26.00 11449.00
79 10.5.2 VESTIDURA DE ARISTAS EN VIGAS RECTAS ml 879.95 16.5 53.3 3 18.00 Normal 5.2618 18.0 4,630 21 3.00 8.41888 14.00 7,408.19 4.00 2,778.07 695 10.5.2 18.00 4630.12 10.5.2 18.00 4630.12 10.5.2 18.00 4630.12
80 10.6 VESTIDURA DE ELEMENTOS DE FACHADA 10.6 0.00 0.00 10.6 0.00 0.00 10.6 0.00 0.00
81 10.6.1 COLOCACIÓN DE VESTIDURA DE ELEMENTOS DE FACHADA (Mezcla C:A 1:5, E=2cm) m2 103.29 6 17.2 3 6.00 Crítica 19.28 6.0 1,991 8 3.00 30.848 5.00 3,186.29 1.00 1,194.86 1,195 10.6.1 5.00 3186.29 10.6.1 5.00 3186.29 10.6.1 5.00 3186.29
82 10.6.2 COLOCACIÓN DE VESTIDURA DE ELEMENTOS DE FACHADA: VESTIDURA DE ARISTAS ml 306.31 17 18.0 3 7.00 Crítica 5.1 7.0 1,562 21 3.00 8.16 5.00 2,499.49 2.00 937.31 469 10.6.2 6.00 2030.84 10.6.2 5.00 2499.49 10.6.2 5.00 2499.49
83 10.6.3 COLOCACIÓN DE VESTIDURA DE DERRAMES (Mezcla C:A 1:5, E=2cm, A=12cm) ml 187.05 18 10.4 3 4.00 Crítica 5.19 4.0 971 23 3.00 8.304 3.00 1,553.26 1.00 582.47 582 10.6.3 3.00 1553.26 10.6.3 3.00 1553.26 10.6.3 3.00 1553.26
84 10.6.4 COLOCACIÓN DE BRUÑAS E=1cm ml 2378.09 25 95.1 4 24.00 Normal 3.1553 24.0 7,504 31 4.00 5.04848 19.00 12,005.74 5.00 4,502.15 900 10.6.4 24.00 7503.59 10.6.4 24.00 7503.59 10.6.4 24.00 7503.59
85 11 CIELORRASOS 11 0.00 0.00 11 0.00 0.00 11 0.00 0.00
86 11.1 INTALACIÓN DE CIELO RASO HORIZONTAL (Mezcla C:A 1:4, E=2.5cm) m2 778 8 97.3 4 25.00 Normal 23.64 25.0 18,392 10 4.00 37.824 19.00 29,427.07 6.00 11,035.15 1,839 11.1 25.00 18391.92 11.1 25.00 18391.92 11.1 25.00 18391.92
87 11.2 INTALACIÓN DE CIELO RASO SUSPENDIDO 0.61x0.61x4 mm m2 158 12 13.2 2 7.00 Normal 34.89 7.0 5,513 15 2.00 55.824 5.00 8,820.19 2.00 3,307.57 1,654 11.2 7.00 5512.62 11.2 7.00 5512.62 11.2 7.00 5512.62
88 11.3 TARRAJEO DE SUPERFICIES EN FONDO DE ESCALERAS (Mezcla C:A 1:5, E=1.5cm) m2 24.71 10 2.5 1 3.00 Normal 14.2 3.0 351 13 1.00 22.72 2.00 561.41 1.00 210.53 211 11.3 3.00 350.88 11.3 3.00 350.88 11.3 3.00 350.88
89 11.4 INTALACIÓN DE VESTIDURA DE ARISTAS EN FONDO DE ESCALERAS ml 29.08 15 1.9 2 1.00 Normal 5.7881 1.0 168 19 2.00 9.26096 1.00 269.31 0.00 100.99 - 11.4 1.00 168.32 11.4 1.00 168.32 11.4 1.00 168.32
90 12 PISOS Y PAVIMENTOS 12 0.00 0.00 12 0.00 0.00 12 0.00 0.00
91 12.1 COLOCACIÓN CONTRAPISO DE 40mm (Mezcla C:A, Base 1:5, Acabado 1:2) m2 508.47 85 6.0 2 3.00 Normal 17.8052 3.0 9,053 106 2.00 28.4883 2.00 14,485.46 1.00 5,432.05 5,432 12.1 3.00 9053.41 12.1 3.00 9053.41 12.1 3.00 9053.41
