Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
0.195 20.000 3.900
1619 + 500 0.240
0.325 20.000 6.500
1619 + 520 0.410
0.205 20.000 4.100
1619 + 540 0.000
0.000 20.000 0.000
1619 + 560 0.000
0.075 20.000 1.500
1619 + 580 0.150
0.150 20.000 3.000
1619 + 600 0.150
0.075 20.000 1.500
1619 + 620 0.000
0.080 20.000 1.600
1619 + 640 0.160
0.160 20.000 3.200
1619 + 660 0.160
0.080 20.000 1.600
1619 + 680 0.000
0.000 20.000 0.000
1619 + 700 0.000
0.070 20.000 1.400
1619 + 720 0.140
0.070 20.000 1.400
1619 + 740 0.000
0.000 20.000 0.000
1619 + 760 0.000
0.005 20.000 0.100
1619 + 780 0.010
0.560 20.000 11.200
1619 + 800 1.110
1.110 9.670 10.734
1619 + 809.67 1.110
3.105 0.000 0.000
1619 + 896.42 5.100
5.100 3.580 18.258
1619 + 900 5.100
5.650 20.000 113.000
1619 + 920 6.200
5.380 20.000 107.600
1619 + 940 4.560
4.455 20.000 89.100
1619 + 960 4.350
6.075 20.000 121.500
1619 + 980 7.800
7.195 20.000 143.900
1620 + 000 6.590
7.605 20.000 152.100
1620 + 020 8.620
9.305 20.000 186.100
1620 + 040 9.990
9.975 20.000 199.500
1620 + 060 9.960
12.595 20.000 251.900
1620 + 080 15.230
15.880 20.000 317.600
1620 + 100 16.530
TOTAL FOR ITEM 104(1)a1 1,752.292
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
17.995 20.000 359.900
1620 + 120 19.460
19.115 20.000 382.300
1620 + 140 18.770
18.450 20.000 369.000
1620 + 160 18.130
18.145 20.000 362.900
1620 + 180 18.160
18.170 20.000 363.400
1620 + 200 18.180
18.305 20.000 366.100
1620 + 220 18.430
18.010 20.000 360.200
1620 + 240 17.590
18.510 20.000 370.200
1620 + 260 19.430
19.175 20.000 383.500
1620 + 280 18.920
19.040 20.000 380.800
1620 + 300 19.160
17.600 20.000 352.000
1620 + 320 16.040
15.785 20.000 315.700
1620 + 340 15.530
12.755 20.000 255.100
1620 + 360 9.980
8.945 20.000 178.900
1620 + 380 7.910
7.255 20.000 145.100
1620 + 400 6.600
6.600 20.000 132.000
1620 + 420 6.600
6.725 20.000 134.500
1620 + 440 6.850
9.055 20.000 181.100
1620 + 460 11.260
11.910 20.000 238.200
1620 + 480 12.560
9.005 20.000 180.100
1620 + 500 5.450
5.215 20.000 104.300
1620 + 520 4.980
5.665 20.000 113.300
1620 + 540 6.350
6.575 20.000 131.500
1620 + 560 6.800
5.145 20.000 102.900
1620 + 580 3.490
2.505 20.000 50.100
1620 + 600 1.520
2.270 20.000 45.400
1620 + 620 3.020
3.550 20.000 71.000
1620 + 640 4.080
TOTAL FOR ITEM 104(1)a1 6,429.500
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
2.820 20.000 56.400
1620 + 660 1.560
2.510 20.000 50.200
1620 + 680 3.460
2.405 20.000 48.100
1620 + 700 1.350
2.715 20.000 54.300
1620 + 720 4.080
4.495 20.000 89.900
1620 + 740 4.910
4.935 20.000 98.700
1620 + 760 4.960
4.715 20.000 94.300
1620 + 780 4.470
4.375 20.000 87.500
1620 + 800 4.280
3.000 20.000 60.000
1620 + 820 1.720
0.860 20.000 17.200
1620 + 840 0.000
0.000 20.000 0.000
1620 + 860 0.000
0.145 20.000 2.900
1620 + 880 0.290
0.145 20.000 2.900
1620 + 900 0.000
0.420 20.000 8.400
1620 + 920 0.840
0.420 20.000 8.400
1620 + 940 0.000
1.520 20.000 30.400
1620 + 960 3.040
4.530 20.000 90.600
1620 + 980 6.020
3.985 20.000 79.700
1621 + 000 1.950
4.235 20.000 84.700
1621 + 020 6.520
6.340 20.000 126.800
1621 + 040 6.160
7.305 20.000 146.100
1621 + 060 8.450
9.340 20.000 186.800
1621 + 080 10.230
11.415 20.000 228.300
1621 + 100 12.600
8.640 20.000 172.800
1621 + 120 4.680
3.490 20.000 69.800
1621 + 140 2.300
1.565 20.000 31.300
1621 + 160 0.830
1.630 20.000 32.600
1621 + 180 2.430
4.165 20.000 83.300
1621 + 200 5.900
TOTAL FOR ITEM 104(1)a1 2042.400
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
12.155 20.000 243.100
1622 + 200 12.250
10.990 20.000 219.800
1622 + 220 9.730
10.375 20.000 207.500
1622 + 240 11.020
17.136 20.000 342.710
1622 + 260 23.251
17.491 20.000 349.810
1622 + 280 11.730
8.225 20.000 164.500
1622 + 300 4.720
7.865 20.000 157.300
1622 + 320 11.010
12.420 20.000 248.400
1622 + 340 13.830
10.285 20.000 205.700
1622 + 360 6.740
7.500 20.000 150.000
1622 + 380 8.260
8.325 20.000 166.500
1622 + 400 8.390
8.290 20.000 165.800
1622 + 420 8.190
8.080 20.000 161.600
1622 + 440 7.970
8.005 20.000 160.100
1622 + 460 8.040
7.205 20.000 144.100
1622 + 480 6.370
5.365 20.000 107.300
1622 + 500 4.360
3.590 20.000 71.800
1622 + 520 2.820
2.310 20.000 46.200
1622 + 540 1.800
1.505 20.000 30.100
1622 + 560 1.210
0.680 20.000 13.600
1622 + 580 0.150
0.075 20.000 1.500
1622 + 600 0.000
0.000 20.000 0.000
1622 + 620 0.000
0.000 20.000 0.000
1622 + 640 0.000
0.000 20.000 0.000
1622 + 660 0.000
0.000 20.000 0.000
1622 + 680 0.000
0.000 20.000 0.000
1622 + 700 0.000
0.005 20.000 0.100
1622 + 720 0.010
0.005 20.000 0.100
1622 + 740 0.000
2.120 20.000 42.400
1622 + 760 4.240
TOTAL FOR ITEM 104(1)a1 3,400.020
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
Regional Office No. XII
Corner Alunan Ave. - Mabini St. Koronadal City
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
5.535 20.000 110.700
1622 + 780 6.830
3.840 20.000 76.800
1622 + 800 0.850
1.415 20.000 28.300
1622 + 820 1.980
3.755 20.000 75.100
1622 + 840 5.530
2.990 20.000 59.800
1622 + 860 0.450
0.225 20.000 4.500
1622 + 880 0.000
0.000 20.000 0.000
1622 + 900 0.000
0.000 20.000 0.000
1622 + 920 0.000
3.930 20.000 78.600
1622 + 940 7.860
3.930 20.000 78.600
1622 + 960 0.000
0.000 20.000 0.000
1622 + 980 0.000
7.565 20.000 151.300
1623 + 000 15.130
12.740 20.000 254.800
1623 + 020 10.350
10.738 20.000 214.750
1623 + 040 11.125
5.688 20.000 113.750
1623 + 060 0.250
0.270 20.000 5.400
1623 + 080 0.290
2.300 20.000 46.000
1623 + 100 4.310
4.180 20.000 83.600
1623 + 120 4.050
4.305 20.000 86.100
1623 + 140 4.560
4.335 20.000 86.700
1623 + 160 4.110
4.415 20.000 88.300
1623 + 180 4.720
4.385 20.000 87.700
1623 + 200 4.050
4.380 20.000 87.600
1623 + 220 4.710
4.700 20.000 94.000
1623 + 240 4.690
5.650 20.000 113.000
1623 + 260 6.610
6.815 20.000 136.300
1623 + 280 7.020
7.020 16.000 112.320
1623 + 296 7.020
1623 + 320
1623 + 340
1623 + 360
1623 + 380
1623 + 400
1623 + 416 0.000
0.000 4.000 0.000
1623 + 440 0.000
0.000 20.000 0.000
1623 + 460 0.000
0.000 20.000 0.000
1623 + 480 0.000
0.000 20.000 0.000
1623 + 500 0.000
0.000 20.000 0.000
1623 + 520 0.000
0.000 20.000 0.000
1623 + 540 0.000
0.000 20.000 0.000
1623 + 560 0.000
0.000 20.000 0.000
1623 + 580 0.000
0.000 20.000 0.000
1623 + 600 0.000
0.000 20.000 0.000
1623 + 620 0.000
0.000 20.000 0.000
1623 + 640 0.000
3.095 20.000 61.900
1623 + 660 6.190
4.105 20.000 82.100
1623 + 680 2.020
TOTAL FOR ITEM 104(1)a1 2,418.020
Prepared by : Checked by :
JAMES A. MARCILLANA SUKARNO D. DILANGALEN
Project Engineer Project Engineer III
Vicente T. Lao Construction DPWH Regional Office XII
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
EXCEPTION 01
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
0.195 20.000 3.900
1619 + 500 0.240
0.325 20.000 6.500
1619 + 520 0.410
0.205 20.000 4.100
1619 + 540 0.000
