GLOBE LTE – FDD SPARROW PROJECT

GOAF
4G ACCEPTANCE REPORT

Single Site Verification

SITE NAME GOAF

ENODEB ID 338434

AREA SLZ

CITY / PROVINCE CAMARINES SUR

MME TURISMO POOL 1

DT PERFORMED BY Jhoemary Guevarra

DATE DT PERFORMED May 31, 2019

APPROVED BY:

HUAWEI RF MANAGER GLOBE TELECOM RPI


[DATE] [DATE]

Allan Geronimo Erwin Roque

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 1 of 37 Version: 1.0
DOCUMENT HISTORY

REVISION DATE DESCRIPTION APPROVED CHECKED


Revision 1 May 21, 2019 First Report Submission Macky Johnie Samonte Kenneth Isaac Namit

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 2 of 37 Version: 1.0
4G SSV ACCEPTANCE CERTIFICATE

SITE GOAF

Site Configuration:
MME Name: TURISMO POOL 1 Site Name: GOAF
Site Type : Outdoor Macro Site ID : 338434

Huawei Technologies hereby certifies that the relevant parts of the Works referred to in this Conditional Acceptance Certificate
complies with the Network Rollout Procurement Agreement, in particular the Specifications and this has successfully passed the
SSV Acceptance Tests on the particular new site Basis.

The required Documentation is attached with this certificate.

Counter Signatures:

Huawei Technologies Representative Globe Telecom RF Representative

Name: Allan Geronimo Yin Xing Name: Macky Johnie Samonte Erwin Roque

Position: RF Manager RF Director Position: SLZ RgPM Engineer Luzon RgPM Head

Date: Date:

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 3 of 37 Version: 1.0
EXECUTIVE SUMMARY

This document records the performance test result of new site GOAF of the Globe LTE FDD network to verify if the newly build
site performance achieves the performance requirements. All KPIs are divided into several parts, including RRC Connection Suc-
cess Rate, ERAB Setup Success Rate, PS Call Drop Rate, Intra-Frequency Handover Success Rate, User DL/UL Peak Throughput,
Average DL/UL Throughput that are pre-defined in the LTE KPI Proposal for SSV acceptance.

The document is highly confidential and is strictly to be used only by Globe and Huawei. This SSV Acceptance Report is made
according to the agreement document describing the area and the applicable design rules and values. This document will be
submitted in Hardcopy and Softcopy included supporting data. Information contained in this document shall not be disclosed to
any other party unless it is expressly authorized by Globe and Huawei.

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 4 of 37 Version: 1.0
Remark:
- This page is left blank intentionally

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 5 of 37 Version: 1.0
TABLE OF CONTENTS
1 INTRODUCTION ........................................................................................................................................................ 8
2 TOOLS USED ............................................................................................................................................................ 9
3 DRIVE TEST METHODOLOGY ................................................................................................................................. 10
4 CELL INFORMATION and CROSS SECTOR VERIFICATION ....................................................................................... 11
5 DRIVE TEST PLOTS ................................................................................................................................................. 12
5.1 Drive Test Pre-Define Route .................................................................................................................................. 12
5.2 Drive Test Plots and Graphs .................................................................................................................................. 13
6 STATIONARY TEST SCREENSHOTS ......................................................................................................................... 20
6.1 Stationary Test Locations ...................................................................................................................................... 20
6.2 SpeedTest Screenshot Results .............................................................................................................................. 21
7 OSS REPORT ........................................................................................................................................................... 27
7.1 NMS / OSS KPI Summary ....................................................................................................................................... 27
8 DRIVE TEST STATISTIC............................................................................................................................................ 27
8.1 Drive Test Measurements ..................................................................................................................................... 27
8.2 Mobility Handover Test ......................................................................................................................................... 27
8.3 Stationary Test Measurements ............................................................................................................................. 28
Table 8-C: Stationary Test KPI Result ............................................................................................................................ 28
9 DRIVE TEST LOG FILES............................................................................................................................................ 28
9.1 Drive Test Log Files Round 1 Laptop 1 .................................................................................................................. 28
10 KPI OPTIMIZATION ACTIVITIES .............................................................................................................................. 29
11 CONCLUSION and SUMMARY................................................................................................................................ 29
12 ABBREVIATION ...................................................................................................................................................... 30
13 APPENDIX .............................................................................................................................................................. 31
13.1 As-built Antenna Photo ......................................................................................................................................... 31
13.2 Modulation Scheme ................................................................................................. Error! Bookmark not defined.
13.3 OSS KPI Graph........................................................................................................................................................ 34

