AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016

POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Kibungan Hydropower Compliant with the Work Program and Posting of performance bond.
LUZON CAR Benguet Kibungan 1,000.00
Corporation Non-compliant with the RESHERR.

Bakun & Mankayan 1 Hydroelectric Compliant with the Work Program. Non-compliant with the Posting of
HEDCOR, Inc. 12.70
Mankayan Power Project performance bond and RESHERR.

Bokod & Kabayan 3 Hydroelectric Compliant with the Posting of performance bond. Non-compliant with
Hedcor Benguet, Inc. 14.30
Kabayan Power Project the Work Program and RESHERR.

Man-asok Hydroelectric Power Compliant with the Work Plan and RESHERR. Non-compliant with the
Buguias Benguet Electric Cooperative, Inc. 3.00
Project Posting of performance bond.

Buguias & Compliant with the Work Program. Non-compliant with the Posting of
Kabayan 1 Hedcor Benguet, Inc. 20.00
Kabayan performance bond and RESHERR.

San Roque Upper East Pump Strategic Power Development Compliant with the Work Program, Posting of performance bond and
Itogon 600.00
Storage Corp. RESHERR.

Strategic Power Development Compliant with the Work Program, Posting of performance bond and
San Roque West Pump Storage 400.00
Corp. RESHERR.

Eddet Adaoay 2 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Kabayan United Hydro Power Builders 1.80
Power Project and RESHERR.

Eddet Adaoay 1 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
United Hydro Power Builders 1.00
Power Project and RESHERR.

Natalang B Hydroelectric Compliant with the Work Plan. Non-compliant with the Posting of
Kabayan Aboitiz Power Corporation 38.00
Power Project performance bond and RESHERR.

Kapangan & Kapangan Hydroelectric Power Cordillera Hydro Electric Power Compliant with the Work Plan and Posting of performance bond. Non-
60.00
Kibungan Project Corporation compliant with the RESHERR.

Compliant with the Work Program and Posting of performance bond.


La Trinidad Bineng 1-2B Combination HEDCOR, Inc. 16.50
Non-compliant with the RESHERR.

Sabangan Hydroelectric Power


Sabangan Hedcor Sabangan, Inc. Compliant with the Work Plan. Non-compliant with the RESHERR. 14.00
Project

Abdao Hydroelectric Power Compliant with the Work Plan and RESHERR. Non-compliant with the
Tabaan Sur, Tuba AV Garcia Power Systems Corp. 2.00
Project Posting of performance bond.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Kanggas Hydroelectric Power Goldlink Global Energy Compliant with the Work Program and RESHERR. Non-compliant with
Benguet Tuba 3.00
Project Corporation the Posting of performance bond.

Tadiangan Hydroelectric Goldlink Global Energy Compliant with the Work Program and RESHERR. Non-compliant with
4.70
Power Project Corporation the Posting of performance bond.

Irisan 1 Hydroelectric Power


Tuba HEDCOR, Inc. Compliant with the Work Plan. Non-compliant with the RESHERR. 3.80
Plant

Tublay 1 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Tublay AT Dinum Company 0.90
Project Non-compliant with the RESHERR.

Compliant with the Work Program. Non-compliant with the Posting of


Tublay 2 AT Dinum Company 6.00
performance bond and RESHERR.

Maris Main Canals 2 Compliant with the Work Program. Non-compliant with the Posting of
Ifugao Alfonso Lista SN Aboitiz Power - Greenfield, Inc. 1.75
Hydroelectric Power Project performance bond and RESHERR.

Asipulo & Likud Hydroelectric Power


Provincial Government of Ifugao Compliant with the Work Plan. Non-compliant with the RESHERR. 0.82
Kiangan Project

Asin Hydroelectric Power Compliant with the Work Program and RESHERR. Non-compliant with
Kiangan Kiangan Mini Hydro Corporation 4.00
Project the Posting of performance bond.

Ibulao 1 Hydroelectric Power Compliant with the Work Program and RESHERR. Non-compliant with
Kiangan Mini Hydro Corporation 6.00
Project the Posting of performance bond.

Ibulao 2 Hydroelectric Power Compliant with the Posting of performance bond and RESHERR. Non-
Enerhighlands Corporation 8.80
Project compliant with the Work Program.

Hungduan Hydroelectric Compliant with the Work Program and RESHERR. Non-compliant with
Kiangan Mini Hydro Corporation 4.00
Power Project the Posting of performance bond.

Ambangal Hydroelectric Power


Kiangan Provincial Government of Ifugao Compliant with the Work Plan. Non-compliant with the RESHERR. 0.20
Plant

Ibulao Hydroelectric Power Compliant with the RESHERR. Non-compliant with the Work Plan and
Lagawe Hydrocore, Inc. 4.50
Project Posting of performance bond.
Lamut Hydroelectric Power Compliant with the Posting of performance bond and RESHERR. Non-
Lamut Enerhighlands Corporation 9.00
Project compliant with the Work Program.
Tinoc 1 Hydroelectric Power Compliant with RESHERR. Non-compliant with the Work Plan and
Tinoc Quadriver Energy Corporation 4.10
Project Posting of performance bond.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Tinoc 2 Hydroelectric Power Compliant with RESHERR. Non-compliant with the Work Plan and
Ifugao Tinoc Quadriver Energy Corporation 6.50
Project Posting of performance bond.

Tinoc 3 Hydroelectric Power Compliant with RESHERR. Non-compliant with the Work Plan and
Quadriver Energy Corporation 5.00
Project Posting of performance bond.

Tinoc 4 Hydroelectric Power Non-compliant with the Work Plan, Posting of performance bond and
Philnew Hydro Power Corp 6.00
Project RESHERR.

Tinoc 5 Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Philnewriver Power Corp. 6.90
Project (Lower Luhong) performance bond and RESHERR.
Tinoc 6 Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Philnewriver Power Corp. 8.00
Project (Wangwang) performance bond and RESHERR.
Chico Hydroelectric Power San Lorenzo Ruiz Piat Energy and Non-compliant with the Work Program, Posting of performance bond
Kalinga 150.00
Project Water, Inc. and RESHERR.

Biyao Hydroelectric Power Compliant with the Work Plan, Posting of Performance Bond and
Balbalan Biyao Hydro Power Corporation 0.80
Project RESHERR.
Saltan B Hydroelectric Power Compliant with the RESHERR. Non-compliant with the Work Program
Balbalan PNOC - Renewables Corp. 24.00
Project and Posting of performance bond.
Bulanao Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Tabuk DPJ Engineers and Consultants 1.00
Project performance bond and RESHERR.

Chico River Hydroelectric San Lorenzo Ruiz Builders & Non-compliant with the Work Program, Posting of performance bond
45.00
Power Project Developers Group, Inc. and RESHERR.

Tinglayan Hydroelectric Power Pan Pacific Renewable Power Compliant with the Work Program and RESHERR. Non-compliant with
Tinglayan 4.32
Project Philippine Corp. the Posting of performance bond.

Apayao-Abulog Hydroelectric Pan Pacific Renewable Power Compliant with the Work Program and RESHERR. Non-compliant with
Apayao Kabugao 600.00
Power Project Philippine Corp. the Posting of performance bond.

Mountain Tanudan Hydroelectric Power Asiapac Green Renewable Energy Non-compliant with the Work Program, Posting of performance bond
Barlig 2.40
Province Project Corporation and RESHERR.

Enodey-Abit 1 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Bauko Kadipo Bauko Hydropower Corp. 2.00
Power Project and RESHERR.

