MD16
CO13
CM01
CM21
COOIS
Discrete Manufacturing
Material Master creation
BOM Create
WC Create
Routing Create
PIR Generate
MRP Run Single Item - Multi level
Evaluation through MRP List - Individual Display
Stock Requirement List
Conversion of Planned order to Production order
Create production order without planned order
Order Management
Confirmation for order
Confirmation for time ticket
Goods issue
Goods Receipt
Techo or close order
Create Prod order from Planned order Convert planned order into prodution / process order
Cancel Production order
To check load on work center Capacity planning
Capacity levelling using planning table
Production order infor
rocess order
CS01 BOM Create Master
CR01 WC Create Master
CA01 Routing Create Master
C223 Create Production version Master
MRP1 MRP2 MRP3 MRP4
General Data Procurement Forecast Req BOM explosion/dependent req
MRP Procedure Schedulling Planning Discontinued parts
Lot size Net Req Calculation Available Check Repetitive Mfg
MRP areas Configurable mat
Work schedulling
General Data Find Intra-material
Tolerance data Trigger points in routing
In-house prod time
In SAP PP we can perform availability check at various places
1 At the time of Production order creation
2 At the time of Production order release
3 We can activate dynamic availability check at the time of goods issue (optional)