92 12.2 COLOCACIÓN CONTRAPISO DE 48mm (Mezcla C:A, Base 1:5, Acabado 1:2) m2 449.53 80 5.6 2 3.00 Normal 19.9876 3.0 8,985 100 2.00 31.9802 2.00 14,376.04 1.00 5,391.02 5,391 12.2 3.00 8985.03 12.2 3.00 8985.03 12.2 3.00 8985.03
93 12.3 COLOCACIÓN PISO DE CERAMICO ANTIDESLIZANTE 40 x 40 cm. m2 460.39 12 38.4 3 13.00 Normal 41.2555 13.0 18,994 15 3.00 66.0088 10.00 30,389.79 3.00 11,396.17 3,799 12.3 13.00 18993.62 12.3 13.00 18993.62 12.3 13.00 18993.62
94 12.4 COLOCACIÓN PISO DE CERAMICO 30 x 30 cm. m2 52.3 11 4.8 3 2.00 Normal 36.9583 2.0 1,933 14 3.00 59.1333 1.00 3,092.67 1.00 1,159.75 1,160 12.4 2.00 1932.92 12.4 2.00 1932.92 12.4 2.00 1932.92
95 12.5 COLOCACIÓN PISO DE VINILICO E=2.5mm m2 449.53 14 32.1 3 11.00 Normal 39.9752 11.0 17,970 18 3.00 63.9603 9.00 28,752.08 2.00 10,782.03 5,391 12.5 11.00 17970.05 12.5 11.00 17970.05 12.5 11.00 17970.05
96 12.6 COLOCACIÓN PISO DE CEMENTO: ACABADO BRUÑADO E=1" m2 46.5 90 0.5 1 1.00 Normal 12.3 1.0 572 113 1.00 19.68 0.00 915.12 1.00 343.17 343 12.6 1.00 571.95 12.6 1.00 571.95 12.6 1.00 571.95
97 13 VEREDAS 13 0.00 0.00 13 0.00 0.00 13 0.00 0.00
98 13.1 VEREDAS: REVESTIMIENTO CON MEZCLA C:A 1:5 E=2CM m2 79.6 7 11.4 2 6.00 Normal 17.8198 6.0 1,418 9 2.00 28.5117 5.00 2,269.53 1.00 851.07 851 13.1 6.00 1418.46 13.1 6.00 1418.46 13.1 6.00 1418.46
99 14 CONTRAZOCALOS 14 0.00 0.00 14 0.00 0.00 14 0.00 0.00
100 14.1 COLOCACIÓN CONTRAZOCALO DE MADERA CEDRO 3/4"x4" (Incluye Rodón) ml 215.28 28 7.7 3 3.00 Normal 19.9313 3.0 4,291 35 3.00 31.8901 2.00 6,865.30 1.00 2,574.49 2,574 14.1 3.00 4290.81 14.1 3.00 4290.81 14.1 3.00 4290.81
101 14.2 COLOCACIÓN CONTRAZOCALO CEMENTO S/COLOREAR H = 15 CM PULIDO ml 19.22 22 0.9 1 1.00 Normal 4.5244 1.0 87 28 1.00 7.23904 1.00 139.13 0.00 52.18 - 14.2 1.00 86.96 14.2 1.00 86.96 14.2 1.00 86.96
102 14.3 COLOCACIÓN CONTRAZOCALO DE CERAMICO 30 x 30 cm. m2 93.05 11 8.5 3 3.00 Normal 41.3083 3.0 3,844 14 3.00 66.0933 2.00 6,149.98 1.00 2,306.24 2,306 14.3 3.00 3843.74 14.3 3.00 3843.74 14.3 3.00 3843.74
103 15 ZOCALOS 15 0.00 0.00 15 0.00 0.00 15 0.00 0.00
104 15.1 COLOCACIÓN DE ZOCALO DE CERAMICO LINEA PLAIN VERDE 30x30 CM. m2 5.37 7 0.8 1 1.00 Normal 45.9076 1.0 247 9 1.00 73.4522 1.00 394.44 0.00 147.91 - 15.1 1.00 246.52 15.1 1.00 246.52 15.1 1.00 246.52
