Procedure
System for Stop Work Authority Assessments
Revision History
Revision Description of
DATE Initiated By Completed By
No# Changes
1st Oct 2017 Management Integration for ISO Management
01 Representative 14001 and OHSAS Representative
18001 & ISO 31000

Distribution List
Sr. No/
Designation Issue Date Distributed by

Management
01 HSE Manager 1st Oct 2017
Representative
Management
02 Management Representative 1st Oct 2017
Representative
03 Management
CEO 1st Oct 2017
Representative

04 Management
Chairman 1st Oct 2017
Representative

Revision
Document Issue Revision Original Document Document Document
Issue
Number Number Number Issue Date Prepared By Reviewed by Approved By
Date
HSE Manager MR / CEO Chairman

Copyright

This document contains confidential information. It may be copied in full or in parts only by Al-Jaber
International Company and only for the purpose of Al-Jaber International Company related activities.
Disclosure of any information contained within this procedure to any person (s) outside the employee of Al-
Jaber International Company without written permission of the Top Management is strictly prohibited.

This document is the property of Al-Jaber International Company. Any copying and distribution of
this document without the approval of the Management is prohibited. Page 1 of 6
Al-Jaber International Company
System for Stop Work Authority Assessments
Original Issue Date: Revision Issue date:
Doc. No: AJB-SWA-RISK-01 Issue Number: 01 Revision Number: 01
01st January 2017 01st October 2017

STOP WORK AUTHORITY

Contents
PURPOSE ................................................................................................................................. 2
SCOPE ...................................................................................................................................... 2
PROGRAM OVERVIEW ............................................................................................................ 2
ROLES AND RESPONSIBILITIES ..............................................................................................2
INTERVENTION PROTOCOL ....................................................................................................2
TRAINING.................................................................................................................................. 3
FOLLOW-UP ............................................................................................................................. 4
RECOGNITION.......................................................................................................................... 4
ATTACHMENT A - STOP WORK AUTHORITY CARDS (Example) ............................................5

This document is the property of Al-Jaber International Company. Any copying and distribution of
this document without the approval of the Management is prohibited. Page 2 of 6
Al-Jaber International Company
System for Stop Work Authority Assessments
Original Issue Date: Revision Issue date:
Doc. No: AJB-SWA-RISK-01 Issue Number: 01 Revision Number: 01
01st January 2017 01st October 2017

1. PURPOSE

This program provides an outline of site and project Stop Work Authority (SWA) for Al-Jaber
Generation (Generation) employees, contractors, and visitors to foster a culture in which it is
accepted and expected to have a questioning attitude.

2. SCOPE

This program applies to all employee and contractor personnel at Al-Jaber Safety Trilateral
(SST) sites.

3. PROGRAM OVERVIEW

This program formally establishes the SWA of Generation employees and contractors. The
SWA empowers employees and contractors to stop individual tasks or group operations when
the control of health, safety, and environmental (HSE) risk is not clearly established or
understood.
 All employees and contractors have the authority and obligation to stop any task or
operation where concerns or questions regarding the control of HSE risk exist.
 No work will resume until all stop-work issues and concerns have been adequately
addressed. Any form of retribution or intimidation directed at any individual or company
for exercising their authority as outlined in this program will not be tolerated.

4. ROLES AND RESPONSIBILITIES

Persons in the following roles have responsibilities in support of this program:

a) Company employees and contractors are responsible for initiating a Stop


Work intervention when warranted, supporting the intervention of others, and
properly reporting all Stop Work actions.

b) Foremen and supervisors are responsible for creating a culture where SWA is
exercised freely, honoring a Stop Work request, working to resolve issues
before operations resume, recognizing proactive participation, and ensuring all
Stop Work actions are properly reported with required follow-up completed.

This document is the property of Al-Jaber International Company. Any copying and distribution of
this document without the approval of the Management is prohibited. Page 3 of 6
Al-Jaber International Company
System for Stop Work Authority Assessments
Original Issue Date: Revision Issue date:
Doc. No: AJB-SWA-RISK-01 Issue Number: 01 Revision Number: 01
01st January 2017 01st October 2017

c) Site managers are responsible for establishing the clear expectation to exercise
SWA, creating a culture where SWA is exercised freely, resolving SWA conflicts
when they arise, and holding those accountable who choose not to comply with
established SWA policies.

d) Site safety program staff is responsible for monitoring compliance with the
requirements of this program; maintaining associated documents, processes, and
training materials; identifying trends; and sharing lessons learned.