LIST OF TABLE
Table 1-A: Site Details ..................................................................................................................................................... 8
Table 2-A: List of Tools .................................................................................................................................................... 9
Table 3-A: Mobility Test 1 Set-up Laptop 1................................................................................................................... 10
Table 3-B: Mobility Test 2 Set-up Laptop 1 ................................................................................................................... 10
Table 3-C: Stationary Test Set-up Laptop 1................................................................................................................... 10
Table 4-A: Parameters and Cross Sector Checking ...........................................................Error! Bookmark not defined.
Table 4-B: Antenna Details................................................................................................Error! Bookmark not defined.
Table 7-A: OSS KPI Result .............................................................................................................................................. 27
Table 8-A: Mobile Drive Test KPI Result ........................................................................................................................ 27
Table 8-B: Mobile Drive Test Handover Result ............................................................................................................. 27
Table 8-C: Stationary Test KPI Result ............................................................................................................................ 28
Table 9-A: Drive Test Log Files Round 1 Laptop 1 ......................................................................................................... 28
Table 10-A: Physical Changes Summary ....................................................................................................................... 29
Table 10-B: Parameter Changes Summary ................................................................................................................... 29

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 6 of 37 Version: 1.0
LIST OF FIGURE
Figure 1-A: Site Map........................................................................................................................................................ 8
Figure 5-A: Drive Test Predefined Route ...................................................................................................................... 12
Figure 5-B: MS1 Serving PCI ..............................................................................................Error! Bookmark not defined.
Figure 5-C: MS1 RSRP (dBm) .............................................................................................Error! Bookmark not defined.
Figure 5-D: RSRP Graph .....................................................................................................Error! Bookmark not defined.
Figure 5-E: MS1 SINR (dB) .................................................................................................Error! Bookmark not defined.
Figure 5-F: SINR Graph ......................................................................................................Error! Bookmark not defined.
Figure 5-G: MS1 Download Throughput (kbps) ................................................................Error! Bookmark not defined.
Figure 5-H: Download Throughput Graph ........................................................................Error! Bookmark not defined.
Figure 5-I: Event Failures – Handover Success ..................................................................Error! Bookmark not defined.
Figure 5-J: Event Failures – CSFB Service Success .............................................................Error! Bookmark not defined.
Figure 6-A: Stationary Test Points ................................................................................................................................. 20
Figure 6-B: Test Loc1 of GOAF-1 SpeedTest Screenshot............................................................................................... 21
Figure 6-C: Test Loc1 of GOAF-2 SpeedTest Screenshot ............................................................................................... 23
Figure 6-D: Test Loc3 of GOAF-3 SpeedTest Screenshot .............................................................................................. 25
Figure 13-A: As-Built Antenna Photo Sector 1 .............................................................................................................. 31
Figure 13-B: Antenna Mechanical Tilt Photo Sector 1 .................................................................................................. 31
Figure 13-C: Antenna Electrical Tilt Photo Sector 1 ...................................................................................................... 31
Figure 13-D: As-built Antenna Photo Sector 2 .............................................................................................................. 32
Figure 13-E: Antenna Mechanical Tilt Photo Sector 2 .................................................................................................. 32
Figure 13-F: Antenna Electrical Tilt Photo Sector 2 ...................................................................................................... 32
Figure 13-G: As-built Antenna Photo Sector 3 .............................................................................................................. 33
Figure 13-H: Antenna Mechanical Tilt Photo Sector 3 .................................................................................................. 33
Figure 13-I: Antenna Electrical Tilt Photo Sector 3 ....................................................................................................... 33
Figure 13-J: DL Modulation Scheme .................................................................................Error! Bookmark not defined.
Figure 13-K: Site Availability Rate Graph ...................................................................................................................... 34
Figure 13-L: RRC Connection Success Rate (Service) (BH) Graph ................................................................................. 34
Figure 13-M: E-RAB Setup Success Rate (BH) Graph .................................................................................................... 35
Figure 13-N: PS Call Drop Rate (BH) Graph ................................................................................................................... 35
Figure 13-O: Intra-frequency HO Success Rate (BH) Graph .......................................................................................... 36
Figure 13-P: Total Traffic Volume (BH) Graph............................................................................................................... 36
Figure 13-Q: Average Throughput (BH) Graph ............................................................................................................. 37

