Вы находитесь на странице: 1из 29

DAILY RE

No Time Start Time Finish Duration TT Number


1 0:00 0:30 0:30 ST-20190314-03836
2 0:30 2:00 1:30 ST-20190314-03861
3 2:00 2:45 0:45 ST-20190314-03863
4 2:45 3:30 0:45 ST-20190314-03869
5 3:30 4:30 1:00 ST-20190314-03872
6 4:30 6:00 1:30 ST-20190314-03876
7 6:00 6:30 0:30 ST-20190314-03878
8 6:30 8:00 1:30 ST-20190314-03880
9 8:00 9:00 1:00
8:00 Handover to Sh
Total 9:00

No Time Start Time Finish Duration TT Number


1 0:00 0:45 0:45 ST-20190314-03884
2 0:45 1:30 0:45 ST-20190314-03886
3 1:30 2:30 1:00 ST-20190314-03890
4 2:30 4:00 1:30 ST-20190314-03897
5 4:00 5:00 1:00 ST-20190314-03900
6 5:00 6:00 1:00 ST-20190314-03907
7 6:00 7:00 1:00 ST-20190314-03911
8 7:00 8:00 1:00 ST-20190314-03917
9 8:00 9:00 1:00
8:00 Handover to Sh
Total 9:00

No Time Start Time Finish Duration TT Number


1 0:00 0:45 0:45 ST-20190314-02933
2 0:45 1:30 0:45 ST-20190314-02940
3 1:30 3:00 1:30 ST-20190314-02945
4 3:00 4:00 1:00 ST-20190314-02949
5 4:00 5:00 1:00 ST-20190314-02966
6 5:00 6:00 1:00 ST-20190314-02970
7 6:00 7:00 1:00 ST-20190314-02981
8 7:00 8:00 1:00 ST-20190314-02985
9 8:00 9:00 1:00
8:00 Handover to Sh
Total 9:00
DAILY REPORT
Description Dispatch by
title RM POWER KWH PLN, LV, MDB Rect Ady
priority
title RM POWER KWH Sent to Yeyen Ady
title RM POWER Panel DC Switch UPS B.2 Lantai 1 Ady
title RM POWER Panel MDB RECT 1.1 Lantai 1 Ady
title A.11.04 Lantai 3 Ady
A.11.05 Lantai 3 Ady
A.11.06 Lantai 3 Ady
A.12.01 Lantai 3 Ady
Break Time
Handover to Shift 2

Description Dispatch by
RM POWER ACPDB MDS A Lantai 2 Fahmi
RM POWER ACPDB MDS B Lantai 2 Fahmi
RM POWER ACPDB 4.3 Lantai 3A Fahmi
A.16.04 Lantai 3 Fahmi
A.16.05 Lantai 3 Fahmi
A.16.06 Lantai 3 Fahmi
A.17.01 Lantai 3 Fahmi
A.05.03 Lantai 3A Fahmi
Break Time
Handover to Shift 2

Description Dispatch by
RM POWER MAIN PANEL 3.A Lantai 3 Jembar
RM POWER MAIN PANEL 3.B Lantai 3 Jembar
B.11.04 Lantai 3 Jembar
B.11.05 Lantai 3 Jembar
B.12.03 Lantai 3 Jembar
B.13.02 Lantai 3 Jembar
B.16.8 Lantai 3A Jembar
A.05.02 Lantai 3A Jembar
Break Time
Handover to Shift 2
Date Thu, 14 Mar 2019
Action Status Job Status Order Number Personil
RM Done FCOM Ady
RM Done FCOM Ady
RM Done FCOM Ady
RM Done FCOM Ady
RM Done FCOM Ady
RM Done FCOM Ady
RM Done FCOM Ady
RM Done FCOM Ady

Team A

Action Status Job Status Order Number Personil


RM Done FCOM Fahmi
RM Done FCOM Fahmi
RM Done FCOM Fahmi
RM Done FCOM Fahmi
RM Done FCOM Fahmi
RM Done FCOM Fahmi
RM Done FCOM Fahmi
RM Done FCOM Fahmi

Team A

Action Status Job Status Order Number Personil


RM Done FCOM Jembar
RM Done FCOM Jembar
RM Done FCOM Jembar
RM Done FCOM Jembar
RM Done FCOM Jembar
RM Done FCOM Jembar
RM Done FCOM Jembar
RM Done FCOM Jembar

Team A
Routine Maintenance Docu
Name: Lambok Name:
Task Documentation Task

RM POWER MAIN PANEL 3.A RM POWER KWH PLN, LV, MDB


Lantai 3 Rect

RM POWER MAIN PANEL 3.B RM POWER KWH Sent to Yeyen


Lantai 3

RM POWER Panel DC Switch UPS


B.11.04 Lantai 3 B.2 Lantai 1

RM POWER Panel MDB RECT 1.1


B.11.05 Lantai 3 Lantai 1
B.12.03 Lantai 3 A.11.04 Lantai 3

B.13.02 Lantai 3 A.11.05 Lantai 3

B.16.8 Lantai 3A A.11.06 Lantai 3

A.12.01 Lantai 3
utine Maintenance Documentation
Fahmi Name: Jembar
Task Documentation Task

RM POWER KWH PLN, LV, MDB RM POWER ACPDB MDS A Lantai


Rect 2

RM POWER ACPDB MDS B Lantai


RM POWER KWH Sent to Yeyen 2

RM POWER Panel DC Switch UPS


B.2 Lantai 1 RM POWER ACPDB 4.3 Lantai 3A

RM POWER Panel MDB RECT 1.1 A.16.04 Lantai 3


Lantai 1
A.11.04 Lantai 3 A.16.05 Lantai 3

A.11.05 Lantai 3 A.16.06 Lantai 3

A.11.06 Lantai 3 A.17.01 Lantai 3

A.12.01 Lantai 3
Documentation
Massive Problem Occured
No TT/Order Number Masive Problem Occured Description Status
1
2
3
Handover to Shift 2