0.000 20.000 0.000
1619 + 560 0.000
0.075 20.000 1.500
1619 + 580 0.150
0.150 20.000 3.000
1619 + 600 0.150
0.075 20.000 1.500
1619 + 620 0.000
0.080 20.000 1.600
1619 + 640 0.160
0.160 20.000 3.200
1619 + 660 0.160
0.080 20.000 1.600
1619 + 680 0.000
0.000 20.000 0.000
1619 + 700 0.000
0.070 20.000 1.400
1619 + 720 0.140
0.070 20.000 1.400
1619 + 740 0.000
0.000 20.000 0.000
1619 + 760 0.000
0.005 20.000 0.100
1619 + 780 0.010
0.560 20.000 11.200
1619 + 800 1.110
1.110 9.670 10.734
1619 + 809.67 1.110
3.105 0.000 0.000
1619 + 896.42 5.100
5.100 3.580 18.258
1619 + 900 5.100
5.650 20.000 113.000
1619 + 920 6.200
5.380 20.000 107.600
1619 + 940 4.560
4.455 20.000 89.100
1619 + 960 4.350
6.075 20.000 121.500
1619 + 980 7.800
7.195 20.000 143.900
1620 + 000 6.590
7.605 20.000 152.100
1620 + 020 8.620
9.305 20.000 186.100
1620 + 040 9.990
9.975 20.000 199.500
1620 + 060 9.960
12.595 20.000 251.900
1620 + 080 15.230
15.880 20.000 317.600
1620 + 100 16.530
TOTAL FOR ITEM 104(1)a1 1,752.292
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
17.995 20.000 359.900
1620 + 120 19.460
19.115 20.000 382.300
1620 + 140 18.770
18.450 20.000 369.000
1620 + 160 18.130
18.145 20.000 362.900
1620 + 180 18.160
18.170 20.000 363.400
1620 + 200 18.180
18.305 20.000 366.100
1620 + 220 18.430
18.010 20.000 360.200
1620 + 240 17.590
18.510 20.000 370.200
1620 + 260 19.430
19.175 20.000 383.500
1620 + 280 18.920
19.040 20.000 380.800
1620 + 300 19.160
17.600 20.000 352.000
1620 + 320 16.040
15.785 20.000 315.700
1620 + 340 15.530
12.755 20.000 255.100
1620 + 360 9.980
8.945 20.000 178.900
1620 + 380 7.910
7.255 20.000 145.100
1620 + 400 6.600
6.600 20.000 132.000
1620 + 420 6.600
6.725 20.000 134.500
1620 + 440 6.850
9.055 20.000 181.100
1620 + 460 11.260
11.910 20.000 238.200
1620 + 480 12.560
9.005 20.000 180.100
1620 + 500 5.450
5.215 20.000 104.300
1620 + 520 4.980
5.665 20.000 113.300
1620 + 540 6.350
6.575 20.000 131.500
1620 + 560 6.800
5.145 20.000 102.900
1620 + 580 3.490
2.505 20.000 50.100
1620 + 600 1.520
2.270 20.000 45.400
1620 + 620 3.020
3.550 20.000 71.000
1620 + 640 4.080
TOTAL FOR ITEM 104(1)a1 6,429.500
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
2.820 20.000 56.400
1620 + 660 1.560
2.510 20.000 50.200
1620 + 680 3.460
2.405 20.000 48.100
1620 + 700 1.350
2.715 20.000 54.300
1620 + 720 4.080
4.495 20.000 89.900
1620 + 740 4.910
4.935 20.000 98.700
1620 + 760 4.960
4.715 20.000 94.300
1620 + 780 4.470
4.375 20.000 87.500
1620 + 800 4.280
3.000 20.000 60.000
1620 + 820 1.720
0.860 20.000 17.200
1620 + 840 0.000
0.000 20.000 0.000
1620 + 860 0.000
0.145 20.000 2.900
1620 + 880 0.290
0.145 20.000 2.900
1620 + 900 0.000
0.420 20.000 8.400
1620 + 920 0.840
0.420 20.000 8.400
1620 + 940 0.000
1.520 20.000 30.400
1620 + 960 3.040
4.530 20.000 90.600
1620 + 980 6.020
3.985 20.000 79.700
1621 + 000 1.950
4.235 20.000 84.700
1621 + 020 6.520
6.340 20.000 126.800
1621 + 040 6.160
7.305 20.000 146.100
1621 + 060 8.450
9.340 20.000 186.800
1621 + 080 10.230
11.415 20.000 228.300
1621 + 100 12.600
8.640 20.000 172.800
1621 + 120 4.680
3.490 20.000 69.800
1621 + 140 2.300
1.565 20.000 31.300
1621 + 160 0.830
1.630 20.000 32.600
1621 + 180 2.430
4.165 20.000 83.300
1621 + 200 5.900
TOTAL FOR ITEM 104(1)a1 2042.400
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening Of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
12.155 20.000 243.100
1622 + 200 12.250
10.990 20.000 219.800
1622 + 220 9.730
10.375 20.000 207.500
1622 + 240 11.020
18.645 20.000 372.900
1622 + 260 26.270
19.000 20.000 380.000
1622 + 280 11.730
8.225 20.000 164.500
1622 + 300 4.720
7.865 20.000 157.300
1622 + 320 11.010
12.420 20.000 248.400
1622 + 340 13.830
10.285 20.000 205.700
1622 + 360 6.740
7.500 20.000 150.000
1622 + 380 8.260
8.325 20.000 166.500
1622 + 400 8.390
8.290 20.000 165.800
1622 + 420 8.190
8.080 20.000 161.600
1622 + 440 7.970
8.005 20.000 160.100
1622 + 460 8.040
7.205 20.000 144.100
1622 + 480 6.370
5.365 20.000 107.300
1622 + 500 4.360
3.590 20.000 71.800
1622 + 520 2.820
2.310 20.000 46.200
1622 + 540 1.800
1.505 20.000 30.100
1622 + 560 1.210
0.680 20.000 13.600
1622 + 580 0.150
0.075 20.000 1.500
1622 + 600 0.000
0.000 20.000 0.000
1622 + 620 0.000
0.000 20.000 0.000
1622 + 640 0.000
0.000 20.000 0.000
1622 + 660 0.000
0.000 20.000 0.000
1622 + 680 0.000
0.000 20.000 0.000
1622 + 700 0.000
0.005 20.000 0.100
1622 + 720 0.010
0.005 20.000 0.100
1622 + 740 0.000
2.120 20.000 42.400
1622 + 760 4.240
TOTAL FOR ITEM 104(1)a1 3,460.400
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
AS-ST
Regional Office No. XII
Corner Alunan Ave. - Mabini St. Koronadal City
Contract ID : 17-MO-0049
Project Name : Contractor:
Widening of Digos-Makar Road
Project Location : Malungon, Sarangani Province
Limits Km.1618+340 - Km. 1623+680
Vicente T. Lao
Net Length of
Concrete
Pavement : 4,620 ln.m
Item No. :104(1)a1
Description : Embankment (from Roadway Excavation)
Unit : cu.m.
Station Area Fill (m²) Ave. Area (m²) Length (m) Volume Fill (m³)
5.535 20.000 110.700
1622 + 780 6.830
3.840 20.000 76.800
1622 + 800 0.850
1.415 20.000 28.300
1622 + 820 1.980
3.755 20.000 75.100
1622 + 840 5.530
2.990 20.000 59.800
1622 + 860 0.450
0.225 20.000 4.500
1622 + 880 0.000
0.000 20.000 0.000
1622 + 900 0.000
0.000 20.000 0.000
1622 + 920 0.000
3.930 20.000 78.600
1622 + 940 7.860
3.930 20.000 78.600
1622 + 960 0.000
0.000 20.000 0.000
1622 + 980 0.000
9.565 20.000 191.300
1623 + 000 19.130
16.135 20.000 322.700
1623 + 020 13.140
13.085 20.000 261.700
1623 + 040 13.030
6.640 20.000 132.800
1623 + 060 0.250
0.270 20.000 5.400
1623 + 080 0.290
2.300 20.000 46.000
1623 + 100 4.310
4.180 20.000 83.600
1623 + 120 4.050
4.305 20.000 86.100
1623 + 140 4.560
4.335 20.000 86.700
1623 + 160 4.110
4.415 20.000 88.300
1623 + 180 4.720
4.385 20.000 87.700
1623 + 200 4.050
4.380 20.000 87.600
1623 + 220 4.710
4.700 20.000 94.000
1623 + 240 4.690
5.650 20.000 113.000
1623 + 260 6.610
6.815 20.000 136.300
1623 + 280 7.020
7.020 10.000 70.200
1623 + 290 7.020
1623 + 320
1623 + 340
1623 + 360
1623 + 380
1623 + 400
1623 + 420 0.000
0.000 20.000 0.000
1623 + 440 0.000
0.000 20.000 0.000
1623 + 460 0.000
0.000 20.000 0.000
1623 + 480 0.000
0.000 20.000 0.000
1623 + 500 0.000
0.000 20.000 0.000
1623 + 520 0.000
0.000 20.000 0.000
1623 + 540 0.000
0.000 20.000 0.000
1623 + 560 0.000
0.000 20.000 0.000
1623 + 580 0.000
0.000 20.000 0.000
1623 + 600 0.000
0.000 20.000 0.000
1623 + 620 0.000
0.000 20.000 0.000
1623 + 640 0.000
3.095 20.000 61.900
1623 + 660 6.190
4.105 20.000 82.100
1623 + 680 2.020
AS-STAKED
Contractor:
Remarks
EXCEPTION 01
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
cu.m.
ANTITY CALCULATION
AS-STAKED
Contractor:
Remarks
BUAYAN
BRIDGE
EXCEPTION 03
cu.m.
