Вы находитесь на странице: 1из 3

SAPURA FABRICATION SDN. BHD.

(83307-K)
(Formerly known as SapuraKencana HL Sdn. Bhd.)

Plot D1, Lumut Port Inductrial Park, Kampung Acheh, Mukim of Lumut,
Daerah Manjung, 32000 Sitiawan, Perak Darul Ridzuan, Malaysia
Tel : +605690 8777 Fax : +6056922609 www.sapuraenergy.com

LIFTING / SHIFTING OPERATION RELEASE NOTE

Job No :
Date :
Project : PEGAGA DEVELOPMENT PROJECT
PTW No:
Description : LIFTING & SHIFTING PEGAGA
K-PANELS PORTION C & D

Date of Operati :

CHECKED BY
RESPONSIBLE (SKHL AGREED BY
ITEM DESCRIPTION REMARK
DEPARTMENT RESPONSIBLE (CLIENT)
DEPARTMENT)

1.0 PROCEDURE
Submitted and approved by Client. ENGINEERING

2.0 SITE PREPARATION/ READINESS


No obstruction to crane / boogie path RIGG.SUPV.

Crane / boogie path identified or marke RIGG.SUPV.

Barricade the area RIGG.SUPV.

No unauthorized person along crane /


boogie path RIGG.SUPV.

Necessary scaffolding erected PRODUCTION

Temporary attachment to panel remov RIGG.SUPV.


before lifting.

3.0 JOB HAZARDS ANALYSIS


Submitted and approved RIGGING DEPARTMENT

Briefing to all parties RIGGING DEPARTMENT

4.0 WELDING
Completion of welding PRODUCTION / QMD

Visual acceptance PRODUCTION / QMD

NDT acceptance PRODUCTION / QMD

5.0 LIFTING PADEYES


Completion of welding PRODUCTION / QMD

Visual acceptance PRODUCTION / QMD

NDT acceptance QMD

6.0 CRANE / BOOGIE AND LIFTING GEAR

Crane / Boogie certification - DOSH


and Third Party RIGGING DEPARTMENT

Crane / Boogie and Lifting Gears


Inspection Checklist completed RIGGING DEPARTMENT

Crane / Boogie operator - licence and


fitness RIGGING DEPARTMENT

Certificate of lifting gears RIGGING DEPARTMENT

Lifting gear arrangement as per proced RIGGING DEPARTMENT

HSE-CL-028 Rev 6 (April 2017)


CHECKED BY
RESPONSIBLE (SKHL AGREED BY
ITEM DESCRIPTION REMARK
DEPARTMENT RESPONSIBLE (CLIENT)
DEPARTMENT)
Shackle fit to padeyes RIGGING DEPARTMENT

HSE-CL-028 Rev 6 (April 2017)


CHECKED BY
RESPONSIBLE (SKHL AGREED BY
ITEM DESCRIPTION REMARK
DEPARTMENT RESPONSIBLE (CLIENT)
DEPARTMENT)

7.0 LIFTING / SHIFTING OPERATION


Lifting / Shifting Coordinator identified RIGGING DEPARTMENT

Key Personnel identified RIGGING DEPARTMENT

8.0 WEATHER
Weather condition RIGGING DEPARTMENT

9.0 OTHER (if any)


Contingency & rescue plan RIGGING DEPARTMENT

We hereby confirmed that all requirements have been satisfactorily complied to proceed the above operation.

We hereby request for issuance of Release Note.

1) Reviewed and agreed by: Name : ____________________________


ENGINEERING DEPARTMENT Date : ____________________________

2) Reviewed and agreed by: Name : ____________________________


QM DEPARTMENT Date : ____________________________

3) Reviewed and agreed by: Name : ____________________________


PRODUCTION DEPARTMENT Date : ____________________________
(Rigging Section)

4) Verified by: Name : ____________________________


HSE DEPARTMENT Date : ____________________________

5) Reviewed and agreed by: Name : ____________________________


PROJECT MANAGER Date : ____________________________

6) Reviewed and agreed by (if required): Name : ____________________________


CLIENT Date : ____________________________

HSE-CL-028 Rev 6 (April 2017)