DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

1618 + 340 0.000


0.701 20.000 14.010
1618 + 360 1.401
0.701 20.000 14.010
1618 + 380 0.000
0.000 20.000 0.000
1618 + 400 0.000
0.000 20.000 0.000
1618 + 420 0.000
0.000 20.000 0.000
1618 + 440 0.000
0.000 20.000 0.000
1618 + 460 0.000
0.000 20.000 0.000
1618 + 480 0.000
0.000 20.000 0.000
1618 + 500 0.000
0.000 20.000 0.000
1618 + 520 0.000
0.000 20.000 0.000
1618 + 540 0.000
0.000 20.000 0.000
1618 + 560 0.000
0.000 20.000 0.000
1618 + 580 0.000
0.000 20.000 0.000
1618 + 600 0.000
0.000 20.000 0.000
1618 + 620 0.000
0.000 20.000 0.000
1618 + 640 0.000
0.000 20.000 0.000
1618 + 680 0.000
0.000 20.000 0.000
1618 + 700 0.000
0.000 20.000 0.000
1618 + 720 0.000
0.000 20.000 0.000
1618 + 740 0.000
0.000 20.000 0.000
1618 + 760 0.000
0.000 20.000 0.000
1618 + 780 0.000
0.000 20.000 0.000
1618 + 800 0.000
0.000 20.000 0.000
1618 + 820 0.000
0.000 20.000 0.000
1618 + 840 0.000
0.000 20.000 0.000
1618 + 860 0.000
0.000 20.000 0.000
1618 + 445 0.000
0.000 20.000 0.000
1618 + 452 0.000
0.000 20.000 0.000
1618 + 880 0.000
0.000 20.000 0.000
1618 + 900 0.000
0.000 3.000 0.000
1618 + 903 0.000
TOTAL FOR ITEM 104(1)a1 28.020
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

0.280 17.000 4.760


1618 + 920 0.560
0.480 20.000 9.600
1618 + 940 0.400
0.805 20.000 16.100
1618 + 960 1.210
6.505 20.000 130.100
1618 + 980 11.800
15.990 20.000 319.800
1619 + 000 20.180
10.975 20.000 219.500
1619 + 020 1.770
1.855 20.000 37.100
1619 + 040 1.940
1.480 20.000 29.600
1619 + 060 1.020
1.510 20.000 30.200
1619 + 080 2.000
2.855 20.000 57.100
1619 + 100 3.710
4.860 20.000 97.200
1619 + 120 6.010
5.860 20.000 117.200
1619 + 140 5.710
9.910 20.000 198.200
1619 + 160 14.110
16.110 20.000 322.200
1619 + 180 18.110
9.055 20.000 181.100
1619 + 200 0.000
0.040 20.000 0.800
1619 + 220 0.080
2.060 20.000 41.200
1619 + 240 4.040
3.525 20.000 70.500
1619 + 260 3.010
2.425 20.000 48.500
1619 + 280 1.840
1.485 20.000 29.700
1619 + 300 1.130
1.160 20.000 23.200
1619 + 320 1.190
1.095 20.000 21.900
1619 + 340 1.000
1.045 20.000 20.900
1619 + 360 1.090
2.345 20.000 46.900
1619 + 380 3.600
4.695 20.000 93.900
1619 + 400 5.790
4.025 20.000 80.500
1619 + 420 2.260
1.745 20.000 34.900
1619 + 440 1.230
0.935 20.000 18.700
1619 + 460 0.640
0.395 20.000 7.900
1619 + 480 0.150
TOTAL FOR ITEM 104(1)a1 2,309.260
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
0.195 20.000 3.900
1619 + 500 0.240
0.325 20.000 6.500
1619 + 520 0.410
0.205 20.000 4.100
1619 + 540 0.000
0.000 20.000 0.000
1619 + 560 0.000
0.075 20.000 1.500
1619 + 580 0.150
0.150 20.000 3.000
1619 + 600 0.150
0.075 20.000 1.500
1619 + 620 0.000
0.080 20.000 1.600
1619 + 640 0.160
0.160 20.000 3.200
1619 + 660 0.160
0.080 20.000 1.600
1619 + 680 0.000
0.000 20.000 0.000
1619 + 700 0.000
0.070 20.000 1.400
1619 + 720 0.140
0.070 20.000 1.400
1619 + 740 0.000
0.000 20.000 0.000
1619 + 760 0.000
0.005 20.000 0.100
1619 + 780 0.010
0.560 20.000 11.200
1619 + 800 1.110
1.110 9.670 10.734
1619 + 809.67 1.110
3.105 0.000 0.000
1619 + 896.42 5.100
5.100 3.580 18.258
1619 + 900 5.100
5.650 20.000 113.000
1619 + 920 6.200
5.380 20.000 107.600
1619 + 940 4.560
4.455 20.000 89.100
1619 + 960 4.350
6.075 20.000 121.500
1619 + 980 7.800
7.195 20.000 143.900
1620 + 000 6.590
7.605 20.000 152.100
1620 + 020 8.620
9.305 20.000 186.100
1620 + 040 9.990
9.975 20.000 199.500
1620 + 060 9.960
12.595 20.000 251.900
1620 + 080 15.230
15.880 20.000 317.600
1620 + 100 16.530
TOTAL FOR ITEM 104(1)a1 1,752.292
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
17.995 20.000 359.900
1620 + 120 19.460
19.115 20.000 382.300
1620 + 140 18.770
18.450 20.000 369.000
1620 + 160 18.130
18.145 20.000 362.900
1620 + 180 18.160
18.170 20.000 363.400
1620 + 200 18.180
18.305 20.000 366.100
1620 + 220 18.430
18.010 20.000 360.200
1620 + 240 17.590
18.510 20.000 370.200
1620 + 260 19.430
19.175 20.000 383.500
1620 + 280 18.920
19.040 20.000 380.800
1620 + 300 19.160
17.600 20.000 352.000
1620 + 320 16.040
15.785 20.000 315.700
1620 + 340 15.530
12.755 20.000 255.100
1620 + 360 9.980
8.945 20.000 178.900
1620 + 380 7.910
7.255 20.000 145.100
1620 + 400 6.600
6.600 20.000 132.000
1620 + 420 6.600
6.725 20.000 134.500
1620 + 440 6.850
9.055 20.000 181.100
1620 + 460 11.260
11.910 20.000 238.200
1620 + 480 12.560
9.005 20.000 180.100
1620 + 500 5.450
5.215 20.000 104.300
1620 + 520 4.980
5.665 20.000 113.300
1620 + 540 6.350
6.575 20.000 131.500
1620 + 560 6.800
5.145 20.000 102.900
1620 + 580 3.490
2.505 20.000 50.100
1620 + 600 1.520
2.270 20.000 45.400
1620 + 620 3.020
3.550 20.000 71.000
1620 + 640 4.080
TOTAL FOR ITEM 104(1)a1 6,429.500
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
2.820 20.000 56.400
1620 + 660 1.560
2.510 20.000 50.200
1620 + 680 3.460
2.405 20.000 48.100
1620 + 700 1.350
2.715 20.000 54.300
1620 + 720 4.080
4.495 20.000 89.900
1620 + 740 4.910
4.935 20.000 98.700
1620 + 760 4.960
4.715 20.000 94.300
1620 + 780 4.470
4.375 20.000 87.500
1620 + 800 4.280
3.000 20.000 60.000
1620 + 820 1.720
0.860 20.000 17.200
1620 + 840 0.000
0.000 20.000 0.000
1620 + 860 0.000
0.145 20.000 2.900
1620 + 880 0.290
0.145 20.000 2.900
1620 + 900 0.000
0.420 20.000 8.400
1620 + 920 0.840
0.420 20.000 8.400
1620 + 940 0.000
1.520 20.000 30.400
1620 + 960 3.040
4.530 20.000 90.600
1620 + 980 6.020
3.985 20.000 79.700
1621 + 000 1.950
4.235 20.000 84.700
1621 + 020 6.520
6.340 20.000 126.800
1621 + 040 6.160
7.305 20.000 146.100
1621 + 060 8.450
9.340 20.000 186.800
1621 + 080 10.230
11.415 20.000 228.300
1621 + 100 12.600
8.640 20.000 172.800
1621 + 120 4.680
3.490 20.000 69.800
1621 + 140 2.300
1.565 20.000 31.300
1621 + 160 0.830
1.630 20.000 32.600
1621 + 180 2.430
4.165 20.000 83.300
1621 + 200 5.900
TOTAL FOR ITEM 104(1)a1 2042.400
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

3.270 20.000 65.400


1621 + 220 0.640
0.480 20.000 9.600
1621 + 240 0.320
0.800 20.000 16.000
1621 + 260 1.280
0.640 20.000 12.800
1621 + 280 0.000
1.805 20.000 36.100
1621 + 300 3.610
3.490 20.000 69.800
1621 + 320 3.370
3.305 20.000 66.100
1621 + 340 3.240
2.105 20.000 42.100
1621 + 360 0.970
0.485 20.000 9.700
1621 + 380 0.000
0.000 20.000 0.000
1621 + 400 0.000
0.000 20.000 0.000
1621 + 420 0.000
0.010 20.000 0.200
1621 + 440 0.020
0.125 20.000 2.500
1621 + 460 0.230
0.115 20.000 2.300
1621 + 480 0.000
0.015 20.000 0.300
1621 + 500 0.030
0.015 20.000 0.300
1621 + 520 0.000
0.000 20.000 0.000
1621 + 540 0.000
0.000 20.000 0.000
1621 + 560 0.000
0.000 20.000 0.000
1621 + 580 0.000
0.000 20.000 0.000
1621 + 600 0.000
1.985 20.000 39.700
1621 + 620 3.970
5.085 20.000 101.700
1621 + 640 6.200
6.150 20.000 123.000
1621 + 660 6.100
6.425 20.000 128.500
1621 + 680 6.750
6.990 20.000 139.800
1621 + 700 7.230
6.415 20.000 128.300
1621 + 720 5.600
TOTAL FOR ITEM 104(1)a1 994.200
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

5.915 20.000 118.300


1621 + 740 6.230
6.275 20.000 125.500
1621 + 760 6.320
7.435 20.000 148.700
1621 + 780 8.550
8.765 20.000 175.300
1621 + 800 8.980
8.890 20.000 177.800
1621 + 820 8.800
4.650 20.000 93.000
1621 + 840 0.500
4.735 20.000 94.700
1621 + 860 8.970
8.695 20.000 173.900
1621 + 880 8.420
10.620 20.000 212.400
1621 + 900 12.820
12.775 20.000 255.500
1621 + 920 12.730
12.540 20.000 250.800
1621 + 940 12.350
11.445 20.000 228.900
1621 + 960 10.540
8.020 20.000 160.400
1621 + 980 5.500
5.340 20.000 106.800
1622 + 000 5.180
8.610 20.000 172.200
1622 + 020 12.040
13.485 20.000 269.700
1622 + 040 14.930
18.972 20.000 379.445
1622 + 060 23.015
21.837 20.000 436.745
1622 + 080 20.660
17.105 20.000 342.100
1622 + 100 13.550
13.895 20.000 277.900
1622 + 120 14.240
13.540 20.000 270.800
1622 + 140 12.840
12.555 20.000 251.100
1622 + 160 12.270
12.165 20.000 243.300
1622 + 180 12.060
TOTAL FOR ITEM 104(1)a1 4,965.290
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY

Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
12.155 20.000 243.100
1622 + 200 12.250
10.990 20.000 219.800
1622 + 220 9.730
10.375 20.000 207.500
1622 + 240 11.020
17.136 20.000 342.710
1622 + 260 23.251
17.491 20.000 349.810
1622 + 280 11.730
8.225 20.000 164.500
1622 + 300 4.720
7.865 20.000 157.300
1622 + 320 11.010
12.420 20.000 248.400
1622 + 340 13.830
10.285 20.000 205.700
1622 + 360 6.740
7.500 20.000 150.000
1622 + 380 8.260
8.325 20.000 166.500
1622 + 400 8.390
8.290 20.000 165.800
1622 + 420 8.190
8.080 20.000 161.600
1622 + 440 7.970
8.005 20.000 160.100
1622 + 460 8.040
7.205 20.000 144.100
1622 + 480 6.370
5.365 20.000 107.300
1622 + 500 4.360
3.590 20.000 71.800
1622 + 520 2.820
2.310 20.000 46.200
1622 + 540 1.800
1.505 20.000 30.100
1622 + 560 1.210
0.680 20.000 13.600
1622 + 580 0.150
0.075 20.000 1.500
1622 + 600 0.000
0.000 20.000 0.000
1622 + 620 0.000
0.000 20.000 0.000
1622 + 640 0.000
0.000 20.000 0.000
1622 + 660 0.000
0.000 20.000 0.000
1622 + 680 0.000
0.000 20.000 0.000
1622 + 700 0.000
0.005 20.000 0.100
1622 + 720 0.010
0.005 20.000 0.100
1622 + 740 0.000
2.120 20.000 42.400
1622 + 760 4.240
TOTAL FOR ITEM 104(1)a1 3,400.020
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
Regional Office No. XII
Corner Alunan Ave. - Mabini St. Koronadal City
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
5.535 20.000 110.700
1622 + 780 6.830
3.840 20.000 76.800
1622 + 800 0.850
1.415 20.000 28.300
1622 + 820 1.980
3.755 20.000 75.100
1622 + 840 5.530
2.990 20.000 59.800
1622 + 860 0.450
0.225 20.000 4.500
1622 + 880 0.000
0.000 20.000 0.000
1622 + 900 0.000
0.000 20.000 0.000
1622 + 920 0.000
3.930 20.000 78.600
1622 + 940 7.860
3.930 20.000 78.600
1622 + 960 0.000
0.000 20.000 0.000
1622 + 980 0.000
7.565 20.000 151.300
1623 + 000 15.130
12.740 20.000 254.800
1623 + 020 10.350
10.738 20.000 214.750
1623 + 040 11.125
5.688 20.000 113.750
1623 + 060 0.250
0.270 20.000 5.400
1623 + 080 0.290
2.300 20.000 46.000
1623 + 100 4.310
4.180 20.000 83.600
1623 + 120 4.050
4.305 20.000 86.100
1623 + 140 4.560
4.335 20.000 86.700
1623 + 160 4.110
4.415 20.000 88.300
1623 + 180 4.720
4.385 20.000 87.700
1623 + 200 4.050
4.380 20.000 87.600
1623 + 220 4.710
4.700 20.000 94.000
1623 + 240 4.690
5.650 20.000 113.000
1623 + 260 6.610
6.815 20.000 136.300
1623 + 280 7.020
7.020 16.000 112.320
1623 + 296 7.020

1623 + 320

1623 + 340

1623 + 360

1623 + 380

1623 + 400
1623 + 416 0.000
0.000 4.000 0.000
1623 + 440 0.000
0.000 20.000 0.000
1623 + 460 0.000
0.000 20.000 0.000
1623 + 480 0.000
0.000 20.000 0.000
1623 + 500 0.000
0.000 20.000 0.000
1623 + 520 0.000
0.000 20.000 0.000
1623 + 540 0.000
0.000 20.000 0.000
1623 + 560 0.000
0.000 20.000 0.000
1623 + 580 0.000
0.000 20.000 0.000
1623 + 600 0.000
0.000 20.000 0.000
1623 + 620 0.000
0.000 20.000 0.000
1623 + 640 0.000
3.095 20.000 61.900
1623 + 660 6.190
4.105 20.000 82.100
1623 + 680 2.020
TOTAL FOR ITEM 104(1)a1 2,418.020

TOTAL FOR ITEM, 101(9)


ITEM 101(9) 28.02
ITEM 101(9) 2,309.26
ITEM 101(9) 1,752.29
ITEM 101(9) 6,429.50
ITEM 101(9) 2,042.40
ITEM 101(9) 994.20
ITEM 101(9) 4,965.29
ITEM 101(9) 3,400.02
ITEM 101(9) 2,418.02
TOTAL 24,339.00

Prepared by : Checked by :
JAMES A. MARCILLANA SUKARNO D. DILANGALEN
Project Engineer Project Engineer III
Vicente T. Lao Construction DPWH Regional Office XII
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
EXCEPTION 01

cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.