4.090 20.000
1620 + 160 3.380
3.380 20.000
1620 + 180 3.380
4.180 20.000
1620 + 200 4.980
4.140 20.000
1620 + 220 3.300
3.830 20.000
1620 + 240 4.360
3.930 20.000
1620 + 260 3.500
3.220 20.000
1620 + 280 2.940
3.140 20.000
1620 + 300 3.340
3.795 20.000
1620 + 320 4.250
5.450 20.000
1620 + 340 6.650
5.660 20.000
1620 + 360 4.670
4.675 20.000
1620 + 380 4.680
5.780 20.000
1620 + 400 6.880
6.075 20.000
1620 + 420 5.270
5.945 20.000
1620 + 440 6.620
5.155 20.000
1620 + 460 3.690
3.650 20.000
1620 + 480 3.610
4.555 20.000
1620 + 500 5.500
16.415 20.000
1620 + 520 27.330
26.890 20.000
1620 + 540 26.450
24.655 20.000
1620 + 560 22.860
23.000 20.000
1620 + 580 23.140
24.355 20.000
1620 + 600 25.570
25.215 20.000
1620 + 620 24.860
24.920 20.000
1620 + 640 24.980
26.190 20.000
1620 + 660 27.400
26.665 20.000
1620 + 680 25.930
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road
4.835 20.000
1621 + 780 4.580
5.015 20.000
1621 + 800 5.450
5.270 20.000
1621 + 820 5.090
4.890 20.000
1621 + 840 4.690
4.110 20.000
1621 + 860 3.530
3.860 20.000
1621 + 880 4.190
4.260 20.000
1621 + 900 4.330
4.080 20.000
1621 + 920 3.830
4.310 20.000
1621 + 940 4.790
5.300 20.000
1621 + 960 5.810
5.005 20.000
1621 + 980 4.200
4.145 20.000
1622 + 000 4.090
5.075 20.000
1622 + 020 6.060
3.690 20.000
1622 + 040 1.320
1.875 20.000
1622 + 060 2.430
3.520 20.000
1622 + 080 4.610
4.425 20.000
1622 + 100 4.240
4.225 20.000
1622 + 120 4.210
4.650 20.000
1622 + 140 5.090
5.890 20.000
1622 + 160 6.690
6.460 20.000
1622 + 180 6.230
6.095 20.000
1622 + 200 5.960
6.245 20.000
1622 + 220 6.530
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road
5.555 20.000
1622 + 240 4.580
3.130 20.000
1622 + 260 1.680
5.910 20.000
1622 + 280 10.140
15.965 20.000
1622 + 300 21.790
21.540 20.000
1622 + 320 21.290
18.460 20.000
1622 + 340 15.630
10.580 20.000
1622 + 360 5.530
4.810 20.000
1622 + 380 4.090
6.503 20.000
1622 + 400 8.915
7.548 20.000
1622 + 420 6.180
6.215 20.000
1622 + 440 6.250
6.315 20.000
1622 + 460 6.380
6.630 20.000
1622 + 480 6.880
9.846 20.000
1622 + 500 12.812
14.214 20.000
1622 + 520 15.615
18.165 20.000
1622 + 540 20.714
22.463 20.000
1622 + 560 24.212
25.442 20.000
1622 + 580 26.671
26.943 20.000
1622 + 600 27.215
26.740 20.000
1622 + 620 26.264
27.624 20.000
1622 + 640 28.983
28.206 20.000
1622 + 660 27.429
27.671 20.000
1622 + 680 27.912
27.566 20.000
1622 + 700 27.219
28.040 20.000
1622 + 720 28.860
27.927 20.000
1622 + 740 26.994
28.105 20.000
1622 + 760 29.215
27.120 20.000
1622 + 780 25.025
26.323 20.000
1622 + 800 27.621
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road
24.067 20.000
1622 + 820 20.512
10.901 20.000
1622 + 840 1.290
1.345 20.000
1622 + 860 1.400
1.435 20.000
1622 + 880 1.470
1.485 20.000
1622 + 900 1.500
1.500 20.000
1622 + 920 1.500
1.515 20.000
1622 + 940 1.530
1.530 20.000
1622 + 960 1.530
2.080 20.000
1622 + 980 2.630
2.665 20.000
1623 + 000 2.700
2.750 20.000
1623 + 020 2.800
2.875 20.000
1623 + 040 2.950
2.955 20.000
1623 + 060 2.960
2.950 20.000
1623 + 080 2.940
2.830 20.000
1623 + 100 2.720
2.735 20.000
1623 + 120 2.750
2.665 20.000
1623 + 140 2.580
2.585 20.000
1623 + 160 2.590
2.600 20.000
1623 + 180 2.610
2.595 20.000
1623 + 200 2.580
2.595 20.000
1623 + 220 2.610
2.555 20.000
1623 + 240 2.500
2.505 20.000
1623 + 260 2.510
2.495 20.000
1623 + 280 2.480
1.240 16.000
1623 + 296
1623 + 320
1623 + 340
1623 + 360
1623 + 380
1623 + 400
Prepared by : Checked by :
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
307.950
173.940
142.810
65.240
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
EXCEPTION 01
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
41.140
91.400
822.480 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
145.700
235.500
315.900
395.400
433.500
433.250
420.460
412.150
401.860
393.120
391.300
385.880
393.730
410.730
405.030
404.660
397.010
385.700
375.800
359.000
364.500
324.200
264.500
310.100
372.700
394.700
419.900
471.210
518.850
10,936.340 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
715.640
1018.000
1109.400
1088.000
1117.900
1110.200
1087.400
1098.500
1096.700
1086.600
1121.500
1133.000
1120.400
1157.700
565.888
0.000
112.251
567.800
506.600
516.900
500.100
464.800
282.400
115.200
143.400
123.300
77.100
79.400
92.200
19,208.279 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
81.800
67.600
83.600
82.800
76.600
78.600
64.400
62.800
75.900
109.000
113.200
93.500
115.600
121.500
118.900
103.100
73.000
91.100
328.300
537.800
493.100
460.000
487.100
504.300
498.400
523.800
533.300
5,979.100 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
521.200
502.000
496.280
542.880
558.000
545.100
554.300
585.620
623.570
628.020
625.970
625.210
606.510
594.800
586.460
587.530
593.540
598.260
611.450
611.430
601.690
608.630
620.380
601.420
549.010
527.280
542.270
562.300
16211.110 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
587.350
665.000
554.100
427.700
294.400
253.100
505.280
616.740
599.000
597.600
511.960
477.920
544.300
559.680
597.810
598.560
566.850
477.490
323.490
170.300
94.100
93.900
95.400
100.300
107.200
104.700
10,524.230 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
96.700
100.300
105.400
97.800
82.200
77.200
85.200
81.600
86.200
106.000
100.100
82.900
101.500
73.800
37.500
70.400
88.500
84.500
93.000
117.800
129.200
121.900
124.900
2,144.600 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
111.100
62.600
118.200
319.300
430.800
369.200
211.600
96.200
130.050
150.950
124.300
126.300
132.600
196.920
284.270
363.290
449.260
508.830
538.860
534.794
552.474
564.124
553.414
551.314
560.794
558.544
562.094
542.400
526.460
10,231.040 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
481.330
218.020
26.900
28.700
29.700
30.000
30.300
30.600
41.600
53.300
55.000
57.500
59.100
59.000
56.600
54.700
53.300
51.700
52.000
51.900
51.900
51.100
50.100
49.900
19.840
BUAYAN
BRIDGE
EXCEPTION 02
65.580
48.050
48.700
49.300
50.500
50.100
50.300
50.400
50.200
50.100
50.100
49.900
50.500
2,407.820 cu.m.
SUKARNO D. DILANGALEN
Project Engineer III
DPWH Regional Office XII
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road
4.090 20.000
1620 + 160 3.380
3.380 20.000
1620 + 180 3.380
4.180 20.000
1620 + 200 4.980
4.140 20.000
1620 + 220 3.300
3.830 20.000
1620 + 240 4.360
3.930 20.000
1620 + 260 3.500
3.220 20.000
1620 + 280 2.940
3.140 20.000
1620 + 300 3.340
3.795 20.000
1620 + 320 4.250
5.450 20.000
1620 + 340 6.650
5.660 20.000
1620 + 360 4.670
4.675 20.000
1620 + 380 4.680
5.780 20.000
1620 + 400 6.880
6.075 20.000
1620 + 420 5.270
5.945 20.000
1620 + 440 6.620
5.155 20.000
1620 + 460 3.690
3.650 20.000
1620 + 480 3.610
4.555 20.000
1620 + 500 5.500
16.415 20.000
1620 + 520 27.330
26.890 20.000
1620 + 540 26.450
24.655 20.000
1620 + 560 22.860
23.000 20.000
1620 + 580 23.140
24.355 20.000
1620 + 600 25.570
25.215 20.000
1620 + 620 24.860
24.920 20.000
1620 + 640 24.980
26.190 20.000
1620 + 660 27.400
26.665 20.000
1620 + 680 25.930
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening Of Digos-Makar Road
4.835 20.000
1621 + 780 4.580
5.015 20.000
1621 + 800 5.450
5.270 20.000
1621 + 820 5.090
4.890 20.000
1621 + 840 4.690
4.110 20.000
1621 + 860 3.530
3.860 20.000
1621 + 880 4.190
4.260 20.000
1621 + 900 4.330
4.080 20.000
1621 + 920 3.830
4.310 20.000
1621 + 940 4.790
5.300 20.000
1621 + 960 5.810
5.005 20.000
1621 + 980 4.200
4.145 20.000
1622 + 000 4.090
5.075 20.000
1622 + 020 6.060
3.690 20.000
1622 + 040 1.320
1.875 20.000
1622 + 060 2.430
3.520 20.000
1622 + 080 4.610
4.425 20.000
1622 + 100 4.240
4.225 20.000
1622 + 120 4.210
4.650 20.000
1622 + 140 5.090
5.890 20.000
1622 + 160 6.690
6.460 20.000
1622 + 180 6.230
6.095 20.000
1622 + 200 5.960
6.245 20.000
1622 + 220 6.530
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road
5.555 20.000
1622 + 240 4.580
3.130 20.000
1622 + 260 1.680
5.910 20.000
1622 + 280 10.140
15.965 20.000
1622 + 300 21.790
21.540 20.000
1622 + 320 21.290
18.460 20.000
1622 + 340 15.630
10.580 20.000
1622 + 360 5.530
4.810 20.000
1622 + 380 4.090
4.250 20.000
1622 + 400 4.410
5.295 20.000
1622 + 420 6.180
6.215 20.000
1622 + 440 6.250
6.315 20.000
1622 + 460 6.380
6.630 20.000
1622 + 480 6.880
6.885 20.000
1622 + 500 6.890
7.830 20.000
1622 + 520 8.770
17.860 20.000
1622 + 540 26.950
26.220 20.000
1622 + 560 25.490
31.285 20.000
1622 + 580 37.080
35.295 20.000
1622 + 600 33.510
33.105 20.000
1622 + 620 32.700
32.285 20.000
1622 + 640 31.870
33.490 20.000
1622 + 660 35.110
34.445 20.000
1622 + 680 33.780
34.720 20.000
1622 + 700 35.660
34.585 20.000
1622 + 720 33.510
33.875 20.000
1622 + 740 34.240
35.030 20.000
1622 + 760 35.820
36.780 20.000
1622 + 780 37.740
42.145 20.000
1622 + 800 46.550
TOTAL FOR ITEM 102(2)b
DETAILED QUANTITY CALCULATION
Agency:
Department of Public Works & Highways
OFFICE OF THE REGIONAL DIRECTOR
12TH REGIONAL OFFICE, KORONADAL CITY
Contract ID : 17-MO-0049
Project Name :
Widening of Digos-Makar Road
24.015 20.000
1622 + 820 1.480
1.385 20.000
1622 + 840 1.290
1.345 20.000
1622 + 860 1.400
1.435 20.000
1622 + 880 1.470
1.485 20.000
1622 + 900 1.500
1.500 20.000
1622 + 920 1.500
1.515 20.000
1622 + 940 1.530
1.530 20.000
1622 + 960 1.530
2.080 20.000
1622 + 980 2.630
2.665 20.000
1623 + 000 2.700
2.750 20.000
1623 + 020 2.800
2.875 20.000
1623 + 040 2.950
2.955 20.000
1623 + 060 2.960
2.950 20.000
1623 + 080 2.940
2.830 20.000
1623 + 100 2.720
2.735 20.000
1623 + 120 2.750
2.665 20.000
1623 + 140 2.580
2.585 20.000
1623 + 160 2.590
2.600 20.000
1623 + 180 2.610
2.595 20.000
1623 + 200 2.580
2.595 20.000
1623 + 220 2.610
2.555 20.000
1623 + 240 2.500
2.505 20.000
1623 + 260 2.510
2.495 20.000
1623 + 280 2.480
1.240 10.000
1623 + 296
1623 + 320
1623 + 340
1623 + 360
1623 + 380
1623 + 400
1623 + 420
1623 + 440
Prepared by : Checked by :
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
307.950
173.940
142.810
65.240
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
EXCEPTION 01
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
41.140
91.400
822.480 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
145.700
235.500
315.900
395.400
433.500
452.700
452.500
448.600
433.800
401.200
391.300
397.500
473.000
525.500
482.300
444.900
407.100
385.700
375.800
359.000
364.500
324.200
264.500
310.100
372.700
438.400
531.800
574.900
567.000
11,705.000 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
798.800
1088.500
1109.400
1088.000
1117.900
1110.200
1087.400
1098.500
1096.700
1086.600
1121.500
1133.000
1120.400
1157.700
565.888
0.000
112.251
567.800
506.600
516.900
500.100
464.800
282.400
115.200
143.400
123.300
77.100
79.400
92.200
19,361.939 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
81.800
67.600
83.600
82.800
76.600
78.600
64.400
62.800
75.900
109.000
113.200
93.500
115.600
121.500
118.900
103.100
73.000
91.100
328.300
537.800
493.100
460.000
487.100
504.300
498.400
523.800
533.300
5,979.100 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
521.200
502.000
500.700
547.300
558.000
545.100
554.300
632.800
707.400
684.600
645.900
641.900
623.200
594.800
651.800
718.500
728.800
713.700
689.200
691.600
661.100
633.700
648.300
660.900
622.200
578.400
654.100
748.100
17659.600 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
684.700
665.000
554.100
427.700
294.400
253.100
535.600
671.700
639.700
633.900
532.200
529.000
646.000
637.200
662.500
688.000
702.800
600.500
362.200
170.300
94.100
93.900
95.400
100.300
107.200
104.700
11,486.200 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
96.700
100.300
105.400
97.800
82.200
77.200
85.200
81.600
86.200
106.000
100.100
82.900
101.500
73.800
37.500
70.400
88.500
84.500
93.000
117.800
129.200
121.900
124.900
2,144.600 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
111.100
62.600
118.200
319.300
430.800
369.200
211.600
96.200
85.000
105.900
124.300
126.300
132.600
137.700
156.600
357.200
524.400
625.700
705.900
662.100
645.700
669.800
688.900
694.400
691.700
677.500
700.600
735.600
842.900
11,809.800 cu.m.