Documentation
No
1

3
m Occured
Action

2
Vendor Activity
No Vendor Name
1
2
3

Handover to Shift 2

Documentation
No
1 0

2 0
Vendor Activity
Job Description Order

Handover to Shift 2

Documentation
0

0
Status
FORM ROUTINE MAINTENANCE KWH PLN, LV and MDB

RM Name RM POWER KWH PLN, LV, MDB Rect Duration 0:30


TT Number ST-20190314-03836 Date 3/14/2019
Location 1st Floor and Outdoor Start Time 0:00
Name of Tester Ady End Time 0:30

No Description Parameter Value Estimation Time

1 KWH PLN STAND KWH LWBP 21699.413


STAND KWH WBP 4324.849
STAND TOTAL KWH 26024.621
STAND KVARH 8541.998
TEGANGAN R (V) 57.641
TEGANGAN S (V) 57.128
TEGANGAN T (V) 57.542
ARUS R (A) 2.377
ARUS S (A) 2.359
ARUS T (A) 2.378
COS Q 0.951 30 Menit
KVA MAX WBP 0.426

2 LVMSB1 KW 10698
KWH 44654

3 MDB Rec 1.1 KW 443.2


KWH 27501812

4 MDB Rec 1.2 KW 442.4


KWH 16141565

Note about this site:

Signature Signature

Ady Dendi Eka Putra


Engineer Supervisor
FORM ROUTINE MAINTENANCE KWH

RM Name RM POWER KWH Sent to Yeyen Duration 1:30


TT Number ST-20190314-03861 Date 3/14/2019
Location All Floor Start Time 0:30
Name of Tester Ady End Time 2:00

Status
No Description KVA KW KVAR KWH Problem Found Estimation Time
OK NOK
1 Panel MDB rec 1.1 434 425 85 27501812 √
2 Panel MDB rec 1.2 422 415 82 16141565 √
3 Panel UPS 1-2 150 145 41 9960852 √
4 Panel UPS A-B 147 141 42 9977556 √
5 Panel UPS 3-4 150 145 45 9917691 √
6 Panel UPS C-D 149 143 41 9948003 √
7 MDP 1 105 105 -8 2211486 √
8 MDP 2 105 105 -8 2236091 √
9 Main Panel 2.1 88 84 28 7020806 √
10 Main Panel 2.2 48 44 13 2087167 √
11 Main Panel 2.A 83 79 27 6755147 √
12 Main Panel 2.B 44 42 13 2039479 √
13 Main Panel 3.1 64 62 15 5110306 √
14 Main Panel 3.2 74 71 21 3412746 √
15 Main Panel 3.A 63 61 -15 1689953 √
16 Main Panel 3.B 72 69 20 3417175 √
17 Main Panel 4.1 4 3 1 484613 √
18 Main Panel 4.A 4 4 2 499946 √
19 MDS A 29 28 -7 1924726 √
20 MDS 1 5 -4 -3 16384 √
21 ACPDB 2.1 20 19 6 2146432 √
22 ACPDB 2.2 26 24 9 1861662 √
23 ACPDB 2.3 16 15 5 1190164 √
24 ACPDB 2.4 24 22 8 1819958 √
25 BUSOL 1 0 0 0 1866 √
26 ACPDB 2.A 13 12 4 1643788 √
27 ACPDB 2.B 30 28 10 2086330 √
28 ACPDB 2.C 16 15 6 1159304 √
29 ACPDB 2.D 25 24 8 1871153 √
30 BUSOL A 0 0 0 2771 √
31 ACPDB 2.5 16 15 4 587808 √
90 Menit
32 ACPDB 2.6 22 20 8 1202734 √
33 ACPDB 2.7 9 9 3 307275 √
34 ACPDB 2.E 15 14 4 551659 √
35 ACPDB 2.F 21 13 14 784912 √
36 ACPDB 2.G 9 8 -3 226115 √
37 ACPDB 3.1 9 8 3 1115204 √
38 ACPDB 3.2 7 7 2 1112608 √
39 ACPDB 3.3 19 18 5 1851113 √
40 ACPDB 3.A 7 7 2 1080154 √
41 ACPDB 3.B 7 7 2 1195134 √
42 ACPDB 3.C 20 20 5 1951609 √
43 ACPDB 3.4 18 17 6 1087453 √
44 ACPDB 3.5 12 11 4 674438 √
45 ACPDB 3.6 16 16 4 484759 √
46 ACPDB 3.7 4 3 1 117885 √
47 ACPDB 3.8 Not Available Not Available Not Available Not Available √ Different Panel Dis
48 ACPDB 3.9 Not Available Not Available Not Available Not Available √ Different Panel Dis
49 ACPDB 3.10 Not Available Not Available Not Available Not Available √ Different Panel Dis
50 ACPDB 3.D 18 12 11 769218 √
51 ACPDB 3.E 17 17 5 871966 √
52 ACPDB 3.F 17 16 4 717613 √
53 ACPDB 3.G 17 16 6 435792 √
54 ACPDB 3.H Not Available Not Available Not Available Not Available √ Different Panel Dis
55 ACPDB 3.I Not Available Not Available Not Available Not Available √ Different Panel Dis
56 ACPDB 3.J Not Available Not Available Not Available Not Available √ Different Panel Dis
57 ACPDB 4.1 0 0 0 39952 √
58 ACPDB 4.2 4 3 1 378622 √
59 ACPDB 4.3 7 6 -2 64847 √
60 ACPDB 4.A 0 0 0 44824 √
61 ACPDB 4.B 4 3 1 371963 √
62 ACPDB 4.C 7 6 -2 63935 √