TOTAL FOR ITEM, 101(9)


cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
SUKARNO D. DILANGALEN
Project Engineer III
DPWH Regional Office XII
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

1618 + 340 0.000


0.701 20.000 14.010
1618 + 360 1.401
0.701 20.000 14.010
1618 + 380 0.000
0.000 20.000 0.000
1618 + 400 0.000
0.000 20.000 0.000
1618 + 420 0.000
0.000 20.000 0.000
1618 + 440 0.000
0.000 20.000 0.000
1618 + 460 0.000
0.000 20.000 0.000
1618 + 480 0.000
0.000 20.000 0.000
1618 + 500 0.000
0.000 20.000 0.000
1618 + 520 0.000
0.000 20.000 0.000
1618 + 540 0.000
0.000 20.000 0.000
1618 + 560 0.000
0.000 20.000 0.000
1618 + 580 0.000
0.000 20.000 0.000
1618 + 600 0.000
0.000 20.000 0.000
1618 + 620 0.000
0.000 20.000 0.000
1618 + 640 0.000
0.000 20.000 0.000
1618 + 680 0.000
0.000 20.000 0.000
1618 + 700 0.000
0.000 20.000 0.000
1618 + 720 0.000
0.000 20.000 0.000
1618 + 740 0.000
0.000 20.000 0.000
1618 + 760 0.000
0.000 20.000 0.000
1618 + 780 0.000
0.000 20.000 0.000
1618 + 800 0.000
0.000 20.000 0.000
1618 + 820 0.000
0.000 20.000 0.000
1618 + 840 0.000
0.000 20.000 0.000
1618 + 860 0.000
0.000 20.000 0.000
1618 + 445 0.000
0.000 20.000 0.000
1618 + 452 0.000
0.000 20.000 0.000
1618 + 880 0.000
0.000 20.000 0.000
1618 + 900 0.000
0.000 3.000 0.000
1618 + 903 0.000
TOTAL FOR ITEM 104(1)a1 28.020
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

0.280 17.000 4.760


1618 + 920 0.560
0.480 20.000 9.600
1618 + 940 0.400
0.805 20.000 16.100
1618 + 960 1.210
6.505 20.000 130.100
1618 + 980 11.800
15.990 20.000 319.800
1619 + 000 20.180
10.975 20.000 219.500
1619 + 020 1.770
1.855 20.000 37.100
1619 + 040 1.940
1.480 20.000 29.600
1619 + 060 1.020
1.510 20.000 30.200
1619 + 080 2.000
2.855 20.000 57.100
1619 + 100 3.710
4.860 20.000 97.200
1619 + 120 6.010
5.860 20.000 117.200
1619 + 140 5.710
9.910 20.000 198.200
1619 + 160 14.110
16.110 20.000 322.200
1619 + 180 18.110
9.055 20.000 181.100
1619 + 200 0.000
0.040 20.000 0.800
1619 + 220 0.080
2.060 20.000 41.200
1619 + 240 4.040
3.525 20.000 70.500
1619 + 260 3.010
2.425 20.000 48.500
1619 + 280 1.840
1.485 20.000 29.700
1619 + 300 1.130
1.160 20.000 23.200
1619 + 320 1.190
1.095 20.000 21.900
1619 + 340 1.000
1.045 20.000 20.900
1619 + 360 1.090
2.345 20.000 46.900
1619 + 380 3.600
4.695 20.000 93.900
1619 + 400 5.790
4.025 20.000 80.500
1619 + 420 2.260
1.745 20.000 34.900
1619 + 440 1.230
0.935 20.000 18.700
1619 + 460 0.640
0.395 20.000 7.900
1619 + 480 0.150
TOTAL FOR ITEM 104(1)a1 2,309.260
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
0.195 20.000 3.900
1619 + 500 0.240
0.325 20.000 6.500
1619 + 520 0.410
0.205 20.000 4.100
1619 + 540 0.000
0.000 20.000 0.000
1619 + 560 0.000
0.075 20.000 1.500
1619 + 580 0.150
0.150 20.000 3.000
1619 + 600 0.150
0.075 20.000 1.500
1619 + 620 0.000
0.080 20.000 1.600
1619 + 640 0.160
0.160 20.000 3.200
1619 + 660 0.160
0.080 20.000 1.600
1619 + 680 0.000
0.000 20.000 0.000
1619 + 700 0.000
0.070 20.000 1.400
1619 + 720 0.140
0.070 20.000 1.400
1619 + 740 0.000
0.000 20.000 0.000
1619 + 760 0.000
0.005 20.000 0.100
1619 + 780 0.010
0.560 20.000 11.200
1619 + 800 1.110
1.110 9.670 10.734
1619 + 809.67 1.110
3.105 0.000 0.000
1619 + 896.42 5.100
5.100 3.580 18.258
1619 + 900 5.100
5.650 20.000 113.000
1619 + 920 6.200
5.380 20.000 107.600
1619 + 940 4.560
4.455 20.000 89.100
1619 + 960 4.350
6.075 20.000 121.500
1619 + 980 7.800
7.195 20.000 143.900
1620 + 000 6.590
7.605 20.000 152.100
1620 + 020 8.620
9.305 20.000 186.100
1620 + 040 9.990
9.975 20.000 199.500
1620 + 060 9.960
12.595 20.000 251.900
1620 + 080 15.230
15.880 20.000 317.600
1620 + 100 16.530
TOTAL FOR ITEM 104(1)a1 1,752.292
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
17.995 20.000 359.900
1620 + 120 19.460
19.115 20.000 382.300
1620 + 140 18.770
18.450 20.000 369.000
1620 + 160 18.130
18.145 20.000 362.900
1620 + 180 18.160
18.170 20.000 363.400
1620 + 200 18.180
18.305 20.000 366.100
1620 + 220 18.430
18.010 20.000 360.200
1620 + 240 17.590
18.510 20.000 370.200
1620 + 260 19.430
19.175 20.000 383.500
1620 + 280 18.920
19.040 20.000 380.800
1620 + 300 19.160
17.600 20.000 352.000
1620 + 320 16.040
15.785 20.000 315.700
1620 + 340 15.530
12.755 20.000 255.100
1620 + 360 9.980
8.945 20.000 178.900
1620 + 380 7.910
7.255 20.000 145.100
1620 + 400 6.600
6.600 20.000 132.000
1620 + 420 6.600
6.725 20.000 134.500
1620 + 440 6.850
9.055 20.000 181.100
1620 + 460 11.260
11.910 20.000 238.200
1620 + 480 12.560
9.005 20.000 180.100
1620 + 500 5.450
5.215 20.000 104.300
1620 + 520 4.980
5.665 20.000 113.300
1620 + 540 6.350
6.575 20.000 131.500
1620 + 560 6.800
5.145 20.000 102.900
1620 + 580 3.490
2.505 20.000 50.100
1620 + 600 1.520
2.270 20.000 45.400
1620 + 620 3.020
3.550 20.000 71.000
1620 + 640 4.080
TOTAL FOR ITEM 104(1)a1 6,429.500
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
2.820 20.000 56.400
1620 + 660 1.560
2.510 20.000 50.200
1620 + 680 3.460
2.405 20.000 48.100
1620 + 700 1.350
2.715 20.000 54.300
1620 + 720 4.080
4.495 20.000 89.900
1620 + 740 4.910
4.935 20.000 98.700
1620 + 760 4.960
4.715 20.000 94.300
1620 + 780 4.470
4.375 20.000 87.500
1620 + 800 4.280
3.000 20.000 60.000
1620 + 820 1.720
0.860 20.000 17.200
1620 + 840 0.000
0.000 20.000 0.000
1620 + 860 0.000
0.145 20.000 2.900
1620 + 880 0.290
0.145 20.000 2.900
1620 + 900 0.000
0.420 20.000 8.400
1620 + 920 0.840
0.420 20.000 8.400
1620 + 940 0.000
1.520 20.000 30.400
1620 + 960 3.040
4.530 20.000 90.600
1620 + 980 6.020
3.985 20.000 79.700
1621 + 000 1.950
4.235 20.000 84.700
1621 + 020 6.520
6.340 20.000 126.800
1621 + 040 6.160
7.305 20.000 146.100
1621 + 060 8.450
9.340 20.000 186.800
1621 + 080 10.230
11.415 20.000 228.300
1621 + 100 12.600
8.640 20.000 172.800
1621 + 120 4.680
3.490 20.000 69.800
1621 + 140 2.300
1.565 20.000 31.300
1621 + 160 0.830
1.630 20.000 32.600
1621 + 180 2.430
4.165 20.000 83.300
1621 + 200 5.900
TOTAL FOR ITEM 104(1)a1 2042.400
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

3.270 20.000 65.400


1621 + 220 0.640
0.480 20.000 9.600
1621 + 240 0.320
0.800 20.000 16.000
1621 + 260 1.280
0.640 20.000 12.800
1621 + 280 0.000
1.805 20.000 36.100
1621 + 300 3.610
3.490 20.000 69.800
1621 + 320 3.370
3.305 20.000 66.100
1621 + 340 3.240
2.105 20.000 42.100
1621 + 360 0.970
0.485 20.000 9.700
1621 + 380 0.000
0.000 20.000 0.000
1621 + 400 0.000
0.000 20.000 0.000
1621 + 420 0.000
0.010 20.000 0.200
1621 + 440 0.020
0.125 20.000 2.500
1621 + 460 0.230
0.115 20.000 2.300
1621 + 480 0.000
0.015 20.000 0.300
1621 + 500 0.030
0.015 20.000 0.300
1621 + 520 0.000
0.000 20.000 0.000
1621 + 540 0.000
0.000 20.000 0.000
1621 + 560 0.000
0.000 20.000 0.000
1621 + 580 0.000
0.000 20.000 0.000
1621 + 600 0.000
1.985 20.000 39.700
1621 + 620 3.970
5.085 20.000 101.700
1621 + 640 6.200
6.150 20.000 123.000
1621 + 660 6.100
6.425 20.000 128.500
1621 + 680 6.750
6.990 20.000 139.800
1621 + 700 7.230
6.415 20.000 128.300
1621 + 720 5.600
TOTAL FOR ITEM 104(1)a1 994.200
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)

5.915 20.000 118.300


1621 + 740 6.230
6.275 20.000 125.500
1621 + 760 6.320
7.435 20.000 148.700
1621 + 780 8.550
8.765 20.000 175.300
1621 + 800 8.980
8.890 20.000 177.800
1621 + 820 8.800
4.650 20.000 93.000
1621 + 840 0.500
4.735 20.000 94.700
1621 + 860 8.970
8.695 20.000 173.900
1621 + 880 8.420
10.620 20.000 212.400
1621 + 900 12.820
12.775 20.000 255.500
1621 + 920 12.730
12.540 20.000 250.800
1621 + 940 12.350
11.445 20.000 228.900
1621 + 960 10.540
8.020 20.000 160.400
1621 + 980 5.500
5.340 20.000 106.800
1622 + 000 5.180
8.610 20.000 172.200
1622 + 020 12.040
13.485 20.000 269.700
1622 + 040 14.930
19.145 20.000 382.900
1622 + 060 23.360
22.010 20.000 440.200
1622 + 080 20.660
17.105 20.000 342.100
1622 + 100 13.550
13.895 20.000 277.900
1622 + 120 14.240
13.540 20.000 270.800
1622 + 140 12.840
12.555 20.000 251.100
1622 + 160 12.270
12.165 20.000 243.300
1622 + 180 12.060
TOTAL FOR ITEM 104(1)a1 4,972.200
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY

Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
12.155 20.000 243.100
1622 + 200 12.250
10.990 20.000 219.800
1622 + 220 9.730
10.375 20.000 207.500
1622 + 240 11.020
18.645 20.000 372.900
1622 + 260 26.270
19.000 20.000 380.000
1622 + 280 11.730
8.225 20.000 164.500
1622 + 300 4.720
7.865 20.000 157.300
1622 + 320 11.010
12.420 20.000 248.400
1622 + 340 13.830
10.285 20.000 205.700
1622 + 360 6.740
7.500 20.000 150.000
1622 + 380 8.260
8.325 20.000 166.500
1622 + 400 8.390
8.290 20.000 165.800
1622 + 420 8.190
8.080 20.000 161.600
1622 + 440 7.970
8.005 20.000 160.100
1622 + 460 8.040
7.205 20.000 144.100
1622 + 480 6.370
5.365 20.000 107.300
1622 + 500 4.360
3.590 20.000 71.800
1622 + 520 2.820
2.310 20.000 46.200
1622 + 540 1.800
1.505 20.000 30.100
1622 + 560 1.210
0.680 20.000 13.600
1622 + 580 0.150
0.075 20.000 1.500
1622 + 600 0.000
0.000 20.000 0.000
1622 + 620 0.000
0.000 20.000 0.000
1622 + 640 0.000
0.000 20.000 0.000
1622 + 660 0.000
0.000 20.000 0.000
1622 + 680 0.000
0.000 20.000 0.000
1622 + 700 0.000
0.005 20.000 0.100
1622 + 720 0.010
0.005 20.000 0.100
1622 + 740 0.000
2.120 20.000 42.400
1622 + 760 4.240
TOTAL FOR ITEM 104(1)a1 3,460.400
DETAILED QUANTITY CALCULATION

Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
Regional Office No. XII
Corner Alunan Ave. - Mabini St. Koronadal City
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
5.535 20.000 110.700
1622 + 780 6.830
3.840 20.000 76.800
1622 + 800 0.850
1.415 20.000 28.300
1622 + 820 1.980
3.755 20.000 75.100
1622 + 840 5.530
2.990 20.000 59.800
1622 + 860 0.450
0.225 20.000 4.500
1622 + 880 0.000
0.000 20.000 0.000
1622 + 900 0.000
0.000 20.000 0.000
1622 + 920 0.000
3.930 20.000 78.600
1622 + 940 7.860
3.930 20.000 78.600
1622 + 960 0.000
0.000 20.000 0.000
1622 + 980 0.000
9.565 20.000 191.300
1623 + 000 19.130
16.135 20.000 322.700
1623 + 020 13.140
13.085 20.000 261.700
1623 + 040 13.030
6.640 20.000 132.800
1623 + 060 0.250
0.270 20.000 5.400
1623 + 080 0.290
2.300 20.000 46.000
1623 + 100 4.310
4.180 20.000 83.600
1623 + 120 4.050
4.305 20.000 86.100
1623 + 140 4.560
4.335 20.000 86.700
1623 + 160 4.110
4.415 20.000 88.300
1623 + 180 4.720
4.385 20.000 87.700
1623 + 200 4.050
4.380 20.000 87.600
1623 + 220 4.710
4.700 20.000 94.000
1623 + 240 4.690
5.650 20.000 113.000
1623 + 260 6.610
6.815 20.000 136.300
1623 + 280 7.020
7.020 10.000 70.200
1623 + 290 7.020

1623 + 320

1623 + 340

1623 + 360

1623 + 380

1623 + 400
1623 + 420 0.000
0.000 20.000 0.000
1623 + 440 0.000
0.000 20.000 0.000
1623 + 460 0.000
0.000 20.000 0.000
1623 + 480 0.000
0.000 20.000 0.000
1623 + 500 0.000
0.000 20.000 0.000
1623 + 520 0.000
0.000 20.000 0.000
1623 + 540 0.000
0.000 20.000 0.000
1623 + 560 0.000
0.000 20.000 0.000
1623 + 580 0.000
0.000 20.000 0.000
1623 + 600 0.000
0.000 20.000 0.000
1623 + 620 0.000
0.000 20.000 0.000
1623 + 640 0.000
3.095 20.000 61.900
1623 + 660 6.190
4.105 20.000 82.100
1623 + 680 2.020

TOTAL FOR ITEM 104(1)a1 2,549.800

TOTAL FOR ITEM, 101(9)


ITEM 101(9) 28.02
ITEM 101(9) 2,309.26
ITEM 101(9) 1,752.29
ITEM 101(9) 6,429.50
ITEM 101(9) 2,042.40
ITEM 101(9) 994.20
ITEM 101(9) 4,972.20
ITEM 101(9) 3,460.40
ITEM 101(9) 2,549.80
TOTAL 24,538.07
Prepared by : Checked by :

JAMES A. MARCILLANA SUKARNO D. DILANGALEN


Project Engineer Project Engineer III
Vicente T. Lao Construction DPWH Regional Office XII
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
EXCEPTION 01

cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
cu.m.
ANTITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Remarks
BUAYAN
BRIDGE
EXCEPTION 03
cu.m.

TOTAL FOR ITEM, 101(9)


cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
SUKARNO D. DILANGALEN
Project Engineer III
DPWH Regional Office XII
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
1618 + 340 21.158
15.398 20.000
1618 + 360 9.637
8.697 20.000
1618 + 380 7.757
7.141 20.000
1618 + 400 6.524
3.262 20.000
1618 + 420
0.000 20.000
1618 + 440
0.000 20.000
1618 + 460
0.000 20.000
1618 + 480
0.000 20.000
1618 + 500
0.000 20.000
1618 + 520
0.000 20.000
1618 + 540
0.000 20.000
1618 + 560
0.000 20.000
1618 + 580
0.000 20.000
1618 + 600
0.000 20.000
1618 + 620
0.000 20.000
1618 + 640
0.000 20.000
1618 + 660
0.000 20.000
1618 + 680
0.000 20.000
1618 + 700
0.000 20.000
1618 + 720
0.000 20.000
1618 + 740
0.000 20.000
1618 + 760
0.000 20.000
1618 + 780
0.000 20.000
1618 + 800
0.000 20.000
1618 + 820
0.000 20.000
1618 + 840
0.000 20.000
1618 + 860
0.000 20.000
1618 + 880
0.000 20.000
1618 + 900
0.000 3.000
1618 + 903 0.000
2.420 17.000
1618 + 920 4.840
4.570 20.000
1618 + 940 4.300
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
7.285 20.000
1618 + 960 10.270
11.775 20.000
1618 + 980 13.280
15.795 20.000
1619 + 000 18.310
19.770 20.000
1619 + 020 21.230
21.675 20.000
1619 + 040 22.120
21.663 20.000
1619 + 060 21.205
21.023 20.000
1619 + 080 20.841
20.608 20.000
1619 + 100 20.374
20.093 20.000
1619 + 120 19.812
19.656 20.000
1619 + 140 19.500
19.565 20.000
1619 + 160 19.630
19.294 20.000
1619 + 180 18.958
19.687 20.000
1619 + 200 20.415
20.537 20.000
1619 + 220 20.658
20.252 20.000
1619 + 240 19.845
20.233 20.000
1619 + 260 20.621
19.851 20.000
1619 + 280 19.080
19.285 20.000
1619 + 300 19.490
18.790 20.000
1619 + 320 18.090
17.950 20.000
1619 + 340 17.810
18.225 20.000
1619 + 360 18.640
16.210 20.000
1619 + 380 13.780
13.225 20.000
1619 + 400 12.670
15.505 20.000
1619 + 420 18.340
18.635 20.000
1619 + 440 18.930
19.735 20.000
1619 + 460 20.540
20.995 20.000
1619 + 480 21.450
23.561 20.000
1619 + 500 25.671
25.943 20.000
1619 + 520 26.214
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
35.782 20.000
1619 + 540 45.350
50.900 20.000
1619 + 560 56.450
55.470 20.000
1619 + 580 54.490
54.400 20.000
1619 + 600 54.310
55.895 20.000
1619 + 620 57.480
55.510 20.000
1619 + 640 53.540
54.370 20.000
1619 + 660 55.200
54.925 20.000
1619 + 680 54.650
54.835 20.000
1619 + 700 55.020
54.330 20.000
1619 + 720 53.640
56.075 20.000
1619 + 740 58.510
56.650 20.000
1619 + 760 54.790
56.020 20.000
1619 + 780 57.250
57.885 20.000
1619 + 800 58.520
58.520 9.670
1619 + 809.67 58.520
44.935 0.000
1619 + 896.42 31.350
31.355 3.580
1619 + 900 31.360
28.390 20.000
1619 + 920 25.420
25.330 20.000
1619 + 940 25.240
25.845 20.000
1619 + 960 26.450
25.005 20.000
1619 + 980 23.560
23.240 20.000
1620 + 000 22.920
14.120 20.000
1620 + 020 5.320
5.760 20.000
1620 + 040 6.200
7.170 20.000
1620 + 060 8.140
6.165 20.000
1620 + 080 4.190
3.855 20.000
1620 + 100 3.520
3.970 20.000
1620 + 120 4.420
4.610 20.000
1620 + 140 4.800
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