5. INTERVENTION PROTOCOL

An established intervention protocol creates an environment where people know how to act and
respond.
In general, the SWA process takes a stop, notify, correct, and resume approach to resolve a
perceived unsafe work action or condition. These steps should be the framework for all Stop
Work interventions.As we know from experience with behavior-based safety processes, a
workforce that clearly understands how to initiate, receive, and respond to a Stop Work
intervention is more likely to participate.

a) TRAINING
Training for the SWA program shall be conducted as part of all new employee and contractor
site orientation. A review of the SWA shall be included as part of all field location safety
briefings, and in regular safety meetings.
Stop Work Authority cards (see Attachment A) can be obtained by contacting site management.
b) Protocol Instruction - Steps
1. When a person identifies a perceived unsafe condition or act, error, omission, or lack of
understanding that could result in an undesirable event, that person shall immediately
initiate a Stop Work intervention with the person(s) potentially at risk.
2. If the supervisor is readily available and the affected person(s) is not in immediate risk,
coordinate the Stop Work action through the supervisor. If the supervisor is not readily
available or the affected person(s) is in immediate risk, initiate the Stop Work
intervention directly with those at risk.
3. Initiate Stop Work interventions in a positive manner. Briefly introduce yourself and start
the conversation with the phrase, “I am using my Stop Work Authority because….” Using
this phrase will clarify the initiator’s intent and set expectations.
4. Notify all affected personnel and supervision of the stop work issue. If necessary, stop
associated work activities, remove person(s) from the area, stabilize the situation, and
make the area as safe as possible.
5. All involved parties discuss the stop work issue and agree on how to proceed.
This document is the property of Al-Jaber International Company. Any copying and distribution of
this document without the approval of the Management is prohibited. Page 4 of 6
Al-Jaber International Company
System for Stop Work Authority Assessments
Original Issue Date: Revision Issue date:
Doc. No: AJB-SWA-RISK-01 Issue Number: 01 Revision Number: 01
01st January 2017 01st October 2017
6. If it is determined and agreed the task or operation can proceed as-is (for example, the
stop work initiator was unaware of certain facts or procedures), the affected persons
should thank the initiator for their concern and proceed with the work.
7. If it is determined and agreed that the stop work issue is valid, then every attempt should
be made to resolve the issue to the satisfaction of all affected persons before work is
restarted.
8. If the stop work issue cannot be resolved immediately, suspend work until proper
resolution is achieved. When opinions differ as to the validity of the stop work issue or
adequacy of the resolution actions, site management makes the final determination.
9. Positive feedback should be given to all affected employees regarding resolution of the
stop work issue. Under no circumstances should retribution be directed at anyone who
exercises their SWA in good faith.
FOLLOW-UP
The desired outcome of any Stop Work intervention is to address identified concerns to the
satisfaction of all involved persons prior to resuming work. Although most issues can be
adequately resolved in a timely fashion at the job site, additional investigation and corrective
actions may be required occasionally to identify and address root causes.
Stop Work interventions that require additional investigation or follow-up will use existing
protocols and procedures for incident investigation and follow-up.

RECOGNITION
To build and reinforce a culture in which SWA and a questioning attitude are freely exercised
and accepted, line supervisors are encouraged to positively recognize employee and contractor
participation in the program.
At a minimum, each first-line supervisor should informally recognize individuals when they
exercise their authority to stop work or demonstrate constructive participation in a stop-work
intervention. This informal recognition could be the expression of appreciation for a job well
done; an award of an item such as a hat, gloves, or flashlight; or a similar recognition.
Additionally, formal recognition of selected examples of Stop Work interventions and those
responsible should be made during regularly scheduled safety meetings.

This document is the property of Al-Jaber International Company. Any copying and distribution of
this document without the approval of the Management is prohibited. Page 5 of 6
Al-Jaber International Company
System for Stop Work Authority Assessments
Original Issue Date: Revision Issue date:
Doc. No: AJB-SWA-RISK-01 Issue Number: 01 Revision Number: 01
01st January 2017 01st October 2017

ATTACHMENT A - STOP WORK AUTHORITY CARDS (Example)

Front of card

Back of card

This document is the property of Al-Jaber International Company. Any copying and distribution of
this document without the approval of the Management is prohibited. Page 6 of 6

Вам также может понравиться