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 7 of 37 Version: 1.0
1 INTRODUCTION
Site MERCDS has finished integration on February 23, 2019. BFT test is conducted on February 23, 2019. Site MERCDS integra-
tion date is officially broadcast on February 23, 2019. While SSV drive testing is conducted on May 31, 2019.

ITEMS Site Information


Site Name GOAF
eNodeB ID 338434
Area SLZ
City / Province CAMARINES SUR
MME TURISMO POOL 1
Frequency Band 3
Site Configuration 2+2+2
Longitude 123.478938
Latitude 13.698186
Date SSV DT Performed May 31, 2019
Table 1-A: Site Details

Figure 1-A: Site Map

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 8 of 37 Version: 1.0
2 TOOLS USED

ITEMS Hardware/Software Version of Test Equipment


Dell Inspiron Intel® Core™ i3-2411M CPU @2.20
Laptop Computer GHz 2.20 GHz RAM 4GB (3.16 usable)
32-bit Operating System (Windows XP/Windows 7)
GPS Receiver G-STAR4 BU-353
GENEX Probe (V300R006)
Drive Test Tool Software
Speed Test
Huawei E5375
GENEX Software Dongle
Huawei P1 Mobile Phone
GENEX Assistant (V300R006)
Data Post Processing Tool
MapInfo 10.0
AC/DC Power Equipment DC-AC Power Inverter 500W
Table 2-A: List of Tools

Tools used to generate this report are:

 GENEX PROBE and Assistant (V300R006) or above


 Microsoft Office (Excel, Access, Word)
 Mapinfo 9.0 and above

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 9 of 37 Version: 1.0
3 DRIVE TEST METHODOLOGY

MOBILITY TEST 1 – LAPTOP 1


* In Mobility Test 1, 1 set of testing equipment will be used for data collection.
MS Equipment Test Type Duration KPI Measured Remarks
RSRP, SINR, Aver- From FTP
2GB download, 10s
MS1 Data Card FTP Download age DL Through- server
idle
put 10.188.173.138
30s call, wait until
Call Setup
MS2 P1 CSFB UE reselect back to To UMTS
Fallback (MO)
LTE
Table 3-A: Mobility Test 1 Set-up Laptop 1

MOBILITY TEST 2 – LAPTOP 1


* In Mobility Test 2, 1 set of testing equipment will be used for data collection. Scanner will serve as an optional testing equip-
ment setup.
MS Equipment Test Type Duration KPI Measured Remarks
RSRP, SINR, Aver-
2GB upload, 10s To FTP server
MS3 Data Card FTP Upload age UL Through-
idle 10.188.173.138
put
MS4 Scanner Idle Idle all the time RSRP, SINR **Optional
Table 3-B: Mobility Test 2 Set-up Laptop 1

STATIONARY TEST – LAPTOP 1


* In Stationary Test, 1 set of testing equipment will be used for data collection.
MS Equipment Test Type Duration KPI Measured Remarks
To Antipolo
Globe
SpeedTest
5 times SpeedTest at
Server (in case
each test location. Re- Average Ping
Average Ping
peat the test at 3 dif- RTT, User Peak
RTT in
MS5 Data Card SpeedTest ferent test locations DL Throughput,
SpeedTest fail,
evenly distributed in User Peak UL
will verify the
each sector; 1 test lo- Throughput
Average Ping
cation per sector.
RTT by perform-
ing Ping Test to
FTP Server)
Table 3-C: Stationary Test Set-up Laptop 1