4.090 20.000
1620 + 160 3.380
3.380 20.000
1620 + 180 3.380
4.180 20.000
1620 + 200 4.980
4.140 20.000
1620 + 220 3.300
3.830 20.000
1620 + 240 4.360
3.930 20.000
1620 + 260 3.500
3.220 20.000
1620 + 280 2.940
3.140 20.000
1620 + 300 3.340
3.795 20.000
1620 + 320 4.250
5.450 20.000
1620 + 340 6.650
5.660 20.000
1620 + 360 4.670
4.675 20.000
1620 + 380 4.680
5.780 20.000
1620 + 400 6.880
6.075 20.000
1620 + 420 5.270
5.945 20.000
1620 + 440 6.620
5.155 20.000
1620 + 460 3.690
3.650 20.000
1620 + 480 3.610
4.555 20.000
1620 + 500 5.500
16.415 20.000
1620 + 520 27.330
26.890 20.000
1620 + 540 26.450
24.655 20.000
1620 + 560 22.860
23.000 20.000
1620 + 580 23.140
24.355 20.000
1620 + 600 25.570
25.215 20.000
1620 + 620 24.860
24.920 20.000
1620 + 640 24.980
26.190 20.000
1620 + 660 27.400
26.665 20.000
1620 + 680 25.930
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
26.060 20.000
1620 + 700 26.190
25.100 20.000
1620 + 720 24.010
24.814 20.000
1620 + 740 25.618
27.144 20.000
1620 + 760 28.670
27.900 20.000
1620 + 780 27.130
27.255 20.000
1620 + 800 27.380
27.715 20.000
1620 + 820 28.050
29.281 20.000
1620 + 840 30.512
31.179 20.000
1620 + 860 31.845
31.401 20.000
1620 + 880 30.957
31.299 20.000
1620 + 900 31.640
31.261 20.000
1620 + 920 30.881
30.326 20.000
1620 + 940 29.770
29.740 20.000
1620 + 960 29.710
29.323 20.000
1620 + 980 28.936
29.377 20.000
1621 + 000 29.817
29.677 20.000
1621 + 020 29.537
29.913 20.000
1621 + 040 30.289
30.573 20.000
1621 + 060 30.856
30.572 20.000
1621 + 080 30.287
30.085 20.000
1621 + 100 29.882
30.432 20.000
1621 + 120 30.981
31.019 20.000
1621 + 140 31.057
30.071 20.000
1621 + 160 29.085
27.451 20.000
1621 + 180 25.816
26.364 20.000
1621 + 200 26.912
27.114 20.000
1621 + 220 27.315
28.115 20.000
1621 + 240 28.915
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
29.368 20.000
1621 + 260 29.820
33.250 20.000
1621 + 280 36.680
27.705 20.000
1621 + 300 18.730
21.385 20.000
1621 + 320 24.040
14.720 20.000
1621 + 340 5.400
12.655 20.000
1621 + 360 19.910
25.264 20.000
1621 + 380 30.618
30.837 20.000
1621 + 400 31.056
29.950 20.000
1621 + 420 28.844
29.880 20.000
1621 + 440 30.916
25.598 20.000
1621 + 460 20.280
23.896 20.000
1621 + 480 27.512
27.215 20.000
1621 + 500 26.918
27.984 20.000
1621 + 520 29.050
29.891 20.000
1621 + 540 30.731
29.928 20.000
1621 + 560 29.125
28.343 20.000
1621 + 580 27.560
23.875 20.000
1621 + 600 20.189
16.175 20.000
1621 + 620 12.160
8.515 20.000
1621 + 640 4.870
4.705 20.000
1621 + 660 4.540
4.695 20.000
1621 + 680 4.850
4.770 20.000
1621 + 700 4.690
5.015 20.000
1621 + 720 5.340
5.360 20.000
1621 + 740 5.380
5.235 20.000
1621 + 760 5.090
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

4.835 20.000
1621 + 780 4.580
5.015 20.000
1621 + 800 5.450
5.270 20.000
1621 + 820 5.090
4.890 20.000
1621 + 840 4.690
4.110 20.000
1621 + 860 3.530
3.860 20.000
1621 + 880 4.190
4.260 20.000
1621 + 900 4.330
4.080 20.000
1621 + 920 3.830
4.310 20.000
1621 + 940 4.790
5.300 20.000
1621 + 960 5.810
5.005 20.000
1621 + 980 4.200
4.145 20.000
1622 + 000 4.090
5.075 20.000
1622 + 020 6.060
3.690 20.000
1622 + 040 1.320
1.875 20.000
1622 + 060 2.430
3.520 20.000
1622 + 080 4.610
4.425 20.000
1622 + 100 4.240
4.225 20.000
1622 + 120 4.210
4.650 20.000
1622 + 140 5.090
5.890 20.000
1622 + 160 6.690
6.460 20.000
1622 + 180 6.230
6.095 20.000
1622 + 200 5.960
6.245 20.000
1622 + 220 6.530
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

5.555 20.000
1622 + 240 4.580
3.130 20.000
1622 + 260 1.680
5.910 20.000
1622 + 280 10.140
15.965 20.000
1622 + 300 21.790
21.540 20.000
1622 + 320 21.290
18.460 20.000
1622 + 340 15.630
10.580 20.000
1622 + 360 5.530
4.810 20.000
1622 + 380 4.090
6.503 20.000
1622 + 400 8.915
7.548 20.000
1622 + 420 6.180
6.215 20.000
1622 + 440 6.250
6.315 20.000
1622 + 460 6.380
6.630 20.000
1622 + 480 6.880
9.846 20.000
1622 + 500 12.812
14.214 20.000
1622 + 520 15.615
18.165 20.000
1622 + 540 20.714
22.463 20.000
1622 + 560 24.212
25.442 20.000
1622 + 580 26.671
26.943 20.000
1622 + 600 27.215
26.740 20.000
1622 + 620 26.264
27.624 20.000
1622 + 640 28.983
28.206 20.000
1622 + 660 27.429
27.671 20.000
1622 + 680 27.912
27.566 20.000
1622 + 700 27.219
28.040 20.000
1622 + 720 28.860
27.927 20.000
1622 + 740 26.994
28.105 20.000
1622 + 760 29.215
27.120 20.000
1622 + 780 25.025
26.323 20.000
1622 + 800 27.621
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

24.067 20.000
1622 + 820 20.512
10.901 20.000
1622 + 840 1.290
1.345 20.000
1622 + 860 1.400
1.435 20.000
1622 + 880 1.470
1.485 20.000
1622 + 900 1.500
1.500 20.000
1622 + 920 1.500
1.515 20.000
1622 + 940 1.530
1.530 20.000
1622 + 960 1.530
2.080 20.000
1622 + 980 2.630
2.665 20.000
1623 + 000 2.700
2.750 20.000
1623 + 020 2.800
2.875 20.000
1623 + 040 2.950
2.955 20.000
1623 + 060 2.960
2.950 20.000
1623 + 080 2.940
2.830 20.000
1623 + 100 2.720
2.735 20.000
1623 + 120 2.750
2.665 20.000
1623 + 140 2.580
2.585 20.000
1623 + 160 2.590
2.600 20.000
1623 + 180 2.610
2.595 20.000
1623 + 200 2.580
2.595 20.000
1623 + 220 2.610
2.555 20.000
1623 + 240 2.500
2.505 20.000
1623 + 260 2.510
2.495 20.000
1623 + 280 2.480
1.240 16.000
1623 + 296

1623 + 320

1623 + 340

1623 + 360

1623 + 380

1623 + 400

1623 + 416 3.150


2.733 24.000
1623 + 440 2.315
2.403 20.000
1623 + 460 2.490
2.435 20.000
1623 + 480 2.380
2.465 20.000
1623 + 500 2.550
2.525 20.000
1623 + 520 2.500
2.505 20.000
1623 + 540 2.510
2.515 20.000
1623 + 560 2.520
2.520 20.000
1623 + 580 2.520
2.510 20.000
1623 + 600 2.500
2.505 20.000
1623 + 620 2.510
2.505 20.000
1623 + 640 2.500
2.495 20.000
1623 + 660 2.490
2.525 20.000
1623 + 680 2.560
TOTAL FOR ITEM 102(2)b

TOTAL FOR ITEM,


ITEM 102(2)b
ITEM 102(2)b
ITEM 102(2)b
ITEM 102(2)b
ITEM 102(2)b
ITEM 102(2)b
ITEM 102(2)b
ITEM 102(2)b
ITEM 102(2)b
TOTAL

Prepared by : Checked by :

JAMES A. MARCILLANA SUKARNO D. DILAN


Project Engineer Project Engineer
Vicente T. Lao Construction DPWH Regional Off
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)

307.950

173.940

142.810

65.240

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000
EXCEPTION 01
0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

41.140

91.400

822.480 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
145.700

235.500

315.900

395.400

433.500

433.250

420.460

412.150

401.860

393.120

391.300

385.880

393.730

410.730

405.030
404.660

397.010

385.700

375.800

359.000

364.500

324.200

264.500

310.100

372.700

394.700

419.900

471.210

518.850

10,936.340 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
715.640

1018.000

1109.400

1088.000

1117.900

1110.200

1087.400

1098.500

1096.700

1086.600

1121.500

1133.000

1120.400

1157.700

565.888
0.000

112.251

567.800

506.600

516.900

500.100

464.800

282.400

115.200

143.400

123.300

77.100

79.400

92.200

19,208.279 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
81.800

67.600

83.600

82.800

76.600

78.600

64.400

62.800

75.900

109.000

113.200

93.500

115.600

121.500
118.900

103.100

73.000

91.100

328.300

537.800

493.100

460.000

487.100

504.300

498.400

523.800

533.300

5,979.100 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
521.200

502.000

496.280

542.880

558.000

545.100

554.300

585.620

623.570

628.020

625.970

625.210

606.510

594.800
586.460

587.530

593.540

598.260

611.450

611.430

601.690

608.630

620.380

601.420

549.010

527.280

542.270

562.300

16211.110 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
587.350

665.000

554.100

427.700

294.400

253.100

505.280

616.740

599.000

597.600

511.960

477.920

544.300

559.680
597.810

598.560

566.850

477.490

323.490

170.300

94.100

93.900

95.400

100.300

107.200

104.700

10,524.230 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
96.700

100.300

105.400

97.800

82.200

77.200

85.200

81.600

86.200

106.000

100.100

82.900

101.500

73.800
37.500

70.400

88.500

84.500

93.000

117.800

129.200

121.900

124.900

2,144.600 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
111.100

62.600

118.200

319.300

430.800

369.200

211.600

96.200

130.050

150.950

124.300

126.300

132.600

196.920
284.270

363.290

449.260

508.830

538.860

534.794

552.474

564.124

553.414

551.314

560.794

558.544

562.094

542.400

526.460

10,231.040 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
481.330

218.020

26.900

28.700

29.700

30.000

30.300

30.600

41.600

53.300

55.000

57.500

59.100

59.000
56.600

54.700

53.300

51.700

52.000

51.900

51.900

51.100

50.100

49.900
19.840

BUAYAN
BRIDGE
EXCEPTION 02

65.580

48.050

48.700

49.300

50.500

50.100

50.300

50.400

50.200

50.100

50.100

49.900

50.500

2,407.820 cu.m.

TOTAL FOR ITEM, 101(9)


822.48 cu.m.
10,936.34 cu.m.
19,208.28 cu.m.
5,979.10 cu.m.
16,211.11 cu.m.
10,524.23 cu.m.
2,144.60 cu.m.
10,231.04 cu.m.
2,407.82 cu.m.
78,465.00 cu.m.

SUKARNO D. DILANGALEN
Project Engineer III
DPWH Regional Office XII
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
1618 + 340 21.158
15.398 20.000
1618 + 360 9.637
8.697 20.000
1618 + 380 7.757
7.141 20.000
1618 + 400 6.524
3.262 20.000
1618 + 420
0.000 20.000
1618 + 440
0.000 20.000
1618 + 460
0.000 20.000
1618 + 480
0.000 20.000
1618 + 500
0.000 20.000
1618 + 520
0.000 20.000
1618 + 540
0.000 20.000
1618 + 560
0.000 20.000
1618 + 580
0.000 20.000
1618 + 600
0.000 20.000
1618 + 620
0.000 20.000
1618 + 640
0.000 20.000
1618 + 660
0.000 20.000
1618 + 680
0.000 20.000
1618 + 700
0.000 20.000
1618 + 720
0.000 20.000
1618 + 740
0.000 20.000
1618 + 760
0.000 20.000
1618 + 780
0.000 20.000
1618 + 800
0.000 20.000
1618 + 820
0.000 20.000
1618 + 840
0.000 20.000
1618 + 860
0.000 20.000
1618 + 880
0.000 20.000
1618 + 900
0.000 3.000
1618 + 903 0.000
2.420 17.000
1618 + 920 4.840
4.570 20.000
1618 + 940 4.300
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
7.285 20.000
1618 + 960 10.270
11.775 20.000
1618 + 980 13.280
15.795 20.000
1619 + 000 18.310
19.770 20.000
1619 + 020 21.230
21.675 20.000
1619 + 040 22.120
22.635 20.000
1619 + 060 23.150
22.625 20.000
1619 + 080 22.100
22.430 20.000
1619 + 100 22.760
21.690 20.000
1619 + 120 20.620
20.060 20.000
1619 + 140 19.500
19.565 20.000
1619 + 160 19.630
19.875 20.000
1619 + 180 20.120
23.650 20.000
1619 + 200 27.180
26.275 20.000
1619 + 220 25.370
24.115 20.000
1619 + 240 22.860
22.245 20.000
1619 + 260 21.630
20.355 20.000
1619 + 280 19.080
19.285 20.000
1619 + 300 19.490
18.790 20.000
1619 + 320 18.090
17.950 20.000
1619 + 340 17.810
18.225 20.000
1619 + 360 18.640
16.210 20.000
1619 + 380 13.780
13.225 20.000
1619 + 400 12.670
15.505 20.000
1619 + 420 18.340
18.635 20.000
1619 + 440 18.930
21.920 20.000
1619 + 460 24.910
26.590 20.000
1619 + 480 28.270
28.745 20.000
1619 + 500 29.220
28.350 20.000
1619 + 520 27.480
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
39.940 20.000
1619 + 540 52.400
54.425 20.000
1619 + 560 56.450
55.470 20.000
1619 + 580 54.490
54.400 20.000
1619 + 600 54.310
55.895 20.000
1619 + 620 57.480
55.510 20.000
1619 + 640 53.540
54.370 20.000
1619 + 660 55.200
54.925 20.000
1619 + 680 54.650
54.835 20.000
1619 + 700 55.020
54.330 20.000
1619 + 720 53.640
56.075 20.000
1619 + 740 58.510
56.650 20.000
1619 + 760 54.790
56.020 20.000
1619 + 780 57.250
57.885 20.000
1619 + 800 58.520
58.520 9.670
1619 + 809.67 58.520
44.935 0.000
1619 + 896.42 31.350
31.355 3.580
1619 + 900 31.360
28.390 20.000
1619 + 920 25.420
25.330 20.000
1619 + 940 25.240
25.845 20.000
1619 + 960 26.450
25.005 20.000
1619 + 980 23.560
23.240 20.000
1620 + 000 22.920
14.120 20.000
1620 + 020 5.320
5.760 20.000
1620 + 040 6.200
7.170 20.000
1620 + 060 8.140
6.165 20.000
1620 + 080 4.190
3.855 20.000
1620 + 100 3.520
3.970 20.000
1620 + 120 4.420
4.610 20.000
1620 + 140 4.800
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

4.090 20.000
1620 + 160 3.380
3.380 20.000
1620 + 180 3.380
4.180 20.000
1620 + 200 4.980
4.140 20.000
1620 + 220 3.300
3.830 20.000
1620 + 240 4.360
3.930 20.000
1620 + 260 3.500
3.220 20.000
1620 + 280 2.940
3.140 20.000
1620 + 300 3.340
3.795 20.000
1620 + 320 4.250
5.450 20.000
1620 + 340 6.650
5.660 20.000
1620 + 360 4.670
4.675 20.000
1620 + 380 4.680
5.780 20.000
1620 + 400 6.880
6.075 20.000
1620 + 420 5.270
5.945 20.000
1620 + 440 6.620
5.155 20.000
1620 + 460 3.690
3.650 20.000
1620 + 480 3.610
4.555 20.000
1620 + 500 5.500
16.415 20.000
1620 + 520 27.330
26.890 20.000
1620 + 540 26.450
24.655 20.000
1620 + 560 22.860
23.000 20.000
1620 + 580 23.140
24.355 20.000
1620 + 600 25.570
25.215 20.000
1620 + 620 24.860
24.920 20.000
1620 + 640 24.980
26.190 20.000
1620 + 660 27.400
26.665 20.000
1620 + 680 25.930
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
26.060 20.000
1620 + 700 26.190
25.100 20.000
1620 + 720 24.010
25.035 20.000
1620 + 740 26.060
27.365 20.000
1620 + 760 28.670
27.900 20.000
1620 + 780 27.130
27.255 20.000
1620 + 800 27.380
27.715 20.000
1620 + 820 28.050
31.640 20.000
1620 + 840 35.230
35.370 20.000
1620 + 860 35.510
34.230 20.000
1620 + 880 32.950
32.295 20.000
1620 + 900 31.640
32.095 20.000
1620 + 920 32.550
31.160 20.000
1620 + 940 29.770
29.740 20.000
1620 + 960 29.710
32.590 20.000
1620 + 980 35.470
35.925 20.000
1621 + 000 36.380
36.440 20.000
1621 + 020 36.500
35.685 20.000
1621 + 040 34.870
34.460 20.000
1621 + 060 34.050
34.580 20.000
1621 + 080 35.110
33.055 20.000
1621 + 100 31.000
31.685 20.000
1621 + 120 32.370
32.415 20.000
1621 + 140 32.460
33.045 20.000
1621 + 160 33.630
31.110 20.000
1621 + 180 28.590
28.920 20.000
1621 + 200 29.250
32.705 20.000
1621 + 220 36.160
37.405 20.000
1621 + 240 38.650
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)
34.235 20.000
1621 + 260 29.820
33.250 20.000
1621 + 280 36.680
27.705 20.000
1621 + 300 18.730
21.385 20.000
1621 + 320 24.040
14.720 20.000
1621 + 340 5.400
12.655 20.000
1621 + 360 19.910
26.780 20.000
1621 + 380 33.650
33.585 20.000
1621 + 400 33.520
31.985 20.000
1621 + 420 30.450
31.695 20.000
1621 + 440 32.940
26.610 20.000
1621 + 460 20.280
26.450 20.000
1621 + 480 32.620
32.300 20.000
1621 + 500 31.980
31.860 20.000
1621 + 520 31.740
33.125 20.000
1621 + 540 34.510
34.400 20.000
1621 + 560 34.290
35.140 20.000
1621 + 580 35.990
30.025 20.000
1621 + 600 24.060
18.110 20.000
1621 + 620 12.160
8.515 20.000
1621 + 640 4.870
4.705 20.000
1621 + 660 4.540
4.695 20.000
1621 + 680 4.850
4.770 20.000
1621 + 700 4.690
5.015 20.000
1621 + 720 5.340
5.360 20.000
1621 + 740 5.380
5.235 20.000
1621 + 760 5.090
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description : Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

4.835 20.000
1621 + 780 4.580
5.015 20.000
1621 + 800 5.450
5.270 20.000
1621 + 820 5.090
4.890 20.000
1621 + 840 4.690
4.110 20.000
1621 + 860 3.530
3.860 20.000
1621 + 880 4.190
4.260 20.000
1621 + 900 4.330
4.080 20.000
1621 + 920 3.830
4.310 20.000
1621 + 940 4.790
5.300 20.000
1621 + 960 5.810
5.005 20.000
1621 + 980 4.200
4.145 20.000
1622 + 000 4.090
5.075 20.000
1622 + 020 6.060
3.690 20.000
1622 + 040 1.320
1.875 20.000
1622 + 060 2.430
3.520 20.000
1622 + 080 4.610
4.425 20.000
1622 + 100 4.240
4.225 20.000
1622 + 120 4.210
4.650 20.000
1622 + 140 5.090
5.890 20.000
1622 + 160 6.690
6.460 20.000
1622 + 180 6.230
6.095 20.000
1622 + 200 5.960
6.245 20.000
1622 + 220 6.530
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