Enodey-Abit 2 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Kadipo Bauko Hydropower Corp. 1.20
Power Project and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Mountain Enodey-Abit 3 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Bauko Kadipo Bauko Hydropower Corp. 2.00
Province Power Project and RESHERR.

Ampassit Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Kadipo Bauko Hydro Power Corp. 1.20
Project and RESHERR.

Enodey 1A Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Kadipo Bauko Hydro Power Corp. 1.80
Power Project and RESHERR.

BIMAKA Renewable Energy


Besao 1 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Besao Development Corporation 4.50
Project Non-compliant with the RESHERR.
(BREDCO)
BIMAKA Renewable Energy
Besao 2 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Development Corporation 7.00
Project Non-compliant with the RESHERR.
(BREDCO)
BIMAKA Renewable Energy
Besao 3 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Development Corporation 4.00
Project Non-compliant with the RESHERR.
(BREDCO)
BIMAKA Renewable Energy
Besao 1A Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Development Corporation 2.60
Project Non-compliant with the RESHERR.
(BREDCO)
BIMAKA Renewable Energy
Besao 1B Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Development Corporation 1.70
Project Non-compliant with the RESHERR.
(BREDCO)
BIMAKA Renewable Energy
Besao 2A Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Development Corporation 1.10
Project Non-compliant with the RESHERR.
(BREDCO)
Talubin Hydroelectric Power Mountain Province Electric Compliant with the Work Program and Posting of performance bond.
Bontoc 5.40
Project Cooperative, Inc. Non-compliant with the RESHERR.
Mabungao Hydroelectric Southeast Asia Renewable Power Non-compliant with the Work Program, Posting of performance bond
Mabungao 5.70
Power Project Corporation and RESHERR.

Malecom Hydroelectric Power Southeast Asia Renewable Power Non-compliant with the Work Program, Posting of performance bond
Malecom 0.80
Project Corporation and RESHERR.

Malig Hydroelectric Power Southeast Asia Renewable Power Non-compliant with the Work Program, Posting of performance bond
Malig 1.10
Project Corporation and RESHERR.

Lower Siffu Hydroelectric Asiapac Green Renewable Energy Compliant with the Work Program. Non-compliant with the Posting of
Natonin 8.00
Power Project Corporation performance bond and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Mountain Upper Siffu Hydroelectric Asiapac Green Renewable Energy Compliant with the Work Program. Non-compliant with the Posting of
CAR Natonin 8.00
Province Power Project Corporation performance bond and RESHERR.
Pantor Hydroelectric Power Southeast Asia Renewable Power Non-compliant with the Work Program, Posting of performance bond
1.20
Project Corporation and RESHERR.
Dicapan Hydroelectric Power Asiapac Green Renewable Energy Compliant with the Work Program. Non-compliant with the Posting of
Tadian 3.00
Project Corporation performance bond and RESHERR.
Tineg Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Abra Lagayan Sta. Clara Power Corp. 16.00
Project and RESHERR.

Three Rivers Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Manabo Sta. Clara Power Corp. 10.00
Power Project and RESHERR.

Amtuagan Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Tubo Sta. Clara Power Corp. 8.50
Power Project and RESHERR.

Gayaman (Tubo) Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Sta. Clara Power Corp. 8.50
Power Project and RESHERR.

Benguet & Bakun & Mankayan 2 Hydroelectric Compliant with the Work Program. Non-compliant with the Posting of
HEDCOR, Inc. 20.30
Ilocos Sur Cervantes Power Project performance bond and RESHERR.

Boga Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Mt. Province Bauko Kadipo Bauko Hydro Power Corp. 1.00
Project Non-compliant with the RESHERR.

Compliant with the Work Program and Posting of performance bond.


Upper Chico Kadipo Bauko Hydro Power Corp. 2.10
Non-compliant with the RESHERR.
Compliant with the Work Program and Posting of performance bond.
Lower Chico Kadipo Bauko Hydro Power Corp. 3.40
Non-compliant with the RESHERR.
Alilem Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
I Ilocos Sur Alilem Philnewriver Power Corp. 16.20
Project performance bond and RESHERR.

Bakun AC Hydroelectric Power


Luzon Hydro Corporation Compliant with the Work Plan. Non-compliant with the RESHERR. 70.00
Plant

Quirino Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Quirino Philnewriver Power Corp. 11.50
Project performance bond and RESHERR.

Matibuey Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
San Emilio Sta. Clara Power Corp. 6.50
Project and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Danac Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
I Ilocos Sur Sugpon Philnewriver Power Corp. 3.00
Project performance bond and RESHERR.

Baroro 1 Hydroelectric Power Team (Philippines) Renewable Compliant with the Posting of performance bond. Non-compliant with
La Union Bagulin 1.00
Project Energy Corporation the Work Program and RESHERR.

Baroro 2 Hydroelectric Power Team (Philippines) Renewable Compliant with the Posting of performance bond. Non-compliant with
3.00
Project Energy Corporation the Work Program and RESHERR.

Baroro 3 Hydroelectric Power Team (Philippines) Renewable Compliant with the Posting of performance bond. Non-compliant with
1.50
Project Energy Corporation the Work Program and RESHERR.

Naguilian Hydroelectric Power Naguilian Mini-Hydro Electric Non-compliant with the Work Program, Posting of performance bond
Naguilian 6.10
Project Corporation and RESHERR.

Tubao Hydroelectric Power Tubao Mini-Hydro Electric Compliant with the Work Plan. Non-compliant with the Posting of
Tubao 1.50
Project Corporation performance bond and RESHERR.

Baua 1 Hydroelectric Power Pan Pacific Renewable Power Compliant with the Work Program and RESHERR. Non-compliant with
II Cagayan Gonzaga 4.44
Project Philippine Corp. the Posting of performance bond.

Pinacanauan River Sunwest Water & Electric Non-compliant with the Work Plan, Posting of performance bond and
Peñablanca 6.00
Hydroelectric Power Project Company, Inc. RESHERR.

Isabela / Dibuluan Hydroelectric Power Greenpower Resources Compliant with the Work Plan and Posting of performance bond. Non-
San Augustin 5.50
Quirino Project Corporation compliant with the RESHERR.

Magat F Hydroelectric Power Compliant with the Posting of performance bond. Non-compliant with
Isabela Cordon PhilCarbon Inc. 0.60
Project the Work Program and RESHERR.

Ilaguen 2 Hydroelectric Power Compliant with the Work Plan and Posting of performance bond. Non-
Dinapigue Isabela Power Corporation 14.00
Project compliant with the RESHERR.

Ilaguen 3 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Echague Isabela Power Corporation 11.00
Project Non-compliant with the RESHERR.

Ilaguen 4 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Isabela Power Corporation 10.00
Project Non-compliant with the RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Maris Main Canals 1 Compliant with the Work Program. Non-compliant with the Posting of
II Isabela Ramon SN Aboitiz Power - Greenfield, Inc. 6.00
Hydroelectric Power Project performance bond and RESHERR.

Magat A Hydroelectric Power I-Magat Renewable Energy Compliant with the Work Plan. Non-compliant with the Posting of
1.30
Project Corporation performance bond and RESHERR.

Magat B Hydroelectric Power I-Magat Renewable Energy Compliant with the Work Plan. Non-compliant with the Posting of
1.00
Project Corporation performance bond and RESHERR.

San Augustin / Dabubu Hydroelectric Power Greenpower Resources Compliant with the Work Program and Posting of performance bond.
4.50
Madella Project Corporation Non-compliant with the RESHERR.

Disabungan Hydroelectric Greenpower Resources Compliant with the Work Plan and Posting of performance bond. Non-
San Mariano 5.50
Power Project Corporation compliant with the RESHERR.

