• A to F Blast Fce, G Blast Fce, Coke Plant, LD#1, part load of 500 TPD, Power Houses
aux, Blower Houses, Pump House#2, West Plant area part load, Centac Compressor,
SP#2 part
• To ensure continuous supply when above situation would arise, generation in in-
house Power Houses is to be maintained at least to Base Load level at all time to
prevent capital damage in case situation arises.
A typical process flow of Base load management
Incidence
In house To manage base
Occurred(Inhouse High in house
generation goes load Start DG / fire High works power
TG/Boiler tripping power cost to
below base load LDO in in house cost
or BFG/CO gas manage base load
80MW Boiler
shortage)
Business case: The Base Load is the minimum generation that needs to be
maintained in PH#3 + PH#4 + PH#5 at any time. Present value is 80 MW. If
generation in the three power house is lower than 80 MW during gas shortage, 80
MW is maintained by either coal firing at PH#4 or by running DG. This inccurs cost
which is essential to ensure power supply to avoid capital damage
Load reduction
in LD#1: 6MW
MW
6 MW in FY'17 H1 24000
LDO saving
Base Load reduction 0.69 PH3/4- 36
KL,DG-90 KL
3 MW in FY'17 H2 12000