105 15.2 COLOCACIÓN DE ZOCALO DE CERAMICO LINEA PLAIN NARANJA 30x30 CM. m2 6.31 7 0.9 1 1.00 Normal 45.9076 1.0 290 9 1.00 73.4522 1.00 463.48 0.00 173.81 - 15.2 1.00 289.68 15.2 1.00 289.68 15.2 1.00 289.68
106 15.3 COLOCACIÓN DE ZOCALO DE CERAMICO LINEA PLAIN BLANCO 30x30 CM. m2 105.1 7 15.0 3 6.00 Normal 45.9076 6.0 4,825 9 3.00 73.4522 4.00 7,719.82 2.00 2,894.93 1,447 15.3 6.00 4824.89 15.3 6.00 4824.89 15.3 6.00 4824.89
107 15.4 COLOCACIÓN DE TERMINAL PLÁSTICO PARA CERAMICOS m2 89.57 15 6.0 2 3.00 Normal 4.0973 3.0 367 19 2.00 6.55568 2.00 587.19 1.00 220.20 220 15.4 3.00 367.00 15.4 3.00 367.00 15.4 3.00 367.00
108 16 REVESTIMIENTO DE GRADAS Y ESCALERAS 16 0.00 0.00 16 0.00 0.00 16 0.00 0.00
109 16.1 REVESTIMIENTO DE GRADAS Y PELDAÑOS CON CERAMICO LINEA RUSTICA m2 24.92 6 4.2 2 3.00 Normal 47.8857 3.0 1,193 8 2.00 76.6171 2.00 1,909.30 1.00 715.99 716 16.1 3.00 1193.31 16.1 3.00 1193.31 16.1 3.00 1193.31
110 16.2 REVESTIMIENTO DE DESCANSOS CON CERAMICO LINEA RUSTICA m2 9.24 10 0.9 1 1.00 Normal 42.0976 1.0 389 13 1.00 67.3562 1.00 622.37 0.00 233.39 - 16.2 1.00 388.98 16.2 1.00 388.98 16.2 1.00 388.98
111 16.3 COLOCACIÓN DE CANTONERA DE ALUMINIO 2"X11/2" CON ANCLAJE ml 78.87 30 2.6 1.5 2.00 Normal 8.914 2.0 703 38 1.50 14.2624 1.00 1,124.88 1.00 421.83 422 16.3 2.00 703.05 16.3 2.00 703.05 16.3 2.00 703.05
112 17 CARPINTERIA DE MADERA 17 0.00 0.00 17 0.00 0.00 17 0.00 0.00
113 17.1 INSTALACIÓN DE PUERTAS CONTRAPLACADAS m2 23.28 2 11.6 3 4.00 Normal 134.8032 4.0 3,138 3 3.00 215.685 3.00 5,021.15 1.00 1,882.93 1,883 17.1 4.00 3138.22 17.1 4.00 3138.22 17.1 4.00 3138.22
114 17.2 INSTALACIÓN DE PUERTAS DE TABLERO REBAJADO m2 11.04 1.5 7.4 2.5 3.00 Normal 346.9722 3.0 3,831 2 2.50 555.156 2.00 6,128.92 1.00 2,298.34 2,298 17.2 3.00 3830.57 17.2 3.00 3830.57 17.2 3.00 3830.57
115 18 CARPINTERIA METALICA Y HERRERIA 18 0.00 0.00 18 0.00 0.00 18 0.00 0.00
116 18.1 INSTALACIÓN DE TUBO ELECTROSOLDADO 2"x1" ml 421.08 30 14.0 3 5.00 Normal 19.4707 5.0 8,199 38 3.00 31.1531 4.00 13,117.96 1.00 4,919.23 4,919 18.1 5.00 8198.72 18.1 5.00 8198.72 18.1 5.00 8198.72
117 18.2 INSTALACIÓN DE TUBO ELECTROSOLDADO 4"x2" ml 25.5 28 0.9 1 1.00 Normal 21.86 1.0 557 35 1.00 34.976 1.00 891.89 0.00 334.46 - 18.2 1.00 557.43 18.2 1.00 557.43 18.2 1.00 557.43