San Mariano & Ilaguen Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Isabela Power Corp. 19.00
San Guillermo Project performance bond and RESHERR.

San Mateo Lateral B National Irrigation Administration Compliant with the Work Plan. Non-compliant with the RESHERR. 0.045

Greenpower Resources Compliant with the Work Program and Posting of performance bond.
San Pablo San Pablo 8.00
Corporation Non-compliant with the RESHERR.

Tumauini Hydroelectric Power Compliant with RESHERR. Non-compliant with the Work Plan and
Tumauini Quadriver Energy Corporation 7.80
Project (Lower Cascade) Posting of performance bond.

Tumauini Hydroelectric Power Non-compliant with the Work Plan, Posting of performance bond and
Philnew Hydro Power Corp 14.00
Project (Upper Cascade) RESHERR.

Alfonso Mangayngay Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Nueva Vizcaya United Hydro Power Builders 1.60
Castañeda Power Project and RESHERR.

Denip Hydroelectric Power JRV Renewable Energy Compliant with the Work Program. Non-compliant with the Posting of
2.30
Project Corporation performance bond and RESHERR.

Abaca Hydroelectric Power JRV Renewable Energy Non-compliant with the Work Program, Posting of performance bond
Alfonzo 3.20
Project Corporation and RESHERR.

Matuno 1 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Ambaguio Smith Bell Mini-Hydro Corp. 7.40
Project performance bond and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Matuno 2 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Nueva Vizcaya Bambang Smith Bell Mini-Hydro Corp. 7.90
Project performance bond and RESHERR.

Matuno Hydroelectric Power Compliant with the Work Plan and RESHERR. Non-compliant with the
Epower Technologies Corp. 8.00
Project Posting of performance bond.
Dupax del Norte
Casignan Hydroelectric Power JRV Renewable Energy Compliant with the Work Program. Non-compliant with the Posting of
and Alfonzo 5.00
Project Corporation performance bond and RESHERR.
Castañeda
Didipio 1 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Kasibu AT Dinum Company 2.50
Project Non-compliant with the RESHERR.

Didipio 2 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
AT Dinum Company 6.60
Project Non-compliant with the RESHERR.

Namanaan Hydroelectric Compliant with the Work Program and Posting of performance bond.
AT Dinum Company 0.60
Power Project Non-compliant with the RESHERR.

Edralin Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
AT Dinum Company 1.20
Project Non-compliant with the RESHERR.

Commonal-Uddiawan
Solano Smith Bell Mini-Hydro Corp. Compliant with the Work Plan. Non-compliant with the RESHERR. 1.80
Hydroelectric Power Plant

Addalam Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Quirino Aglipay Quirino Power Energy Corporation 3.60
Project and RESHERR.
Addalam Hydroelectric Power Quirino Resources Development Compliant with the Work Program and Posting of performance bond.
Cabbaroguis 26.00
Project Corp. Non-compliant with the RESHERR.
Geblem 1 Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Nagtipunan Gedangan Enterprises Co. 0.70
Project and RESHERR.

Gawagan 1 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Gedangan Enterprises Co. 4.30
Power Project and RESHERR.

Gawagan 2 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Gedangan Enterprises Co. 2.60
Power Project and RESHERR.

Dakgan 1 Hydroelectric Power Asiapacific Renewables Compliant with the Work Program and Posting of performance bond.
9.00
Project Corporation Non-compliant with the RESHERR.

Dakgan 2 Hydroelectric Power Asiapacific Renewables Compliant with the Work Program and Posting of performance bond.
12.00
Project Corporation Non-compliant with the RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Amro River Hydroelectric Alternergy Viento Partners Non-compliant with the Work Program, Posting of performance bond
III Aurora Casiguran 3.00
Power Project Corporation and RESHERR.

Talaytay Hydroelectric Power PTC Energy, Inc. (Aurora Energy Compliant with the Posting of performance bond. Non-compliant with
Dinalungan 1.45
Project Corporation) the Work Program and RESHERR.

Davildavilan Hydroelectric Compliant with the Work Plan. Non-compliant with the Posting of
Dingalan PTC Energy, Inc. 1.00
Power Project performance bond and RESHERR.

Diteki Hydroelectric Power PTC Energy, Inc. (Aurora Energy Compliant with the Posting of performance bond. Non-compliant with
San Luis 1.67
Project Corporation) the Work Program and RESHERR.

Calaanan Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Nueva Ecija Bongabon Hydrokinetic Corp. 2.00
Project Non-compliant with the RESHERR.
Dupinga Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Gabaldon Constellation Energy Corporation 3.00
Project performance bond and RESHERR.

Rio Chico Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
General Tinio LGU of Gen. Tinio 2.00
Project and RESHERR.

Balintingon Hydroelectric First Gen Luzon Power Non-compliant with the Work Program, Posting of performance bond
General Tiño 30.00
Power Project Corporation and RESHERR.
Pantabangan (Pump
First Gen Prime Energy Compliant with the Work Program. Non-compliant with the Posting of
Pantabangan Storage)Hydroelectric Power 300.00
Corporation performance bond and RESHERR.
Project
Diaman Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
United Hydro Power Builders 1.80
Project and RESHERR.

PRISMC Hydroelectric Power Compliant with the Work Plan, Posting of Performance Bond and
Rizal PNOC-Renewables Corporation 1.00
Project RESHERR.

SDC Hydroelectric Power Compliant with the RESHERR. Non-compliant with the Work Program
San Jose PNOC-Renewables Corporation 0.50
Project and Posting of performance bond.

Angat (Pump Storage) First Gen Premier Energy Compliant with the Work Program. Non-compliant with the Posting of
Bulacan Norzagaray 300.00
Hydroelectric Power Project Corporation performance bond and RESHERR.

Mariveles Hydroelectric Power Southeast Asia Renewable Power Compliant with the Work Program. Non-compliant with the Posting of
Bataan Mariveles 1.10
Project Corporation performance bond and RESHERR.

Camiling 1 Hydroelectric Compliant with the Work Program and Posting of performance bond.
Tarlac Mayantoc Northgreen Energy Corporation 5.40
Power Project Non-compliant with the RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Camiling River 3 Hydroelectric Compliant with the Posting of performance bond. Non-compliant with
III Tarlac Mayantoc Northgreen Energy Corporation 3.40
Power Project the Work Program and RESHERR.

Coto 1 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Zambales Masinloc Coto Hydro Corp. 6.50
Project performance bond and RESHERR.

South Lauis & Coto 2 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Coto Hydro Corp. 2.80
Mabininal Project performance bond and RESHERR.
Nueva Ecija / Gabaldon / San Compliant with the Work Program. Non-compliant with the Posting of
Lingod River United Hydro Power Builders 2.50
Aurora Luis performance bond and RESHERR.

Laguna / Pangil / Real & Siniloan Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
IV-A Sierra Madre Water Corporation 35.00
Quezon Mauban Project performance bond and RESHERR.

Compliant with the Work Program. Non-compliant with the Posting of


Quezon General Nakar Umiray 1 Laguna Hydroenergy Corporation 6.00
performance bond and RESHERR.
Maapon Hydroelectric Power Compliant with the Work Program and Posting of performance bond
Lucban Renesons Energy Corporation 2.60
Project and RESHERR.

Greenpower Resources Compliant with the Work Program. Non-compliant with the Posting of
Maddela Dabubu 2 4.30
Corporation performance bond and RESHERR.

Calmenue Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Mauban Sta. Clara Power Corp. 2.00
Project and RESHERR.

