0 оценок0% нашли этот документ полезным (0 голосов)
10 просмотров2 страницы
This document provides guidelines for sizing electrical cables and earth strips based on fault current and clearing time. It specifies that for a 17kA fault level with a 1 second clearing time, an aluminum cable with XLPE insulation and cross-sectional area of 181 square mm is required along with a galvanized iron earth strip sized at 313 square mm. Cable and earth strip sizing is calculated based on material type and fault clearing characteristics using the formula provided.
This document provides guidelines for sizing electrical cables and earth strips based on fault current and clearing time. It specifies that for a 17kA fault level with a 1 second clearing time, an aluminum cable with XLPE insulation and cross-sectional area of 181 square mm is required along with a galvanized iron earth strip sized at 313 square mm. Cable and earth strip sizing is calculated based on material type and fault clearing characteristics using the formula provided.
This document provides guidelines for sizing electrical cables and earth strips based on fault current and clearing time. It specifies that for a 17kA fault level with a 1 second clearing time, an aluminum cable with XLPE insulation and cross-sectional area of 181 square mm is required along with a galvanized iron earth strip sized at 313 square mm. Cable and earth strip sizing is calculated based on material type and fault clearing characteristics using the formula provided.