ITY CALCULATION
AS-STAKED
Contractor:
Volume Cut
Remarks
(m³)
480.300
27.700
26.900
28.700
29.700
30.000
30.300
30.600
41.600
53.300
55.000
57.500
59.100
59.000
56.600
54.700
53.300
51.700
52.000
51.900
51.900
51.100
50.100
49.900
12.400
BUAYAN
BRIDGE
EXCEPTION 03
48.700
49.300
50.500
50.100
50.300
50.400
50.200
50.100
50.100
49.900
50.500
50.900
50.300
50.900
2,247.500 cu.m.
TOTAL FOR ITEM, 101(9)
822.48 cu.m.
11,705.00 cu.m.
19,361.94 cu.m.
5,979.10 cu.m.
17,659.60 cu.m.
11,486.20 cu.m.
2,144.60 cu.m.
11,809.80 cu.m.
2,247.50 cu.m.
83,216.22 cu.m.
SUKARNO D. DILANGALEN
Project Engineer III
DPWH Regional Office XII
PROJECT ID No. 17-MO-0049
PROJECT LOCATION: WIDENING OF DIGOS-MAKAR ROAD,NAGPAN,MALUN
QUANTI
ORIGINAL CONTRACT
ITEM NO. DESCRIPTION
UNIT QTY. UNIT COST
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) month 9.30 7,938.00
Provision for 4x4 Pick-up Type Service Vehicle for the Engineer
A.1.1(2) months 9.30 63,406.35
(Rental Basis)
100 (4) Individual Removal of Trees (large,above 900 mmØ) each 20.00 4,433.21
101(10) Removal of Existing Road Signs ( Kilometer Post & Road Signs) each 7.00 230.29
311(1)a PCC Pavement (Plain)-Conventional Method, 150mm thick sq.m. 4,581.00 1,192.19
311(1)e1.1 PCC Pavement (Plain)-Conventional Method, 280 mm thick sq.m. 30,956.00 2,067.66
500(1)b3 Pipe Culverts, 910 mm dia. (36"Ø) - Class IV ln.m. 56.00 6,864.05
506(1) Stone Masonry cu.m. 8,145.00 3,728.36
603(3)a1 Metal Guardrail (Metal Flex Beam),Including Concrete Post - Class B ln.m. 147.00 3,625.20
620 (1)a1.1 Reintallation of Chevron Directional Signs (0.45m x 0.60m) each 199.00 385.06
622(1)a Bio-Engineering Coco Fiber Erosion Control Net (CGN 400) sq.m. 6,528.00 603.92
622(2)b Bio-Engineering Coco Fascine Erosion Control System (CGR 200) ln.m. 2,680.00 702.68
622(3)b Bio-Engineering Erosion Control System ( Vetiver Grass) sq.m. 6,528.00 224.79
TOTAL AMOUNT
Prepared by:
JAMES A. MARCILLANA
Project Engineer
Vicente T. Lao Construction
MAKAR ROAD,NAGPAN,MALUNGON SARANGANI
73,823.40 -
589,679.06 - - -
13,522.92 - -
926,286.79 - - -
80,198.74 - -
615,501.60 - -
88,664.20 - -
27,260.56 - -
264,723.21 - -
551,739.63 - -
26,131.27 - -
475,885.08 - -
135,801.43 - -
1,612.03 - -
7,180,332.15 -
651,803.13 -
456,705.48 -
20,945.71 -
7,040,055.75 -
2,150,767.83 -
5,954,398.85 -
1,034,340.91 -
5,461,422.39 -
5,185,128.55 -
8,482,418.00 -
384,386.80 -
30,367,492.20 835.39 3,114,634.66
8,649.20 -
348,582.96 -
17,580.64 -
6,324,007.25 -
1,647,927.36 -
1,628,199.30 -
76,626.94 -
ORIGINAL CONTRACT
QTY. AMOUNT
9.30 73,823.40
9.30 589,679.06
3.00 13,522.92
9.30 926,286.79
9.30 80,198.74
19592.06
1.00 615,501.60
20.00 88,664.20
8.00 27,260.56
433.00 264,723.21
849.00 551,739.63
11.00 26,131.27
3,366.00 475,885.08
943.00 135,801.43
7.00 1,612.03
78,465.00 7,180,332.15
3,421.00 651,803.13
308.00 456,705.48
71.00 20,945.71
24,339.00 7,040,055.75
44,817.00 2,150,767.83
13,495.00 5,954,398.85
677.00 1,034,340.91
4,581.00 5,461,422.39
31,537.225 65,208,258.64
51,619.00 5,185,128.55
1,400.00 8,482,418.00
56.00 384,386.80
8,980.39 33,482,126.86
5.00 8,649.20
376.00 1,363,075.20
3,366.00 348,582.96
4.00 17,580.64
1,525.00 6,324,007.25
1,422.00 1,647,927.36
1,387.00 1,628,199.30
199.00 76,626.94
1,911.80 1,154,574.26
800.00 562,144.00
1,911.60 429,708.56
160,124,996.63
PHP 160,124,989.95
PROPOSED REVISED CONTRACT PHP 160,124,996.63
-PHP 6.68
2,146,420.14
QUANTITY SHEET
AREAS VOLUM
LENGTH
STATIONS
(meters) ITEM 102(2)b
ITEM 104(1)a1 ITEM 102(2)b
0.00
24.00
24.00
0.00
EXCEPTION 01
0.00
4.34
9.00
15.90
31.60
38.30
36.40
34.20
26.70
27.90
53.00
92.10
113.90
133.00
160.80
84.90
0.80
39.90
67.90
47.20
29.70
23.20
21.90
20.90
46.90
78.20
64.80
34.90
18.70
7.90
3.90
6.50
4.10
0.00
1.50
3.00
1.50
1.60
3.00
1.40
0.00
1.40
1.40
0.00
0.00
11.10
10.73
18.07
60.70
78.11
74.81
69.37
18.26
113.00
107.60
89.10
121.50
143.90
152.10
186.10
199.50
202.30
215.20
243.60
260.80
257.70
281.10
313.40
331.50
347.10
361.30
374.60
372.80
344.00
315.70
255.10
178.90
145.10
132.00
134.53
181.13
238.20
180.10
104.30
113.30
131.50
102.90
50.10
45.40
71.00
56.40
50.20
48.10
54.30
89.90
98.70
94.30
87.50
60.00
17.20
0.00
2.90
2.90
8.40
8.40
30.40
90.60
79.70
84.70
126.80
146.10
186.80
218.60
163.10
69.80
31.30
32.60
83.30
65.40
9.60
16.00
12.80
36.10
69.80
66.10
42.10
9.70
0.00
0.00 EXCEPTION 01
0.20
2.50
2.30
0.30
0.30
0.00
0.00
0.00
5.30
55.60
131.60
170.60
174.80
169.40
176.47
160.17
146.30
172.70
203.40
203.40
102.50
105.60
191.30
230.30
253.90
239.60
246.60
185.90
126.00
204.50
297.60
386.10
451.60
411.90
358.80
322.20
288.80
270.30
266.80
248.70
254.30
290.40
273.10
182.70
180.70
245.50
196.90
154.60
179.80
194.90
189.10
182.10
166.60
130.50
99.80
73.40
69.10
42.50
2.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
73.50
84.00
32.80
85.40
74.40
11.30
0.00
0.00
91.40
91.40
0.00
123.90
250.67
244.73
122.06
13.30
78.70
117.70
114.20
120.80
118.50
116.10
116.40
117.60
118.10
142.50
81.25
EXCEPTION 02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
76.40
117.70
24,339.00
QUANTITY SHEET
AREAS
1618 + 320.00
1618 + 340.00 20.00
1618 + 360.00 20.00
1618 + 380.00 20.00
1618 + 400.00 20.00
1618 + 903.00
1618 + 920.00 17.00
1618 + 940.00 20.00
1618 + 960.00 20.00
1618 + 980.00 20.00
1619 + 000.00 20.00
1619 + 020.00 20.00
1619 + 040.00 20.00
1619 + 060.00 20.00
1619 + 080.00 20.00
1619 + 100.00 20.00
1619 + 120.00 20.00
1619 + 140.00 20.00
1619 + 160.00 20.00
1619 + 180.00 20.00
1619 + 200.00 20.00
1619 + 220.00 20.00
1619 + 240.00 20.00
1619 + 260.00 20.00
1619 + 280.00 20.00
1619 + 300.00 20.00
1619 + 320.00 20.00
1619 + 340.00 20.00
1619 + 360.00 20.00
1619 + 380.00 20.00
1619 + 400.00 20.00
1619 + 420.00 20.00
1619 + 440.00 20.00
1619 + 460.00 20.00
1619 + 480.00 20.00
1619 + 500.00 20.00
1619 + 520.00 20.00
1619 + 540.00 20.00
1619 + 560.00 20.00
1619 + 580.00 20.00
1619 + 600.00 20.00
1619 + 620.00 20.00
1619 + 640.00 20.00
1619 + 660.00 20.00
1619 + 680.00 20.00
1619 + 700.00 20.00
1619 + 720.00 20.00
1619 + 740.00 20.00
1619 + 760.00 20.00
1619 + 780.00 20.00
1619 + 800.00 20.00
1619 + 820.00 20.00
1619 + 840.00 20.00
1619 + 860.00 20.00
1619 + 880.00 20.00
1619 + 900.00 20.00
1619 + 920.00 20.00
1619 + 940.00 20.00
1619 + 960.00 20.00
1619 + 980.00 20.00
1620 + 000.00 20.00
1620 + 020.00 20.00
1620 + 040.00 20.00
1620 + 060.00 20.00
1620 + 080.00 20.00
1620 + 100.00 20.00
1620 + 120.00 20.00
1620 + 140.00 20.00
1620 + 160.00 20.00
1620 + 180.00 20.00
1620 + 200.00 20.00
1620 + 220.00 20.00
1620 + 240.00 20.00
1620 + 260.00 20.00
1620 + 280.00 20.00
1620 + 300.00 20.00
1620 + 320.00 20.00
1620 + 340.00 20.00
1620 + 360.00 20.00
1620 + 380.00 20.00
1620 + 400.00 20.00
1620 + 420.00 20.00
1620 + 440.00 20.00
1620 + 460.00 20.00
1620 + 480.00 20.00
1620 + 500.00 20.00
1620 + 520.00 20.00
1620 + 540.00 20.00
1620 + 560.00 20.00
1620 + 580.00 20.00
1620 + 600.00 20.00
1620 + 620.00 20.00
1620 + 640.00 20.00
1620 + 660.00 20.00
1620 + 680.00 20.00
1620 + 700.00 20.00
1620 + 720.00 20.00
1620 + 740.00 20.00
1620 + 760.00 20.00
1620 + 780.00 20.00
1620 + 800.00 20.00
1620 + 820.00 20.00
1620 + 840.00 20.00
1620 + 860.00 20.00
1620 + 880.00 20.00
1620 + 900.00 20.00
1620 + 920.00 20.00