5.555 20.000
1622 + 240 4.580
3.130 20.000
1622 + 260 1.680
5.910 20.000
1622 + 280 10.140
15.965 20.000
1622 + 300 21.790
21.540 20.000
1622 + 320 21.290
18.460 20.000
1622 + 340 15.630
10.580 20.000
1622 + 360 5.530
4.810 20.000
1622 + 380 4.090
4.250 20.000
1622 + 400 4.410
5.295 20.000
1622 + 420 6.180
6.215 20.000
1622 + 440 6.250
6.315 20.000
1622 + 460 6.380
6.630 20.000
1622 + 480 6.880
6.885 20.000
1622 + 500 6.890
7.830 20.000
1622 + 520 8.770
17.860 20.000
1622 + 540 26.950
26.220 20.000
1622 + 560 25.490
31.285 20.000
1622 + 580 37.080
35.295 20.000
1622 + 600 33.510
33.105 20.000
1622 + 620 32.700
32.285 20.000
1622 + 640 31.870
33.490 20.000
1622 + 660 35.110
34.445 20.000
1622 + 680 33.780
34.720 20.000
1622 + 700 35.660
34.585 20.000
1622 + 720 33.510
33.875 20.000
1622 + 740 34.240
35.030 20.000
1622 + 760 35.820
36.780 20.000
1622 + 780 37.740
42.145 20.000
1622 + 800 46.550
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road

Project Location : Malungon, Sarangani Province


Limits Km.1618+340 - Km. 1623+680
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :102(2)b
Description Roadway Excavation (Surplus Common)
Unit : cu.m.
Station Area Cut (m²) Ave. Area (m²) Length (m)

24.015 20.000
1622 + 820 1.480
1.385 20.000
1622 + 840 1.290
1.345 20.000
1622 + 860 1.400
1.435 20.000
1622 + 880 1.470
1.485 20.000
1622 + 900 1.500
1.500 20.000
1622 + 920 1.500
1.515 20.000
1622 + 940 1.530
1.530 20.000
1622 + 960 1.530
2.080 20.000
1622 + 980 2.630
2.665 20.000
1623 + 000 2.700
2.750 20.000
1623 + 020 2.800
2.875 20.000
1623 + 040 2.950
2.955 20.000
1623 + 060 2.960
2.950 20.000
1623 + 080 2.940
2.830 20.000
1623 + 100 2.720
2.735 20.000
1623 + 120 2.750
2.665 20.000
1623 + 140 2.580
2.585 20.000
1623 + 160 2.590
2.600 20.000
1623 + 180 2.610
2.595 20.000
1623 + 200 2.580
2.595 20.000
1623 + 220 2.610
2.555 20.000
1623 + 240 2.500
2.505 20.000
1623 + 260 2.510
2.495 20.000
1623 + 280 2.480
1.240 10.000
1623 + 296

1623 + 320

1623 + 340

1623 + 360

1623 + 380

1623 + 400

1623 + 420

1623 + 440

1623 + 460 2.490


2.435 20.000
1623 + 480 2.380
2.465 20.000
1623 + 500 2.550
2.525 20.000
1623 + 520 2.500
2.505 20.000
1623 + 540 2.510
2.515 20.000
1623 + 560 2.520
2.520 20.000
1623 + 580 2.520
2.510 20.000
1623 + 600 2.500
2.505 20.000
1623 + 620 2.510
2.505 20.000
1623 + 640 2.500
2.495 20.000
1623 + 660 2.490
2.525 20.000
1623 + 680 2.560
2.545 20.000
1623 + 640 2.530
2.515 20.000
1623 + 660 2.500
2.545 20.000
1623 + 680 2.590

TOTAL FOR ITEM 102(2)b


TOTAL FOR ITEM,
ITEM 101(9)
ITEM 101(9)
ITEM 101(9)
ITEM 101(9)
ITEM 101(9)
ITEM 101(9)
ITEM 101(9)
ITEM 101(9)
ITEM 101(9)
TOTAL

Prepared by : Checked by :

JAMES A. MARCILLANA SUKARNO D. DILAN


Project Engineer Project Engineer
Vicente T. Lao Construction DPWH Regional Off
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)

307.950

173.940

142.810

65.240

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000
EXCEPTION 01
0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

41.140

91.400

822.480 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
145.700

235.500

315.900

395.400

433.500

452.700

452.500

448.600

433.800

401.200

391.300

397.500

473.000

525.500

482.300
444.900

407.100

385.700

375.800

359.000

364.500

324.200

264.500

310.100

372.700

438.400

531.800

574.900

567.000

11,705.000 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
798.800

1088.500

1109.400

1088.000

1117.900

1110.200

1087.400

1098.500

1096.700

1086.600

1121.500

1133.000

1120.400

1157.700

565.888
0.000

112.251

567.800

506.600

516.900

500.100

464.800

282.400

115.200

143.400

123.300

77.100

79.400

92.200

19,361.939 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
81.800

67.600

83.600

82.800

76.600

78.600

64.400

62.800

75.900

109.000

113.200

93.500

115.600

121.500
118.900

103.100

73.000

91.100

328.300

537.800

493.100

460.000

487.100

504.300

498.400

523.800

533.300

5,979.100 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
521.200

502.000

500.700

547.300

558.000

545.100

554.300

632.800

707.400

684.600

645.900

641.900

623.200

594.800
651.800

718.500

728.800

713.700

689.200

691.600

661.100

633.700

648.300

660.900

622.200

578.400

654.100

748.100

17659.600 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
684.700

665.000

554.100

427.700

294.400

253.100

535.600

671.700

639.700

633.900

532.200

529.000

646.000

637.200
662.500

688.000

702.800

600.500

362.200

170.300

94.100

93.900

95.400

100.300

107.200

104.700

11,486.200 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
96.700

100.300

105.400

97.800

82.200

77.200

85.200

81.600

86.200

106.000

100.100

82.900

101.500

73.800
37.500

70.400

88.500

84.500

93.000

117.800

129.200

121.900

124.900

2,144.600 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
111.100

62.600

118.200

319.300

430.800

369.200

211.600

96.200

85.000

105.900

124.300

126.300

132.600

137.700
156.600

357.200

524.400

625.700

705.900

662.100

645.700

669.800

688.900

694.400

691.700

677.500

700.600

735.600

842.900

11,809.800 cu.m.
ITY CALCULATION

AS-STAKED

Contractor:

Vicente T. Lao Construction

Volume Cut
Remarks
(m³)
480.300

27.700

26.900

28.700

29.700

30.000

30.300

30.600

41.600

53.300

55.000

57.500

59.100

59.000
56.600

54.700

53.300

51.700

52.000

51.900

51.900

51.100

50.100

49.900
12.400

BUAYAN
BRIDGE
EXCEPTION 03

48.700

49.300

50.500

50.100

50.300

50.400

50.200

50.100

50.100

49.900

50.500

50.900

50.300

50.900

2,247.500 cu.m.
TOTAL FOR ITEM, 101(9)
822.48 cu.m.
11,705.00 cu.m.
19,361.94 cu.m.
5,979.10 cu.m.
17,659.60 cu.m.
11,486.20 cu.m.
2,144.60 cu.m.
11,809.80 cu.m.
2,247.50 cu.m.
83,216.22 cu.m.

SUKARNO D. DILANGALEN
Project Engineer III
DPWH Regional Office XII
PROJECT ID No. 17-MO-0049
PROJECT LOCATION: WIDENING OF DIGOS-MAKAR ROAD,NAGPAN,MALUN

QUANTI

ORIGINAL CONTRACT
ITEM NO. DESCRIPTION
UNIT QTY. UNIT COST

A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) month 9.30 7,938.00

Provision for 4x4 Pick-up Type Service Vehicle for the Engineer
A.1.1(2) months 9.30 63,406.35
(Rental Basis)

B.5 Project Billboard (DPWH and COA) each 3.00 4,507.64

B.7 Occupational Safety and Health Program months 9.30 99,600.73

B.8 Traffic Management months 9.30 8,623.52

B.9 Mobilization/Demobilization L.s. 1.00 615,501.60

100 (4) Individual Removal of Trees (large,above 900 mmØ) each 20.00 4,433.21

101(4)a Removal of RCPC ( 24'' Ø) - 610 mmØ ln.m. 8.00 3,407.57

101(6)b Removal of Straight Type Concrete Headwall cu.m. 433.00 611.37

Removal of Stone Masonry Lined Drainage Structures & Grouted


101(6)c cu.m. 849.00 649.87
Riprap

101(6)d Removal of Structures/Obstruction(Concrete Barrier) cu.m. 11.00 2,375.57


101(8) Removal of Existing Guardrails ln.m. 3,366.00 141.38

101(9) Removal of Existing Guardrail Post each 943.00 144.01

101(10) Removal of Existing Road Signs ( Kilometer Post & Road Signs) each 7.00 230.29

102(2)b Roadway Excavation (Surplus Common ) cu.m. 78,465.00 91.51

103(1)a Structure Excavation ( Common Soil ) cu.m. 3,421.00 190.53

103(3) Foundation Fill cu.m. 308.00 1,482.81

103(6)a Pipe Culvert and Drain Excavation cu.m. 71.00 295.01

104(1)a1 Embankment from Roadway Excavation cu.m. 24,339.00 289.25

105(1)a Subgrade Preparation (Common Material) sq.m. 44,817.00 47.99

200 (1) Aggregate Sub-base Course cu.m. 13,495.00 441.23

300(1) Gravel Surface Course (Uncrushed) cu.m. 677.00 1,527.83

311(1)a PCC Pavement (Plain)-Conventional Method, 150mm thick sq.m. 4,581.00 1,192.19

311(1)e1.1 PCC Pavement (Plain)-Conventional Method, 280 mm thick sq.m. 30,956.00 2,067.66

404(1)a Reinforcing Steel Bar Grade 40 kg. 51,619.00 100.45

405(2)a Structural Concrete "Class B" cu.m. 1,400.00 6,058.87

500(1)b3 Pipe Culverts, 910 mm dia. (36"Ø) - Class IV ln.m. 56.00 6,864.05
506(1) Stone Masonry cu.m. 8,145.00 3,728.36

602(3)c Kilometer Post (Reinstallation) each 5.00 1,729.84

603(3)a1 Metal Guardrail (Metal Flex Beam),Including Concrete Post - Class B ln.m. 147.00 3,625.20

603(3)a1.1 Reinstallation of Metal Guardrail Including Post ln.m. 3,366.00 103.56

603(3)b1 Guardrail (End Piece) - Fish Tail each 4.00 4,395.16

Solar Pavement Levelled Marker/Stud (Flush Type), Type G105 (Road


607(3)b each 1,525.00 4,146.89
Star)

612(1) Reflectorized Thermopalstic Pavement Markings (White) sq.m. 1,422.00 1,158.88

612(2) Reflectorized Thermopalstic Pavement Markings (Yellow) sq.m. 1,387.00 1,173.90

620 (1)a1.1 Reintallation of Chevron Directional Signs (0.45m x 0.60m) each 199.00 385.06

622(1)a Bio-Engineering Coco Fiber Erosion Control Net (CGN 400) sq.m. 6,528.00 603.92

622(2)b Bio-Engineering Coco Fascine Erosion Control System (CGR 200) ln.m. 2,680.00 702.68

622(3)b Bio-Engineering Erosion Control System ( Vetiver Grass) sq.m. 6,528.00 224.79

TOTAL AMOUNT

Prepared by:
JAMES A. MARCILLANA
Project Engineer
Vicente T. Lao Construction
MAKAR ROAD,NAGPAN,MALUNGON SARANGANI

QUANTITY COST OF REVISION


PROPOSED VARIATION ORDER No.01
INAL CONTRACT
CHANGE ORDER
EXTRA WORK
NEGATIVE POSITIVE
TOTAL COST
QTY. AMOUNT QTY. AMOUNT QTY. AMOUNT