(Laguio) Laginbayan Malaki 2 Compliant with the Work Program and Posting of performance bond.
Enervantage Supplier's Co., Inc. 3.10
Hydroelectric Power Project Non-compliant with the RESHERR.

Mauban Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Aurora All Asia Energy Corporation 10.00
Project and RESHERR.

Kinanliman Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Real Municipality of Real, Quezon 1.60
Power Project and RESHERR.

Labayat River (Upper Cascade) Repower Energy Development Compliant with the Work Program and Posting of performance bond.
7.00
Hydroelectric Power Project Corporation Non-compliant with the RESHERR.

Piapi River Hydroelectric Repower Energy Development Compliant with the Work Program and Posting of performance bond.
3.30
Power Project Corporation Non-compliant with the RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Labayat River (Lower Cascade) Repower Energy Development Compliant with the Work Program and Posting of performance bond.
Quezon Real 2.80
Hydroelectric Power Project Corporation Non-compliant with the RESHERR.

Tignoan River (Upper Cascade) Repower Energy Development Compliant with the Work Program and Posting of performance bond.
3.50
Hydroelectric Power Project Corporation Non-compliant with the RESHERR.

Tibag Hydroelectric Power Repower Energy Development Compliant with the Work Program and Posting of performance bond.
5.00
Project Corporation Non-compliant with the RESHERR.

Tignoan Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Aurora All Asia Energy Corporation 20.00
Project performance bond and RESHERR.

Lalawinan Hydroelectric Repower Energy Development Compliant with the Work Program and Posting of performance bond.
3.00
Power Project Corporation Non-compliant with the RESHERR.

Laguio (Laginbayan) Malaki 1 Compliant with the Work Program and Posting of performance bond.
Rizal Enervantage Supplier's Co., Inc. 1.60
Hydroelectric Power Project Non-compliant with the RESHERR.

Wawa Pumped Storage 1 Olympia Violago Water & Power, Compliant with the Work Program and Posting of performance bond.
Rodriguez 500.00
Hydroelectric Power Project Inc Non-compliant with the RESHERR.

Wawa Pumped Storage 3 Olympia Violago Water & Power, Compliant with the Work Program. Non-compliant with the Posting of
50.00
Hydroelectric Power Project Inc performance bond and RESHERR.

Wawa Pumped Storage 2 Olympia Violago Water & Power, Compliant with the Work Program. Non-compliant with the Posting of
100.00
Hydroelectric Power Project Inc performance bond and RESHERR.

Majayjay Hydroelectric Power Majayjay Hydropower Company, Compliant with the Work Plan and Posting of performance bond. Non-
Laguna Majayjay 3.00
Project Inc. compliant with the RESHERR.

Repower Energy Development Compliant with the Work Program. Non-compliant with the Posting of
Balanac (Middle) 5.00
Corporation performance bond and RESHERR.

Indang and Indang Hydroelectric Power Compliant with the RESHERR. Non-compliant with the Work Program
Cavite Energywise Corporation 1.50
Maragondon Project and Posting of Performance Bond.

Oriental San Ignacio Hydroelectric Alpaparay Resort & Development Non-compliant with the Work Program, Posting of performance bond
IV-B Baco 0.50
Mindoro Power Project Corporation and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Oriental Dulangan Hydroelectric Power Compliant with the RESHERR. Non-compliant with the Work Program
IV-B Baco PNOC - Renewables Corp. 8.25
Mindoro Project and Posting of performance bond.

Linao-Cawayan (Lower
Oriental Mindoro Electric
Cascade) Hydroelectric Power Compliant with the Work Plan and RESHERR. 2.10
Cooperative, Inc.
Plant
Linao-Cawayan (Upper
Oriental Mindoro Electric
Cascade) Hydroelectric Power Compliant with the Work Plan and RESHERR. 2.10
Cooperative, Inc.
Project
Bansud Hydroelectric Power Sunwest Water and Electric Co., Compliant with the Work Program and Posting of performance bond.
Bansud 1.50
Project Inc. Non-compliant with the RESHERR.
Catuiran (Upper Cascade) Compliant with the Work Program. Non-compliant with the Posting of
Naujan Philnew Hydro Power Corp 8.00
Hydroelectric Power Project performance bond and RESHERR.

Catuiran Hydroelectric Power Compliant with the Work Plan, Posting of Performance Bond and
Catuiran Hydro Power Corp. 8.00
Project RESHERR.

Mag-asawang Tubig B Philippine Hybrid Energy Systems, Non-compliant with the Work Program, Posting of performance bond
1.00
Hydroelectric Power Project Inc. and RESHERR.

Inabasan Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
San Teodoro Ormin Power, Inc 10.00
Project performance bond and RESHERR.

Linao Cawayan Hydroelectric


Compliant with the Work Program and Posting of performance bond.
Power Project (Phase 2 - tail - Mindoro Grid Corporation 1.00
Non-compliant with the RESHERR.
end)

Alag Tributary 1 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Constellation Energy Corporation 2.80
Power Project and RESHERR.

Alag Tributary 2 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Constellation Energy Corporation 2.80
Power Project and RESHERR.

San Teodoro & Inabasan Phase II Compliant with the Work Program and Posting of performance bond.
Ormin Power, Inc. 10.00
Puerto Gallera Hydroelectric Power Project Non-compliant with the RESHERR.

Marangas River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Palawan Bataraza AQA Global Power Inc. 12.00
Power Project and RESHERR.

Sologon River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Brooke's Point AQA Global Power Inc. 12.00
Power Project and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Busuanga River 1 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Palawan Busuanga AQA Global Power Inc. 8.00
Power Project and RESHERR.

Ilian River (Kaliwa) Non-compliant with the Work Program, Posting of performance bond
Dumaran AQA Global Power Inc. 20.00
Hydroelectric Power Project and RESHERR.

Ilian River (Kanan) Non-compliant with the Work Program, Posting of performance bond
AQA Global Power Inc. 12.00
Hydroelectric Power Project and RESHERR.

Bulalakao-1 North River Alternergy Viento Partners Non-compliant with the Work Program, Posting of performance bond
El Nido 0.34
Hydroelectric Power Project Corporation and RESHERR.

Bulalakao-2 South River Alternergy Viento Partners Non-compliant with the Work Program, Posting of performance bond
0.44
Hydroelectric Power Project Corporation and RESHERR.

Bato-Bato (Kaliwa) Non-compliant with the Work Program, Posting of performance bond
Narra AQA Global Power Inc. 12.00
Hydroelectric Power Project and RESHERR.

Estrella River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
AQA Global Power Inc. 8.00
Power Project and RESHERR.

Malasgao (Kaliwa) Non-compliant with the Work Program, Posting of performance bond
AQA Global Power Inc. 10.00
Hydroelectric Power Project and RESHERR.

Batang-Batang Hydroelectric Non-compliant with the Work Plan, Posting of performance bond and
Narra Langongan Power Corporation 3.50
Power Project RESHERR.

Langogan Hydroelectric Power Non-compliant with the Work Plan, Posting of performance bond and
Puerto Princesa Langongan Power Corporation 6.80
Project RESHERR.

Puerto Princesa Inaguan River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
AQA Global Power Inc. 12.00
City Power Project and RESHERR.

Culasian River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Rizal AQA Global Power Inc. 10.00
Power Project and RESHERR.

Barabakan River 1 Non-compliant with the Work Program, Posting of performance bond
Roxas AQA Global Power Inc. 15.00
Hydroelectric Power Project and RESHERR.