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 10 of 37 Version: 1.0
4 CELL INFORMATION and CROSS SECTOR VERIFICATION
SECTOR 1 SECTOR 2 SECTOR 3
ITEM
GOAF-1/11 GOAF-101/111 GOAF-2/12 GOAF-102/112 GOAF-3/13 GOAF-103/113

eNodeB ID 338434 338434 338434 338434 338434 338434


Cell ID 1/11 101/111 2/12 102/112 3/13 103/113
TAC 3018 3018 3018 3018 3018 3018
Physical Cell ID 315 269 316 267 317 268
DL EARFCN 1650/1525 1650/1525 1650/1525 1650/1525 1650/1525 1650/1525
UL EARFCN 19650/19525 19650/19525 19650/19525 19650/19525 19650/19525 19650/19525

Bandwidth 10MHz/5MHz 10 MHz / 5MHz 10MHz/5MHz 10 MHz / 5MHz 10MHz/5MHz 10 MHz / 5MHz

Root Sequence Index 740 176 336 144 368 708

CROSS SECTOR OK OK OK
Table 4-A: Parameters and Cross Sector Checking

SECTOR 1 SECTOR 2 SECTOR 3


ITEM
GOAF-1/11 GOAF-101/111 GOAF-2/12 GOAF-102/112 GOAF-3/13 GOAF-103/113
PHYSICAL AZIMUTH 60 120 260
LOGICAL AZIMUTH 35 85 95 145 235 285
M-TILT 2 2 2
E-TILT (RET) 10 6 4 6 5 6
ANTENNA HEIGHT 48 m 48 m 48 m
ANTENNA TYPE 4 ports 4 ports 4 ports
Table 4-B: Antenna Details

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 11 of 37 Version: 1.0
4.1 DRIVE TEST PLOTS

4.2 Drive Test Pre-Define Route

Figure 4-A: Drive Test Predefined Route

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 12 of 37 Version: 1.0
4.3 Drive Test Plots and Graphs
* Based on the Best Serving Cell PCI plot, there is no swapped sector on site GOAF.

Figure 4-B: L1800 Serving PCI PRE DT

R2

R3

R3 R1
L1 R1
L1

L2

L3
L3

R2 L2

Figure 4-C: L1800 Serving PCI POST DT

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 13 of 37 Version: 1.0
*Pre and Post sample percentage of the serving cells for L18 DB.

Sector SC Color SC Pre-DT Sample Percentage Post Sample Percentage


L1 315 45.05 29.65
L2 316 - 22.88
L3 317 39.92 11.82
R1 269 - 25.26
R2 267 12.04 5.51
R3 268 - 4.03

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 14 of 37 Version: 1.0
Figure 4-D: L1800 RSRP (dBm) PRE DT

Figure 4-E: L1800 RSRP (dBm) POST DT

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 15 of 37 Version: 1.0
Figure 4-E: L1800 SINR (dB) PRE DT

Figure 4-F: L1800 SINR (dB) POST DT


Note: Please see RSRP Plot for Justification.

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 16 of 37 Version: 1.0
Figure 4-G: L1800 Download Throughput (kbps) PRE DT

Figure 4-H: L1800 Download Throughput (kbps) POST DT


Note: Please see RSRP Plot for Justification.

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 17 of 37 Version: 1.0
Figure 4-I: L1800 Event Failures –Handover PRE DT

Figure 4-J: L1800 Event Failures –Handover POST DT

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 18 of 37 Version: 1.0
Figure 4-K: Event Failures – CSFB Service Success POST DT

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 19 of 37 Version: 1.0
5 STATIONARY TEST SCREENSHOTS

5.1 Stationary Test Locations

Test Loc Sec 103/113


Test Loc Sec 1/11

Test Loc Sec 101/111


Test Loc Sec 3/13

Test Loc Sec 2/12

Test Loc Sec 102/112

Figure 5-A: Stationary Test Points

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 20 of 37 Version: 1.0
5.2 SpeedTest Screenshot Results

