SAUDI ARAMCO ID/PID - 18-May-05 -REV 0 (Standards Cutoff -March 2013) Rev 7 30-Apr-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Air Filtration Devices Installation SAIC-K-4029 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General

Filter type and efficiency, shall be as specified in Construction Schedule "Q"


A1
Specifications Att. IV Para 3.3

Filters shall be placed at the location indicated on the Construction


drawings. Each equipment unit shall be installed at the location
indicated on the
SAES-K-001
A2 drawings and in accordance with details of mounting, with vibration
Para 5.1.7
isolation as required by the Design Specifications and in accordance
to
equipment Manufacturer’s recommendations.

HVAC systems of Communication Facilities shall have fresh air


make-up filters (where fresh air make-up is used) and internal air
SAES-K-003
A3 recirculation filters. HVAC Systems of Communication Facilities and
Para 5.3 6.3
Data Centers shall have fresh air make-up filters (where fresh air
make-up is used) and internal air recirculation filters.

Viscous oil filters shall not be used for Communication Facilities. SAES-K-003
A4
Viscous oil filters shall not be used. Para 5.3 6.3.3

Differential pressure gauges shall be provided across the filter


SAES-K-002
A5 assemblies for essential operating facilities. Differential pressure
Para 7.1.2
gauges shall be provided across the filter assemblies.

SAES-K-001
A6 Casing filter mounts or filters shall have seals to prevent air by pass. Para 4.8.8.6
4.8.8.8
GI 2.710
A7 Filters used during construction shall be cleaned or replaced
Para 5.13 e
B Air pre-filters and final-filters (Dust Filters)

Built-up central HVAC systems shall be provided with pre-filters and SAES-K-001
B1
final filters. Para 4.8.15.1

Filters of packaged air handling units and filters of any residential SAES-K-001
B2 HVAC system shall be replaceable media or washable material with a Para 4.8.15.2
minimum 70 % weight arrestance rating as per ASHRAE STD 52. 4.8.15.3

SAES-K-001
B3 Pre-filters and final-filters shall be upstream of coils and fans.
Para 4.8.15.5

Access door shall be provided to every filter.Access doors shall be


provided to every valve, coil, filter, damper or mechanical device for
SAES-K-001
B4 inspection and/or adjustment and be with inreachable distance.
Para 5.1.3
Access doors for fire dampers shall be positioned so that dampers
can be reset and fusible links replaced, if necessary.

Page 1 of 3
In Group I, Divisions 1.1 and 1.2 Occupancies, Ventilation air system
supply system serving sensitive areas shall be equipped with
SAES-K-100
B5 additional filters having minimum efficiencies of 90 percent
Section 1
downstream of cooling, coils, humidification equipment and the
associated supply fan (UMC Para 402.3)

The HVAC systems of all buildings containing electronic equipment


shall be equipped with pre-filters and final filters. The pre-filters shall
SAES-K-002
B6 have a minimum of 25% dust spot efficiency and the final filters shall
Para 7.1.1
provide a minimum of 85% dust spot efficiency, as defined by
ASHRAE STD 52.

C Chemical filters

Chemical filters shall be provided inside the rooms where


concentration of corrosive gases exceeds G1 classification level as
defined in ISA S71.04. In all buildings, containing electronic
equipment, the concentration of corrosive gases shall be
SAES-K-002
C1 limited to the G1 environmental classification level as defined Para 7.2 7.2.1
in ISA S71.04, as required by SAES-J-801.
Note: Whether the concentration of corrosive gases exceed G1 level
or not shall be determined by SAPMT through proponent and/or
Process Engineering Division

When it is confirmed by the Proponent and/or Process Engineering


Division that the concentration of corrosive gases in the local plant
SAES-K-002
C2 environment will exceed the G1 classification level, chemical filters
Para 7.2.2
shall be provided to limit the concentration of gases inside rooms
containing electronic equipment, to G1 classification level.

Page 2 of 3
SAUDI ARAMCO ID/PID - 18-May-05 -REV 0 (Standards Cutoff -March 2013) Rev 7 30-Apr-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Air Filtration Devices Installation SAIC-K-4029 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-K-001 - Heating, Ventilating and Air Conditioning (HVAC) 05 JULY, 2009 Design and Installation of Heating,
Ventilating and Air Conditioning Systems 05 December 2012
2- SAES-K-100 - Saudi Aramco Mechanical (HVAC) Code 31 May, 2004 20 October 2012
3- SAES-K-002 - Air Conditioning Systems for Essential Operating Facilities 31 May, 2004 15 August 20012

4- SAES-K-003 - Air Conditioning System for Communications Building 31 May, 2004 Facilities & Data Centers 19 December 2010
5- GI 2.710 - MECHANICAL COMPLETION AND PERFORMANCE ACCEPTANCE OF FACILITIES 03/15/2010
6- Uniform Mechancal Code (UMC), 1997 2009
7- Schedule "Q" -- Saudi Aramco Quality Requirements - 02/2008

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 3 of 3