Sicop Hydroelectric Power Sunwest Water and Electric Co., Non-compliant with the Work Program, Posting of performance bond
Romblon Odiongan 0.60
Project Inc. and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Gabuan Hydroelectric Power Sunwest Water and Electric Co., Non-compliant with the Work Program, Posting of performance bond
IV-B Romblon Odiongan 0.70
Project Inc. and RESHERR.

Libertad Hydroelectric Power Sunwest Water and Electric Co., Non-compliant with the Work Program, Posting of performance bond
0.72
Project Inc. and RESHERR.

Cantingas Hydroelectric Power


Romblon Romblon Electric Cooperative, Inc. Compliant with the Work Plan. Non-compliant with the RESHERR. 0.90
Plant

Parpajoja-Nabitas Sunwest Water and Electric Co., Non-compliant with the Work Program, Posting of performance bond
San Andres 0.85
Hydroelectric Power Project Inc. and RESHERR.

Kanan B-1 Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Quezon General Nakar Energy World Kanan River, Inc. 150.00
Project Non-compliant with the RESHERR.

Upper Botocan River Compliant with the Work Program. Non-compliant with the Posting of
Laguna Majayjay Aurora All Asia Energy Corporation 8.64
Hydroelectric Power Project performance bond and RESHERR.

Barit 2 Hydroelectric Power Compliant with the Posting of performance bond. Non-compliant with
V Camarines Sur Buhi People's Energy Services Inc. 0.60
Project the Work Program and RESHERR.

Barit 1 Hydroelectric Power


People's Energy Services Inc. Compliant with the Work Plan. Non-compliant with the RESHERR. 1.80
Plant

Barit (Irrigation Discharge) Non-compliant with the Work Plan, Posting of performance bond and
Buhi NASCENT Technologies Corp. 0.40
Hydroelectric Power Project RESHERR.
Ranggas Hydroelectric Power Clean and Green Energy Solutions, Compliant with the Work Plan. Non-compliant with the Posting of
Goa & Tigaon, 1.50
Project Inc. performance bond and RESHERR.
Hitoma 1 Hydroelectric Power Sunwest Water & Electric
Catanduanes Caramoran Compliant with the Work Plan and RESHERR. 1.50
Plant Company, Inc.
Kapipian Hydroelectric Power Sunwest Water & Electric Compliant with the Work Plan and Posting of performance bond. Non-
San Miguel 2.40
Project Company, Inc. compliant with the RESHERR.
Solong Hydroelectric Power Sunwest Water & Electric
Compliant with the Work Plan and RESHERR. 2.10
Plant Company, Inc.
Camarines Colasi Hydroelectric Power Colasi Mini Hydro Electric Power Compliant with the Work Plan. Non-compliant with the Posting of
Mercedes 0.96
Norte Project Plant Corporation performance bond and RESHERR.
Sunwest Water and Electric Co.,
Upper Cawayan 1 Inc. - Sorsogon II Electric
Sorsogon Compliant with the Work Plan. Non-compliant with the RESHERR. 0.60
Hydroelectric Power Plant Cooperative, Inc. (SUWECO-
SORECO II)
Cawayan 2 Hydroelectric Sunwest Water and Electric Co., Compliant with the Work Program and Posting of performance bond.
Sorsogon 0.99
Power Project Inc. Non-compliant with the RESHERR.
LUZON Sum 5,292.92 104.065
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Main Aklan River Hydroelectric Sunwest Water & Electric Non-compliant with the Work Plan, Posting of performance bond and
VISAYAS VI Aklan Libacao 15.00
Power Project Company, Inc. RESHERR.

Aklan Pumped-Storage Strategic Power Development Compliant with the Work Program and RESHERR. Non-compliant with
Nabaoy 200.00
Hydroelectric Power Project Corp. the Posting of performance bond.
Villasiga 2 Hydroelectric Power Sunwest Water and Electric Co., Non-compliant with the Work Program, Posting of performance bond
Antique Bugasong 9.40
Project Inc. and RESHERR.

Villasiga Hydroelectric Power Sunwest Water & Electric Compliant with the RESHERR. Non-compliant with the Work Plan and
Bugasong 8.00
Project Company, Inc. 2 Posting of performance bond.

Maninila (Lower Cascade) Non-compliant with the Work Plan, Posting of performance bond and
San Remegio Century Peak Energy Corporation 4.50
Hydroelectric Power Project RESHERR.

Maninila (Upper Cascade) Non-compliant with the Work Plan, Posting of performance bond and
Century Peak Energy Corporation 3.10
Hydroelectric Power Project RESHERR.

Sibalom (Upper Cascade) Non-compliant with the Work Plan, Posting of performance bond and
Century Peak Energy Corporation 4.20
Hydroelectric Power Project RESHERR.

Sibalom (Middle Cascade) Non-compliant with the Work Plan, Posting of performance bond and
Century Peak Energy Corporation 4.00
Hydroelectric Power Project RESHERR.

Sibalom (Lower Cascade) Non-compliant with the Work Plan, Posting of performance bond and
Century Peak Energy Corporation 3.30
Hydroelectric Power Project RESHERR.
Caro-an Hydroelectric Power Compliant with the Work Plan and Posting of performance bond. Non-
Sebaste Antique Electric Cooperative, Inc. 0.84
Project compliant with the RESHERR.

Ipayo Hydroelectric Power Compliant with the Work Plan and Posting of performance bond. Non-
Antique Electric Cooperative, Inc. 1.30
Project compliant with the RESHERR.

Igbulo (Bais) Hydroelectric Compliant with the Work Plan. Non-compliant with the Posting of
Iloilo Igbaras Century Peak Energy Corporation 5.10
Power Project performance bond and RESHERR.
Negros Bago 4 Hydroelectric Power Alsons Energy Development Compliant with the Work Program. Non-compliant with the Posting of
Bago & Murcia 11.00
Occidental Project Corporation performance bond and RESHERR.

Don Salvador Bago 2 Hydroelectric Power Alsons Energy Development Compliant with the Work Program and Posting of performance bond.
10.00
Benedicto Project Corporation Non-compliant with the RESHERR.

Hilabangan (Upper Cascade) Non-compliant with the Work Plan, Posting of performance bond and
Kabankalan Century Peak Energy Corporation 4.80
Hydroelectric Power Project RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Negros Hilabangan (Lower Cascade) Non-compliant with the Work Plan, Posting of performance bond and
VI Kabankalan Century Peak Energy Corporation 3.00
Occidental Hydroelectric Power Project RESHERR.

Lower Himogaan Hydroelectric Compliant with the Work Plan. Non-compliant with the Posting of
Sagay LGU of Sagay 4.00
Power Project performance bond and RESHERR.
Bago 1 Hydroelectric Power Alsons Energy Development Compliant with the Work Program and Posting of performance bond.
San Carlos City 4.00
Project Corporation Non-compliant with the RESHERR.

Initihan Hydroelectric Power Bago River Hydro Power Compliant with the Work Program. Non-compliant with the Posting of
3.00
Project Corporation performance bond and RESHERR.

Bago-Prosperidad 2 Bago River Hydro Power Compliant with the Work Program. Non-compliant with the Posting of
2.00
Hydroelectric Power Project Corporation performance bond and RESHERR.
Malugo Hydroelectric Power Non-compliant with the Work Plan, Posting of performance bond and
Silay Vivant-Malogo Hydropower, Inc. 6.00
Project RESHERR.

Silay & E. B Malogo Phase 3 Hydroelectric Compliant with the Posting of performance bond. Non-compliant with
Vivant-Malogo Hydropower, Inc. 2.00
Magalona Power Project the Work Program and RESHERR.

