ZONE 2 - CLASH 1 - ALL

DUCTWORK AND UNIT ZONE 1 - CLASH 1 - WITH


CLASHES WITH TRUSSES TRUSSES
(NEED BOXED OUT AREA (NEED BOXED OUT AREA
FOR UNIT, SUPPLY AIR FOR SUPPLY AIR DUCT
AND RETURN AIR DUCT THROUGH WALL)
SO IT CAN RUN THROUGH
TRUSSES)

ZONE 3 - CLASH 3 WITH


TRUSSES
(NEED BOXED OUT AREA ZONE 1 - CLASH 2 - WITH
THROUGH WALL FOR TRUSSES
PENETRATION) (NEED BOXED OUT AREA
FOR EXHAUST AIR DUCT
THROUGH TRUSSES)

ZONE 3 - CLASH 1 WITH


TRUSSES
(NEED BOXED OUT AREA
THROUGH WALL FOR
PENETRATION)

ZONE 1 - CLASH 2 - WITH


TRUSSES
(NEED BOXED OUT AREA
ZONE 3 - CLASH 2 WITH ZONE 5 - CLASH 2 - WITH FOR EXHAUST AIR DUCT
TRUSSES TRUSSES THROUGH WALL)
(NEED BOXED OUT AREA (NEED BOXED OUT AREA
FOR UNIT THROUGH WALL FOR UNIT, SUPPLY AND
ZONE 5 - CLASH 2 - WITH ZONE 4 - CLASH 6 - WITH
AND EXHAUST DUCT RUN EXHAUST AIR DUCT
TRUSSES TRUSSES
THROUGH TRUSSES) THROUGH TRUSSES AND
(NEED BOXED OUT AREA (NEED BOXED OUT AREA
WALLS)
FOR SUPPLY AND FOR EXHAUST AIR
EXHAUST AIR DUCT THROUGH TRUSSES AND
THROUGH TRUSSES) WALL).
PS TRUSSES SEEM TO
EXTEND PAST WALL.

ZONE 4 - CLASH 1 - WITH


TRUSSES
(NEED BOXED OUT AREA
FOR SUPPLY AIR AND
EXHAUST THROUGH
TRUSSES AND WALL)

ZONES 6 RECEIVED 21/6/2019


AND ZONE 7 RECIEVED
26/6/2019 - STILL FINALISING
COORDINATION.

ZONE 4 - CLASH 3 - WITH ZONE 4 - CLASH 2 - WITH


TRUSSES TRUSSES
(NEED BOXED OUT AREA (NEED BOXED OUT AREA
FOR MAKEUP AIR, FOR SUPPLY AIR AND
KITCHEN EXHAUST, EXHAUST THROUGH
RETURN AND SUPPLY AIR TRUSSES AND WALL)
THROUGH TRUSSES AND
WALL)

ZONE 4 - CLASH 4 & 5 -


WITH TRUSSES
(NEED BOXED OUT AREA
FOR DISHWASHER
EXHAUST AIR DUCT
RISING FROM RANGE
HOOD AND KITCHEN
EXHAUST COMING
THROUGH WALL)