Four laning of Trichiraopalli (Km. 0.000) to Kallagam (Km. 38.

700) Section of
NH-227 on Hybrid Annuity Mode in the State of Tamil Nadu under NHDP Phase-IV.

Bill No. 10: TOLL PLAZA


QUANTITY CALCULATION FOR TOLL PLAZA 1

Clearing Grubbing Quantities Total Rate (Rs) Amount (Rs)

At entrance het 1 7489 0.75

At toll het 1 2178 0.22

At exit het 1 7489 0.75

Sub total 1.72 1.72 37455.00 64258

Embankment

At entrance Cum 1 7489 1 0.6 4493.40

At toll Cum 1 2178 1 0.6 1306.80

At exit Cum 1 7489 1 0.6 4493.40

Sub total 10293.60 10293.60 368.00 3788045

Foot Path on outer LHS

Excavation Cum 1 567.00 0.2025 114.82 114.82 43.00 4937

GSB Cum 1 567 0.135 76.55 76.55 1343.00 102800

Sand Cum 1 567 0.0225 12.76 12.76 1800.13 22965

Tiles Sqm 1 567 0.9 510.30 510.30 1150.00 586845

Longitudinal Drain

Excavation Cum 1 567.00 0.525 297.68 297.68 43.00 12800

RCC (M20) Cum 1 567 0.24 136.08 136.08 4814.00 655089

PCC M15 of 75mm thick Cum 1 567 0.0675 38.27 38.27 3939.00 150755

Steel MT 1 8.16 8.16 8.16 52805.00 431142

Kerb Painting Sqm 1 230.57 230.57 230.57 46.00 10606

Foot Path - Outer RHS

Excavation Cum 1 567.00 0.2025 114.82 114.82 43.00 4937

GSB Cum 1 567 0.135 76.55 76.55 1343.00 102800

Sand Cum 1 567 0.0225 12.76 12.76 1800.13 22965

Tiles Sqm 1 567 0.9 510.30 510.30 1150.00 586845

Longitudinal Drain

Excavation Cum 1 567.00 0.525 297.68 297.68 43.00 12800

RCC (M20) Cum 1 567 0.24 136.08 136.08 4814.00 655089

PCC M15 of 75mm thick Cum 1 567 0.0675 38.27 38.27 3939.00 150755

Steel MT 1 8.16 8.16 8.16 52805.00 431142

Kerb Painting Sqm 1 235.31 235.31 235.31 46.00 10824

Foot path At toll

Tile Sqm 8 35.0 1.4 392.00 392.00 1150.00 450800

Kerb m 8 74.0 592.00 592.00 399.60 236563

Transverse Coverd drain 100 mm thick PCC (M20) Cum 2 168.8 0.18 60.77 60.77 4525.00 274975

Kerb Painting Sqm 8 74.0 0.415 245.68 245.68 46.00 11301

Chambers (M20) Cum 8 0.3 0.36 0.86 0.86 4814.00 4159

Electrical Cable Chambers (M20) Cum 12 1.5 0.38 6.84 6.84 4814.00 32928

300dia Rain water RCC Hume Pipe m 2 84.4 168.80 168.80 2000.00 337600

Pavement

Area 17156

PQC Cum 1 17156 0.300 5146.80 5146.80 4903.00 25234760

DLC Cum 1 17156 0.150 2573.40 2573.40 3297.00 8484500

GSB II Cum 1 17156 0.000 0.00 0.00 0

GSB I Cum 1 17156 0.150 2573.40 2573.40 1343.00 3456076

Subgrade Cum 1 17156 0.500 8578.00 8578.00 403.00 3456934

Providing Toll Plaza building including arrangement of electricity supply

Administrative Block Change room and Pantry Sqm 135 135.00 135.00 15000.00 2025000

Bill of Quantities 1 CTL GSPL


Four laning of Trichiraopalli (Km. 0.000) to Kallagam (Km. 38.700) Section of
NH-227 on Hybrid Annuity Mode in the State of Tamil Nadu under NHDP Phase-IV.

Control Bulding Sqm 371.964 371.96 371.96 15000.00 5579459

Maintenance camp Sqm 205.183 205.18 205.18 8500.00 1744055

Fuel station Sqm 56.2929 56.29 56.29 8500.00 478490

Generator Room Sqm 76 76.19 76.19 5000.00 380965

Toll both

Sigle No.'s 6 6.00 6.00 125000.00 750000

Double No.'s 1 1.00 1.00 150000.00 150000

Providing ,installation and commissioning electricity operated barriers gates


For 3.2m wide Toll lane No.'s 6 6.00 6.00 110000.00 660000

For 4.5m wide Non Tollable lane No.'s 2 2.00 2.00 110000.00 220000

Providing and installing canopy for toll plaza Sqm 1 48.600 17.5 850.50 850.50 4500.00 3827250

Providing and fixing barded wire fencing

Through out Rnm 2 1000 2000.00 2000.00 350.00 700000

Providing and laying 150mm dia PVC pipes in toll booth island Rnm 153 153.00 153.00 300.00 45900

Providing and fixing Hazard marker No.'s 6 6.00 6.00 564.00 3384

Lane Marking Sqm 763 763.00 763.00 518.00 395234

Providing and erecting street light

Double arm type of fixing in median No.'s 35 36.00 36.00 40000.00 1440000

High mast lighting No.'s 2 2.00 2.00 500000.00 1000000

Generator No.'s 1 1.00 1.00 500000.00 500000

Chevron Marking Sqm 8 7.793 8.00 62.34 518.00 32294

Protection Posts (200 dia) No.'s 8 8.00 8.00 5000.00 40000

Land scape Sqm 2 43.60 50 4360.00 4360.00 150.00 654000

Toilet Block(one on each side) Sqm 2 10.00 4 80.00 80.00 15000.00 1200000

Construction of New jersy type barrier


At toll median Rnm 4 8 32.00 32.00 8474.01 271168

Consruction of Tunnel Rnm 1 43.60 43.60 43.60 35000.00 1526000

Weighing Station (Weigh in Motion) No.'s 8 8.00 600000.00 4800000

Static Weigh Bridge No.'s 2 2.00 2250000.00 4500000

Solar Pannels Sqm 1 48.600 17.5 850.50 850.50 5000.00 4252500

Bar code Marking Sqm 1 171.12 171.12 171.12 518.00 88640

Toll Management System No.'s 8 8.00 1600000.00 12800000

Quantities for 1 Toll Plazas 99853336