1620 + 940.00 20.00
1620 + 960.00 20.00
1620 + 980.00 20.00
1621 + 000.00 20.00
1621 + 020.00 20.00
1621 + 040.00 20.00
1621 + 060.00 20.00
1621 + 080.00 20.00
1621 + 100.00 20.00
1621 + 120.00 20.00
1621 + 140.00 20.00
1621 + 160.00 20.00
1621 + 180.00 20.00
1621 + 200.00 20.00
1621 + 220.00 20.00
1621 + 240.00 20.00
1621 + 260.00 20.00
1621 + 280.00 20.00
1621 + 300.00 20.00
1621 + 320.00 20.00
1621 + 340.00 20.00
1621 + 360.00 20.00
1621 + 380.00 20.00
1621 + 400.00 20.00
1621 + 420.00 20.00
1621 + 440.00 20.00
1621 + 460.00 20.00
1621 + 480.00 20.00
1621 + 500.00 20.00
1621 + 520.00 20.00
1621 + 540.00 20.00
1621 + 560.00 20.00
1621 + 580.00 20.00
1621 + 600.00 20.00
1621 + 620.00 20.00
1621 + 640.00 20.00
1621 + 660.00 20.00
1621 + 680.00 20.00
1621 + 700.00 20.00
1621 + 720.00 20.00
1621 + 740.00 20.00
1621 + 760.00 20.00
1621 + 780.00 20.00
1621 + 800.00 20.00
1621 + 820.00 20.00
1621 + 840.00 20.00
1621 + 860.00 20.00
1621 + 880.00 20.00
1621 + 900.00 20.00
1621 + 920.00 20.00
1621 + 940.00 20.00
1621 + 960.00 20.00
1621 + 980.00 20.00
1622 + 000.00 20.00
1622 + 020.00 20.00
1622 + 040.00 20.00
1622 + 060.00 20.00
1622 + 080.00 20.00
1622 + 100.00 20.00
1622 + 120.00 20.00
1622 + 140.00 20.00
1622 + 160.00 20.00
1622 + 180.00 20.00
1622 + 200.00 20.00
1622 + 220.00 20.00
1622 + 240.00 20.00
1622 + 260.00 20.00
1622 + 280.00 20.00
1622 + 300.00 20.00
1622 + 320.00 20.00
1622 + 340.00 20.00
1622 + 360.00 20.00
1622 + 380.00 20.00
1622 + 400.00 20.00
1622 + 420.00 20.00
1622 + 440.00 20.00
1622 + 460.00 20.00
1622 + 480.00 20.00
1622 + 500.00 20.00
1622 + 520.00 20.00
1622 + 540.00 20.00
1622 + 560.00 20.00
1622 + 580.00 20.00
1622 + 600.00 20.00
1622 + 620.00 20.00
1622 + 640.00 20.00
1622 + 660.00 20.00
1622 + 680.00 20.00
1622 + 700.00 20.00
1622 + 720.00 20.00
1622 + 740.00 20.00
1622 + 760.00 20.00
1622 + 780.00 20.00
1622 + 800.00 20.00
1622 + 820.00 20.00
1622 + 840.00 20.00
1622 + 860.00 20.00
1622 + 880.00 20.00
1622 + 900.00 20.00
1622 + 920.00 20.00
1622 + 940.00 20.00
1622 + 960.00 20.00
1622 + 980.00 20.00
1623 + 000.00 20.00
1623 + 020.00 20.00
1623 + 040.00 20.00
1623 + 060.00 20.00
1623 + 080.00 20.00
1623 + 100.00 20.00
1623 + 120.00 20.00
1623 + 140.00 20.00
1623 + 160.00 20.00
1623 + 180.00 20.00
1623 + 200.00 20.00
1623 + 220.00 20.00
1623 + 240.00 20.00
1623 + 260.00 20.00
1623 + 280.00 20.00
1623 + 300.00 20.00
1623 + 320.00 20.00
1623 + 340.00 20.00
1623 + 360.00 20.00
1623 + 380.00 20.00
1623 + 400.00 20.00
1623 + 420.00 20.00
1623 + 440.00 20.00
1623 + 460.00 20.00
1623 + 480.00 20.00
1623 + 500.00 20.00
1623 + 520.00 20.00
1623 + 540.00 20.00
1623 + 560.00 20.00
1623 + 580.00 20.00
1623 + 600.00 20.00
1623 + 620.00 20.00
1623 + 640.00 20.00
1623 + 660.00 20.00
1623 + 680.00 20.00
Y SHEET
VOLUME
COMMON REMARKS
EMBANKMENT
EXCAVATION
(Cu.m.)
(Cu.m.)
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY. LOCATION
(mts.)
1619 + 160.00 GEMILINA 0.6 1 RT
1619 + 160.00 IPIL-IPIL 0.5 1 LT
1619 + 240.00 NARRA 0.3 7 LT
1619 + 600.00 MAHOGANY 0.25 14 LT
1619 + 680.00 JACKFRUIT 0.2 1 LT
1619 + 940.00 NEEM TREE 0.3 1 LT
1619 + 940.00 STAR APPLE 0.3 1 RT
1620 + 000.00 GEMILINA 0.6 1 RT
1620 + 000.00 NEEM TREE 0.3 1 RT
1620 + 040.00 MAHOGANY 3.5 1 LT
1620 + 040.00 NEEM TREE 0.3 1 RT
1620 + 080.00 JACKFRUIT 0.3 1 LT
1620 + 100.00 MAHOGANY 0.6 1 RT
1620 + 120.00 MAHOGANY 0.6 4 RT
1620 + 120.00 CAMACHILI 0.3 1 LT
1620 + 180.00 NEEM TREE 0.3 1 LT
1620 + 200.00 MANGO 0.3 1 LT
1620 + 220.00 GEMILINA 0.3 1 RT
1620 + 220.00 MAHOGANY 0.6 2 RT
1620 + 240.00 GEMILINA 0.6 1 LT
1620 + 260.00 MANGO 0.4 1 LT
1620 + 300.00 MAHOGANY 0.6 4 LT
1620 + 320.00 MANGO 0.4 1 LT
1620 + 340.00 JACKFRUIT 0.3 1 LT
1620 + 360.00 JACKFRUIT 0.3 2 LT
1620 + 360.00 MAHOGANY 0.5 3 LT
1620 + 340.00 CAMACHILI 0.6 1 RT
1620 + 360.00 MANGO 0.4 1 RT
1620 + 360.00 MAHOGANY 0.3 2 RT
1620 + 380.00 MAHOGANY 0.3 2 LT
1620 + 400.00 SANTOL 0.25 3 LT
1620 + 420.00 SANTOL 0.3 3 LT
1620 + 420.00 TAMARIND 0.4 1 RT
1620 + 420.00 BAGRASS 0.25 3 RT
1620 + 440.00 MAHOGANY 0.4 8 LT
1620 + 440.00 CAMACHILI 0.4 2 LT
1620 + 460.00 KASOY 0.3 1 LT
1620 + 520.00 MAHOGANY 0.4 4 RT
1620 + 520.00 MAHOGANY 0.3 4 LT
1620 + 520.00 MAHOGANY 0.3 4 RT
1620 + 560.00 CAMACHILI 0.5 2 LT
1620 + 560.00 MAHOGANY 0.3 1 LT
1620 + 600.00 MAHOGANY 0.5 1 LT
1620 + 680.00 JACKFRUIT 0.4 1 RT
1620 + 780.00 MAHOGANY 0.5 4 RT
1620 + 820.00 MAHOGANY 0.5 8 RT
1620 + 840.00 GEMILINA 0.4 3 LT
1620 + 900.00 MAHOGANY 0.4 11 RT
1620 + 920.00 MAHOGANY 0.4 2 RT
1621 + 060.00 GEMILINA 0.4 1 LT
1621 + 100.00 JACKFRUIT 0.3 1 LT
1621 + 140.00 GEMILINA 0.4 2 RT
1621 + 180.00 NARRA 0.4 1 LT
1621 + 240.00 NARRA 0.3 2 RT
1621 + 380.00 NARRA 0.3 1 RT
1621 + 400.00 MAHOGANY 0.3 1 RT
1621 + 420.00 MAHOGANY 0.3 1 RT
1621 + 440.00 MAHOGANY 0.3 1 RT
1621 + 460.00 MAHOGANY 0.3 1 RT
1621 + 500.00 MAHOGANY 0.3 1 RT
1621 + 620.00 NEEM TREE 0.5 1 LT
1621 + 620.00 PALM OIL 0.7 1 LT
1621 + 640.00 MANGO 0.5 1 LT
1621 + 660.00 ACASIA 0.6 1 RT
1621 + 740.00 NEEM TREE 0.5 1 LT
1621 + 740.00 SANTOL 0.4 1 LT
1621 + 740.00 NEEM TREE 0.5 1 RT
1621 + 760.00 PALM OIL 0.7 1 RT
1621 + 760.00 JACKFRUIT 0.35 1 LT
1621 + 800.00 PALM OIL 0.7 2 RT
1621 + 820.00 TAMARIND 0.6 2 LT
1621 + 820.00 MAHOGANY 0.5 1 LT
1621 + 820.00 GEMILINA 0.4 2 RT
1621 + 820.00 NEEM TREE 0.4 2 RT
1621 + 860.00 JACKFRUIT 0.35 1 LT
1621 + 860.00 GEMILINA 0.5 3 LT
1621 + 860.00 SANTOL 0.4 1 LT
1621 + 880.00 STAR APPLE 0.5 1 RT
1621 + 900.00 MAHOGANY 0.5 2 RT
1621 + 900.00 NEEM TREE 0.4 3 RT
1621 + 900.00 MANGO 0.3 2 LT
1621 + 920.00 GEMILINA 0.45 1 RT
1621 + 920.00 NEEM TREE 0.4 2 RT
1621 + 920.00 MAHOGANY 0.5 3 LT
1621 + 980.00 MAHOGANY 0.4 3 LT
1622 + 000.00 MAHOGANY 1 1 LT
1622 + 000.00 ACASIA 0.6 1 LT
1622 + 020.00 MAHOGANY 0.4 4 RT
1622 + 020.00 GEMILINA 0.5 1 RT
1622 + 080.00 MAHOGANY 0.4 1 LT
1622 + 100.00 MAHOGANY 0.6 2 LT
1622 + 120.00 NARRA 0.4 6 LT
1622 + 140.00 NARRA 0.4 2 RT
1622 + 160.00 GEMILINA 0.6 2 RT
1622 + 180.00 MOLAVE 0.4 2 RT
1622 + 200.00 MAHOGANY 0.5 3 LT
1622 + 200.00 MAHOGANY 0.4 4 RT
1622 + 300.00 NARRA 0.5 3 LT
1622 + 300.00 MAHOGANY 0.3 1 RT
1622 + 340.00 MAHOGANY 0.3 3 RT
1622 + 360.00 MAHOGANY 0.3 3 RT
1622 + 380.00 NARRA 0.5 3 RT
1622 + 400.00 MAHOGANY 0.3 2 RT
1622 + 440.00 NARRA 0.5 1 LT
1622 + 460.00 MAHOGANY 0.3 1 RT
1622 + 480.00 MAHOGANY 0.3 2 RT
1622 + 480.00 NARRA 0.5 4 LT
1622 + 500.00 GEMILINA 0.5 2 RT
1622 + 520.00 MAHOGANY 0.3 1 RT
1622 + 520.00 NARRA 0.4 5 LT
1622 + 540.00 GEMILINA 0.4 5 RT
1622 + 600.00 MAHOGANY 0.4 1 RT
1622 + 680.00 GEMILINA 0.4 2 RT
1622 + 700.00 MAHOGANY 0.3 3 RT
1622 + 900.00 MAHOGANY 0.3 1 RT
1622 + 940.00 IPIL-IPIL 0.9 1 RT
1622 + 960.00 MAHOGANY 0.3 2 RT
1622 + 980.00 NARRA 0.3 1 RT
1623 + 000.00 MAHOGANY 0.4 2 RT
1623 + 080.00 MAHOGANY 0.4 2 RT
1623 + 120.00 DOL-DOL 0.5 2 RT
1623 + 140.00 NEEM TREE 0.4 3 RT
1623 + 160.00 NEEM TREE 0.4 3 RT
1623 + 160.00 GEMILINA 0.6 1 RT
1623 + 220.00 GEMILINA 0.6 2 LT
1623 + 240.00 GEMILINA 0.3 1 LT
1623 + 500.00 BAGRASS 0.5 3 RT
1623 + 540.00 BAGRASS 0.4 1 RT
1623 + 580.00 BAGRASS 0.4 4 RT
1623 + 600.00 BAGRASS 0.5 8 RT
1623 + 620.00 BAGRASS 0.4 5 RT
1623 + 660.00 BAGRASS 0.4 2 RT
TOTAL 295
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY. LOCATION
(mts.)