Malogo Phase 2 Hydroelectric Compliant with the Posting of performance bond. Non-compliant with
Victorias & Cadiz Vivant-Malogo Hydropower, Inc. 5.00
Power Project the Work Program and RESHERR.
Cantakoy Hydroelectric Power Compliant with the RESHERR. Non-compliant with the Work Plan and
VII Bohol Danao Quadriver Energy Corporation 8.00
Project Posting of performance bond.
Loboc Hydroelectric Power
Loboc Sta. Clara Power Corporation Compliant with the Work Plan. Non-compliant with the RESHERR. 1.20
Plant
Sevilla Hydroelectric Power BOHECO 1 Sevilla Mini Hydro
Sevilla Compliant with the Work Plan. Non-compliant with the RESHERR. 2.50
Plant Corp.
Kawasan Waterfalls Compliant with the Work Program and Posting of performance bond.
Cebu Alegria T.A.G Mineral Resources, Inc. 0.50
Hydroelectric Power Project Non-compliant with the RESHERR.
Argao Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Argao Universal Hydrotechnologies, Inc. 0.80
Project and RESHERR.

Basak II Hydroelectric Power Non-compliant with the Work Plan, Posting of performance bond and
Badian Rapids Innoenergy, Inc. 0.50
Project RESHERR.

Negros Amlan Hydroelectric Power Amlan Hydroelectric Power Compliant with the Work Plan and Posting of performance bond. Non-
Amlan 0.80
Oriental Plant Corporation compliant with the RESHERR.

Amlan (Plant A) Hydroelectric Natural Power Sources Non-compliant with the Work Plan, Posting of performance bond and
Amlan 3.20
Power Project Intergration,Inc. RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Negros Amlan (Plant B) Hydroelectric Natural Power Sources Non-compliant with the Work Plan, Posting of performance bond and
VII Amlan 1.50
Oriental Power Project Intergration,Inc. RESHERR.

Amlan (Plant C) Hydroelectric Natural Power Sources Non-compliant with the Work Plan, Posting of performance bond and
0.80
Power Project Intergration,Inc. RESHERR.

Pacuan -Guinobaan Compliant with the RESHERR. Non-compliant with the Work Program
La Libertad PNOC - Renewables Corp. 33.00
Hydroelectric Power Project and Posting of performance bond.
Canaway 1 Hydroelectric Compliant with the Work Program. Non-compliant with the Posting of
Siaton Orbysy Holdings, Inc. 1.60
Power Project performance bond and RESHERR.
Canaway 2 Hydroelectric Compliant with the Work Program. Non-compliant with the Posting of
Orbysy Holdings, Inc. 1.40
Power Project performance bond and RESHERR.
Senona Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Siquijor Lazi AQA Global Power Inc. 3.20
Project Non-compliant with the RESHERR.
Gabangan Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
AQA Global Power Inc. 4.14
Project Non-compliant with the RESHERR.

Pumped Storage Bolusao San Lorenzo Ruiz Samar Energy Compliant with the Work Program. Non-compliant with the Posting of
VIII Eastern Samar Lawaan 300.00
Hydroelectric Power Project and Water, Inc. performance bond and RESHERR.

Run-of-River Bolusao San Lorenzo Ruiz Samar Energy Compliant with the Work Program. Non-compliant with the Posting of
12.00
Hydroelectric Power Project and Water, Inc. performance bond and RESHERR.

Compliant with the Work Program. Non-compliant with the Posting of


Maslog Upper Maslog Iraya Energy Corporation 9.00
performance bond and RESHERR.

Caminto River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Leyte Inopacan Leyte IV Electric Cooperative, Inc. 0.50
Power Project and RESHERR.

Binaha-an River Hydroelectric Engineering & Development Compliant with the RESHERR. Non-compliant with the Work Program
Jaro & Pastrana 2.20
Power Project Corporation of the Philippines and Posting of performance bond.

Bao Hydroelectric Power Leyte V Electric Cooperative, Inc Compliant with the Posting of performance bond. Non-compliant with
Kananga 1.50
Project (LEYECO V) the Work Program and RESHERR.

Dumagocdoc River Non-compliant with the Work Program, Posting of performance bond
Matalom Leyte IV Electric Cooperative, Inc. 0.60
Hydroelectric Power Project and RESHERR.

Western Calbiga Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Calbiga Meadowland Developers, Inc. 15.00
Samar Project performance bond and RESHERR.
VISAYAS Sum 712.98 4.50
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Zamboanga Bayog Hydroelectric Power Compliant with the Posting of Performance Bond and RESHERR. Non-
MINDANAO IX Bayog Global Sibagat Hydro Power Corp. 6.00
del Sur Project compliant with the Work Program.

Dumingag & Sindangan 4 Hydroelectric Alsons Energy Development Non-compliant with the Work Program, Posting of performance bond
8.00
Midsalip Power Project Corporation and RESHERR.

Pasonanca (Upstream) Non-compliant with the Work Plan, Posting of performance bond and
Zamboanga City PhilCarbon Inc. 1.00
Hydroelectric Power Project RESHERR.

Pasonanca Hydroelectric Non-compliant with the Work Plan, Posting of performance bond and
PhilCarbon Inc. 0.05
Power Project RESHERR.

Saaz Hydroelectric Power Non-compliant with the Work Program and Posting of performance
Meadowland Developers, Inc. 1.00
Project bond and RESHERR.

Zamboanga Polandoc Hydroelectric Power Euro Hydro Power (Asia) Holdings, Compliant with the Work Program. Non-compliant with the Posting of
Leon Postigo 2.00
del Norte Project Inc. performance bond and RESHERR.

Dapitan River (Middle) Euro Hydro Power (Asia) Holdings, Compliant with the Posting of performance bond. Non-compliant with
Mutia 3.60
Hydroelectric Power Project Inc. the Work Program and RESHERR.

Dapitan River (Upper) Euro Hydro Power (Asia) Holdings, Compliant with the Posting of performance bond. Non-compliant with
3.60
Hydroelectric Power Project Inc. the Work Program and RESHERR.

Zamboanga Compliant with the Work Program and Posting of performance bond.
Alimpaya Everhydro Corporation 0.50
City Non-compliant with the RESHERR.
Patalon Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Everhydro Corporation 0.50
Project Non-compliant with the RESHERR.
Tagpangi Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Everhydro Corporation 0.50
Project Non-compliant with the RESHERR.
Ayala Hydroelectric Power Compliant with the Work Program and Posting of performance bond.
Everhydro Corporation 1.00
Project Non-compliant with the RESHERR.
Katipunan River Hydroelectric Repower Energy Development Compliant with the Work Program and Posting of performance bond.
X Bukidnon 2.10
Power Project Corporation Non-compliant with the RESHERR.

Pulanai River Hydroelectric Repower Energy Development Compliant with the Work Program and Posting of performance bond.
10.60
Power Project Corporation Non-compliant with the RESHERR.
Tumalaong Hydroelectric First Gen Mindanao Hydro Power Compliant with the Posting of performance bond. Non-compliant with
Baungon 9.00
Power Project Corp. the Work Plan and RESHERR.

Baungon and Bubunawan Hydroelectric FGEN Bubunawan Hydro Compliant with the Posting of performance bond. Non-compliant with
23.00
Libona Power Project Corporation the Work Plan and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Baungon and Bubunawan Hydroelectric


Bubunawan Power Company, Inc. Compliant with the Work Plan. Non-compliant with the RESHERR. 7.00
Libonan Power Plant

Compliant with the Work Program and Posting of performance bond.


Dancagan Kitaotao 1 Hedcor Bukidnon, Inc. 35.00
Non-compliant with the RESHERR.

