Вы находитесь на странице: 1из 1

Following points may required to include in every shift.

1. Status of PCB should be mentioned in the Log book


2. Status of Both the encoders should be mentioned in the log book
3. Status of NTP1 & 2 Should be included in the log book
4. Parameters of both the Motors should be mentioned in the log book
5. Antenna rotation sound status should be observed in 7th floor and to be mentioned in the
log book
6. Status of obstruction lights should be mentioned in the log book
7. It is the responsibility of the Shift takeover person to verify the availability of walkie talkie
set.

Вам также может понравиться