1619 + 160.00 GEMILINA 0.6 1 RT
1619 + 160.00 IPIL-IPIL 0.5 1 LT
1619 + 240.00 NARRA 0.3 7 LT
1619 + 600.00 MAHOGANY 0.25 14 LT
1619 + 640.00 BANANA 0.2 10 LT
1619 + 680.00 JACKFRUIT 0.2 1 LT
1619 + 940.00 NEEM TREE 0.3 1 LT
1619 + 940.00 STAR APPLE 0.3 1 RT
1620 + 000.00 GEMILINA 0.6 1 RT
1620 + 000.00 NEEM TREE 0.3 1 RT
1620 + 040.00 MAHOGANY 3.5 1 LT
1620 + 040.00 NEEM TREE 0.3 1 RT
1620 + 080.00 JACKFRUIT 0.3 1 LT
1620 + 100.00 MAHOGANY 0.6 1 RT
1620 + 120.00 MAHOGANY 0.6 4 RT
1620 + 120.00 CAMACHILI 0.3 1 LT
1620 + 180.00 NEEM TREE 0.3 1 LT
1620 + 200.00 MANGO 0.3 1 LT
1620 + 220.00 GEMILINA 0.3 1 RT
1620 + 220.00 MAHOGANY 0.6 2 RT
1620 + 240.00 GEMILINA 0.6 1 LT
1620 + 260.00 MANGO 0.4 1 LT
1620 + 300.00 MAHOGANY 0.6 4 LT
1620 + 320.00 MANGO 0.4 1 LT
1620 + 340.00 JACKFRUIT 0.3 1 LT
1620 + 360.00 JACKFRUIT 0.3 2 LT
1620 + 360.00 MAHOGANY 0.5 3 LT
1620 + 340.00 CAMACHILI 0.6 1 RT
1620 + 360.00 MANGO 0.4 1 RT
1620 + 360.00 MAHOGANY 0.3 2 RT
1620 + 380.00 MAHOGANY 0.3 2 LT
1620 + 400.00 SANTOL 0.25 3 LT
1620 + 420.00 SANTOL 0.3 3 LT
1620 + 420.00 TAMARIND 0.4 1 RT
1620 + 420.00 BAGRASS 0.25 3 RT
1620 + 440.00 MAHOGANY 0.4 8 LT
1620 + 440.00 CAMACHILI 0.4 2 LT
1620 + 460.00 KASOY 0.3 1 LT
1620 + 520.00 MAHOGANY 0.4 4 RT
1620 + 520.00 MAHOGANY 0.3 4 LT
1620 + 520.00 MAHOGANY 0.3 4 RT
1620 + 560.00 CAMACHILI 0.5 2 LT
1620 + 560.00 MAHOGANY 0.3 1 LT
1620 + 600.00 MAHOGANY 0.5 1 LT
1620 + 680.00 JACKFRUIT 0.4 1 RT
1620 + 780.00 MAHOGANY 0.5 4 RT
1620 + 820.00 MAHOGANY 0.5 8 RT
1620 + 840.00 GEMILINA 0.4 3 LT
1620 + 900.00 MAHOGANY 0.4 11 RT
1620 + 920.00 MAHOGANY 0.4 2 RT
1621 + 060.00 GEMILINA 0.4 1 LT
1621 + 100.00 JACKFRUIT 0.3 1 LT
1621 + 140.00 GEMILINA 0.4 2 RT
1621 + 180.00 NARRA 0.4 1 LT
1621 + 180.00 BANANA 0.25 6 RT
1621 + 200.00 BANANA 0.25 7 RT
1621 + 240.00 NARRA 0.3 2 RT
1621 + 320.00 BANANA 0.25 6 RT
1621 + 340.00 BANANA 0.25 7 LT
1621 + 360.00 BANANA 0.25 10 RT
1621 + 380.00 NARRA 0.3 1 RT
1621 + 400.00 MAHOGANY 0.3 1 RT
1621 + 420.00 MAHOGANY 0.3 1 RT
1621 + 440.00 MAHOGANY 0.3 1 RT
1621 + 460.00 MAHOGANY 0.3 1 RT
1621 + 500.00 MAHOGANY 0.3 1 RT
1621 + 620.00 NEEM TREE 0.5 1 LT
1621 + 620.00 PALM OIL 0.7 1 LT
1621 + 640.00 MANGO 0.5 1 LT
1621 + 660.00 ACASIA 0.6 1 RT
1621 + 700.00 BANANA 0.25 10 LT
1621 + 720.00 BANANA 0.25 8 LT
1621 + 740.00 NEEM TREE 0.5 1 LT
1621 + 740.00 SANTOL 0.4 1 LT
1621 + 740.00 NEEM TREE 0.5 1 RT
1621 + 760.00 PALM OIL 0.7 1 RT
1621 + 760.00 JACKFRUIT 0.35 1 LT
1621 + 800.00 PALM OIL 0.7 2 RT
1621 + 820.00 TAMARIND 0.6 2 LT
1621 + 820.00 MAHOGANY 0.5 1 LT
1621 + 820.00 GEMILINA 0.4 2 RT
1621 + 820.00 NEEM TREE 0.4 2 RT
1621 + 860.00 JACKFRUIT 0.35 1 LT
1621 + 860.00 GEMILINA 0.5 3 LT
1621 + 860.00 SANTOL 0.4 1 LT
1621 + 880.00 STAR APPLE 0.5 1 RT
1621 + 900.00 MAHOGANY 0.5 2 RT
1621 + 900.00 NEEM TREE 0.4 3 RT
1621 + 900.00 MANGO 0.3 2 LT
1621 + 920.00 GEMILINA 0.45 1 RT
1621 + 920.00 NEEM TREE 0.4 2 RT
1621 + 920.00 MAHOGANY 0.5 3 LT
1621 + 980.00 MAHOGANY 0.4 3 LT
1622 + 000.00 MAHOGANY 1 1 LT
1622 + 000.00 ACASIA 0.6 1 LT
1622 + 020.00 MAHOGANY 0.4 4 RT
1622 + 020.00 GEMILINA 0.5 1 RT
1622 + 080.00 MAHOGANY 0.4 1 LT
1622 + 100.00 MAHOGANY 0.6 2 LT
1622 + 120.00 NARRA 0.4 6 LT
1622 + 140.00 NARRA 0.4 2 RT
1622 + 160.00 GEMILINA 0.6 2 RT
1622 + 180.00 MOLAVE 0.4 2 RT
1622 + 200.00 MAHOGANY 0.5 3 LT
1622 + 200.00 MAHOGANY 0.4 4 RT
1622 + 300.00 NARRA 0.5 3 LT
1622 + 300.00 MAHOGANY 0.3 1 RT
1622 + 340.00 MAHOGANY 0.3 3 RT
1622 + 360.00 MAHOGANY 0.3 3 RT
1622 + 380.00 NARRA 0.5 3 RT
1622 + 400.00 MAHOGANY 0.3 2 RT
1622 + 440.00 NARRA 0.5 1 LT
1622 + 460.00 MAHOGANY 0.3 1 RT
1622 + 480.00 MAHOGANY 0.3 2 RT
1622 + 480.00 NARRA 0.5 4 LT
1622 + 500.00 GEMILINA 0.5 2 RT
1622 + 520.00 MAHOGANY 0.3 1 RT
1622 + 520.00 NARRA 0.4 5 LT
1622 + 540.00 GEMILINA 0.4 5 RT
1622 + 600.00 MAHOGANY 0.4 1 RT
1622 + 680.00 GEMILINA 0.4 2 RT
1622 + 700.00 MAHOGANY 0.3 3 RT
1622 + 900.00 MAHOGANY 0.3 1 RT
1622 + 940.00 IPIL-IPIL 0.9 1 RT
1622 + 960.00 MAHOGANY 0.3 2 RT
1622 + 980.00 NARRA 0.3 1 RT
1623 + 000.00 MAHOGANY 0.4 2 RT
1623 + 080.00 MAHOGANY 0.4 2 RT
1623 + 120.00 DOL-DOL 0.5 2 RT
1623 + 140.00 NEEM TREE 0.4 3 RT
1623 + 160.00 NEEM TREE 0.4 3 RT
1623 + 160.00 GEMILINA 0.6 1 RT
1623 + 220.00 GEMILINA 0.6 2 LT
1623 + 240.00 GEMILINA 0.3 1 LT
1623 + 500.00 BAGRASS 0.5 3 RT
1623 + 540.00 BAGRASS 0.4 1 RT
1623 + 580.00 BAGRASS 0.4 4 RT
1623 + 600.00 BAGRASS 0.5 8 RT
1623 + 620.00 BAGRASS 0.4 5 RT
1623 + 660.00 BAGRASS 0.4 2 RT
TOTAL 359
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY. LOCATION
(mts.)