Panoon Hydroelectric Power


Impasugong Gerphil Renewable Energy, Inc. Compliant with the Work Plan. Non-compliant with the RESHERR. 0.22
Plant

Gakaon Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
LGU of Impasugong 2.23
Project and RESHERR.

Atugan 1 River Hydroelectric Compliant with the Work Program. Non-compliant with the Posting of
Gerphil Renewable Energy, Inc. 2.40
Power Project performance bond and RESHERR.

Compliant with the Work Program. Non-compliant with the Posting of


Atugan 4 Gerphil Renewable Energy, Inc. 3.50
performance bond and RESHERR.

Impasugong and Tagoloan Hydroelectric Power Compliant with the Posting of performance bond. Non-compliant with
FGEN Tagoloan Hydro Corporation 39.00
Sumilao Project the Work Plan and RESHERR.
Maladugao River (Lower
Kalilangan & Bukidnon Maladugao Hydro Compliant with the Work Plan and Posting of performance bond. Non-
Cascade) Hydroelectric Power 10.00
Wao Power Corporation compliant with the RESHERR.
Project
Umalag 1 Hydroelectric Power Compliant with the Posting of performance bond. Non-compliant with
Libona Meadowland Developers, Inc. 1.80
Project the Work Program and RESHERR.

Sawaga Hydroelectric Power Euro Hydro Power (Asia) Holdings, Compliant with the Work Program. Non-compliant with the Posting of
Malaybalay 1.20
Project Inc. performance bond and RESHERR.

Repower Energy Development Compliant with the Work Program and Posting of performance bond.
2.00
Corporation Non-compliant with the RESHERR.

Middle Canayan Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Sta. Clara Power Corp. 3.00
Power Project and RESHERR.
Malitbog Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Malitbog Philnewriver Power Corp. 3.40
Project performance bond and RESHERR.

Silo-o Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Philnewriver Power Corp. 4.50
Project performance bond and RESHERR.

Culaman Hydroelectric Power Oriental Energy and Power Compliant with the Posting of Performance Bond and RESHERR. Non-
Manolo 10.00
Project Generation Corporation compliant with the Work Plan.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)
Agusan River Hydroelectric
Bukidnon Manolo Fortich FG Bukidnon Power Corp. Compliant with the Work Plan and RESHERR. 1.60
Power Plant

Mangima Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Philnewriver Power Corp. 10.00
Project performance bond and RESHERR.

First Bukidnon Electric


Maramag Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Maramag Cooperative, Inc. transferred to 2.00
Project performance bond and RESHERR.
Maramag Mini-Hydro Corporation

Repower Energy Development Compliant with the Work Program and Posting of performance bond.
Pulangui IV 10.00
Corporation Non-compliant with the RESHERR.

Manolo Fortich 1 Hydroelectric Compliant with the Work Plan and Posting of performance bond. Non-
Santiago Hedcor Bukidnon, Inc. 43.40
Power Project compliant with the RESHERR.

Manolo Fortich 2 Compliant with the Work Plan and Posting of performance bond. Non-
Hedcor Bukidnon, Inc. 25.40
Hydroelectric Power Project compliant with the RESHERR.

Manupali Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Valencia Matic Hydropower Corporation 9.00
Project performance bond and RESHERR.

Upper Manupali Hydroelectric Bukidnon II Electric Cooperative, Compliant with the Work Program and Posting of performance bond.
2.00
Power Project Inc. Non-compliant with the RESHERR.

Maladugao River (Upper


UHPC Bukidnon Hydro Power I Compliant with the Work Plan and Posting of performance bond. Non-
Wao Cascade) Hydroelectric Power 5.50
Corporation compliant with the RESHERR.
Project
Cagayan de Mat-i 1 Hydroelectric Power Non-compliant with the Work Plan, Posting of performance bond and
Claveria Philnew Hydro Power Corp 4.85
Oro Project RESHERR.

Misamis Langaran Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Calamba Kaltimex Langaran Hydro Inc. 3.64
Occidental Project performance bond and RESHERR.

Clarin Hydroelectric Power Non-compliant with the Work Plan, Posting of performance bond and
Clarin Philnew Hydro Power Corp 6.20
Project RESHERR.

Misamis Cagayan de Oro Limbatangon Hydroelectric Turbines Resource & Development Non-compliant with the Work Plan, Posting of performance bond and
9.00
Oriental City Power Project Corp. RESHERR.

Mat-i 2 Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Philnewriver Power Corp. 1.60
Project performance bond and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Misamis Cagayan de Oro Mat-i 3 Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Philnewriver Power Corp. 3.25
Oriental City Project performance bond and RESHERR.

Umalag 2 Hydroelectric Power Compliant with the Posting of performance bond. Non-compliant with
Meadowland Developers, Inc. 2.50
Project the Work Program and RESHERR.

Cabulig Hydroelectric Power


Claveria Mindanao Energy Systems, Inc. Non-compliant with the RESHERR. 8.00
Plant

Lower Cabulig Hydroelectric Compliant with the Work Program and Posting of performance bond.
Jasaan Mindanao Energy Systems, Inc. 10.00
Power Project Non-compliant with the RESHERR.

Odiongan, Odiongan River A Mini- Non-compliant with the Work Program, Posting of performance bond
JE Hydropower Ventures, Inc. 0.25
Gingoog City Hydroelectric Power Project and RESHERR.

Lanao del Bayug Hydroelectric Power Euro Hydro Power (Asia) Holdings, Compliant with the Work Program. Non-compliant with the Posting of
Iligan City 1.00
Norte Project Inc. performance bond and RESHERR.
Lower Bayug Hydroelectric Euro Hydro Power (Asia) Holdings, Compliant with the Posting of performance bond. Non-compliant with
4.00
Power Project Inc. the Work Program and RESHERR.

Upper Bayug Hydroelectric Euro Hydro Power (Asia) Holdings, Compliant with the Posting of performance bond. Non-compliant with
3.30
Power Project Inc. the Work Program and RESHERR.

Bulanog-Batang Hydroelectric Bukidnon Hydro Energy Compliant with the Work Program and Posting of performance bond.
150.00
Power Project Corporation Non-compliant with the RESHERR.

Agus VIII Modular Compliant with the Work Program and Posting of performance bond
Fu-Tai Philippines, Inc. 12.00
Hydroelectric Power Project and RESHERR.

Titunod Hydroelectric Power Euro Hydro Power (Asia) Holdings, Compliant with the Work Program. Non-compliant with the Posting of
Kolambogan 1.00
Project Inc. performance bond and RESHERR.
Lanao del
Pantar & Compliant with the Work Program and Posting of performance bond.
X/ARMM Norte/Lanao Agus III Maranao Energy Corp. 225.00
Baloi/Saguiaran Non-compliant with the RESHERR.
del Sur
Tamugan Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
XI Davao del Sur Davao City HEDCOR, Inc. 11.50
Project and RESHERR.
Ruparan Hydroelectric Power Davao de Sur Electric Cooperative, Compliant with the Work Program. Non-compliant with the Posting of
Digos City 5.00
Project Inc. performance bond and RESHERR.

Malita Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Malita LGU of Malita, Davao del Sur 2.50
Project performance bond and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Tudaya 2 Hydroelectric Power


XI Davao del Sur Sta. Cruz Hedcor Tudaya, Inc. Compliant with the Work Plan. Non-compliant with the RESHERR. 7.00
Plant

Tudaya 1 Hydroelectric Power


Hedcor Sibulan, Inc . Compliant with the Work Plan. Non-compliant with the RESHERR. 6.60
Plant
Compostela Upper Maco Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Maco Sta. Clara Power Corp. 4.00
Valley Power Project and RESHERR.
Mt. Leonard Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Sta. Clara Power Corp. 2.00
Power Project and RESHERR.
Tagum R Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Sta. Clara Power Corp. 4.00
Project and RESHERR.
Hijo R. I Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Sta. Clara Power Corp. 3.00
Project and RESHERR.