118 18.3 INSTALACIÓN DE MARCO METALICO P/PUERTAS DE TUBO ELECTROSOLDADO 2"x1" ml 419.98 15 28.0 3 10.00 Normal 20.4 10.0 8,568 19 3.00 32.64 7.00 13,708.15 3.00 5,140.56 1,714 18.3 10.00 8567.59 18.3 10.00 8567.59 18.3 10.00 8567.59
119 18.4 INSTALACIÓN DE PORTAÑUELAS METALICAS m2 6 10 0.6 1 1.00 Normal 20.67 1.0 124 13 1.00 33.072 0.00 198.43 1.00 74.41 74 18.4 1.00 124.02 18.4 1.00 124.02 18.4 1.00 124.02
120 18.5 INSTALACIÓN DE PUERTA DE MELAMINE CON MARCO DE ALUMINIO m2 15.21 7 2.2 2 2.00 Normal 61.589 2.0 937 9 2.00 98.5424 1.00 1,498.83 1.00 562.06 562 18.5 2.00 936.77 18.5 2.00 936.77 18.5 2.00 936.77
121 18.6 INSTALACIÓN DE DIVISION MELAMINE Y ALUMINIO PARA SERVICIOS HIGIENICOS m2 21.77 7 3.1 2 2.00 Normal 56.58 2.0 1,232 9 2.00 90.528 1.00 1,970.79 1.00 739.05 739 18.6 2.00 1231.75 18.6 2.00 1231.75 18.6 2.00 1231.75
122 18.7 INSTALACIÓN DE BARANDA METALICA DE F°G°, D=2 1/2" ml 202.8 15 13.5 3 5.00 Normal 31.67 5.0 6,423 19 3.00 50.672 4.00 10,276.28 1.00 3,853.61 3,854 18.7 5.00 6422.68 18.7 5.00 6422.68 18.7 5.00 6422.68
123 19 CERRAJERIA 19 0.00 0.00 19 0.00 0.00 19 0.00 0.00
124 19.1 INSTALACIÓN DE BISAGRAS CAPUCHINAS ALUMINIZADAS 4" Und 77 40 1.9 2 1.00 Normal 8 1.0 616 50 2.00 12.8 1.00 985.60 0.00 369.60 - 19.1 1.00 616.00 19.1 1.00 616.00 19.1 1.00 616.00
125 19.2 INSTALACIÓN DE BISAGRAS TIPO VAIVEN Und 20 40 0.5 1 1.00 Normal 12 1.0 240 50 1.00 19.2 0.00 384.00 1.00 144.00 144 19.2 1.00 240.00 19.2 1.00 240.00 19.2 1.00 240.00
126 19.3 INSTALACIÓN DE CERRADURA PARA PUERTAS PRINCIPALES 3 GPS Pza 1 8 0.1 1 1.00 Normal 83.8531 1.0 84 10 1.00 134.165 0.00 134.16 1.00 50.31 50 19.3 1.00 83.85 19.3 1.00 83.85 19.3 1.00 83.85
127 19.4 INSTALACIÓN DE CERRADURA PARA PUERTAS INTERIORES 2 GPS Pza 19 10 1.9 2 1.00 Normal 63.7531 1.0 1,211 13 2.00 102.005 1.00 1,938.09 0.00 726.79 - 19.4 1.00 1211.31 19.4 1.00 1211.31 19.4 1.00 1211.31
128 19.5 INSTALACIÓN DE CERRADURA DE BOLA SS.HH. Pza 1 8 0.1 1 1.00 Normal 44.7531 1.0 45 10 1.00 71.605 0.00 71.60 1.00 26.85 27 19.5 1.00 44.75 19.5 1.00 44.75 19.5 1.00 44.75
129 19.6 INSTALACIÓN DE PICAPORTE DE ALUMINIO 6" Pza 1 2 0.5 1 1.00 Normal 21.473 1.0 21 3 1.00 34.3568 0.00 34.36 1.00 12.88 13 19.6 1.00 21.47 19.6 1.00 21.47 19.6 1.00 21.47
130 20 VIDRIOS, CRISTALES Y SIMILARES 20 0.00 0.00 20 0.00 0.00 20 0.00 0.00
131 20.1 INSTALACIÓN DE VIDRIO TRANSPARENTE DOBLE, E=4mm p2 134.18 60 2.2 2 2.00 Normal 3.7268 2.0 500 75 2.00 5.96288 1.00 800.10 1.00 300.04 300 20.1 2.00 500.06 20.1 2.00 500.06 20.1 2.00 500.06