Note about this site:

Signature Signature

Ady Dendi Eka Putra


Engineer Supervisor
FORM ROUTINE MAINTENANCE

RM Name RM POWER Panel DC Switch UPS B.2 Lantai 1 Periodic


Name of Tester Ady Date 14/03/2019
Work Order No. ST-20190314-03863 Start Time 2:00
Location 1st Floor End Time 2:45

A. General List
Status Estimation
No. Task List Problem Found Remarks Tim e
OK NOK
1 Phisical Check Rack v
2 Phisical check dongle v
3 Labelling Check Rack v 8 menit
4 Thermal Imager Connection
5 cleaning up v

Note about this site:

Signature

Ady

FORM ROUTINE MAINTENANCE

RM Name RM POWER Panel MDB RECT 1.1 Lantai 1 Periodic


Name of Tester Ady Date 14/03/2019
Work Order No. ST-20190314-03869 Start Time 2:45
Location 1st Floor End Time 3:30

A. General List
Status Estimation
No. Task List Problem Found Remarks
OK NOK Tim e
1 Phisical Check Rack v
2 Phisical check dongle v
3 Labelling Check Rack v 8 menit
4 Thermal Imager Connection
5 cleaning up v

B. Metering MDB REC BNB Bandung


Time Volt R Volt S Volt T Arus R Arus S Arus T Freq. Cos Q KW
2 Minute

Note about this site:

Signature

Ady

FORM ROUTINE MAINTENANCE

RM Name RM POWER MAIN PANEL 3.A Lantai 3 Periodic


Name of Tester Jembar Date 14/03/2019
Work Order No. ST-20190314-02933 Start Time 0:00
Location 3rd Floor End Time 0:45

A. General List
Status
No. Task List OK NOK Problem found Remarks Estimation Time
1 Prepare For RM √ - - 10 Menit
2 Phisical Check Rack √ - -
3 Phisical Connection Cable √ - -
4 Labelling Check Rack √ - -
5 Labelling Check Cable √ - - 15 Menit
6 Room Temperature √ - -
7 Cleaning Rack √ - -
8 Thermal Imaging connection √ - -

B. Measurement Record Main Panel


No Parameter Value Estimation Time
1 Summary Voltage (V) 379
Ampere (A) 99
KWH 1391764
2 Power SummaryKW 62
KVAR 16
KVA 64
3 Ampere IR 105
IS 101
IT 89
IN 29

Note about this site:

Signature Signature

Jembar (Name)
Engineer Supervisor

FORM ROUTINE MAINTENANCE

MAIN Panel Name RM POWER MAIN PANEL 3.B Lantai 3 Duration 0:45
Name of Tester Jembar Date 14/03/2019
Work Order No. ST-20190314-02940 Start Time 0:45
Location 3rd Floor End Time 1:30

A. General List
Status
No. Task List Problem found Remarks Estimation Time
OK NOK
1 Prepare For RM √ - - 10 Menit
2 Phisical Check Rack √ - -
3 Phisical Connection Cable √ - -
4 Labelling Check Rack √ - -
5 Labelling Check Cable √ - - 15 Menit
6 Room Temperature √ - -
7 Cleaning Rack √ - -
8 Thermal Imaging connection √ - -

B. Measurement Record Main Panel


No Parameter Value Estimation Time
1 Summary Voltage (V) 378
Ampere (A) 113
KWH 3059543
2 Power SummaryKW 71
KVAR 21
KVA 74
3 Ampere IR 100
IS 114
IT 123
IN 53

Note about this site:

Signature Signature

Jembar (Name)
Engieer Supervisor
ID :

FORM ROUTINE MAINTENANCE PANELACPDB

Panel ACPDB Name RM POWER ACPDB MDS A Lantai 2 Periodic :


Name of Tester Fahmi Date 3/14/2019
Work Order No. ST-20190314-03884 Start Time 0:00
Location : 2nd Floor End Time 0:45
Duration 0:45

A. General List
Status
No. Task List Problem Found
Remarks Estimation Time
OK NOK
1 Prepare For RM v - -
2 Phisical Check Rack v - -
3 Phisical Connection Cabl v - -
4 Labelling Check Rack v - -
5 Labelling Check Cable v - -
6 Room Temperature 24.5⁰ - -
7 Cleaning Rack √ - -
8 Thermal Imaging connecti 22.1⁰ - -