73,823.40 -

589,679.06 - - -

13,522.92 - -

926,286.79 - - -

80,198.74 - -

615,501.60 - -

88,664.20 - -

27,260.56 - -

264,723.21 - -

551,739.63 - -

26,131.27 - -
475,885.08 - -

135,801.43 - -

1,612.03 - -

7,180,332.15 -

651,803.13 -

456,705.48 -

20,945.71 -

7,040,055.75 -

2,150,767.83 -

5,954,398.85 -

1,034,340.91 -

5,461,422.39 -

64,006,482.96 581.225 1,201,775.68

5,185,128.55 -

8,482,418.00 -

384,386.80 -
30,367,492.20 835.39 3,114,634.66

8,649.20 -

532,904.40 229.00 830,170.80

348,582.96 -

17,580.64 -

6,324,007.25 -

1,647,927.36 -

1,628,199.30 -

76,626.94 -

3,942,389.76 4,616.20 3,942,389.76 -

1,883,182.40 800.00 562,144.00 -

1,467,429.12 6,528.00 1,467,429.12 -

160,124,989.95 5,971,962.88 5,146,581.14 -

ORIGINAL CONTRACT

Checked by: PROPOSED REVISED CONTRACT


DIFFERENCE
SUKARNO D. DILANGALEN
Project Engineer III
DPWH REGION XII
REVISED CONTRACT

QTY. AMOUNT

9.30 73,823.40

9.30 589,679.06

3.00 13,522.92

9.30 926,286.79

9.30 80,198.74
19592.06
1.00 615,501.60

20.00 88,664.20

8.00 27,260.56

433.00 264,723.21

849.00 551,739.63

11.00 26,131.27
3,366.00 475,885.08

943.00 135,801.43

7.00 1,612.03

78,465.00 7,180,332.15

3,421.00 651,803.13

308.00 456,705.48

71.00 20,945.71

24,339.00 7,040,055.75

44,817.00 2,150,767.83

13,495.00 5,954,398.85

677.00 1,034,340.91

4,581.00 5,461,422.39

31,537.225 65,208,258.64

51,619.00 5,185,128.55

1,400.00 8,482,418.00

56.00 384,386.80
8,980.39 33,482,126.86

5.00 8,649.20

376.00 1,363,075.20

3,366.00 348,582.96

4.00 17,580.64

1,525.00 6,324,007.25

1,422.00 1,647,927.36

1,387.00 1,628,199.30

199.00 76,626.94

1,911.80 1,154,574.26

800.00 562,144.00

1,911.60 429,708.56

160,124,996.63

PHP 160,124,989.95
PROPOSED REVISED CONTRACT PHP 160,124,996.63
-PHP 6.68
2,146,420.14
QUANTITY SHEET

AREAS VOLUM
LENGTH
STATIONS
(meters) ITEM 102(2)b
ITEM 104(1)a1 ITEM 102(2)b

1618 + 340.00 12.514 0.00 0.00


1618 + 360.00 20.00 7.520 2.40 200.34
1618 + 380.00 20.00 5.213 0.00 127.33
1618 + 400.00 20.00 4.150 0.00 93.63
1618 + 420.00
1618 + 440.00
1618 + 460.00
1618 + 480.00
1618 + 500.00
1618 + 520.00
1618 + 540.00
1618 + 560.00
1618 + 580.00
1618 + 600.00
1618 + 620.00
1618 + 640.00
1618 + 660.00
1618 + 680.00
1618 + 700.00
1618 + 720.00
1618 + 740.00
1618 + 760.00
1618 + 780.00
1618 + 800.00
1618 + 820.00
1618 + 840.00
1618 + 860.00
1618 + 880.00
1618 + 903.00 0.00 0.00 0.00
1618 + 920.00 17.00 2.56 0.51 21.76
1618 + 940.00 20.00 2.65 0.39 52.10
1618 + 960.00 20.00 8.92 1.20 115.65
1618 + 980.00 20.00 10.81 1.96 197.25
1619 + 000.00 20.00 15.67 1.87 264.80
1619 + 020.00 20.00 18.58 1.77 342.50
1619 + 040.00 20.00 19.05 1.65 376.30
1619 + 060.00 20.00 20.92 1.02 399.70
1619 + 080.00 20.00 21.74 1.77 426.60
1619 + 100.00 20.00 21.56 3.53 433.00
1619 + 120.00 20.00 20.62 5.68 421.80
1619 + 140.00 20.00 18.95 5.71 395.70
1619 + 160.00 20.00 18.78 7.59 377.30
1619 + 180.00 20.00 19.82 8.49 386.00
1619 + 200.00 20.00 20.79 0.00 406.10
1619 + 220.00 20.00 21.28 0.08 420.70
1619 + 240.00 20.00 21.17 3.91 424.50
1619 + 260.00 20.00 19.85 2.88 410.20
1619 + 280.00 20.00 18.74 1.84 385.93
1619 + 300.00 20.00 19.49 1.13 382.33
1619 + 320.00 20.00 18.09 1.19 375.80
1619 + 340.00 20.00 16.54 1.00 346.30
1619 + 360.00 20.00 17.23 1.09 337.70
1619 + 380.00 20.00 16.78 3.60 340.10
1619 + 400.00 20.00 11.23 4.22 280.10
1619 + 420.00 20.00 15.92 2.26 271.50
1619 + 440.00 20.00 17.85 1.23 337.70
1619 + 460.00 20.00 20.42 0.64 382.70
1619 + 480.00 20.00 21.39 0.15 418.10
1619 + 500.00 20.00 21.12 0.24 425.10
1619 + 520.00 20.00 20.84 0.41 419.60
1619 + 540.00 20.00 22.21 0.00 430.53
1619 + 560.00 20.00 21.27 0.00 434.83
1619 + 580.00 20.00 20.74 0.15 420.10
1619 + 600.00 20.00 21.30 0.15 420.40
1619 + 620.00 20.00 21.89 0.00 431.90
1619 + 640.00 20.00 21.50 0.16 433.90
1619 + 660.00 20.00 20.58 0.14 420.80
1619 + 680.00 20.00 21.27 0.00 418.50
1619 + 700.00 20.00 21.34 0.00 426.10
1619 + 720.00 20.00 21.86 0.14 432.00
1619 + 740.00 20.00 20.95 0.00 428.10
1619 + 760.00 20.00 21.05 0.00 420.00
1619 + 780.00 20.00 21.84 0.00 428.90
1619 + 800.00 20.00 20.91 1.11 427.50
1619 + 809.67 9.67 20.61 1.11 200.75
1619 + 820.00 10.33 20.16 2.39 210.58
1619 + 840.00 20.00 20.82 3.68 409.80
1619 + 860.00 20.00 19.51 4.13 403.30
1619 + 880.00 20.00 19.34 3.35 388.50
1619 + 896.42 16.42 17.22 5.10 300.16
1619 + 900.00 3.58 16.12 5.10 59.68
1619 + 920.00 20.00 15.42 6.20 315.40
1619 + 940.00 20.00 14.36 4.56 297.80
1619 + 960.00 20.00 14.31 4.35 286.70
1619 + 980.00 20.00 13.89 7.80 282.00
1620 + 000.00 20.00 12.92 6.59 268.10
1620 + 020.00 20.00 4.32 8.62 172.40
1620 + 040.00 20.00 5.20 9.99 95.20
1620 + 060.00 20.00 6.14 9.96 113.40
1620 + 080.00 20.00 3.19 10.27 93.30
1620 + 100.00 20.00 2.52 11.25 57.10
1620 + 120.00 20.00 3.42 13.11 59.40
1620 + 140.00 20.00 3.80 12.97 72.20
1620 + 160.00 20.00 2.38 12.80 61.80
1620 + 180.00 20.00 2.37 15.31 47.50
1620 + 200.00 20.00 3.15 16.03 55.20
1620 + 220.00 20.00 3.30 17.12 64.50
1620 + 240.00 20.00 4.35 17.59 76.50
1620 + 260.00 20.00 3.47 18.54 78.20
1620 + 280.00 20.00 2.92 18.92 63.90
1620 + 300.00 20.00 3.31 18.36 62.30
1620 + 320.00 20.00 3.96 16.04 72.70
1620 + 340.00 20.00 4.68 15.53 86.40
1620 + 360.00 20.00 3.67 9.98 83.50
1620 + 380.00 20.00 3.66 7.91 73.30
1620 + 400.00 20.00 4.88 6.60 85.40
1620 + 420.00 20.00 4.27 6.60 91.50
1620 + 440.00 20.00 5.62 6.85 98.90
1620 + 460.00 20.00 2.69 11.26 83.10
1620 + 480.00 20.00 2.61 12.56 53.00
1620 + 500.00 20.00 3.50 5.45 61.10
1620 + 520.00 20.00 20.46 4.98 239.60
1620 + 540.00 20.00 21.43 6.35 418.90
1620 + 560.00 20.00 20.86 6.80 422.90
1620 + 580.00 20.00 21.58 3.49 424.40
1620 + 600.00 20.00 21.51 1.52 430.90
1620 + 620.00 20.00 20.91 3.02 424.20
1620 + 640.00 20.00 21.32 4.08 422.30
1620 + 660.00 20.00 20.72 1.56 420.40
1620 + 680.00 20.00 20.93 3.46 416.50
1620 + 700.00 20.00 20.19 1.35 411.20
1620 + 720.00 20.00 20.01 4.08 402.00
1620 + 740.00 20.00 21.06 4.91 410.70
1620 + 760.00 20.00 21.67 4.96 427.30
1620 + 780.00 20.00 21.13 4.47 428.00
1620 + 800.00 20.00 20.83 4.28 419.60
1620 + 820.00 20.00 20.05 1.72 408.80
1620 + 840.00 20.00 21.23 0.00 412.80
1620 + 860.00 20.00 21.51 0.00 427.40
1620 + 880.00 20.00 20.95 0.29 424.60
1620 + 900.00 20.00 20.33 0.00 412.80
1620 + 920.00 20.00 20.55 0.84 408.80
1620 + 940.00 20.00 20.72 0.00 412.70
1620 + 960.00 20.00 20.75 3.04 414.70
1620 + 980.00 20.00 20.14 6.02 408.90
1621 + 000.00 20.00 21.64 1.95 417.80
1621 + 020.00 20.00 21.50 6.52 431.40
1621 + 040.00 20.00 21.87 6.16 433.70
1621 + 060.00 20.00 21.05 8.45 429.20
1621 + 080.00 20.00 20.11 10.23 411.60
1621 + 100.00 20.00 20.00 11.63 401.10
1621 + 120.00 20.00 22.37 4.68 423.70
1621 + 140.00 20.00 22.46 2.30 448.30
1621 + 160.00 20.00 22.63 0.83 450.90
1621 + 180.00 20.00 22.59 2.43 452.20
1621 + 200.00 20.00 21.25 5.90 438.40
1621 + 220.00 20.00 21.16 0.64 424.10
1621 + 240.00 20.00 21.65 0.32 428.10
1621 + 260.00 20.00 21.82 1.28 434.70
1621 + 280.00 20.00 20.68 0.00 425.00
1621 + 300.00 20.00 18.73 3.61 394.10
1621 + 320.00 20.00 19.04 3.37 377.70
1621 + 340.00 20.00 4.40 3.24 234.40
1621 + 360.00 20.00 17.91 0.97 223.10
1621 + 380.00 20.00 23.65 0.00 415.60
1621 + 400.00 20.00 23.52 0.00 471.70
1621 + 420.00 20.00 22.48 0.00 460.00
1621 + 440.00 20.00 22.94 0.02 454.20
1621 + 460.00 20.00 21.28 0.23 442.20
1621 + 480.00 20.00 22.62 0.00 439.00
1621 + 500.00 20.00 21.98 0.03 446.00
1621 + 520.00 20.00 21.74 0.00 437.20
1621 + 540.00 20.00 24.51 0.00 462.50
1621 + 560.00 20.00 24.39 0.00 489.00
1621 + 580.00 20.00 25.99 0.00 503.80
1621 + 600.00 20.00 22.74 0.53 487.30
1621 + 620.00 20.00 12.65 5.03 353.90
1621 + 640.00 20.00 6.17 8.13 188.20
1621 + 660.00 20.00 5.27 8.93 114.40
1621 + 680.00 20.00 5.87 8.55 111.40
1621 + 700.00 20.00 5.20 8.39 110.70
1621 + 720.00 20.00 6.09 9.26 112.90
1621 + 740.00 20.00 6.14 6.76 122.30
1621 + 760.00 20.00 5.53 7.87 116.70
1621 + 780.00 20.00 6.04 9.40 115.70
1621 + 800.00 20.00 6.78 10.94 128.20
1621 + 820.00 20.00 5.81 9.40 125.90
1621 + 840.00 20.00 5.34 0.85 111.50
1621 + 860.00 20.00 5.62 9.71 109.60
1621 + 880.00 20.00 6.00 9.42 116.20
1621 + 900.00 20.00 5.25 13.61 112.50
1621 + 920.00 20.00 4.11 11.78 93.60
1621 + 940.00 20.00 4.54 12.18 86.50
1621 + 960.00 20.00 6.37 12.48 109.10
1621 + 980.00 20.00 4.86 6.11 112.30
1622 + 000.00 20.00 6.20 6.49 110.60
1622 + 020.00 20.00 7.65 13.96 138.50
1622 + 040.00 20.00 4.58 15.80 122.30
1622 + 060.00 20.00 3.19 22.81 77.70
1622 + 080.00 20.00 5.38 22.35 85.70
1622 + 100.00 20.00 5.36 18.84 107.40
1622 + 120.00 20.00 5.40 17.04 107.60
1622 + 140.00 20.00 6.16 15.18 115.60
1622 + 160.00 20.00 9.14 13.70 153.00
1622 + 180.00 20.00 7.72 13.33 168.60
1622 + 200.00 20.00 6.90 13.35 146.20
1622 + 220.00 20.00 7.21 11.52 141.10
1622 + 240.00 20.00 6.60 13.91 138.10
1622 + 260.00 20.00 6.62 15.13 132.17
1622 + 280.00 20.00 10.68 12.18 172.97
1622 + 300.00 20.00 13.53 6.09 242.10
1622 + 320.00 20.00 13.05 11.98 265.80
1622 + 340.00 20.00 16.27 12.57 293.20
1622 + 360.00 20.00 11.61 7.12 278.80
1622 + 380.00 20.00 17.78 8.34 293.90
1622 + 400.00 20.00 15.59 9.64 333.70
1622 + 420.00 20.00 15.56 9.85 311.50
1622 + 440.00 20.00 17.33 9.06 328.90
1622 + 460.00 20.00 17.12 9.15 344.50
1622 + 480.00 20.00 17.13 7.51 342.50
1622 + 500.00 20.00 17.10 5.54 342.30
1622 + 520.00 20.00 21.33 4.44 384.30
1622 + 540.00 20.00 23.09 2.90 444.20
1622 + 560.00 20.00 25.19 4.01 482.80
1622 + 580.00 20.00 25.61 0.24 508.00
1622 + 600.00 20.00 25.37 0.00 509.80
1622 + 620.00 20.00 23.26 0.00 486.30
1622 + 640.00 20.00 21.49 0.00 447.50
1622 + 660.00 20.00 33.31 0.00 548.00
1622 + 680.00 20.00 34.27 0.00 675.80
1622 + 700.00 20.00 34.02 0.00 682.90
1622 + 720.00 20.00 35.30 0.00 693.20
1622 + 740.00 20.00 36.98 0.00 722.80
1622 + 760.00 20.00 35.76 0.00 727.40
1622 + 780.00 20.00 36.64 7.35 724.00
1622 + 800.00 20.00 37.71 1.05 743.50
1622 + 820.00 20.00 38.15 2.23 758.60
1622 + 840.00 20.00 38.10 6.31 762.50
1622 + 860.00 20.00 39.84 1.13 779.40
1622 + 880.00 20.00 37.32 0.00 771.60
1622 + 900.00 20.00 36.22 0.00 735.40
1622 + 920.00 20.00 36.44 0.00 726.60
1622 + 940.00 20.00 35.32 9.14 717.60
1622 + 960.00 20.00 35.12 0.00 704.40
1622 + 980.00 20.00 33.87 0.00 689.90
1623 + 000.00 20.00 31.05 12.39 649.20
1623 + 020.00 20.00 32.70 12.68 637.50
1623 + 040.00 20.00 33.21 11.80 659.10
1623 + 060.00 20.00 31.23 0.41 644.40
1623 + 080.00 20.00 31.99 0.92 632.22
1623 + 100.00 20.00 27.45 6.95 594.42
1623 + 120.00 20.00 17.51 4.82 449.60
1623 + 140.00 20.00 18.12 6.60 356.30
1623 + 160.00 20.00 14.50 5.48 326.20
1623 + 180.00 20.00 13.59 6.37 280.90
1623 + 200.00 20.00 12.65 5.24 262.40
1623 + 220.00 20.00 10.57 6.40 232.20
1623 + 240.00 20.00 10.94 5.36 215.10
1623 + 260.00 20.00 5.56 6.45 164.98
1623 + 280.00 20.00 5.96 7.80 115.18
1623 + 290.00 10.00 6.15 8.45 60.55
1623 + 300.00
1623 + 320.00
1623 + 340.00
1623 + 360.00
1623 + 380.00
1623 + 400.00
1623 + 420.00 13.42 0.00 0.00
1623 + 440.00 24.00 15.55 0.00 347.64
1623 + 460.00 20.00 14.57 0.00 301.20
1623 + 480.00 20.00 12.46 0.00 270.30
1623 + 500.00 20.00 12.57 0.00 250.30
1623 + 520.00 20.00 12.81 0.00 253.80
1623 + 540.00 20.00 14.37 0.00 271.80
1623 + 560.00 20.00 14.16 0.00 285.30
1623 + 580.00 20.00 15.41 0.00 295.70
1623 + 600.00 20.00 14.23 0.00 296.40
1623 + 620.00 20.00 12.71 0.00 269.40
1623 + 640.00 20.00 12.92 0.00 256.30
1623 + 660.00 20.00 13.45 7.64 263.66
1623 + 680.00 20.00 12.29 4.13 257.37
TOTAL 78,465.00
VOLUME
REMARKS
ITEM 104(1)a1

0.00
24.00
24.00
0.00

EXCEPTION 01
0.00
4.34
9.00
15.90
31.60
38.30
36.40
34.20
26.70
27.90
53.00
92.10
113.90
133.00
160.80
84.90
0.80
39.90
67.90
47.20
29.70
23.20
21.90
20.90
46.90
78.20
64.80
34.90
18.70
7.90
3.90
6.50
4.10
0.00
1.50
3.00
1.50
1.60
3.00
1.40
0.00
1.40
1.40
0.00
0.00
11.10
10.73
18.07
60.70
78.11
74.81
69.37
18.26
113.00
107.60
89.10
121.50
143.90
152.10
186.10
199.50
202.30
215.20
243.60
260.80
257.70
281.10
313.40
331.50
347.10
361.30
374.60
372.80
344.00
315.70
255.10
178.90
145.10
132.00
134.53
181.13
238.20
180.10
104.30
113.30
131.50
102.90
50.10
45.40
71.00
56.40
50.20
48.10
54.30
89.90
98.70
94.30
87.50
60.00
17.20
0.00
2.90
2.90
8.40
8.40
30.40
90.60
79.70
84.70
126.80
146.10
186.80
218.60
163.10
69.80
31.30
32.60
83.30
65.40
9.60
16.00
12.80
36.10
69.80
66.10
42.10
9.70
0.00
0.00 EXCEPTION 01

0.20
2.50
2.30
0.30
0.30
0.00
0.00
0.00
5.30
55.60
131.60
170.60
174.80
169.40
176.47
160.17
146.30
172.70
203.40
203.40
102.50
105.60
191.30
230.30
253.90
239.60
246.60
185.90
126.00
204.50
297.60
386.10
451.60
411.90
358.80
322.20
288.80
270.30
266.80
248.70
254.30
290.40
273.10
182.70
180.70
245.50
196.90
154.60
179.80
194.90
189.10
182.10
166.60
130.50
99.80
73.40
69.10
42.50
2.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
73.50
84.00
32.80
85.40
74.40
11.30
0.00
0.00
91.40
91.40
0.00
123.90
250.67
244.73
122.06
13.30
78.70
117.70
114.20
120.80
118.50
116.10
116.40
117.60
118.10
142.50
81.25

EXCEPTION 02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
76.40
117.70
24,339.00
QUANTITY SHEET

AREAS

STATIONS LENGTH COMMON


EMBANKMENT
EXCAVATION
(Sq.m.)
(Sq.m.)

1618 + 320.00
1618 + 340.00 20.00
1618 + 360.00 20.00
1618 + 380.00 20.00
1618 + 400.00 20.00

1618 + 903.00
1618 + 920.00 17.00
1618 + 940.00 20.00
1618 + 960.00 20.00
1618 + 980.00 20.00
1619 + 000.00 20.00
1619 + 020.00 20.00
1619 + 040.00 20.00
1619 + 060.00 20.00
1619 + 080.00 20.00
1619 + 100.00 20.00
1619 + 120.00 20.00
1619 + 140.00 20.00
1619 + 160.00 20.00
1619 + 180.00 20.00
1619 + 200.00 20.00
1619 + 220.00 20.00
1619 + 240.00 20.00
1619 + 260.00 20.00
1619 + 280.00 20.00
1619 + 300.00 20.00
1619 + 320.00 20.00
1619 + 340.00 20.00
1619 + 360.00 20.00
1619 + 380.00 20.00
1619 + 400.00 20.00
1619 + 420.00 20.00
1619 + 440.00 20.00
1619 + 460.00 20.00
1619 + 480.00 20.00
1619 + 500.00 20.00
1619 + 520.00 20.00
1619 + 540.00 20.00
1619 + 560.00 20.00
1619 + 580.00 20.00
1619 + 600.00 20.00
1619 + 620.00 20.00
1619 + 640.00 20.00
1619 + 660.00 20.00
1619 + 680.00 20.00
1619 + 700.00 20.00
1619 + 720.00 20.00
1619 + 740.00 20.00
1619 + 760.00 20.00
1619 + 780.00 20.00
1619 + 800.00 20.00
1619 + 820.00 20.00
1619 + 840.00 20.00
1619 + 860.00 20.00
1619 + 880.00 20.00
1619 + 900.00 20.00
1619 + 920.00 20.00
1619 + 940.00 20.00
1619 + 960.00 20.00
1619 + 980.00 20.00
1620 + 000.00 20.00
1620 + 020.00 20.00
1620 + 040.00 20.00
1620 + 060.00 20.00
1620 + 080.00 20.00
1620 + 100.00 20.00
1620 + 120.00 20.00
1620 + 140.00 20.00
1620 + 160.00 20.00
1620 + 180.00 20.00
1620 + 200.00 20.00
1620 + 220.00 20.00
1620 + 240.00 20.00
1620 + 260.00 20.00
1620 + 280.00 20.00
1620 + 300.00 20.00
1620 + 320.00 20.00
1620 + 340.00 20.00
1620 + 360.00 20.00
1620 + 380.00 20.00
1620 + 400.00 20.00
1620 + 420.00 20.00
1620 + 440.00 20.00
1620 + 460.00 20.00
1620 + 480.00 20.00
1620 + 500.00 20.00
1620 + 520.00 20.00
1620 + 540.00 20.00
1620 + 560.00 20.00
1620 + 580.00 20.00
1620 + 600.00 20.00
1620 + 620.00 20.00
1620 + 640.00 20.00
1620 + 660.00 20.00
1620 + 680.00 20.00
1620 + 700.00 20.00
1620 + 720.00 20.00
1620 + 740.00 20.00
1620 + 760.00 20.00
1620 + 780.00 20.00
1620 + 800.00 20.00
1620 + 820.00 20.00
1620 + 840.00 20.00
1620 + 860.00 20.00
1620 + 880.00 20.00
1620 + 900.00 20.00
1620 + 920.00 20.00
1620 + 940.00 20.00
1620 + 960.00 20.00
1620 + 980.00 20.00
1621 + 000.00 20.00
1621 + 020.00 20.00
1621 + 040.00 20.00
1621 + 060.00 20.00
1621 + 080.00 20.00
1621 + 100.00 20.00
1621 + 120.00 20.00
1621 + 140.00 20.00
1621 + 160.00 20.00
1621 + 180.00 20.00
1621 + 200.00 20.00
1621 + 220.00 20.00
1621 + 240.00 20.00
1621 + 260.00 20.00
1621 + 280.00 20.00
1621 + 300.00 20.00
1621 + 320.00 20.00
1621 + 340.00 20.00
1621 + 360.00 20.00
1621 + 380.00 20.00
1621 + 400.00 20.00
1621 + 420.00 20.00
1621 + 440.00 20.00
1621 + 460.00 20.00
1621 + 480.00 20.00
1621 + 500.00 20.00
1621 + 520.00 20.00
1621 + 540.00 20.00
1621 + 560.00 20.00
1621 + 580.00 20.00
1621 + 600.00 20.00
1621 + 620.00 20.00
1621 + 640.00 20.00
1621 + 660.00 20.00
1621 + 680.00 20.00
1621 + 700.00 20.00
1621 + 720.00 20.00
1621 + 740.00 20.00
1621 + 760.00 20.00
1621 + 780.00 20.00
1621 + 800.00 20.00
1621 + 820.00 20.00
1621 + 840.00 20.00
1621 + 860.00 20.00
1621 + 880.00 20.00
1621 + 900.00 20.00
1621 + 920.00 20.00
1621 + 940.00 20.00
1621 + 960.00 20.00
1621 + 980.00 20.00
1622 + 000.00 20.00
1622 + 020.00 20.00
1622 + 040.00 20.00
1622 + 060.00 20.00
1622 + 080.00 20.00
1622 + 100.00 20.00
1622 + 120.00 20.00
1622 + 140.00 20.00
1622 + 160.00 20.00
1622 + 180.00 20.00
1622 + 200.00 20.00
1622 + 220.00 20.00
1622 + 240.00 20.00
1622 + 260.00 20.00
1622 + 280.00 20.00
1622 + 300.00 20.00
1622 + 320.00 20.00
1622 + 340.00 20.00
1622 + 360.00 20.00
1622 + 380.00 20.00
1622 + 400.00 20.00
1622 + 420.00 20.00
1622 + 440.00 20.00
1622 + 460.00 20.00
1622 + 480.00 20.00
1622 + 500.00 20.00
1622 + 520.00 20.00
1622 + 540.00 20.00
1622 + 560.00 20.00
1622 + 580.00 20.00
1622 + 600.00 20.00
1622 + 620.00 20.00
1622 + 640.00 20.00
1622 + 660.00 20.00
1622 + 680.00 20.00
1622 + 700.00 20.00
1622 + 720.00 20.00
1622 + 740.00 20.00
1622 + 760.00 20.00
1622 + 780.00 20.00
1622 + 800.00 20.00
1622 + 820.00 20.00
1622 + 840.00 20.00
1622 + 860.00 20.00
1622 + 880.00 20.00
1622 + 900.00 20.00
1622 + 920.00 20.00
1622 + 940.00 20.00
1622 + 960.00 20.00
1622 + 980.00 20.00
1623 + 000.00 20.00
1623 + 020.00 20.00
1623 + 040.00 20.00
1623 + 060.00 20.00
1623 + 080.00 20.00
1623 + 100.00 20.00
1623 + 120.00 20.00
1623 + 140.00 20.00
1623 + 160.00 20.00
1623 + 180.00 20.00
1623 + 200.00 20.00
1623 + 220.00 20.00
1623 + 240.00 20.00
1623 + 260.00 20.00
1623 + 280.00 20.00
1623 + 300.00 20.00
1623 + 320.00 20.00
1623 + 340.00 20.00
1623 + 360.00 20.00
1623 + 380.00 20.00
1623 + 400.00 20.00
1623 + 420.00 20.00
1623 + 440.00 20.00
1623 + 460.00 20.00
1623 + 480.00 20.00
1623 + 500.00 20.00
1623 + 520.00 20.00
1623 + 540.00 20.00
1623 + 560.00 20.00
1623 + 580.00 20.00
1623 + 600.00 20.00
1623 + 620.00 20.00
1623 + 640.00 20.00
1623 + 660.00 20.00
1623 + 680.00 20.00
Y SHEET