Hijo R. II Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Sta. Clara Power Corp. 3.00
Project and RESHERR.

New Bataan Hydroelectric Euro Hydro Power (Asia) Holdings, Compliant with the Work Plan. Non-compliant with the Posting of
New Bataan 2.40
Power Project Inc. performance bond and RESHERR.

Davao Baganga River Hydroelectric Compliant with the Posting of Performance Bond and RESHERR. Non-
Baganga Global Sibagat Hydro Power Corp. 11.00
Oriental Power Project compliant with the Work Program.

Cateel River Hydroelectric Compliant with the Posting of Performance Bond and RESHERR. Non-
Global Sibagat Hydro Power Corp. 16.00
Power Project compliant with the Work Program.

Osmeña Hydroelectric Power LGS Renewable Energies Non-compliant with the Work Program, Posting of performance bond
Caraga 2.00
Project Corporation and RESHERR.

Sumlog 2 Hydroelectric Power Alsons Energy Development Non-compliant with the Work Program, Posting of performance bond
Lupon 15.00
Project Corporation and RESHERR.

Sumlog 1 Hydroelectric Power Alsons Energy Development Non-compliant with the Work Program, Posting of performance bond
8.00
Project Corporation and RESHERR.

Davao Hydroelectric Power San Lorenzo Ruiz Olympia Energy Non-compliant with the Work Program, Posting of performance bond
Davao del Sur Davao City 140.00
Project and Water, Inc. and RESHERR.

North Alamada Hydroelectric Power Euro Hydro Power (Asia) Holdings, Compliant with the Work Program. Non-compliant with the Posting of
XII Alamada 1.00
Cotabato Project Inc. performance bond and RESHERR.

Magpet 1 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Magpet Universal Hydrotechnologies, Inc. 9.80
Project performance bond and RESHERR.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

North Magpet 2 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
XII Magpet Universal Hydrotechnologies, Inc. 1.30
Cotabato Project performance bond and RESHERR.

Makilala-1 Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Makilala Universal Hydrotechnologies, Inc. 2.00
Power Project and RESHERR.

Sultan Kabulnan 2 Hydroelectric Compliant with the Work Program. Non-compliant with the Posting of
Isulan Philnewriver Power Corp. 110.00
Kudarat Power Project performance bond and RESHERR.
Siguil 1 Hydroelectric Power Alsons Energy Development Compliant with the Work Program. Non-compliant with the Posting of
Sarangani Maasim 8.70
Project Corporation performance bond and RESHERR.

Siguil 2 Hydroelectric Power Alsons Energy Development Compliant with the Work Program. Non-compliant with the Posting of
3.20
Project Corporation performance bond and RESHERR.

Siguil 3 Hydroelectric Power Alsons Energy Development Compliant with the Work Program. Non-compliant with the Posting of
4.80
Project Corporation performance bond and RESHERR.

Kalaong 3 Hydroelectric Power Alsons Energy Development Non-compliant with the Work Program, Posting of performance bond
Maitum 4.00
Project Corporation and RESHERR.

Kalaong 1 Hydroelectric Power Alsons Energy Development Compliant with the Work Program and Posting of performance bond.
Saranggani Maitum 12.00
Project Corporation Non-compliant with the RESHERR.

Kalaong 2 Hydroelectric Power Alsons Energy Development Compliant with the Work Program and Posting of performance bond.
6.00
Project Corporation Non-compliant with the RESHERR.

South Koronadal & Euro Hydro Power (Asia) Holdings, Compliant with the Work Plan. Non-compliant with the Posting of
Marbel 1 0.50
Cotabato Tampakan Inc. performance bond and RESHERR.

Lanon (Lam-alu) Hydroelectric Euro Hydro Power (Asia) Holdings, Compliant with the Work Plan. Non-compliant with the Posting of
Lake Sebu 9.00
Power Project Inc. performance bond and RESHERR.

Takbo Hydroelectric Power South Cotabato I Electric Non-compliant with the Work Program, Posting of performance bond
Sebu, 15.00
Project Cooperative, Inc. and RESHERR.
Agusan del Taguibo 1 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
XIII Butuan Equi-Parco Construction Co. 2.00
Norte Project performance bond and RESHERR.
Taguibo 2 Hydroelectric Power Compliant with the Work Program. Non-compliant with the Posting of
Equi-Parco Construction Co. 2.00
Project performance bond and RESHERR.
Bugsukan Hydroelectric Power Compliant with the Posting of Performance Bond and RESHERR. Non-
Butuan City Global Sibagat Hydro Power Corp. 5.00
Project compliant with the Work Program.
AWARDED HYDROELECTRICPOWER PROJECTS as of January 31, 2016
POTENTIAL INSTALLED
ISLAND / CITY /
REGION PROVINCE PROJECT NAME COMPANY NAME STATUS CAPACITY CAPACITY
GRID MUNICIPALITY
(MW) (MW)

Agusan del Cabadbaran Hydroelectric FGEN Cabadbaran Hydro Compliant with the Posting of performance bond. Non-compliant with
XIII Cabadbaran 9.75
Norte Power Project Corporation the Work Plan and RESHERR.

Lake Mainit Hydroelectric Compliant with the Work Plan and RESHERR. Non-compliant with the
Jabonga Agusan Power Corporation 25.00
Power Project Posting of performance bond.
Puyo Hydroelectric Power Compliant with the Work Plan and Posting of performance bond. Non-
Jabonga FGEN Puyo Hydro Corporation 30.00
Project compliant with the RESHERR.
Asiga Hydroelectric Power Compliant with the Work Plan. Non-compliant with the Posting of
Santiago Asiga Green Energy Corporation 8.00
Project performance bond and RESHERR.
Surigao del Lower Carac-an Hydroelectric Non-compliant with the Work Program, Posting of performance bond
Cantilan Meadowland Developers, Inc. 5.00
Sur Power Project and RESHERR.
Carac-an Hydroelectric Power Compliant with the Work Program. Non-compliantwith the Posting of
Madrid Hydro Link Projects Corporation 25.00
Project performance bond and RESHERR.
Agusan Del Wawa 1 Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Sibagat Equi-Parco Construction Co. 7.70
Sur Project and RESHERR.
Wawa 2 Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Equi-Parco Construction Co. 7.00
Project and RESHERR.

Wawa 3 Hydroelectric Power Non-compliant with the Work Program, Posting of performance bond
Equi-Parco Construction Co. 5.60
Project and RESHERR.

Wawa Hydroelectric Power Global Sibagat Hydropower Compliant with the Posting of Performance Bond and RESHERR. Non-
13.00
Project Corporation compliant with the Work Program.

Malabang & Maitling River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
ARMM Lanao del Sur AQA Global Power Inc. 50.00
Tubaran Power Project and RESHERR.

Baras River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
AQA Global Power Inc. 30.00
Power Project and RESHERR.

Matadi River Hydroelectric Non-compliant with the Work Program, Posting of performance bond
AQA Global Power Inc. 27.00
Power Project and RESHERR.

Lake Dapao Hydroelectric Non-compliant with the Work Program, Posting of performance bond
AQA Global Power Inc. 50.00
Power Project and RESHERR.

MINDANAO Sum 1,453.62 30.92

Grand Total 7,459.52 139.49