B. Measurement Record Panel ACPDB


Cap Load Estimation
MCB No. Phasa Position Rack Remarks Time
(A) (A)
1 32 R Off -
2 32 R Off -
3 32 R Off -
4 32 R Off -
5 32 R Off -
6 32 R On 7.2 B.17.1 -
7 32 R On 4.4 B.17.2 -
8 32 R On 6.3 B.17.3 -
9 32 R On 0.3 B.17.4 -
10 32 R On 0.8 B.17.5 -
11 32 R Off -
12 32 R On 6.5 B.17.7 -
13 32 R On 4.7 B.17.8 -
14 32 R On 0.9 B.16.1 -
15 32 R On 0.5 B.16.2 -
16 32 R On 3.3 B.16.3 -
17 32 R Off -
18 32 R Off -
19 32 R Off -
20 32 R Off -
21 32 R Off -
22 32 R Off -
23 32 R Off -
24 32 R Off -
25 32 S Off -
26 32 S Off -
27 32 S Off -
28 32 S Off -
29 32 S Off -
30 32 S Off -
31 32 S On 0.8 B.17.2 -
32 32 S On 2.1 B.16.4 -
33 32 S Off -
34 32 S On 4.3 B.16.7 -
35 32 S ON 4.8 B.16.8 -
36 32 S On 10.9 B.14.1 -
37 32 S On 2.1 B.15.2 -
38 32 S Off -
39 32 S Off -
40 32 S Off -
41 32 S Off -
42 32 S Off -
43 32 S Off -
44 32 S Off -
45 32 S Off -
46 32 S Off -
47 32 S Off -
48 32 S Off -
49 32 T Off -
50 32 T Off -
51 32 T Off -
52 32 T Off -
53 32 T Off -
54 32 T Off -
55 32 T Off -
56 32 T On 11.1 B.14.8 -
57 32 T On 5.2 B.15.8 -
58 32 T On 7.6 B.15.1 -
59 32 T On 3 B.15.2 -
60 32 T On 6.6 B.15.3 -
61 32 T On 5 B.15.4 -
62 32 T On 0.1 B.15.5 -
63 32 T On 5.7 B.15.6 -
64 32 T On 2.1 B.16.6 -
65 32 T On 3.6 B.15.8 -
66 32 T Off -
67 32 T Off -
68 32 T Off -
69 32 T Off -
70 32 T Off -
71 32 T Off -
72 32 T Off -

Note about this site:

Signature Signature

Fahmi (Name)
Engineer Supervisor
ID : ID :

FORM ROUTINE MAINTENANCE PANELACPDB

Panel ACPDB Name RM POWER ACPDB MDS B Lantai 2 Periodic :


Name of Tester Fahmi Date 14/03/2019
Work Order No. ST-20190314-03886 Start Time 0:45
Location : 2nd Floor End Time 1:30
Duration 0:45

A. General List
Status
No. Task List Problem Found
Remarks Estimation Time
OK NOK
1 Prepare For RM v - -
2 Phisical Check Rack v - -
3 Phisical Connection Cabl v - -
4 Labelling Check Rack v - -
5 Labelling Check Cable v - -
6 Room Temperature 24.5⁰ - -
7 Cleaning Rack √ - -
8 Thermal Imaging connecti 22.1⁰ - -

B. Measurement Record Panel ACPDB


Cap Load Estimation
MCB No. Phasa Position Rack Remarks Time
(A) (A)
1 32 R Off -
2 32 R Off -
3 32 R Off -
4 32 R Off -
5 32 R Off -
6 32 R Off -
7 32 R Off -
8 32 R Off -
9 32 R Off -
10 32 R Off -
11 32 R Off -
12 32 R Off -
13 32 R Off -
14 32 R Off -
15 32 R Off -
16 32 R Off -
17 32 R Off -
18 32 R Off -
19 32 R Off -
20 32 R Off -
21 32 R Off -
22 32 R Off -
23 32 R Off -
24 32 R Off -
25 32 S Off -
26 32 S Off -
27 32 S Off -
28 32 S Off -
29 32 S Off -
30 32 S Off -
31 32 S Off -
32 32 S Off -
33 32 S Off -
34 32 S Off -
35 32 S Off -
36 32 S Off -
37 32 S Off -
38 32 S Off -
39 32 S Off -
40 32 S Off -
41 32 S Off -
42 32 S Off -
43 32 S Off -
44 32 S Off -
45 32 S Off -
46 32 S Off -
47 32 S Off -
48 32 S Off -
49 32 T Off -
50 32 T Off -
51 32 T Off -
52 32 T Off -
53 32 T Off -
54 32 T Off -
55 32 T Off -
56 32 T Off -
57 32 T Off -
58 32 T Off -
59 32 T Off -
60 32 T Off -
61 32 T Off -
62 32 T Off -
63 32 T Off -
64 32 T Off -
65 32 T Off -
66 32 T Off -
67 32 T Off -
68 32 T Off -
69 32 T Off -
70 32 T Off -
71 32 T Off -
72 32 T Off -

Note about this site:

Signature Signature

Fahmi (Name)
Engineer Supervisor
ID : ID :

FORM ROUTINE MAINTENANCE PANEL DCPDB

Panel DCPDB Name RM POWER ACPDB 4.3 Lantai 3A Periodic


Name of Tester Fahmi Date 3/14/2019
Work Order No. ST-20190314-03890 Start Time 1:30
Location : 3A Floor End Time 2:30

A. General List
Status
No. Task List Problem Found
Remarks Estimation Time
OK NOK
1 Prepare For RM v - -
2 Phisical Check Rack v - -
3 Phisical Connection Cabl v - -
4 Labelling Check Rack v - -
5 Labelling Check Cable v - -
6 Room Temperature 24.5⁰ - -
7 Cleaning Rack √ - -
8 Thermal Imaging connecti 22.1⁰ - -

B. Measurement Record Panel ACPDB


Cap Load Estimation
MCB No. Phasa Position Rack Remarks
(A) (A) Time
1 32 R -
2 32 R -
3 32 R -
4 16 R -
5 32 R ON 7.2 A.19.02 -
6 32 R ON 7.8 A.19.04 -
7 32 R -
8 32 R -
9 32 R -
10 32 R -
11 32 R -
12 32 R -
13 32 S -
14 32 S -
15 32 S -
16 32 S -
17 32 S ON 7.1 A.20.02 -
18 32 S ON 7.8 A.20.04 -
19 32 S -
20 32 S -
21 32 S -
22 32 S -
23 32 S -
24 32 S -
25 32 T ON 2.1 A.20.06 -
26 32 T -
27 32 T -
28 32 T -
29 32 T -
30 32 T ON 2.5 A.20.06 -
31 32 T -
32 32 T -
33 32 T -
34 32 T -
35 32 T -
36 32 T -

Note about this site:

Signature Signature

Fahmi (Name)
Engineer Supervisor
ID : ID :
FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.11.04 Lantai 3 Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-03872 Start Time : 3:30 for server
Location : Lantai 3 End Time : 4:30 for router
Duration : 1:00 Minutes for switch
for storage
A. General if any alarm or problem
Status Estimation Time
No. Task List Problem Found Action Required (Minutes)
OK NOK
1 Prepare RM v 7
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2 16
4 Environment v 3
5 Clean & tidy up rack v 1

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1
HOSTNAME: BDGDRC-MGT01 S/N : USB84330ML Type : SWITCH HOSTNAME: BDGDRC-MGT03 S/N : USB84330ML Type : SWITCH
No. Status Estimation Time No. Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 8 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 18 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 2 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1

HOSTNAME: BDGDRC-HB01 USB84330ML SWITCH HOSTNAME: BBDGDRC-SDBILL01 USB84330ML SWITCH


S/N : Type : S/N : Type :
No. No.
Status Estimation Time Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 6 1 Labelling check Connection v 7
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 15 3 Led check indicator v 2 16
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

SIGNATURE SIGNATURE

Ady
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.11.05 Lantai 3 Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-03876 Start Time : 4:30 for server
Location : Lantai 3 End Time : 6:00 for router
Duration : 1:30 Minutes for switch
for storage
A. General if any alarm or problem
Status Estimation Time
No. Task List Problem Found Action Required (Minutes)
OK NOK
1 Prepare RM v 6
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2 16
4 Environment v 3
5 Clean & tidy up rack v 2

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1
HOSTNAME: BDGDRC-MGT02 S/N : USB84330ML Type : SWITCH HOSTNAME: BDGDRC-MGT04 S/N : USB84330ML Type : SWITCH
No. Status Estimation Time No. Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 6
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 15
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1
HOSTNAME: BDGDRC-HB02 S/N : USB84330ML Type : SWITCH HOSTNAME: BDGDRC-SDBILL02 S/N : USB84330ML Type : SWITCH
No. Status Estimation Time No. Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 4 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 13 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data


EQUIPMENT 1
HOSTNAME: BDGDRC-HB04 S/N : USB84330ML Type : SWITCH
No. Status Estimation Time
Task List Problem Found Action Required (Minutes)
OK NOK
1 Labelling check Connection v 6
2 Port check existing v 3
3 Led check indicator v 2 15
4 check Temperature by thermal imager v 3
5 Check PSU v 1

SIGNATURE SIGNATURE

Ady
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.11.06 Lantai 3 Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-03878 Start Time : 6:00 for server
Location : Lantai 3 End Time : 6:30 for router
Duration : 0:30 Minutes for switch
for storage
A. General if any alarm or problem
Status Estimation Time
No. Task List Problem Found Action Required (Minutes)
OK NOK
1 Prepare RM v 2
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2 13
4 Environment v 3
5 Clean & tidy up rack v 3

B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 2
bdgbnbemptes01 SGH252JLMJ bdgbnbempdev01 SGH252JLMY
HOSTNAME: S/N : Type : SERVER HOSTNAME: S/N : Type : SERVER
No. Status Estimation Time No. Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 3 1 Labelling check Connection v 3
2 Port check existing v 2 2 Port check existing v 2
3 Led check indicator v 2 12 3 Led check indicator v 2 11
4 check Temperature by thermal imager v 2 4 check Temperature by thermal imager v 2
5 Check PSU v 3 5 Check PSU v 2

SIGNATURE SIGNATURE

Ady
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.12.01 Lantai 3 Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-03880 Start Time : 6:30 for server
Location : Lantai 3 End Time : 8:00 for router
Duration : 1:30 Minutes for switch
for storage
A. General if any alarm or problem
Status Estimation Time
No. Task List Problem Found Action Required (Minutes)
OK NOK
1 Prepare RM v 3
2 Phisical Check Rack v 2
3 Labelling Check Rack v 2 11
4 Environment v 2
5 Clean & tidy up rack v 2

B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 2 FOX 1446GXN1
BDGDRC-BIL-SF-SA01 FOX 1429GXGL BDGDRC-BIL-SF-SA02
HOSTNAME: S/N : Type : SWITCH HOSTNAME: S/N : Type : SWITCH
No. Status Estimation Time No. Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 4 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 15
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 2 5 Check PSU v 2

EQUIPMENT 1 EQUIPMENT 2
BDGDRC-SAHBEMP-03FL01 BDGDRC-SAHBEMP-03FL02
HOSTNAME: S/N : Type : SWITCH HOSTNAME: S/N : Type : SWITCH
No. Status Estimation Time No. Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 4
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 15 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 2 5 Check PSU v 2

EQUIPMENT 1 EQUIPMENT 2
BDGDRC-SASFEMP-03FL01 BDGDRC-SASFEMP-03FL02
HOSTNAME: S/N : Type : SWITCH HOSTNAME: S/N : Type : SWITCH
No. Status Estimation Time No. Status Estimation Time
Task List Problem Found Action Required (Minutes) Task List Problem Found Action Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 4 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 2
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 2 5 Check PSU v 2

SIGNATURE SIGNATURE

Ady
ENGINEER SUPERVISOR
FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : B.11.04 Lantai 3 Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-02945 Start Time : 1:30 for server
Location : Lantai 3 End Time : 3:00 for router
Duration 1:30 Minutes for switch
for storage
A. General if any alarm or problem
Status
No. Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Prepare RM v 6
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2 16
4 Environment v 3
5 Clean & tidy up rack v 2

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 2
HOSTNAME: SOA EXT0 1 SWITCH HOSTNAME: FOX15 30 GSR K SWITCH
S/N : Type : S/N : Type :
No. Status No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