VOLUME
COMMON REMARKS
EMBANKMENT
EXCAVATION
(Cu.m.)
(Cu.m.)
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY. LOCATION
(mts.)
1619 + 160.00 GEMILINA 0.6 1 RT
1619 + 160.00 IPIL-IPIL 0.5 1 LT
1619 + 240.00 NARRA 0.3 7 LT
1619 + 600.00 MAHOGANY 0.25 14 LT
1619 + 680.00 JACKFRUIT 0.2 1 LT
1619 + 940.00 NEEM TREE 0.3 1 LT
1619 + 940.00 STAR APPLE 0.3 1 RT
1620 + 000.00 GEMILINA 0.6 1 RT
1620 + 000.00 NEEM TREE 0.3 1 RT
1620 + 040.00 MAHOGANY 3.5 1 LT
1620 + 040.00 NEEM TREE 0.3 1 RT
1620 + 080.00 JACKFRUIT 0.3 1 LT
1620 + 100.00 MAHOGANY 0.6 1 RT
1620 + 120.00 MAHOGANY 0.6 4 RT
1620 + 120.00 CAMACHILI 0.3 1 LT
1620 + 180.00 NEEM TREE 0.3 1 LT
1620 + 200.00 MANGO 0.3 1 LT
1620 + 220.00 GEMILINA 0.3 1 RT
1620 + 220.00 MAHOGANY 0.6 2 RT
1620 + 240.00 GEMILINA 0.6 1 LT
1620 + 260.00 MANGO 0.4 1 LT
1620 + 300.00 MAHOGANY 0.6 4 LT
1620 + 320.00 MANGO 0.4 1 LT
1620 + 340.00 JACKFRUIT 0.3 1 LT
1620 + 360.00 JACKFRUIT 0.3 2 LT
1620 + 360.00 MAHOGANY 0.5 3 LT
1620 + 340.00 CAMACHILI 0.6 1 RT
1620 + 360.00 MANGO 0.4 1 RT
1620 + 360.00 MAHOGANY 0.3 2 RT
1620 + 380.00 MAHOGANY 0.3 2 LT
1620 + 400.00 SANTOL 0.25 3 LT
1620 + 420.00 SANTOL 0.3 3 LT
1620 + 420.00 TAMARIND 0.4 1 RT
1620 + 420.00 BAGRASS 0.25 3 RT
1620 + 440.00 MAHOGANY 0.4 8 LT
1620 + 440.00 CAMACHILI 0.4 2 LT
1620 + 460.00 KASOY 0.3 1 LT
1620 + 520.00 MAHOGANY 0.4 4 RT
1620 + 520.00 MAHOGANY 0.3 4 LT
1620 + 520.00 MAHOGANY 0.3 4 RT
1620 + 560.00 CAMACHILI 0.5 2 LT
1620 + 560.00 MAHOGANY 0.3 1 LT
1620 + 600.00 MAHOGANY 0.5 1 LT
1620 + 680.00 JACKFRUIT 0.4 1 RT
1620 + 780.00 MAHOGANY 0.5 4 RT
1620 + 820.00 MAHOGANY 0.5 8 RT
1620 + 840.00 GEMILINA 0.4 3 LT
1620 + 900.00 MAHOGANY 0.4 11 RT
1620 + 920.00 MAHOGANY 0.4 2 RT
1621 + 060.00 GEMILINA 0.4 1 LT
1621 + 100.00 JACKFRUIT 0.3 1 LT
1621 + 140.00 GEMILINA 0.4 2 RT
1621 + 180.00 NARRA 0.4 1 LT
1621 + 240.00 NARRA 0.3 2 RT
1621 + 380.00 NARRA 0.3 1 RT
1621 + 400.00 MAHOGANY 0.3 1 RT
1621 + 420.00 MAHOGANY 0.3 1 RT
1621 + 440.00 MAHOGANY 0.3 1 RT
1621 + 460.00 MAHOGANY 0.3 1 RT
1621 + 500.00 MAHOGANY 0.3 1 RT
1621 + 620.00 NEEM TREE 0.5 1 LT
1621 + 620.00 PALM OIL 0.7 1 LT
1621 + 640.00 MANGO 0.5 1 LT
1621 + 660.00 ACASIA 0.6 1 RT
1621 + 740.00 NEEM TREE 0.5 1 LT
1621 + 740.00 SANTOL 0.4 1 LT
1621 + 740.00 NEEM TREE 0.5 1 RT
1621 + 760.00 PALM OIL 0.7 1 RT
1621 + 760.00 JACKFRUIT 0.35 1 LT
1621 + 800.00 PALM OIL 0.7 2 RT
1621 + 820.00 TAMARIND 0.6 2 LT
1621 + 820.00 MAHOGANY 0.5 1 LT
1621 + 820.00 GEMILINA 0.4 2 RT
1621 + 820.00 NEEM TREE 0.4 2 RT
1621 + 860.00 JACKFRUIT 0.35 1 LT
1621 + 860.00 GEMILINA 0.5 3 LT
1621 + 860.00 SANTOL 0.4 1 LT
1621 + 880.00 STAR APPLE 0.5 1 RT
1621 + 900.00 MAHOGANY 0.5 2 RT
1621 + 900.00 NEEM TREE 0.4 3 RT
1621 + 900.00 MANGO 0.3 2 LT
1621 + 920.00 GEMILINA 0.45 1 RT
1621 + 920.00 NEEM TREE 0.4 2 RT
1621 + 920.00 MAHOGANY 0.5 3 LT
1621 + 980.00 MAHOGANY 0.4 3 LT
1622 + 000.00 MAHOGANY 1 1 LT
1622 + 000.00 ACASIA 0.6 1 LT
1622 + 020.00 MAHOGANY 0.4 4 RT
1622 + 020.00 GEMILINA 0.5 1 RT
1622 + 080.00 MAHOGANY 0.4 1 LT
1622 + 100.00 MAHOGANY 0.6 2 LT
1622 + 120.00 NARRA 0.4 6 LT
1622 + 140.00 NARRA 0.4 2 RT
1622 + 160.00 GEMILINA 0.6 2 RT
1622 + 180.00 MOLAVE 0.4 2 RT
1622 + 200.00 MAHOGANY 0.5 3 LT
1622 + 200.00 MAHOGANY 0.4 4 RT
1622 + 300.00 NARRA 0.5 3 LT
1622 + 300.00 MAHOGANY 0.3 1 RT
1622 + 340.00 MAHOGANY 0.3 3 RT
1622 + 360.00 MAHOGANY 0.3 3 RT
1622 + 380.00 NARRA 0.5 3 RT
1622 + 400.00 MAHOGANY 0.3 2 RT
1622 + 440.00 NARRA 0.5 1 LT
1622 + 460.00 MAHOGANY 0.3 1 RT
1622 + 480.00 MAHOGANY 0.3 2 RT
1622 + 480.00 NARRA 0.5 4 LT
1622 + 500.00 GEMILINA 0.5 2 RT
1622 + 520.00 MAHOGANY 0.3 1 RT
1622 + 520.00 NARRA 0.4 5 LT
1622 + 540.00 GEMILINA 0.4 5 RT
1622 + 600.00 MAHOGANY 0.4 1 RT
1622 + 680.00 GEMILINA 0.4 2 RT
1622 + 700.00 MAHOGANY 0.3 3 RT
1622 + 900.00 MAHOGANY 0.3 1 RT
1622 + 940.00 IPIL-IPIL 0.9 1 RT
1622 + 960.00 MAHOGANY 0.3 2 RT
1622 + 980.00 NARRA 0.3 1 RT
1623 + 000.00 MAHOGANY 0.4 2 RT
1623 + 080.00 MAHOGANY 0.4 2 RT
1623 + 120.00 DOL-DOL 0.5 2 RT
1623 + 140.00 NEEM TREE 0.4 3 RT
1623 + 160.00 NEEM TREE 0.4 3 RT
1623 + 160.00 GEMILINA 0.6 1 RT
1623 + 220.00 GEMILINA 0.6 2 LT
1623 + 240.00 GEMILINA 0.3 1 LT
1623 + 500.00 BAGRASS 0.5 3 RT
1623 + 540.00 BAGRASS 0.4 1 RT
1623 + 580.00 BAGRASS 0.4 4 RT
1623 + 600.00 BAGRASS 0.5 8 RT
1623 + 620.00 BAGRASS 0.4 5 RT
1623 + 660.00 BAGRASS 0.4 2 RT
TOTAL 295
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY. LOCATION
(mts.)
1619 + 160.00 GEMILINA 0.6 1 RT
1619 + 160.00 IPIL-IPIL 0.5 1 LT
1619 + 240.00 NARRA 0.3 7 LT
1619 + 600.00 MAHOGANY 0.25 14 LT
1619 + 640.00 BANANA 0.2 10 LT
1619 + 680.00 JACKFRUIT 0.2 1 LT
1619 + 940.00 NEEM TREE 0.3 1 LT
1619 + 940.00 STAR APPLE 0.3 1 RT
1620 + 000.00 GEMILINA 0.6 1 RT
1620 + 000.00 NEEM TREE 0.3 1 RT
1620 + 040.00 MAHOGANY 3.5 1 LT
1620 + 040.00 NEEM TREE 0.3 1 RT
1620 + 080.00 JACKFRUIT 0.3 1 LT
1620 + 100.00 MAHOGANY 0.6 1 RT
1620 + 120.00 MAHOGANY 0.6 4 RT
1620 + 120.00 CAMACHILI 0.3 1 LT
1620 + 180.00 NEEM TREE 0.3 1 LT
1620 + 200.00 MANGO 0.3 1 LT
1620 + 220.00 GEMILINA 0.3 1 RT
1620 + 220.00 MAHOGANY 0.6 2 RT
1620 + 240.00 GEMILINA 0.6 1 LT
1620 + 260.00 MANGO 0.4 1 LT
1620 + 300.00 MAHOGANY 0.6 4 LT
1620 + 320.00 MANGO 0.4 1 LT
1620 + 340.00 JACKFRUIT 0.3 1 LT
1620 + 360.00 JACKFRUIT 0.3 2 LT
1620 + 360.00 MAHOGANY 0.5 3 LT
1620 + 340.00 CAMACHILI 0.6 1 RT
1620 + 360.00 MANGO 0.4 1 RT
1620 + 360.00 MAHOGANY 0.3 2 RT
1620 + 380.00 MAHOGANY 0.3 2 LT
1620 + 400.00 SANTOL 0.25 3 LT
1620 + 420.00 SANTOL 0.3 3 LT
1620 + 420.00 TAMARIND 0.4 1 RT
1620 + 420.00 BAGRASS 0.25 3 RT
1620 + 440.00 MAHOGANY 0.4 8 LT
1620 + 440.00 CAMACHILI 0.4 2 LT
1620 + 460.00 KASOY 0.3 1 LT
1620 + 520.00 MAHOGANY 0.4 4 RT
1620 + 520.00 MAHOGANY 0.3 4 LT
1620 + 520.00 MAHOGANY 0.3 4 RT
1620 + 560.00 CAMACHILI 0.5 2 LT
1620 + 560.00 MAHOGANY 0.3 1 LT
1620 + 600.00 MAHOGANY 0.5 1 LT
1620 + 680.00 JACKFRUIT 0.4 1 RT
1620 + 780.00 MAHOGANY 0.5 4 RT
1620 + 820.00 MAHOGANY 0.5 8 RT
1620 + 840.00 GEMILINA 0.4 3 LT
1620 + 900.00 MAHOGANY 0.4 11 RT
1620 + 920.00 MAHOGANY 0.4 2 RT
1621 + 060.00 GEMILINA 0.4 1 LT
1621 + 100.00 JACKFRUIT 0.3 1 LT
1621 + 140.00 GEMILINA 0.4 2 RT
1621 + 180.00 NARRA 0.4 1 LT
1621 + 180.00 BANANA 0.25 6 RT
1621 + 200.00 BANANA 0.25 7 RT
1621 + 240.00 NARRA 0.3 2 RT
1621 + 320.00 BANANA 0.25 6 RT
1621 + 340.00 BANANA 0.25 7 LT
1621 + 360.00 BANANA 0.25 10 RT
1621 + 380.00 NARRA 0.3 1 RT
1621 + 400.00 MAHOGANY 0.3 1 RT
1621 + 420.00 MAHOGANY 0.3 1 RT
1621 + 440.00 MAHOGANY 0.3 1 RT
1621 + 460.00 MAHOGANY 0.3 1 RT
1621 + 500.00 MAHOGANY 0.3 1 RT
1621 + 620.00 NEEM TREE 0.5 1 LT
1621 + 620.00 PALM OIL 0.7 1 LT
1621 + 640.00 MANGO 0.5 1 LT
1621 + 660.00 ACASIA 0.6 1 RT
1621 + 700.00 BANANA 0.25 10 LT
1621 + 720.00 BANANA 0.25 8 LT
1621 + 740.00 NEEM TREE 0.5 1 LT
1621 + 740.00 SANTOL 0.4 1 LT
1621 + 740.00 NEEM TREE 0.5 1 RT
1621 + 760.00 PALM OIL 0.7 1 RT
1621 + 760.00 JACKFRUIT 0.35 1 LT
1621 + 800.00 PALM OIL 0.7 2 RT
1621 + 820.00 TAMARIND 0.6 2 LT
1621 + 820.00 MAHOGANY 0.5 1 LT
1621 + 820.00 GEMILINA 0.4 2 RT
1621 + 820.00 NEEM TREE 0.4 2 RT
1621 + 860.00 JACKFRUIT 0.35 1 LT
1621 + 860.00 GEMILINA 0.5 3 LT
1621 + 860.00 SANTOL 0.4 1 LT
1621 + 880.00 STAR APPLE 0.5 1 RT
1621 + 900.00 MAHOGANY 0.5 2 RT
1621 + 900.00 NEEM TREE 0.4 3 RT
1621 + 900.00 MANGO 0.3 2 LT
1621 + 920.00 GEMILINA 0.45 1 RT
1621 + 920.00 NEEM TREE 0.4 2 RT
1621 + 920.00 MAHOGANY 0.5 3 LT
1621 + 980.00 MAHOGANY 0.4 3 LT
1622 + 000.00 MAHOGANY 1 1 LT
1622 + 000.00 ACASIA 0.6 1 LT
1622 + 020.00 MAHOGANY 0.4 4 RT
1622 + 020.00 GEMILINA 0.5 1 RT
1622 + 080.00 MAHOGANY 0.4 1 LT
1622 + 100.00 MAHOGANY 0.6 2 LT
1622 + 120.00 NARRA 0.4 6 LT
1622 + 140.00 NARRA 0.4 2 RT
1622 + 160.00 GEMILINA 0.6 2 RT
1622 + 180.00 MOLAVE 0.4 2 RT
1622 + 200.00 MAHOGANY 0.5 3 LT
1622 + 200.00 MAHOGANY 0.4 4 RT
1622 + 300.00 NARRA 0.5 3 LT
1622 + 300.00 MAHOGANY 0.3 1 RT
1622 + 340.00 MAHOGANY 0.3 3 RT
1622 + 360.00 MAHOGANY 0.3 3 RT
1622 + 380.00 NARRA 0.5 3 RT
1622 + 400.00 MAHOGANY 0.3 2 RT
1622 + 440.00 NARRA 0.5 1 LT
1622 + 460.00 MAHOGANY 0.3 1 RT
1622 + 480.00 MAHOGANY 0.3 2 RT
1622 + 480.00 NARRA 0.5 4 LT
1622 + 500.00 GEMILINA 0.5 2 RT
1622 + 520.00 MAHOGANY 0.3 1 RT
1622 + 520.00 NARRA 0.4 5 LT
1622 + 540.00 GEMILINA 0.4 5 RT
1622 + 600.00 MAHOGANY 0.4 1 RT
1622 + 680.00 GEMILINA 0.4 2 RT
1622 + 700.00 MAHOGANY 0.3 3 RT
1622 + 900.00 MAHOGANY 0.3 1 RT
1622 + 940.00 IPIL-IPIL 0.9 1 RT
1622 + 960.00 MAHOGANY 0.3 2 RT
1622 + 980.00 NARRA 0.3 1 RT
1623 + 000.00 MAHOGANY 0.4 2 RT
1623 + 080.00 MAHOGANY 0.4 2 RT
1623 + 120.00 DOL-DOL 0.5 2 RT
1623 + 140.00 NEEM TREE 0.4 3 RT
1623 + 160.00 NEEM TREE 0.4 3 RT
1623 + 160.00 GEMILINA 0.6 1 RT
1623 + 220.00 GEMILINA 0.6 2 LT
1623 + 240.00 GEMILINA 0.3 1 LT
1623 + 500.00 BAGRASS 0.5 3 RT
1623 + 540.00 BAGRASS 0.4 1 RT
1623 + 580.00 BAGRASS 0.4 4 RT
1623 + 600.00 BAGRASS 0.5 8 RT
1623 + 620.00 BAGRASS 0.4 5 RT
1623 + 660.00 BAGRASS 0.4 2 RT
TOTAL 359
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY. LOCATION
(mts.)
1619 + 160.00 GEMILINA 0.6 1 RT
1619 + 240.00 NARRA 0.3 7 LT
1619 + 600.00 MAHOGANY 0.25 14 LT
1620 + 000.00 GEMILINA 0.6 1 RT
1620 + 000.00 NEEM TREE 0.3 1 RT
1620 + 040.00 MAHOGANY 3.5 1 LT
1620 + 040.00 NEEM TREE 0.3 1 RT
1620 + 100.00 MAHOGANY 0.6 1 RT
1620 + 120.00 MAHOGANY 0.6 4 RT
1620 + 180.00 NEEM TREE 0.3 1 LT
1620 + 220.00 GEMILINA 0.3 1 RT
1620 + 220.00 MAHOGANY 0.6 2 RT
1620 + 240.00 GEMILINA 0.6 1 LT
1620 + 300.00 MAHOGANY 0.6 4 LT
1620 + 360.00 MAHOGANY 0.5 3 LT
1620 + 360.00 MAHOGANY 0.3 2 RT
1620 + 380.00 MAHOGANY 0.3 2 LT
1620 + 420.00 BAGRASS 0.25 3 RT
1620 + 440.00 MAHOGANY 0.4 8 LT
1620 + 520.00 MAHOGANY 0.4 4 RT
1620 + 520.00 MAHOGANY 0.3 4 LT
1620 + 520.00 MAHOGANY 0.3 4 RT
1620 + 560.00 CAMACHILI 0.5 2 LT
1620 + 560.00 MAHOGANY 0.3 1 LT
1620 + 600.00 MAHOGANY 0.5 1 LT
1620 + 680.00 JACKFRUIT 0.4 1 RT
1620 + 780.00 MAHOGANY 0.5 4 RT
1620 + 820.00 MAHOGANY 0.5 8 RT
1620 + 840.00 GEMILINA 0.4 3 LT
1620 + 900.00 MAHOGANY 0.4 11 RT
1620 + 920.00 MAHOGANY 0.4 2 RT
1621 + 060.00 GEMILINA 0.4 1 LT
1621 + 140.00 GEMILINA 0.4 2 RT
1621 + 180.00 NARRA 0.4 1 LT
1621 + 240.00 NARRA 0.3 2 RT
1621 + 380.00 NARRA 0.3 1 RT
1621 + 400.00 MAHOGANY 0.3 1 RT
1621 + 420.00 MAHOGANY 0.3 1 RT
1621 + 440.00 MAHOGANY 0.3 1 RT
1621 + 460.00 MAHOGANY 0.3 1 RT
1621 + 500.00 MAHOGANY 0.3 1 RT
1621 + 660.00 ACASIA 0.6 1 RT
1621 + 740.00 NEEM TREE 0.5 1 LT
1621 + 740.00 NEEM TREE 0.5 1 RT
1621 + 760.00 PALM OIL 0.7 1 RT
1621 + 800.00 PALM OIL 0.7 2 RT
1621 + 820.00 TAMARIND 0.6 2 LT
1621 + 820.00 MAHOGANY 0.5 1 LT
1621 + 820.00 GEMILINA 0.4 2 RT
1621 + 820.00 NEEM TREE 0.4 2 RT
1621 + 860.00 GEMILINA 0.5 3 LT
1621 + 900.00 MAHOGANY 0.5 2 RT
1621 + 900.00 NEEM TREE 0.4 3 RT
1621 + 920.00 GEMILINA 0.45 1 RT
1621 + 920.00 NEEM TREE 0.4 2 RT
1621 + 920.00 MAHOGANY 0.5 3 LT
1621 + 980.00 MAHOGANY 0.4 3 LT
1622 + 000.00 MAHOGANY 1 1 LT
1622 + 000.00 ACASIA 0.6 1 LT
1622 + 020.00 MAHOGANY 0.4 4 RT
1622 + 020.00 GEMILINA 0.5 1 RT
1622 + 080.00 MAHOGANY 0.4 1 LT
1622 + 100.00 MAHOGANY 0.6 2 LT
1622 + 120.00 NARRA 0.4 6 LT
1622 + 140.00 NARRA 0.4 2 RT
1622 + 160.00 GEMILINA 0.6 2 RT
1622 + 180.00 MOLAVE 0.4 2 RT
1622 + 200.00 MAHOGANY 0.5 3 LT
1622 + 200.00 MAHOGANY 0.4 4 RT
1622 + 300.00 NARRA 0.5 3 LT
1622 + 300.00 MAHOGANY 0.3 1 RT
1622 + 340.00 MAHOGANY 0.3 3 RT
1622 + 360.00 MAHOGANY 0.3 3 RT
1622 + 380.00 NARRA 0.5 3 RT
1622 + 400.00 MAHOGANY 0.3 2 RT
1622 + 440.00 NARRA 0.5 1 LT
1622 + 460.00 MAHOGANY 0.3 1 RT
1622 + 480.00 MAHOGANY 0.3 2 RT
1622 + 480.00 NARRA 0.5 4 LT
1622 + 500.00 GEMILINA 0.5 2 RT
1622 + 520.00 MAHOGANY 0.3 1 RT
1622 + 520.00 NARRA 0.4 5 LT
1622 + 540.00 GEMILINA 0.4 5 RT
1622 + 600.00 MAHOGANY 0.4 1 RT
1622 + 680.00 GEMILINA 0.4 2 RT
1622 + 700.00 MAHOGANY 0.3 3 RT
1622 + 900.00 MAHOGANY 0.3 1 RT
1622 + 960.00 MAHOGANY 0.3 2 RT
1622 + 980.00 NARRA 0.3 1 RT
1623 + 000.00 MAHOGANY 0.4 2 RT
1623 + 080.00 MAHOGANY 0.4 2 RT
1623 + 140.00 NEEM TREE 0.4 3 RT
1623 + 160.00 NEEM TREE 0.4 3 RT
1623 + 160.00 GEMILINA 0.6 1 RT
1623 + 220.00 GEMILINA 0.6 2 LT
1623 + 240.00 GEMILINA 0.3 1 LT
1623 + 500.00 BAGRASS 0.5 3 RT
1623 + 540.00 BAGRASS 0.4 1 RT
1623 + 580.00 BAGRASS 0.4 4 RT
1623 + 600.00 BAGRASS 0.5 8 RT
1623 + 620.00 BAGRASS 0.4 5 RT
1623 + 660.00 BAGRASS 0.4 2 RT
TOTAL 257
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY.
(meter)
1619 + 160.00 GEMILINA 0.6 1
1619 + 160.00 IPIL-IPIL 0.5 1
1619 + 240.00 NARRA 0.3 7
1619 + 600.00 MAHOGANY 0.25 14
1619 + 640.00 BANANA 0.2 10
1619 + 680.00 JACKFRUIT 0.2 1
1619 + 940.00 NEEM TREE 0.3 1
1619 + 940.00 STAR APPLE 0.3 1
1620 + 000.00 GEMILINA 0.6 1
1620 + 000.00 NEEM TREE 0.3 1
1620 + 040.00 MAHOGANY 3.5 1
1620 + 040.00 NEEM TREE 0.3 1
1620 + 080.00 JACKFRUIT 0.3 1
1620 + 100.00 MAHOGANY 0.6 1
1620 + 120.00 MAHOGANY 0.6 4
1620 + 120.00 CAMACHILI 0.3 1
1620 + 180.00 NEEM TREE 0.3 1
1620 + 200.00 MANGO 0.3 1
1620 + 220.00 GEMILINA 0.3 1
1620 + 220.00 MAHOGANY 0.6 2
1620 + 240.00 GEMILINA 0.6 1
1620 + 260.00 MANGO 0.4 1
1620 + 300.00 MAHOGANY 0.6 4
1620 + 320.00 MANGO 0.4 1
1620 + 340.00 JACKFRUIT 0.3 1
1620 + 360.00 JACKFRUIT 0.3 2
1620 + 360.00 MAHOGANY 0.5 3
1620 + 340.00 CAMACHILI 0.6 1
1620 + 360.00 MANGO 0.4 1
1620 + 360.00 MAHOGANY 0.3 2
1620 + 380.00 MAHOGANY 0.3 2
1620 + 400.00 SANTOL 0.25 3
1620 + 420.00 SANTOL 0.3 3
1620 + 420.00 TAMARIND 0.4 1
1620 + 420.00 BAGRASS 0.25 3
1620 + 440.00 MAHOGANY 0.4 8
1620 + 440.00 CAMACHILI 0.4 2
1620 + 460.00 KASOY 0.3 1
1620 + 520.00 MAHOGANY 0.4 4
1620 + 520.00 MAHOGANY 0.3 4
1620 + 520.00 MAHOGANY 0.3 4
1620 + 560.00 CAMACHILI 0.5 2
1620 + 560.00 MAHOGANY 0.3 1
1620 + 600.00 MAHOGANY 0.5 1
1620 + 680.00 JACKFRUIT 0.4 1
1620 + 780.00 MAHOGANY 0.5 4
1620 + 820.00 MAHOGANY 0.5 8
1620 + 840.00 GEMILINA 0.4 3
1620 + 900.00 MAHOGANY 0.4 11
1620 + 920.00 MAHOGANY 0.4 2
1621 + 060.00 GEMILINA 0.4 1
1621 + 100.00 JACKFRUIT 0.3 1
1621 + 140.00 GEMILINA 0.4 2
1621 + 180.00 NARRA 0.4 1
1621 + 180.00 BANANA 0.25 6
1621 + 200.00 BANANA 0.25 7
1621 + 240.00 NARRA 0.3 2
1621 + 320.00 BANANA 0.25 6
1621 + 340.00 BANANA 0.25 7
1621 + 360.00 BANANA 0.25 10
1621 + 380.00 NARRA 0.3 1
1621 + 400.00 MAHOGANY 0.3 1
1621 + 420.00 MAHOGANY 0.3 1
1621 + 440.00 MAHOGANY 0.3 1
1621 + 460.00 MAHOGANY 0.3 1
1621 + 500.00 MAHOGANY 0.3 1
1621 + 620.00 NEEM TREE 0.5 1
1621 + 620.00 PALM OIL 0.7 1
1621 + 640.00 MANGO 0.5 1
1621 + 660.00 ACASIA 0.6 1
1621 + 700.00 BANANA 0.25 10
1621 + 720.00 BANANA 0.25 8
1621 + 740.00 NEEM TREE 0.5 1
1621 + 740.00 SANTOL 0.4 1
1621 + 740.00 NEEM TREE 0.5 1
1621 + 760.00 PALM OIL 0.7 1
1621 + 760.00 JACKFRUIT 0.35 1
1621 + 800.00 PALM OIL 0.7 2
1621 + 820.00 TAMARIND 0.6 2
1621 + 820.00 MAHOGANY 0.5 1
1621 + 820.00 GEMILINA 0.4 2
1621 + 820.00 NEEM TREE 0.4 2
1621 + 860.00 JACKFRUIT 0.35 1
1621 + 860.00 GEMILINA 0.5 3
1621 + 860.00 SANTOL 0.4 1
1621 + 880.00 STAR APPLE 0.5 1
1621 + 900.00 MAHOGANY 0.5 2
1621 + 900.00 NEEM TREE 0.4 3
1621 + 900.00 MANGO 0.3 2
1621 + 920.00 GEMILINA 0.45 1
1621 + 920.00 NEEM TREE 0.4 2
1621 + 920.00 MAHOGANY 0.5 3
1621 + 980.00 MAHOGANY 0.4 3
1622 + 000.00 MAHOGANY 1 1
1622 + 000.00 ACASIA 0.6 1
1622 + 020.00 MAHOGANY 0.4 4
1622 + 020.00 GEMILINA 0.5 1
1622 + 080.00 MAHOGANY 0.4 1
1622 + 100.00 MAHOGANY 0.6 2
1622 + 120.00 NARRA 0.4 6
1622 + 140.00 NARRA 0.4 2
1622 + 160.00 GEMILINA 0.6 2
1622 + 180.00 MOLAVE 0.4 2
1622 + 200.00 MAHOGANY 0.5 3
1622 + 200.00 MAHOGANY 0.4 4
1622 + 300.00 NARRA 0.5 3
1622 + 300.00 MAHOGANY 0.3 1
1622 + 340.00 MAHOGANY 0.3 3
1622 + 360.00 MAHOGANY 0.3 3
1622 + 380.00 NARRA 0.5 3
1622 + 400.00 MAHOGANY 0.3 2
1622 + 440.00 NARRA 0.5 1
1622 + 460.00 MAHOGANY 0.3 1
1622 + 480.00 MAHOGANY 0.3 2
1622 + 480.00 NARRA 0.5 4
1622 + 500.00 GEMILINA 0.5 2
1622 + 520.00 MAHOGANY 0.3 1
1622 + 520.00 NARRA 0.4 5
1622 + 540.00 GEMILINA 0.4 5
1622 + 600.00 MAHOGANY 0.4 1
1622 + 680.00 GEMILINA 0.4 2
1622 + 700.00 MAHOGANY 0.3 3
1622 + 900.00 MAHOGANY 0.3 1
1622 + 940.00 IPIL-IPIL 0.9 1
1622 + 960.00 MAHOGANY 0.3 2
1622 + 980.00 NARRA 0.3 1
1623 + 000.00 MAHOGANY 0.4 2
1623 + 080.00 MAHOGANY 0.4 2
1623 + 120.00 DOL-DOL 0.5 2
1623 + 140.00 NEEM TREE 0.4 3
1623 + 160.00 NEEM TREE 0.4 3
1623 + 160.00 GEMILINA 0.6 1
1623 + 220.00 GEMILINA 0.6 2
1623 + 240.00 GEMILINA 0.3 1
1623 + 500.00 BAGRASS 0.5 3
1623 + 540.00 BAGRASS 0.4 1
1623 + 580.00 BAGRASS 0.4 4
1623 + 600.00 BAGRASS 0.5 8
1623 + 620.00 BAGRASS 0.4 5
1623 + 660.00 BAGRASS 0.4 2
TOTAL 359