132 20.2 INSTALACIÓN DE VIDRIO TRANSPARENTE DOBLE, E=6mm p2 577.54 60 9.6 3 4.00 Normal 4.7768 4.0 2,759 75 3.00 7.64288 3.00 4,414.07 1.00 1,655.28 1,655 20.2 4.00 2758.79 20.2 4.00 2758.79 20.2 4.00 2758.79
133 20.3 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS TRANSPARENTE E=6mm p2 119.25 60 2.0 1 2.00 Normal 7.314 2.0 872 75 1.00 11.7024 2.00 1,395.51 0.00 523.32 - 20.3 2.00 872.19 20.3 2.00 872.19 20.3 2.00 872.19
134 20.4 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS TRANSPARENTE PARA PUERTAS E=8mm p2 113.34 60 1.9 1 2.00 Normal 11.114 2.0 1,260 75 1.00 17.7824 2.00 2,015.46 0.00 755.80 - 20.4 2.00 1259.66 20.4 2.00 1259.66 20.4 2.00 1259.66
135 20.5 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO E=4mm p2 40.3 60 0.7 1 1.00 Normal 3.014 1.0 121 75 1.00 4.8224 1.00 194.34 0.00 72.88 - 20.5 1.00 121.46 20.5 1.00 121.46 20.5 1.00 121.46
136 20.6 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO E=6mm p2 880.22 60 14.7 3 5.00 Normal 7.614 5.0 6,702 75 3.00 12.1824 4.00 10,723.19 1.00 4,021.20 4,021 20.6 5.00 6702.00 20.6 5.00 6702.00 20.6 5.00 6702.00
137 20.7 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO E=8mm p2 545.48 60 9.1 2 5.00 Normal 13.114 5.0 7,153 75 2.00 20.9824 4.00 11,445.48 1.00 4,292.05 4,292 20.7 5.00 7153.42 20.7 5.00 7153.42 20.7 5.00 7153.42
138 20.8 INSTALACIÓN DE VIDRIO SISTEMA MODUGLASS GRIS OSCURO PARA PUERTAS E=8mm p2 119.47 60 2.0 1 2.00 Normal 13.614 2.0 1,626 75 1.00 21.7824 2.00 2,602.34 0.00 975.88 - 20.8 2.00 1626.46 20.8 2.00 1626.46 20.8 2.00 1626.46
139 20.9 INSTALACIÓN DE SISTEMA ESTRUCTURAL MURO CORTINA E=6mm p2 1703.9 60 28.4 2 15.00 Crítica 13 15.0 22,151 75 2.00 20.8 11.00 35,441.12 4.00 13,290.42 3,323 20.9 14.00 25473.31 20.9 13.00 28795.91 20.9 13.00 28795.91
140 20.1 INSTALACIÓN DE VIDRIO CATEDRAL p2 774.24 60 12.9 3 5.00 Normal 4.4143 5.0 3,418 75 3.00 7.06288 3.00 5,468.36 2.00 2,050.64 1,025 20.1 5.00 3417.73 20.1 5.00 3417.73 20.1 5.00 3417.73
141 20.11 COLOCACION DE ESPEJOS EN SS.HH. p2 65.42 50 1.3 2 1.00 Crítica 4.9337 1.0 323 63 2.00 7.89392 1.00 516.42 0.00 193.66 - 20.11 1.00 322.76 20.11 1.00 322.76 20.11 1.00 322.76
142 21 PINTURA 21 0.00 0.00 21 0.00 0.00 21 0.00 0.00