1619 + 160.00 GEMILINA 0.6 1 RT
1619 + 240.00 NARRA 0.3 7 LT
1619 + 600.00 MAHOGANY 0.25 14 LT
1620 + 000.00 GEMILINA 0.6 1 RT
1620 + 000.00 NEEM TREE 0.3 1 RT
1620 + 040.00 MAHOGANY 3.5 1 LT
1620 + 040.00 NEEM TREE 0.3 1 RT
1620 + 100.00 MAHOGANY 0.6 1 RT
1620 + 120.00 MAHOGANY 0.6 4 RT
1620 + 180.00 NEEM TREE 0.3 1 LT
1620 + 220.00 GEMILINA 0.3 1 RT
1620 + 220.00 MAHOGANY 0.6 2 RT
1620 + 240.00 GEMILINA 0.6 1 LT
1620 + 300.00 MAHOGANY 0.6 4 LT
1620 + 360.00 MAHOGANY 0.5 3 LT
1620 + 360.00 MAHOGANY 0.3 2 RT
1620 + 380.00 MAHOGANY 0.3 2 LT
1620 + 420.00 BAGRASS 0.25 3 RT
1620 + 440.00 MAHOGANY 0.4 8 LT
1620 + 520.00 MAHOGANY 0.4 4 RT
1620 + 520.00 MAHOGANY 0.3 4 LT
1620 + 520.00 MAHOGANY 0.3 4 RT
1620 + 560.00 CAMACHILI 0.5 2 LT
1620 + 560.00 MAHOGANY 0.3 1 LT
1620 + 600.00 MAHOGANY 0.5 1 LT
1620 + 680.00 JACKFRUIT 0.4 1 RT
1620 + 780.00 MAHOGANY 0.5 4 RT
1620 + 820.00 MAHOGANY 0.5 8 RT
1620 + 840.00 GEMILINA 0.4 3 LT
1620 + 900.00 MAHOGANY 0.4 11 RT
1620 + 920.00 MAHOGANY 0.4 2 RT
1621 + 060.00 GEMILINA 0.4 1 LT
1621 + 140.00 GEMILINA 0.4 2 RT
1621 + 180.00 NARRA 0.4 1 LT
1621 + 240.00 NARRA 0.3 2 RT
1621 + 380.00 NARRA 0.3 1 RT
1621 + 400.00 MAHOGANY 0.3 1 RT
1621 + 420.00 MAHOGANY 0.3 1 RT
1621 + 440.00 MAHOGANY 0.3 1 RT
1621 + 460.00 MAHOGANY 0.3 1 RT
1621 + 500.00 MAHOGANY 0.3 1 RT
1621 + 660.00 ACASIA 0.6 1 RT
1621 + 740.00 NEEM TREE 0.5 1 LT
1621 + 740.00 NEEM TREE 0.5 1 RT
1621 + 760.00 PALM OIL 0.7 1 RT
1621 + 800.00 PALM OIL 0.7 2 RT
1621 + 820.00 TAMARIND 0.6 2 LT
1621 + 820.00 MAHOGANY 0.5 1 LT
1621 + 820.00 GEMILINA 0.4 2 RT
1621 + 820.00 NEEM TREE 0.4 2 RT
1621 + 860.00 GEMILINA 0.5 3 LT
1621 + 900.00 MAHOGANY 0.5 2 RT
1621 + 900.00 NEEM TREE 0.4 3 RT
1621 + 920.00 GEMILINA 0.45 1 RT
1621 + 920.00 NEEM TREE 0.4 2 RT
1621 + 920.00 MAHOGANY 0.5 3 LT
1621 + 980.00 MAHOGANY 0.4 3 LT
1622 + 000.00 MAHOGANY 1 1 LT
1622 + 000.00 ACASIA 0.6 1 LT
1622 + 020.00 MAHOGANY 0.4 4 RT
1622 + 020.00 GEMILINA 0.5 1 RT
1622 + 080.00 MAHOGANY 0.4 1 LT
1622 + 100.00 MAHOGANY 0.6 2 LT
1622 + 120.00 NARRA 0.4 6 LT
1622 + 140.00 NARRA 0.4 2 RT
1622 + 160.00 GEMILINA 0.6 2 RT
1622 + 180.00 MOLAVE 0.4 2 RT
1622 + 200.00 MAHOGANY 0.5 3 LT
1622 + 200.00 MAHOGANY 0.4 4 RT
1622 + 300.00 NARRA 0.5 3 LT
1622 + 300.00 MAHOGANY 0.3 1 RT
1622 + 340.00 MAHOGANY 0.3 3 RT
1622 + 360.00 MAHOGANY 0.3 3 RT
1622 + 380.00 NARRA 0.5 3 RT
1622 + 400.00 MAHOGANY 0.3 2 RT
1622 + 440.00 NARRA 0.5 1 LT
1622 + 460.00 MAHOGANY 0.3 1 RT
1622 + 480.00 MAHOGANY 0.3 2 RT
1622 + 480.00 NARRA 0.5 4 LT
1622 + 500.00 GEMILINA 0.5 2 RT
1622 + 520.00 MAHOGANY 0.3 1 RT
1622 + 520.00 NARRA 0.4 5 LT
1622 + 540.00 GEMILINA 0.4 5 RT
1622 + 600.00 MAHOGANY 0.4 1 RT
1622 + 680.00 GEMILINA 0.4 2 RT
1622 + 700.00 MAHOGANY 0.3 3 RT
1622 + 900.00 MAHOGANY 0.3 1 RT
1622 + 960.00 MAHOGANY 0.3 2 RT
1622 + 980.00 NARRA 0.3 1 RT
1623 + 000.00 MAHOGANY 0.4 2 RT
1623 + 080.00 MAHOGANY 0.4 2 RT
1623 + 140.00 NEEM TREE 0.4 3 RT
1623 + 160.00 NEEM TREE 0.4 3 RT
1623 + 160.00 GEMILINA 0.6 1 RT
1623 + 220.00 GEMILINA 0.6 2 LT
1623 + 240.00 GEMILINA 0.3 1 LT
1623 + 500.00 BAGRASS 0.5 3 RT
1623 + 540.00 BAGRASS 0.4 1 RT
1623 + 580.00 BAGRASS 0.4 4 RT
1623 + 600.00 BAGRASS 0.5 8 RT
1623 + 620.00 BAGRASS 0.4 5 RT
1623 + 660.00 BAGRASS 0.4 2 RT
TOTAL 257
ITEM 100(4) - INDIVIDUAL REMOVAL OF TREES
DIAMETER
STATION ITEM QTY.
(meter)
1619 + 160.00 GEMILINA 0.6 1
1619 + 160.00 IPIL-IPIL 0.5 1
1619 + 240.00 NARRA 0.3 7
1619 + 600.00 MAHOGANY 0.25 14
1619 + 640.00 BANANA 0.2 10
1619 + 680.00 JACKFRUIT 0.2 1
1619 + 940.00 NEEM TREE 0.3 1
1619 + 940.00 STAR APPLE 0.3 1
1620 + 000.00 GEMILINA 0.6 1
1620 + 000.00 NEEM TREE 0.3 1
1620 + 040.00 MAHOGANY 3.5 1
1620 + 040.00 NEEM TREE 0.3 1
1620 + 080.00 JACKFRUIT 0.3 1
1620 + 100.00 MAHOGANY 0.6 1
1620 + 120.00 MAHOGANY 0.6 4
1620 + 120.00 CAMACHILI 0.3 1
1620 + 180.00 NEEM TREE 0.3 1
1620 + 200.00 MANGO 0.3 1
1620 + 220.00 GEMILINA 0.3 1
1620 + 220.00 MAHOGANY 0.6 2
1620 + 240.00 GEMILINA 0.6 1
1620 + 260.00 MANGO 0.4 1
1620 + 300.00 MAHOGANY 0.6 4
1620 + 320.00 MANGO 0.4 1
1620 + 340.00 JACKFRUIT 0.3 1
1620 + 360.00 JACKFRUIT 0.3 2
1620 + 360.00 MAHOGANY 0.5 3
1620 + 340.00 CAMACHILI 0.6 1
1620 + 360.00 MANGO 0.4 1
1620 + 360.00 MAHOGANY 0.3 2
1620 + 380.00 MAHOGANY 0.3 2
1620 + 400.00 SANTOL 0.25 3
1620 + 420.00 SANTOL 0.3 3
1620 + 420.00 TAMARIND 0.4 1
1620 + 420.00 BAGRASS 0.25 3
1620 + 440.00 MAHOGANY 0.4 8
1620 + 440.00 CAMACHILI 0.4 2
1620 + 460.00 KASOY 0.3 1
1620 + 520.00 MAHOGANY 0.4 4
1620 + 520.00 MAHOGANY 0.3 4
1620 + 520.00 MAHOGANY 0.3 4
1620 + 560.00 CAMACHILI 0.5 2
1620 + 560.00 MAHOGANY 0.3 1
1620 + 600.00 MAHOGANY 0.5 1
1620 + 680.00 JACKFRUIT 0.4 1
1620 + 780.00 MAHOGANY 0.5 4
1620 + 820.00 MAHOGANY 0.5 8
1620 + 840.00 GEMILINA 0.4 3
1620 + 900.00 MAHOGANY 0.4 11
1620 + 920.00 MAHOGANY 0.4 2
1621 + 060.00 GEMILINA 0.4 1
1621 + 100.00 JACKFRUIT 0.3 1
1621 + 140.00 GEMILINA 0.4 2
1621 + 180.00 NARRA 0.4 1
1621 + 180.00 BANANA 0.25 6
1621 + 200.00 BANANA 0.25 7
1621 + 240.00 NARRA 0.3 2
1621 + 320.00 BANANA 0.25 6
1621 + 340.00 BANANA 0.25 7
1621 + 360.00 BANANA 0.25 10
1621 + 380.00 NARRA 0.3 1
1621 + 400.00 MAHOGANY 0.3 1
1621 + 420.00 MAHOGANY 0.3 1
1621 + 440.00 MAHOGANY 0.3 1
1621 + 460.00 MAHOGANY 0.3 1
1621 + 500.00 MAHOGANY 0.3 1
1621 + 620.00 NEEM TREE 0.5 1
1621 + 620.00 PALM OIL 0.7 1
1621 + 640.00 MANGO 0.5 1
1621 + 660.00 ACASIA 0.6 1
1621 + 700.00 BANANA 0.25 10
1621 + 720.00 BANANA 0.25 8
1621 + 740.00 NEEM TREE 0.5 1
1621 + 740.00 SANTOL 0.4 1
1621 + 740.00 NEEM TREE 0.5 1
1621 + 760.00 PALM OIL 0.7 1
1621 + 760.00 JACKFRUIT 0.35 1
1621 + 800.00 PALM OIL 0.7 2
1621 + 820.00 TAMARIND 0.6 2
1621 + 820.00 MAHOGANY 0.5 1
1621 + 820.00 GEMILINA 0.4 2
1621 + 820.00 NEEM TREE 0.4 2
1621 + 860.00 JACKFRUIT 0.35 1
1621 + 860.00 GEMILINA 0.5 3
1621 + 860.00 SANTOL 0.4 1
1621 + 880.00 STAR APPLE 0.5 1
1621 + 900.00 MAHOGANY 0.5 2
1621 + 900.00 NEEM TREE 0.4 3
1621 + 900.00 MANGO 0.3 2
1621 + 920.00 GEMILINA 0.45 1
1621 + 920.00 NEEM TREE 0.4 2
1621 + 920.00 MAHOGANY 0.5 3
1621 + 980.00 MAHOGANY 0.4 3
1622 + 000.00 MAHOGANY 1 1
1622 + 000.00 ACASIA 0.6 1
1622 + 020.00 MAHOGANY 0.4 4
1622 + 020.00 GEMILINA 0.5 1
1622 + 080.00 MAHOGANY 0.4 1
1622 + 100.00 MAHOGANY 0.6 2
1622 + 120.00 NARRA 0.4 6
1622 + 140.00 NARRA 0.4 2
1622 + 160.00 GEMILINA 0.6 2
1622 + 180.00 MOLAVE 0.4 2
1622 + 200.00 MAHOGANY 0.5 3
1622 + 200.00 MAHOGANY 0.4 4
1622 + 300.00 NARRA 0.5 3
1622 + 300.00 MAHOGANY 0.3 1
1622 + 340.00 MAHOGANY 0.3 3
1622 + 360.00 MAHOGANY 0.3 3
1622 + 380.00 NARRA 0.5 3
1622 + 400.00 MAHOGANY 0.3 2
1622 + 440.00 NARRA 0.5 1
1622 + 460.00 MAHOGANY 0.3 1
1622 + 480.00 MAHOGANY 0.3 2
1622 + 480.00 NARRA 0.5 4
1622 + 500.00 GEMILINA 0.5 2
1622 + 520.00 MAHOGANY 0.3 1
1622 + 520.00 NARRA 0.4 5
1622 + 540.00 GEMILINA 0.4 5
1622 + 600.00 MAHOGANY 0.4 1
1622 + 680.00 GEMILINA 0.4 2
1622 + 700.00 MAHOGANY 0.3 3
1622 + 900.00 MAHOGANY 0.3 1
1622 + 940.00 IPIL-IPIL 0.9 1
1622 + 960.00 MAHOGANY 0.3 2
1622 + 980.00 NARRA 0.3 1
1623 + 000.00 MAHOGANY 0.4 2
1623 + 080.00 MAHOGANY 0.4 2
1623 + 120.00 DOL-DOL 0.5 2
1623 + 140.00 NEEM TREE 0.4 3
1623 + 160.00 NEEM TREE 0.4 3
1623 + 160.00 GEMILINA 0.6 1
1623 + 220.00 GEMILINA 0.6 2
1623 + 240.00 GEMILINA 0.3 1
1623 + 500.00 BAGRASS 0.5 3
1623 + 540.00 BAGRASS 0.4 1
1623 + 580.00 BAGRASS 0.4 4
1623 + 600.00 BAGRASS 0.5 8
1623 + 620.00 BAGRASS 0.4 5
1623 + 660.00 BAGRASS 0.4 2
TOTAL 359
COCONUT
DIAMETER
STATION ITEM QTY.