BD GD RC-SA BIL- EQUIPMENT
FOX153 0GPDT1 EQUIPMENT 2
HOSTNAME: SOA MGT02 S/N : Type : SWITCH HOSTNAME: S/N : Type : SWITCH
No. Status No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

SIGNATURE SIGNATURE

Jembar
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : B.11.05 Lantai 3 Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-02949 Start Time : 3:00 for server
Location : Lantai 3 End Time : 4:00 for router
Duration 1:00 Minutes for switch
for storage
A. General if any alarm or problem
Status
No. Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Prepare RM v 6
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2 16
4 Environment v 3
5 Clean & tidy up rack v 2

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 B DGDRC -SABIL-SOA IN T0 2 EQUIPMENT 2 FOX15 30GSQK
SOA EXT0 2
HOSTNAME: S/N : Type : SWITCH HOSTNAME: S/N : Type : SWITCH
No. Status No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 2
SOAHB 02
HOSTNAME: S/N : Type : SWITCH HOSTNAME: S/N : Type : SWITCH
No. Status No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

SIGNATURE SIGNATURE

Jembar
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : B.12.03 Lantai 3 Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-02966 Start Time : 4:00 for server
Location : Lantai 3 End Time : 5:00 for router
Duration 1:00 Minutes for switch
for storage
A. General if any alarm or problem
Status
No. Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Prepare RM v 6
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2 16
4 Environment v 3
5 Clean & tidy up rack v 2

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 2
SOA MGT01 FOX1 53 OGSQC
HOSTNAME: S/N : Type : SWITCH HOSTNAME: S/N : Type : SWITCH
No. Status No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data


SOABU 01 EQUIPMENT 1
FOX1 52 9GLEM
HOSTNAME: S/N : Type : SWITCH
No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Labelling check Connection v 5
2 Port check existing v 3
3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3
5 Check PSU v 1

SIGNATURE SIGNATURE

Jembar
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : B.13.02 Lantai 3 Date 14-Mar-19 Color Code:


Work Order No. : ST-20190314-02970 Start Time 5:00 for server
Location : Lantai 3 End Time 6:00 for router
Name Of Tester : Jembar Duration 1:00 Minutes for switch
for storage
A. General if any alarm or problem
Status
No. Task List Problem Found Estim ation Tim e (Minutes)
OK NOK
1 Prepare RM v 6
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2
18
4 Environment v 3
5 Clean & tidy up rack v 2
6 Check Room Temperature v (24,3) 2

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 303 KEHC
SGH BDG-SOA-ESB1EQUIPMENT
6 2
Expansion (pha se 3) SGH 252 JLN6
HOSTNAME: S/N : Type : SWITCH HOSTNAME: S/N : Type : SERVER
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required (Min utes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v (24,3) 3 4 check Temperature by thermal imager v (24,3) 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1 SGH25 2JL RH
Expansion (pha se 3) SGH3 03KEK8
HOSTNAME: S/N : Type : SERVER HOSTNAME: S/N : Type : SERVER
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required (Min utes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v (24,3) 3 4 check Temperature by thermal imager v (24,3) 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


Expansion (pha se 3) EQUIPMENT 1 EQUIPMENT 2
SGH 30 3KEKH SGH2 52JL RX
HOSTNAME: S/N : Type : SERVER HOSTNAME: S/N : Type : SERVER
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required (Min utes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v (24,3) 3 4 check Temperature by thermal imager v (24,3) 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1 SGH 252 JLS4
HOSTNAME: Expansion (pha se 3) SGH3 03 KEJP SERVER HOSTNAME: SERVER
S/N : Type : S/N : Type :
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required (Min utes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v (24,3) 3 4 check Temperature by thermal imager v (24,3) 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data B. Electrical And Environment Data


BDG-SOA-ESB1 8 EQUIPMENT 1
SGH25 2JL RM EQUIPMENT 2
SGH2 52JL RV
HOSTNAME: S/N : Type : SERVER HOSTNAME: S/N : Type : SERVER
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required (Min utes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v (24,3) 3 4 check Temperature by thermal imager v (24,3) 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data


BDG-SOA-ESB1 7 EQUIPMENT 1
SGH25 2JL S0
HOSTNAME: S/N : Type : SERVER
No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Labelling check Connection v 5
2 Port check existing v 3
3 Led check indicator v 2 14
4 check Temperature by thermal imager v (24,3) 3
5 Check PSU v 1

SIGNATURE SIGNATURE

Jembar
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : B.16.8 Lantai 3A Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-02981 Start Time : 6:00 for server
Location : Lantai 3A End Time : 7:00 for router
Name Of Tester : Jembar Duration 1:00 Minutes for switch
for storage
A. General if any alarm or problem
Status
No. Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Prepare RM v 6
2 Phisical Check Rack v 3
3 Labelling Check Rack v 2 16
4 Environment v 3
5 Clean & tidy up rack v 2

B. Electrical And Environment Data B. Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 2
SOA MGT01 FOX1 53 OGSQC SWITCH SWITCH
HOSTNAME: S/N : Type : HOSTNAME: S/N : Type :
No. Status No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 5 1 Labelling check Connection v 5
2 Port check existing v 3 2 Port check existing v 3
3 Led check indicator v 2 14 3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3 4 check Temperature by thermal imager v 3
5 Check PSU v 1 5 Check PSU v 1

B. Electrical And Environment Data


SOABU 01 EQUIPMENT 1
FOX1 52 9GLEM
HOSTNAME: S/N : Type : SWITCH
No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Labelling check Connection v 5
2 Port check existing v 3
3 Led check indicator v 2 14
4 check Temperature by thermal imager v 3
5 Check PSU v 1