COCONUT
DIAMETER
STATION ITEM QTY.
(meter)
1619 + 200.00 COCONUT 0.3 1
1619 + 400.00 COCONUT 0.3 6
1619 + 660.00 COCONUT 0.3 3
1619 + 680.00 COCONUT 0.3 2
1619 + 000.00 COCONUT 0.3 1
1619 + 220.00 COCONUT 0.3 1
1620 + 280.00 COCONUT 0.3 1
1620 + 480.00 COCONUT 0.3 2
1620 + 500.00 COCONUT 0.3 3
1620 + 520.00 COCONUT 0.3 1
1620 + 540.00 COCONUT 0.3 1
1620 + 560.00 COCONUT 0.3 3
1620 + 600.00 COCONUT 0.3 3
1620 + 660.00 COCONUT 0.5 2
1620 + 780.00 COCONUT 0.4 1
1620 + 800.00 COCONUT 0.3 1
1620 + 800.00 COCONUT 0.4 1
1620 + 820.00 COCONUT 0.4 2
1620 + 880.00 COCONUT 0.4 2
1620 + 880.00 COCONUT 0.4 1
1620 + 940.00 COCONUT 0.4 4
1620 + 940.00 COCONUT 0.4 2
1620 + 960.00 COCONUT 0.4 5
1621 + 020.00 COCONUT 0.4 6
1621 + 100.00 COCONUT 0.4 2
1621 + 100.00 COCONUT 0.4 1
1621 + 140.00 COCONUT 0.4 4
1621 + 140.00 COCONUT 0.4 3
1621 + 160.00 COCONUT 0.4 3
1621 + 180.00 COCONUT 0.4 2
1621 + 200.00 COCONUT 0.4 5
1621 + 200.00 COCONUT 0.4 2
1621 + 220.00 COCONUT 0.4 2
161 + 240.00 COCONUT 0.4 3
1621 + 260.00 COCONUT 0.4 3
1621 + 300.00 COCONUT 0.4 2
1621 + 660.00 COCONUT 0.4 4
1621 + 700.00 COCONUT 0.4 1
1621 + 740.00 COCONUT 0.3 2
1621 + 760.00 COCONUT 0.4 1
1621 + 760.00 COCONUT 0.4 1
1621 + 800.00 COCONUT 0.4 1
1621 + 920.00 COCONUT 0.4 1
1622 + 000.00 COCONUT 0.4 3
1622 + 040.00 COCONUT 0.4 3
1622 + 060.00 COCONUT 0.4 3
1622 + 060.00 COCONUT 0.3 3
1622 + 080.00 COCONUT 0.3 3
1622 + 140.00 COCONUT 0.3 1
1622 + 160.00 COCONUT 0.3 1
1622 + 320.00 COCONUT 0.4 1
1622 + 360.00 COCONUT 0.4 1
1622 + 380.00 COCONUT 0.4 2
1622 + 400.00 COCONUT 0.4 1
1622 + 600.00 COCONUT 0.4 1
1622 + 620.00 COCONUT 0.4 2
1622 + 680.00 COCONUT 0.4 2
1622 + 760.00 COCONUT 0.4 1
1622 + 800.00 COCONUT 0.4 1
TOTAL 127
EES

LOCATION
RT
LT
LT
LT
LT
LT
LT
RT
RT
RT
LT
RT
LT
RT
RT
LT
LT
LT
RT
RT
LT
LT
LT
LT
LT
LT
LT
RT
RT
RT
LT
LT
LT
RT
RT
LT
LT
LT
RT
LT
RT
LT
LT
LT
RT
RT
RT
LT
RT
RT
LT
LT
RT
LT
RT
RT
RT
RT
LT
RT
RT
RT
RT
RT
RT
RT
LT
LT
LT
RT
LT
LT
LT
LT
RT
RT
LT
RT
LT
LT
RT
RT
LT
LT
LT
RT
RT
RT
LT
RT
RT
LT
LT
LT
LT
RT
RT
LT
LT
LT
RT
RT
RT
LT
RT
LT
RT
RT
RT
RT
RT
LT
RT
RT
LT
RT
RT
LT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
LT
LT
RT
RT
RT
RT
RT
RT

