SAUDI ARAMCO ID/PID - 18-May-05 -REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Communication Facilities and Data Centers HVAC
SAIC-K-4045 30-Apr-13 HVAC
Requirements
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

HVAC units re-circulating or recycling indoor air within a room (such


as through the wall window units, fan coil units or mini-split direct
expansion units) shall not be used within the following facilities
SAES-K-001
A1 unless prior written approval has been obtained from the HVAC
Para 4.3.1.10
Standards Committee: (1) Communication rooms, e.g., TER; TR or
Computer Rooms (2) Battery / UPS rooms (3) Rooms that house
equipment or devices emitting fumes or gases.

Air-Conditioning Unit: Direct Expansion Split type, Precision Cooling,


for Communication and Data Processing Rooms shall be in SAES-K-101
A2
accordance with ASHRAE-127**, UL-1995, ,ASHRAE 90.1*** and Table 1
9COM # 6000013333.

For Communication Facilities direct expansion (DX) type HVAC


systems shall be used.
Note: SAES-K-003
A3
Chilled water system may be used only with the prior approval of Para. 6.5.1
Communications Engineering & Technical Support Department /
Facilities Engineering Group.

For Communication Facilities and Data Centers, Computer Room


Precision Type air conditioning units shall be used.
Note: SAES-K-003
A4
Other type of air conditioning units may be used only with the prior Para. 6.5.2
approval of Communications Engineering & Technical Support
Department / Facilities Engineering Group.

All HVAC systems for Communication Facilities; Data Centers and


Computer Rooms shall be provided with a standby unit with a
capacity as follows:
a) If the system is served by two or more normally operating air
SAES-K-003
A5 handling units, the capacity of the standby unit(s) shall be at least
Para. 6.6
50% of the system's maximum design capacity.
b) If the system is served by one normally operating air handling unit
only, the capacity of the standby unit shall be equal to the capacity of
the normally operating unit

Location of fresh air intake shall be at a minimum of 2.4 meters SAES-K-003


A6
above grade. Para. 6.7.1

Page 1 of 3
SAUDI ARAMCO ID/PID - 18-May-05 -REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Communication Facilities and Data Centers HVAC
SAIC-K-4045 30-Apr-13 HVAC
Requirements
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

All fresh air intakes shall have the following:


· Sand trap louver
· Filter SAES-K-003
A7
· Bird screen Para. 6.7.2
· Differential pressure gauge
· Volume damper

Communications Facility or Data Center shall be equipped with a SAES-K-003


A8
digital Indoor air temperature and humidity recorder. Para. 6.9.1

The recorder as specified in item A8 shall have the capability of


continuously recording for a minimum duration of six months and SAES-K-003
A9
shall have the capability of being accessed remotely through Saudi Para. 6.9.2
Aramco IT network.

The temperature and humidity measurements shall be performed at


SAES-K-003
A10 1.5 m (±0.3 m) above the floor and 0.1 m (±0.3 m) away from the
Para. 6.9.3
equipment.

HVAC control systems shall be capable to automatic change over SAES-K-003


A11 between the operating and standby units weekly, and/or in the event Para 6.10
of operating unit failure. item 1

HVAC control systems shall be equipped with remote alarms to SAES-K-003


A12 NOCC (Network Operations Control Center) in case of any HVAC Para 6.10
equipment failure and/or any other alarms in the HVAC equipment. item 2

HVAC control systems shall be capable to be connected to Building SAES-K-003


A13 Management System (BMS). The Control shall be BACNET Para 6.10
compatible. item 3

HVAC units shall automatically shut down when fire alarm system is
SAES-K-001
A9 activated, in accordance with SAES-M-100, NFPA 90A and NFPA
Para 4.4.4.3
101.

All exhausts shall be directly to the outside with a point of discharge


of at least 1.5 m away from any openable window or door, and a
minimum of 1m above and 3 m away from any air intake.Toilet rooms’
exhausts require the following:
SAES-K-001
a) A mechanically operated exhaust system capable of
A10 Para 4.4.10.6 .
providing a minimum of four (4) air changes per hour.
4.4.11.3
b) Exhaust shall be directly to the outside with a point of
discharge of at least 1.5 m away from any openable
window or door, and a minimum of 1m above and 3 m
away from any fresh air intake.

HVAC systems of Battery Rooms for Communication Facilities shall


be designed in accordance with the requirements of SAES-K-002.
SAES-K-003
A11 HVAC systems of Battery Rooms for Communication Facilities and
Para 5.4 6.4.1
Data Centers shall be designed in accordance with the requirements
of SAES-K-002 and SAES-P-103.

All air intakes shall have sand-trap-louver, bird screen and manual
volume damper. All fresh air intakes shall have the following: Sand SAES-K-003
A12
trap louver,Filter, Bird screen, Differential pressure gauge, Volume Para 5.7 6.7.2
damper

REMARKS:

Page 2 of 3
REFERENCE DOCUMENTS:
1-SAES-K-001 -- Heating, Ventilating and Air Conditioning (HVAC) 05 July, 2009 Design and Installation of Heating,
Ventilating and Air Conditioning Systems 05 December 2012
2-SAES-K-003 -- Air Conditioning Systems for Communications Buildings 31 May, 2004 Facilities & Data Centers 19 December 2010

3-SAES-K-101 -- Regulated Vendors List for Heating, Ventilating and Air Conditioning (HVAC) Equipment 30 June 2009 27 February 2013

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 3 of 3