143 21.1 APLICACIÓN DE PINTURA LATEX EN CIELO RASO HORIZONTAL (Incluye Vigas y Fondo de Escaleras) m2 998.26 45 22.2 2 12.00 Crítica 8.23 12.0 8,216 56 2.00 13.168 9.00 13,145.09 3.00 4,929.41 1,643 21.1 11.00 9858.82 21.1 10.00 11501.95 21.1 10.00 11501.95
144 21.2 APLICACIÓN DE PINTURA EN MUROS INTERIORES (Incluye Columnas y Derrames) m2 1331.02 30 44.4 3 15.00 Crítica 7.5915 15.0 10,104 38 3.00 12.1464 12.00 16,167.10 3.00 6,062.66 2,021 21.2 14.00 12125.33 21.2 13.00 14146.21 21.2 13.00 14146.21
145 21.3 APLICACIÓN DE PINTURA EN MUROS EXTERIORES (Incluye Columnas y Derrames) m2 1050.24 30 35.0 2 18.00 Crítica 10.23 18.0 10,744 38 2.00 16.368 14.00 17,190.33 4.00 6,446.37 1,612 21.3 17.00 12355.55 21.3 16.00 13967.14 21.3 16.00 13967.14
146 21.4 APLICACIÓN DE PINTURA BARNIZ EN CONTRAZOCALOS DE MADERA m2 169.78 60 2.8 1 3.00 Normal 2.5388 3.0 431 75 1.00 4.06208 2.00 689.66 1.00 258.62 259 21.4 3.00 431.04 21.4 3.00 431.04 21.4 3.00 431.04
147 21.5 APLICACIÓN DE PINTURA BARNIZ EN PUERTAS DE MADERA m2 58.64 20 2.9 1 3.00 Normal 9.1012 3.0 534 25 1.00 14.5619 2.00 853.91 1.00 320.22 320 21.5 3.00 533.69 21.5 3.00 533.69 21.5 3.00 533.69
148 21.6 APLICACIÓN DE PINTURA ANTICORROSIVA EN PUERTAS Y ELEMENTOS DE T. ELECTROSOLDADO (Interior) m2 122.92 35 3.5 2 2.00 Normal 9.8132 2.0 1,206 44 2.00 15.7011 1.00 1,929.98 1.00 723.74 724 21.6 2.00 1206.24 21.6 2.00 1206.24 21.6 2.00 1206.24
149 21.7 APLICACIÓN DE PINTURA ANTICORROSIVA EN BARANDAS, PASAMANOS Y MARCOS m2 419.98 100 4.2 2 3.00 Normal 2.9931 3.0 1,257 125 2.00 4.78896 2.00 2,011.27 1.00 754.23 754 21.7 3.00 1257.04 21.7 3.00 1257.04 21.7 3.00 1257.04
150 22 VARIOS, LIMPIEZA Y JARDINERIA 22 0.00 0.00 22 0.00 0.00 22 0.00 0.00
151 22.1 TRANSPORTE INTERNO DE MATERIALES glb 1 0.2 5.0 2 3.00 Normal 1291.5921 3.0 1,292 0 2.00 2066.55 2.00 2,066.55 1.00 774.96 775 22.1 3.00 1291.59 22.1 3.00 1291.59 22.1 3.00 1291.59
152 22.2 LIMPIEZA PERMAMENTE DE OBRA glb 1 0.7 1.4 2 1.00 Normal 143.282 1.0 143 1 2.00 229.251 1.00 229.25 0.00 85.97 - 22.2 1.00 143.28 22.2 1.00 143.28 22.2 1.00 143.28
153 22.3 LIMPIEZA FINAL DE OBRA m2 1661.13 250 6.6 2 4.00 Crítica 0.5015 4.0 833 313 2.00 0.8024 3.00 1,332.89 1.00 499.83 500 22.3 3.00 1332.89 22.3 3.00 1332.89 22.3 3.00 1332.89
23 FIN 23 0.00 0.00 23 0.00 0.00 23 0.00 0.00
285.0 942,776 217.0 1,508,442 Al 100% 68.0 265.0 993,960 253.0 1,022,401 251.0 1,035,990
Duracion 285.0 dias Duracion 217.0 dias Al 50% 34 29.4% 47.1% 50.0%