LOCATION
LT
LT
LT
LT
RT
LT
LT
RT
RT
RT
RT
RT
RT
RT
LT
RT
LT
RT
RT
LT
RT
LT
LT
RT
RT
LT
LT
LT
LT
LT
LT
RT
LT
LT
LT
LT
LT
RT
LT
RT
RT
RT
LT
RT
RT
RT
LT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
ITEM 506(1) - STONE MASONRY
QUANTITY = 8,145 cu.m
STATION LIMITS LENGTH HEIGHT BASEBOTTOM BASETOP
K1618+980.00 - K1619+000.00 20.00 4.00 2.00 0.60
K1619+046.50 - K1619+067.30 20.80 4.00 2.00 0.60
K1619+155.60 - K1619+210.00 54.40 4.00 2.00 0.60
K1619+294.20 - K1619+348.60 53.10 4.00 2.00 0.60
K1619+384.90 - K1619+453.40 68.50 4.00 2.00 0.60
K1619+934.00 - K1620+000.00 66.00 4.00 2.00 0.60
K1620+040.00 - K1620+065.00 25.00 3.00 2.00 0.60
K1620+448.00 - K1620+548.00 100.00 4.00 2.00 0.60
K1620+981.30 - K1621+068.00 86.70 2.50 2.00 0.60
K1621+126.90 - K1621+177.10 50.20 3.20 2.00 0.60
K1621+305.20 - K1621+335.20 30.00 4.00 2.00 0.60
K1621+376.45 - K1621+632.95 256.50 4.00 2.00 0.60
K1621+606.30 - K1621+666.30 60.00 4.00 2.00 0.60
K1621+657.20 - K1621+721.20 64.00 4.00 2.00 0.60
K1621+772.20 - K1621+814.50 42.30 4.00 2.00 0.60
K1621+863.40 - K1621+963.40 100.00 4.00 2.00 0.60
K1622+023.20 - K1622+083.20 60.00 4.00 2.00 0.60
K1622+214.80 - K1622+278.10 63.30 4.00 2.00 0.60
K1622+293.80 - K1622+374.10 80.30 4.00 2.00 0.60
K1622+403.80 - K1622+523.30 119.50 4.00 2.00 0.60
K1622+547.30 - K1622+597.30 50.00 4.00 2.00 0.60
K1622+603.70 - K1622+733.40 129.70 4.00 2.00 0.60
K1622+741.60 - K1622+776.70 35.10 4.00 2.00 0.60
K1622+848.40 - K1622+958.80 110.40 4.00 2.00 0.60
K1623+270.00 - K1623+300.00 30.00 4.00 2.00 0.60
TOTALVOLUME =

ITEM 506(1) - STONE MASONRY


QUANTITY = 9,741.60 cu.m
STATION LIMITS LENGTH HEIGHT BASEBOTTOM BASETOP
1618 + 980.00 1619+000.00 20.00 4.00 2.00 0.60
1619 + 046.50 1619+067.30 20.80 4.00 2.00 0.60
1619 + 155.60 1619+210.00 54.40 4.00 2.00 0.60
1619 + 294.20 1619+348.60 53.10 4.00 2.00 0.60
1619 + 384.90 1619+453.40 68.50 4.00 2.00 0.60
1619 + 934.00 1620+000.00 66.00 4.00 2.00 0.60
1620 + 040.00 1620+065.00 100.18 3.00 2.00 0.60
1620 + 448.00 1620+548.00 120.00 4.00 2.00 0.60
1620 + 981.30 1621+068.00 86.70 2.50 2.00 0.60
1621 + 126.90 1621+177.10 50.20 3.20 2.00 0.60
1621 + 305.20 1621+335.20 30.00 4.00 2.00 0.60
1621 + 376.45 1621+632.95 256.50 4.00 2.00 0.60
1621 + 606.30 1621+666.30 100.00 4.00 2.00 0.60
1621 + 657.20 1621+721.20 64.00 4.00 2.00 0.60
1621 + 772.20 1621+814.50 42.30 4.00 2.00 0.60
1621 + 863.40 1621+963.40 100.00 4.00 2.00 0.60
1622 + 023.20 1622+083.20 80.00 4.00 2.00 0.60
1622 + 214.80 1622+278.10 63.30 4.00 2.00 0.60
1622 + 293.80 1622+374.10 80.30 4.00 2.00 0.60
1622 + 403.80 1622+523.30 119.50 4.00 2.00 0.60
1622 + 547.30 1622+597.30 50.00 4.00 2.00 0.60
1622 + 603.70 1622+733.40 129.70 4.00 2.00 0.60
1622 + 741.60 1622+776.70 35.10 4.00 2.00 0.60
1622 + 848.40 1622+958.80 110.40 4.00 2.00 0.60
1623 + 270.00 1623+300.00 40.00 4.00 2.00 0.60
TOTALVOLUME =
VOLUME LOCATION
104.00 L/S
108.16 L/S
282.88 L/S
276.12 L/S
356.20 L/S
343.20 R/S
97.50 L/S
520.00 R/S
281.78 L/S
208.83 R/S
156.00 R/S
1,333.80 R/S
312.00 L/S
332.80 R/S
219.96 R/S
520.00 L/S
312.00 R/S
329.16 R/S
417.56 R/S
621.40 R/S
260.00 R/S
674.44 R/S
182.52 R/S
574.08 R/S
156.00 L/S
8,980.39 cu.m.

VOLUME LOCATION
104.00 L/S
108.16 L/S
282.88 L/S
276.12 L/S
356.20 L/S
343.20 R/S
390.71 L/S
624.00 R/S
281.78 L/S
208.83 R/S
156.00 R/S
1,333.80 R/S
520.00 L/S
332.80 R/S
219.96 R/S
520.00 L/S
416.00 R/S
329.16 R/S
417.56 R/S
621.40 R/S
260.00 R/S
674.44 R/S
182.52 R/S
574.08 R/S
208.00 L/S
9,741.60
Item No.

ITEM NO.

A.1.1(8)

A.1.1(2)
B.5
B.7
B.8
B.9
100 (4)
101(4)a
101(6)b
101(6)c
101(6)d
101(8)
101(9)
101(10)
102(2)b
103(1)a
103(3)
103(6)a
104(1)a1
105(1)a
200 (1)
300(1)
311(1)a
311(1)a1.1
404(1)a
405(2)a
500(1)b3
506(1)
602(3)c
603(3)a1
603(3)a1.1
603(3)b1

607(3)b

612(1)
612(2)

620 (1)a1.1

622(1)a

622(2)b

622(3)b
Description

DESCRIPTION

Provision of Field Office for the Engineer (Rental Basis)


Provision for 4x4 Pick-up Type Service Vehicle for the Engineer (Rental
Basis)
Project Billboard (DPWH and COA)
Occupational Safety and Health Program
Traffic Management
Mobilization/Demobilization
Individual Removal of Trees (large,above 900 mmØ)
Removal of RCPC ( 24'' Ø) - 610 mmØ
Removal of Straight Type Concrete Headwall
Removal of Stone Masonry Lined Drainage Structures & Grouted Riprap
Removal of Structures/Obstruction(Concrete Barrier)
Removal of Existing Guardrails
Removal of Existing Guardrail Post
Removal of Existing Road Signs ( Kilometer Post & Road Signs)
Roadway Excavation (Surplus Common )
Structure Excavation ( Common Soil )
Foundation Fill
Pipe Culvert and Drain Excavation
Embankment from Roadway Excavation
Subgrade Preparation (Common Material)
Aggregate Sub-base Course
Gravel Surface Course (Uncrushed)
PCC Pavement (Plain)-Conventional Method, 150mm thick
PCC Pavement (Plain)-Conventional Method, 280 mm thick
Reinforcing Steel Bar Grade 40
Structural Concrete "Class B"
Pipe Culverts, 910 mm dia. (36"Ø) - Class IV
Stone Masonry
Kilometer Post (Reinstallation)
Metal Guardrail (Metal Flex Beam),Including Concrete Post - Class B
Reinstallation of Metal Guardrail Including Post
Guardrail (End Piece) - Fish Tail
Solar Pavement Levelled Marker/Stud (Flush Type), Type G105 (Road
Star)
Reflectorized Thermopalstic Pavement Markings (White)
Reflectorized Thermopalstic Pavement Markings (Yellow)
Reintallation of Chevron Directional Signs (0.45m x 0.60m)

Bio-Engineering Coco Fiber Erosion Control Net (CGN 400)

Bio-Engineering Coco Fascine Erosion Control System (CGR 200)

Bio-Engineering Erosion Control System ( Vetiver Grass)


TOTAL AMOUNT
Original QuantityRevised Quantity Unit Remarks

ORIGINAL CONTRACT

UNIT QTY. UNIT COST TOTAL COST

month 9.30 7,938.00 73,823.40

months 9.30 63,406.35 589,679.06


each 3.00 4,507.64 13,522.92
months 9.30 99,600.73 926,286.79
months 9.30 8,623.52 80,198.74
L.s. 1.00 615,501.60 615,501.60
each 20.00 4,433.21 88,664.20
ln.m. 8.00 3,407.57 27,260.56
cu.m. 433.00 611.37 264,723.21
cu.m. 849.00 649.87 551,739.63
cu.m. 11.00 2,375.57 26,131.27
ln.m. 3,366.00 141.38 475,885.08
each 943.00 144.01 135,801.43
each 7.00 230.29 1,612.03
cu.m. 78,465.00 91.51 7,180,332.15
cu.m. 3,421.00 190.53 651,803.13
cu.m. 308.00 1,482.81 456,705.48
cu.m. 71.00 295.01 20,945.71
cu.m. 24,339.00 289.25 7,040,055.75
sq.m. 44,817.00 47.99 2,150,767.83
cu.m. 13,495.00 441.23 5,954,398.85
cu.m. 677.00 1,527.83 1,034,340.91
sq.m. 4,581.00 1,192.19 5,461,422.39
sq.m. 30,956.00 2,067.66 64,006,482.96
kg. 51,619.00 100.45 5,185,128.55
cu.m. 1,400.00 6,058.87 8,482,418.00
ln.m. 56.00 6,864.05 384,386.80
cu.m. 8,145.00 3,728.36 30,367,492.20
each 5.00 1,729.84 8,649.20
ln.m. 147.00 3,625.20 532,904.40
ln.m. 3,366.00 103.56 348,582.96
each 4.00 4,395.16 17,580.64

each 1,525.00 4,146.89 6,324,007.25

sq.m. 1,422.00 1,158.88 1,647,927.36


sq.m. 1,387.00 1,173.90 1,628,199.30

each 199.00 385.06 76,626.94

sq.m. 6,528.00 603.92 3,942,389.76

ln.m. 2,680.00 702.68 1,883,182.40

sq.m. 6,528.00 224.79 1,467,429.12


160,124,989.95
ITEM NO.

A.1.1(8)

A.1.1(2)

B.5
B.7
B.8
B.9
100 (4)
101(4)a
101(6)b
101(6)c
101(6)d
101(8)
101(9)
101(10)
102(2)b
103(1)a
103(3)
103(6)a
104(1)a1
105(1)a
200 (1)
300(1)
311(1)a
311(1)e1.1
404(1)a
405(2)a
500(1)b3
506(1)
602(3)c
603(3)a1
603(3)a1.1
603(3)b1
607(3)b
612(1)
612(2)
620 (1)a1.1
622(1)a
622(2)b
622(3)b
SUMMARY OF QUANTITIES

DESCRIPTION

Provision of Field Office for the Engineer (Rental Basis)

Provision for 4x4 Pick-up Type Service Vehicle for the Engineer (Rental Basis)

Project Billboard (DPWH and COA)


Occupational Safety and Health Program
Traffic Management
Mobilization/Demobilization
Individual Removal of Trees (large,above 900 mmØ)
Removal of RCPC ( 24'' Ø) - 610 mmØ
Removal of Straight Type Concrete Headwall
Removal of Stone Masonry Lined Drainage Structures & Grouted Riprap
Removal of Structures/Obstruction(Concrete Barrier)
Removal of Existing Guardrails
Removal of Existing Guardrail Post
Removal of Existing Road Signs ( Kilometer Post & Road Signs)
Roadway Excavation (Surplus Common )
Structure Excavation ( Common Soil )
Foundation Fill
Pipe Culvert and Drain Excavation
Embankment from Roadway Excavation
Subgrade Preparation (Common Material)
Aggregate Sub-base Course
Gravel Surface Course (Uncrushed)
PCC Pavement (Plain)-Conventional Method, 150mm thick
PCC Pavement (Plain)-Conventional Method, 280 mm thick
Reinforcing Steel Bar Grade 40
Structural Concrete "Class B"
Pipe Culverts, 910 mm dia. (36"Ø) - Class IV
Stone Masonry
Kilometer Post (Reinstallation)
Metal Guardrail (Metal Flex Beam),Including Concrete Post - Class B
Reinstallation of Metal Guardrail Including Post
Guardrail (End Piece) - Fish Tail
Solar Pavement Levelled Marker/Stud (Flush Type), Type G105 (Road Star)
Reflectorized Thermopalstic Pavement Markings (White)
Reflectorized Thermopalstic Pavement Markings (Yellow)
Reintallation of Chevron Directional Signs (0.45m x 0.60m)
Bio-Engineering Coco Fiber Erosion Control Net (CGN 400)
Bio-Engineering Coco Fascine Erosion Control System (CGR 200)
Bio-Engineering Erosion Control System ( Vetiver Grass)
F QUANTITIES
ORIGINAL AS-TAKED
UNIT REMARKS
QUANTITY QUANTITY

9.30 9.30 month NO CHANGE

9.30 months NO CHANGE


9.30
3.00 3.00 each NO CHANGE

9.30 9.30 months NO CHANGE

9.30 9.30 months NO CHANGE


1.00 1.00 L.s. NO CHANGE

20.00 20.00 each NO CHANGE

8.00 8.00 ln.m. NO CHANGE

433.00 433.00 cu.m. NO CHANGE

849.00 849.00 cu.m. NO CHANGE

11.00 11.00 cu.m. NO CHANGE

3,366.00 3,366.00 ln.m. NO CHANGE


943.00 943.00 each NO CHANGE

7.00 7.00 each NO CHANGE

78,465.00 78,465.00 cu.m. NO CHANGE


3,421.00 3,421.00 cu.m. NO CHANGE
308.00 308.00 cu.m. NO CHANGE
71.00 71.00 cu.m. NO CHANGE
24,339.00 24,339.00 cu.m. NO CHANGE
44,817.00 44,817.00 sq.m. NO CHANGE
13,495.00 13,495.00 cu.m. NO CHANGE
677.00 677.00 cu.m. NO CHANGE
4,581.00 6,381.40 sq.m. INCREASE

30,956.00 31,537.225 sq.m. INCREASE

51,619.00 51,819.00 kg. NO CHANGE


1,400.00 1,400.00 cu.m. NO CHANGE
56.00 56.00 ln.m. NO CHANGE
8,145.00 8,980.39 cu.m. INCREASE
5.00 5.00 each NO CHANGE

147.00 376.00 ln.m. INCREASE


3,366.00 3,366.00 ln.m. NO CHANGE
4.00 4.00 each NO CHANGE

1,525.00 1,525.00 each NO CHANGE

1,422.00 1,422.00 sq.m. NO CHANGE


1,387.00 1,387.00 sq.m. NO CHANGE

199.00 199.00 each NO CHANGE


6,528.00 1,911.736 sq.m. DECREASE
2,680.00 800 ln.m. DECREASE
6,528.00 1,911.736 sq.m. DECREASE
COCONET SCHEDULE SHEET
COCONET/VERTIVER SCHEDULE COCOLOG SCH
SLANT HEIGHT AREA COCOLOG LINES
STATION LENGTH
LEFT RIGHT LEFT RIGHT LEFT
1619+900 0 9 0
1619+920 20 0 9 0.00 180.00 0
1619+940 20 0 9 0.00 180.00 0
1619+960 20 0 9 0.00 180.00 0

1621+960 7 0 0.00 0.00 3


1621+980 20 7 0 140.00 0.00 3
1622+000 20 7 0 140.00 0.00 3
1622+020 20 7 0 140.00 0.00 3
1622+040 20 7 0 140.00 0.00 3
1622+060 20 7 0 140.00 0.00 3
1622+080 20 7 0 140.00 0.00 3

1622+640 9.9 0 0.00 0.00 4


1622+660 20 9.9 0 198.00 0.00 4
1622+680 20 9.9 0 198.00 0.00 4
1622+700 20 9.9 0 198.00 0.00 4
1622+720 20 9.9 0 198.00 0.00 4
1622+740 20 9.9 0 198.00 0.00 4
1622+760 20 9.9 0 198.00 0.00 4
1622+780 20 9.9 0 198.00 0.00 4
1622+800 20 9.9 0 198.00 0.00 4
1622+820 20 9.9 0 198.00 0.00 4
1622+840 20 9.9 0 198.00 0.00 4
1622+860 20 9.9 0 198.00 0.00 4
1622+880 20 9.9 0 198.00 0.00 4
1622+900 20 9.9 0 198.00 0.00 4
1622+920 20 9.9 0 198.00 0.00 4
1622+940 20 9.9 0 198.00 0.00 4
1622+960 20 9.9 0 198.00 0.00 4
1622+980 20 9.9 0 198.00 0.00 4
1623+000 20 9.9 0 198.00 0.00 4
1623+020 20 9.9 0 198.00 0.00 4
1623+040 20 9.9 0 198.00 0.00 4
1623+060 20 9.9 0 198.00 0.00 4
1623+080 20 9.9 0 198.00 0.00 4
1623+100 20 9.9 0 198.00 0.00 4
1623+120 20 9.9 0 198.00 0.00 4
1623+140 20 9.9 0 198.00 0.00 4
1623+160 20 9.9 0 198.00 0.00 4
700 5,988.00 540
520

ITEM 622(1)a and ITEM 622(3)b = 6,528.00 sq.m.


ITEM 622(2)b = 2,680.00 Ln.m.
ITEM NO. QTY. UNIT PRICE COST

ITEM 622(1)a = 1,911.736 603.92 1,154,535.61


ITEM 622(2)b = 800.00 702.68 562,144.00
ITEM 622(3)b = 1,911.736 224.79 429,739.14

TOTAL COST 2,146,418.74

COCONET SCHEDULE SHEET


ITEM 622(1)a / ITEM 622(3)b ITEM 622(2
LENGTH SLANT HEIGHT AREA COCOLOG LINES
STATION
(m) LEFT RIGHT LEFT RIGHT LEFT
1622+960 9.56 0 0.00 0.00 4
1622+980 20 9.56 0 191.17 0.00 4
1623+000 20 9.56 0 191.17 0.00 4
1623+020 20 9.56 0 191.17 0.00 4
1623+040 20 9.56 0 191.17 0.00 4
1623+060 20 9.56 0 191.17 0.00 4
1623+080 20 9.56 0 191.17 0.00 4
1623+100 20 9.56 0 191.17 0.00 4
1623+120 20 9.56 0 191.17 0.00 4
1623+140 20 9.56 0 191.17 0.00 4
1623+160 20 9.56 0 191.17 0.00 4
TOTAL 1,911.736
COCOLOG SCHEDULE
COCOLOG LINES TOTAL
REMARKS
RIGHT LEFT RIGHT
4
4 0 80
4 0 80
4 0 80

0 0 0
0 60 0
0 60 0
0 60 0
0 60 0
0 60 0
0 60 0

0 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
2,440.00 240
COST

1,154,535.61
562,144.00 8.94
429,739.14

2,146,418.74

E SHEET
ITEM 622(2)b
COCOLOG LINES TOTAL
REMARKS
RIGHT LEFT RIGHT
0 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
800.00