SIGNATURE SIGNATURE

Jembar
ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.05.02 Lantai 3A Date Thursday, March 14, 2019 Color Code:
Work Order No. : ST-20190314-02985 Start Time 7:00 for server
Location : 3A Floor End Time 8:00 for router
Name Tester : Jembar Duration 1:00 Hour for switch
for storage
A. General if any alarm or problem
Status
No. Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Prepare RM v
2 Phisical Check Rack v
3 Labelling Check Rack v
20 minutes
4 Environment v
5 Clean & tidy up rack v
6 Check Room Temperature v (25,7)

B. Electrical And Environment Data C Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1
HOSTNAME: BNBFIBRIDGECHASSIS01 S/N : Type : Fibridge HOSTNAME: BNBFIBRIDGECHASSIS02 S/N : Type : Fibridge
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required (Min utes)
OK NOK OK NOK
1 Labelling check Connection v 1 Labelling check Connection v
2 Port check existing v 2 Port check existing v
3 Led check indicator v 10 Minutes 3 Led check indicator v 10 Minutes
4 check Temperature by thermal imager v (21,2) 4 check Temperature by thermal imager v (22,2)
5 Check PSU v 5 Check PSU v

D Electrical And Environment Data E Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1
HOSTNAME: BNBFIBRIDGECHASSIS03 S/N : Type : Fibridge HOSTNAME: BNBFIBRIDGECHASSIS04 S/N : Type : Fibridge
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required(Min utes)
OK NOK OK NOK
1 Labelling check Connection v 1 Labelling check Connection v
2 Port check existing v 2 Port check existing v
3 Led check indicator v 10 Minutes 3 Led check indicator v 10 Minutes
4 check Temperature by thermal imager v (21,4) 4 check Temperature by thermal imager v (21,3)
5 Check PSU v 5 Check PSU v

F Electrical And Environment Data G Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1
HOSTNAME: MODEM 4E1 REOP - Garut S/N : Type : Modem HOSTNAME: MODEM 4E1 REOP - Cikalong S/N : Type : Modem
No. Status No. Status Estimatio n Time
Task List Problem Found Action Required Estim ation Tim e (Minutes) Task List Problem FoundAction Required(Min utes)
OK NOK OK NOK
1 Labelling check Connection v 1 Labelling check Connection v
2 Port check existing v 2 Port check existing v
3 Led check indicator v 5 Minutes 3 Led check indicator v 5 Minutes
4 check Temperature by thermal imager v (21,5) 4 check Temperature by thermal imager v (21,2)
5 Check PSU v 5 Check PSU v

F Electrical And Environment Data


EQUIPMENT 1
HOSTNAME: MODEM 4E1 REOP - Purwak S/N : Type : Modem
No. Status
Task List Problem Found Action Required Estim ation Tim e (Minutes)
OK NOK
1 Labelling check Connection v
2 Port check existing v
3 Led check indicator v 5 Minutes
4 check Temperature by thermal imager v (21,2)
5 Check PSU v

SIGNATURE SIGNATURE

Jembar Dendi
Engineer Supervisor
FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.16.04 Lantai 3 Date : 14-Mar-19


Work Order No. : ST-20190314-03897 Start Time : 2:30
Location : Lantai 3 End Time : 4:00
Duration : 1:30 Minutes

A. General
Status
No. Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Prepare RM v
2 Phisical Check Rack v
3 Labelling Check Rack v 35 minutes
4 Environment v
5 Clean & tidy up rack v

B. Electrical And Environment Data


EQUIPMENT 1
HOSTNAME: XP24K BILLING DRC S/N : 48016 R1 Type : XP 24 K
No. Status
Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Labelling check Connection v
2 Port check existing v
3 Led check indicator v 15 minutes
4 check Temperature by thermal imager v
5 Check PSU v

SIGNATURE SIGNATURE

ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.16.05 Lantai 3 Date : 14-Mar-19


Work Order No. : ST-20190314-03900 Start Time : 4:00
Location : Lantai 3 End Time : 5:00
Duration : 1:00 Minutes

A. General
Status
No. Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Prepare RM v
2 Phisical Check Rack v
3 Labelling Check Rack v 35 minutes
4 Environment v
5 Clean & tidy up rack v

B. Electrical And Environment Data


EQUIPMENT 1
HOSTNAME: XP24K BILLING DRC (BNB-XP24K-XL1)S/N : 48016 CTL Type : XP 24 K
No. Status
Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Labelling check Connection v
2 Port check existing v
3 Led check indicator v 15 minutes
4 check Temperature by thermal imager v
5 Check PSU v

SIGNATURE SIGNATURE

ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.16.06 Lantai 3 Date : 14-Mar-19


Work Order No. : ST-20190314-03907 Start Time : 5:00
Location : Lantai 3 End Time : 6:00
Duration : 1:00 Minutes

A. General
Status
No. Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Prepare RM v
2 Phisical Check Rack v
3 Labelling Check Rack v 35 minutes
4 Environment v
5 Clean & tidy up rack v

B. Electrical And Environment Data


EQUIPMENT 1
HOSTNAME: XP24K BILLING DRC S/N : 18715 L1 Type : XP 24 K
No. Status
Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Labelling check Connection v
2 Port check existing v
3 Led check indicator v 15 minutes
4 check Temperature by thermal imager v
5 Check PSU v

SIGNATURE SIGNATURE

ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.17.01 Lantai 3 Date : 14-Mar-19


Work Order No. : ST-20190314-03911 Start Time : 6:00
Location : Lantai 3 End Time : 7:00
Duration : 1:00 Minutes

A. General
Status
No. Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Prepare RM v
2 Phisical Check Rack v
3 Labelling Check Rack v 35 minutes
4 Environment v
5 Clean & tidy up rack v