(meter)
1619 + 200.00 COCONUT 0.3 1
1619 + 400.00 COCONUT 0.3 6
1619 + 660.00 COCONUT 0.3 3
1619 + 680.00 COCONUT 0.3 2
1619 + 000.00 COCONUT 0.3 1
1619 + 220.00 COCONUT 0.3 1
1620 + 280.00 COCONUT 0.3 1
1620 + 480.00 COCONUT 0.3 2
1620 + 500.00 COCONUT 0.3 3
1620 + 520.00 COCONUT 0.3 1
1620 + 540.00 COCONUT 0.3 1
1620 + 560.00 COCONUT 0.3 3
1620 + 600.00 COCONUT 0.3 3
1620 + 660.00 COCONUT 0.5 2
1620 + 780.00 COCONUT 0.4 1
1620 + 800.00 COCONUT 0.3 1
1620 + 800.00 COCONUT 0.4 1
1620 + 820.00 COCONUT 0.4 2
1620 + 880.00 COCONUT 0.4 2
1620 + 880.00 COCONUT 0.4 1
1620 + 940.00 COCONUT 0.4 4
1620 + 940.00 COCONUT 0.4 2
1620 + 960.00 COCONUT 0.4 5
1621 + 020.00 COCONUT 0.4 6
1621 + 100.00 COCONUT 0.4 2
1621 + 100.00 COCONUT 0.4 1
1621 + 140.00 COCONUT 0.4 4
1621 + 140.00 COCONUT 0.4 3
1621 + 160.00 COCONUT 0.4 3
1621 + 180.00 COCONUT 0.4 2
1621 + 200.00 COCONUT 0.4 5
1621 + 200.00 COCONUT 0.4 2
1621 + 220.00 COCONUT 0.4 2
161 + 240.00 COCONUT 0.4 3
1621 + 260.00 COCONUT 0.4 3
1621 + 300.00 COCONUT 0.4 2
1621 + 660.00 COCONUT 0.4 4
1621 + 700.00 COCONUT 0.4 1
1621 + 740.00 COCONUT 0.3 2
1621 + 760.00 COCONUT 0.4 1
1621 + 760.00 COCONUT 0.4 1
1621 + 800.00 COCONUT 0.4 1
1621 + 920.00 COCONUT 0.4 1
1622 + 000.00 COCONUT 0.4 3
1622 + 040.00 COCONUT 0.4 3
1622 + 060.00 COCONUT 0.4 3
1622 + 060.00 COCONUT 0.3 3
1622 + 080.00 COCONUT 0.3 3
1622 + 140.00 COCONUT 0.3 1
1622 + 160.00 COCONUT 0.3 1
1622 + 320.00 COCONUT 0.4 1
1622 + 360.00 COCONUT 0.4 1
1622 + 380.00 COCONUT 0.4 2
1622 + 400.00 COCONUT 0.4 1
1622 + 600.00 COCONUT 0.4 1
1622 + 620.00 COCONUT 0.4 2
1622 + 680.00 COCONUT 0.4 2
1622 + 760.00 COCONUT 0.4 1
1622 + 800.00 COCONUT 0.4 1
TOTAL 127
EES
LOCATION
RT
LT
LT
LT
LT
LT
LT
RT
RT
RT
LT
RT
LT
RT
RT
LT
LT
LT
RT
RT
LT
LT
LT
LT
LT
LT
LT
RT
RT
RT
LT
LT
LT
RT
RT
LT
LT
LT
RT
LT
RT
LT
LT
LT
RT
RT
RT
LT
RT
RT
LT
LT
RT
LT
RT
RT
RT
RT
LT
RT
RT
RT
RT
RT
RT
RT
LT
LT
LT
RT
LT
LT
LT
LT
RT
RT
LT
RT
LT
LT
RT
RT
LT
LT
LT
RT
RT
RT
LT
RT
RT
LT
LT
LT
LT
RT
RT
LT
LT
LT
RT
RT
RT
LT
RT
LT
RT
RT
RT
RT
RT
LT
RT
RT
LT
RT
RT
LT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
LT
LT
RT
RT
RT
RT
RT
RT
LOCATION
LT
LT
LT
LT
RT
LT
LT
RT
RT
RT
RT
RT
RT
RT
LT
RT
LT
RT
RT
LT
RT
LT
LT
RT
RT
LT
LT
LT
LT
LT
LT
RT
LT
LT
LT
LT
LT
RT
LT
RT
RT
RT
LT
RT
RT
RT
LT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
RT
ITEM 506(1) - STONE MASONRY
QUANTITY = 8,145 cu.m
STATION LIMITS LENGTH HEIGHT BASEBOTTOM BASETOP
K1618+980.00 - K1619+000.00 20.00 4.00 2.00 0.60
K1619+046.50 - K1619+067.30 20.80 4.00 2.00 0.60
K1619+155.60 - K1619+210.00 54.40 4.00 2.00 0.60
K1619+294.20 - K1619+348.60 53.10 4.00 2.00 0.60
K1619+384.90 - K1619+453.40 68.50 4.00 2.00 0.60
K1619+934.00 - K1620+000.00 66.00 4.00 2.00 0.60
K1620+040.00 - K1620+065.00 25.00 3.00 2.00 0.60
K1620+448.00 - K1620+548.00 100.00 4.00 2.00 0.60
K1620+981.30 - K1621+068.00 86.70 2.50 2.00 0.60
K1621+126.90 - K1621+177.10 50.20 3.20 2.00 0.60
K1621+305.20 - K1621+335.20 30.00 4.00 2.00 0.60
K1621+376.45 - K1621+632.95 256.50 4.00 2.00 0.60
K1621+606.30 - K1621+666.30 60.00 4.00 2.00 0.60
K1621+657.20 - K1621+721.20 64.00 4.00 2.00 0.60
K1621+772.20 - K1621+814.50 42.30 4.00 2.00 0.60
K1621+863.40 - K1621+963.40 100.00 4.00 2.00 0.60
K1622+023.20 - K1622+083.20 60.00 4.00 2.00 0.60
K1622+214.80 - K1622+278.10 63.30 4.00 2.00 0.60
K1622+293.80 - K1622+374.10 80.30 4.00 2.00 0.60
K1622+403.80 - K1622+523.30 119.50 4.00 2.00 0.60
K1622+547.30 - K1622+597.30 50.00 4.00 2.00 0.60
K1622+603.70 - K1622+733.40 129.70 4.00 2.00 0.60
K1622+741.60 - K1622+776.70 35.10 4.00 2.00 0.60
K1622+848.40 - K1622+958.80 110.40 4.00 2.00 0.60
K1623+270.00 - K1623+300.00 30.00 4.00 2.00 0.60
TOTALVOLUME =
VOLUME LOCATION
104.00 L/S
108.16 L/S
282.88 L/S
276.12 L/S
356.20 L/S
343.20 R/S
390.71 L/S
624.00 R/S
281.78 L/S
208.83 R/S
156.00 R/S
1,333.80 R/S
520.00 L/S
332.80 R/S
219.96 R/S
520.00 L/S
416.00 R/S
329.16 R/S
417.56 R/S
621.40 R/S
260.00 R/S
674.44 R/S
182.52 R/S
574.08 R/S
208.00 L/S
9,741.60
Item No.
ITEM NO.
A.1.1(8)
A.1.1(2)
B.5
B.7
B.8
B.9
100 (4)
101(4)a
101(6)b
101(6)c
101(6)d
101(8)
101(9)
101(10)
102(2)b
103(1)a
103(3)
103(6)a
104(1)a1
105(1)a
200 (1)
300(1)
311(1)a
311(1)a1.1
404(1)a
405(2)a
500(1)b3
506(1)
602(3)c
603(3)a1
603(3)a1.1
603(3)b1
607(3)b
612(1)
612(2)
620 (1)a1.1
622(1)a
622(2)b
622(3)b
Description
DESCRIPTION
ORIGINAL CONTRACT
A.1.1(8)
A.1.1(2)
B.5
B.7
B.8
B.9
100 (4)
101(4)a
101(6)b
101(6)c
101(6)d
101(8)
101(9)
101(10)
102(2)b
103(1)a
103(3)
103(6)a
104(1)a1
105(1)a
200 (1)
300(1)
311(1)a
311(1)e1.1
404(1)a
405(2)a
500(1)b3
506(1)
602(3)c
603(3)a1
603(3)a1.1
603(3)b1
607(3)b
612(1)
612(2)
620 (1)a1.1
622(1)a
622(2)b
622(3)b
SUMMARY OF QUANTITIES
DESCRIPTION
Provision for 4x4 Pick-up Type Service Vehicle for the Engineer (Rental Basis)
0 0 0
0 60 0
0 60 0
0 60 0
0 60 0
0 60 0
0 60 0
0 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
2,440.00 240
COST
1,154,535.61
562,144.00 8.94
429,739.14
2,146,418.74
E SHEET
ITEM 622(2)b
COCOLOG LINES TOTAL
REMARKS
RIGHT LEFT RIGHT
0 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
0 80 0
800.00