B. Electrical And Environment Data


EQUIPMENT 1
HOSTNAME: BNB-XP20K-XL2 S/N : JPHA 200554 Type : XP 24 K
No. Status
Task List Problem Found Action Required Estimation Time (Minutes)
OK NOK
1 Labelling check Connection v
2 Port check existing v
3 Led check indicator v 15 minutes
4 check Temperature by thermal imager v
5 Check PSU v

SIGNATURE SIGNATURE

ENGINEER SUPERVISOR

FORM ROUTINE MAINTENANCE EQUIPMENT

Service Name : A.05.03 Lantai 3A Date : 14-Mar-19 Color Code:


Work Order No. : ST-20190314-03917 Start Time : 7:00 for server
Location : 3A Floor End Time : 8:00 for router
Name Tester : Fahmi Duration : 1:00 Minutes for switch
for storage
A. General if any alarm or problem
Status
No. Task List Problem Found
Action Required
Estimation Time (Minutes)
OK NOK
1 Prepare RM v
2 Phisical Check Rack v
3 Labelling Check Rack v
20 minutes
4 Environment v
5 Clean & tidy up rack v
6 Check Room Temperature v (25,7)

B. Electrical And Environment Data C Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1

Ty
HOSTNAME: BNBFIBRIDGECHASSIS01 p Fibridge HOSTNAME: BNBFIBRIDGECHASSIS02 Fibridge
No. e No.
S/N : : S/N : Type :
Status Status Estimation Time
Task List Problem Found
Action Required
Estimation Time (Minutes) Task List Problem FoundAction Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 1 Labelling check Connection v
2 Port check existing v 2 Port check existing v
3 Led check indicator v 10 Minutes 3 Led check indicator v 10 Minutes
4 check Temperature by thermal imager v (21,2) 4 check Temperature by thermal imager v (22,2)
5 Check PSU v 5 Check PSU v

D Electrical And Environment Data E Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1

Ty
HOSTNAME: BNBFIBRIDGECHASSIS03 p Fibridge HOSTNAME: BNBFIBRIDGECHASSIS04 Fibridge
No. e No.
S/N : : S/N : Type :
Status Status Estimation Time
Task List Problem Found
Action Required
Estimation Time (Minutes) Task List Problem FoundAction Required (Minutes)
OK NOK OK NOK
1 Labelling check Connection v 1 Labelling check Connection v
2 Port check existing v 2 Port check existing v
3 Led check indicator v 10 Minutes 3 Led check indicator v 10 Minutes
4 check Temperature by thermal imager v (21,4) 4 check Temperature by thermal imager v (21,3)
5 Check PSU v 5 Check PSU v

F Electrical And Environment Data G Electrical And Environment Data


EQUIPMENT 1 EQUIPMENT 1

Ty
HOSTNAME: MODEM 4E1 REOP - Garut p Modem HOSTNAME: MODEM 4E1 REOP - Cikalong Modem
No. e No.
S/N : : S/N : Type :
Status Status Estimation Time
Task List Problem Found
Action Required
Estimation Time (Minutes) Task List Problem FoundAction Required(Minutes)
OK NOK OK NOK
1 Labelling check Connection v 1 Labelling check Connection v
2 Port check existing v 2 Port check existing v
3 Led check indicator v 5 Minutes 3 Led check indicator v 5 Minutes
4 check Temperature by thermal imager v (21,5) 4 check Temperature by thermal imager v (21,2)
5 Check PSU v 5 Check PSU v

F Electrical And Environment Data


EQUIPMENT 1

Ty
HOSTNAME: MODEM 4E1 REOP - Purwak p Modem
No. e
S/N : :
Status
Task List Problem Found
Action Required
Estimation Time (Minutes)
OK NOK
1 Labelling check Connection v
2 Port check existing v
3 Led check indicator v 5 Minutes
4 check Temperature by thermal imager v (21,2)
5 Check PSU v

SIGNATURE SIGNATURE

Dendi
Engineer Supervisor
FORM ROUTINE MAINTENANCE

Service Name : Maintenance Rack B.20.04


Name Of Tester : Err:509
Work Order No. : ST-20151031-02803
Location : Lantai 3

A. General
Status
No. Task List
OK
1 Prepare RM v
2 Phisical Check Rack v
3 Labelling Check Rack v
4 Environment v
5 Clean & tidy up rack v

Electrical
B. And Environment Data
EQUIPMENT 1 BDGSHO03-SAGPRSIN01
HOSTNAME:
No. Status
Task List
OK
1 Labelling check Connection v
2 Port check existing v
3 Led check indicator v
4 check Temperature by thermal imager v(22,1⁰)
5 Check PSU v

SIGNATURE

ENGINEER
ROUTINE MAINTENANCE EQUIPMENT

Rack B.20.04 Date : 30-Oct-15


Start Time : 3:00
-02803 End Time : 4:20
Duration : 80

Status Problem Found


Action Required
NOK
10
8
2
3
10

"FOX1413GQ3C
S/N : Type :
Status Problem Found
Action Required
NOK
13
5
3
5
2

SIGNATURE

Dendi Eka Putra


SUPERVISOR
Color Code:
for server
for router
Minutes for switch
for storage
if any alarm or problem

Estimation Time (Minutes)

33

"BDGSHO03-SAGPRSIN02
EQUIPMENT 2
"
SWITCH HOSTNAME: S/N :
No. Status
Estimation Time (Minutes) Task List
OK NOK
1 Labelling check Connection v
2 Port check existing v
28 3 Led check indicator v
4 check Temperature by thermal imager v(22,5⁰)
5 Check PSU v
EQUIPMENT 2
FOX1405H6TW
Type : SWITCH

Problem Found Action Required Estimation Time (Minutes)

4
5
3 19
5
2

Вам также может понравиться