Figure 5-B: Test Loc1 of GOAF-1/11 SpeedTest Screenshot

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 21 of 37 Version: 1.0
Figure 5-C: Test Loc2 of GOAF-2/12 SpeedTest Screenshot

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 22 of 37 Version: 1.0
Figure 5-D: Test Loc3 of GOAF-3/13 SpeedTest Screenshot

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 23 of 37 Version: 1.0
Figure 5-E: Test Loc4 of GOAF-101/111 SpeedTest Screenshot

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 24 of 37 Version: 1.0
Figure 5-F: Test Loc5 of GOAF-102/112 SpeedTest Screenshot

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 25 of 37 Version: 1.0
Figure 5-G: Test Loc6 of GOAF-103/113 SpeedTest Screenshot

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 26 of 37 Version: 1.0
6 OSS REPORT

6.1 NMS / OSS KPI Summary


7 Days Monitoring
LTE OSS KPI Target KPI Unit Comment
February 19-25, 2018

Site Availability Rate Reference 100.00% %


DL Traffic Volume (BH)
Reference 68833.20168 Mbyte
(2000~2100)
UL Traffic Volume (BH)
Reference 8627.433632 Mbyte
(2000~2100)
RRC Connection Success Rate (Service) (BH)
98.50% 99.71% % PASSED
(2000~2100)
E-RAB Setup Success Rate (BH)
98.80% 99.84% % PASSED
(2000~2100)
PS Call Drop Rate (BH)
1.50% 0.47% % PASSED
(2000~2100)
Intra-frequency HO Success Rate (BH)
Reference 98.77% %
(2000~2100)
Service DL Average Throughput (BH)
Reference 12.62024591 Mbps
(2000~2100)
Service UL Average Throughput (BH)
Reference 1.177423816 Mbps
(2000~2100)
Table 6-A: OSS KPI Result

7 DRIVE TEST STATISTIC

7.1 Drive Test Measurements


Mobile Test
Target KPI DT Result Unit Comment
Key Performance Indicator
Call Setup Fallback (MO) Reference 100.00% %
Average DL Throughput 7.5Mbps 15.786 Mbps Passed
SINR >= -3dB Reference 99.07% %
RSRP > -115dBm Reference 94.31% %
Table 7-A: Mobile Drive Test KPI Result

7.2 Mobility Handover Test

Handover Testing Test Result Comment

Sector1 => Sector2 OK PASSED


Sector1 => Sector3 OK PASSED
Sector2 => Sector3 OK PASSED
Sector2 => Sector1 OK PASSED
Sector3 => Sector1 OK PASSED
Sector3 => Sector2 OK PASSED
Table 7-B: Mobile Drive Test Handover Result

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 27 of 37 Version: 1.0
7.3 Stationary Test Measurements
User User
PING Target
Target Peak DL Target Peak UL
Sam RSRP SINR 32by KPI
Cell Name KPI Result Through KPI Result Through Result
ple (dBm) (dB) tes (Mbps
(ms) put (Mbps) put
(ms) )
(Mbps) (Mbps)
Test
GOAF-1/11 2 -75.5 27 26 40 PASSED 61.81 40 PASSED 19.71 15 PASSED
Loc1
Test
GOAF-2/12 2 -84.38 27 27 40 PASSED 52.53 40 PASSED 19.71 15 PASSED
Loc2
Test
GOAF-3/13 1 -81.75 29 23 40 PASSED 58.12 40 PASSED 19.70 15 PASSED
Loc3
Test
GOAF-101/111 4 -79.13 25 31 40 PASSED 31.21 40 FAILED 8.12 15 FAILED
Loc4
Test
GOAF-102/112 3 -84.38 28 27 40 PASSED 68.32 40 PASSED 21.07 15 PASSED
Loc5
Test
GOAF-103/113 2 -70.75 27 24 40 PASSED 69.1 40 PASSED 22.05 15 PASSED
Loc6

Table 7-C: Stationary Test KPI Result

8 DRIVE TEST LOG FILES

8.1 Drive Test Log Files Round 1 Laptop 1

#[Index] Log Files MS1 GPS


1 FDD_SSV_SLZ_GOAF_RD1L1_DL_01.gen P8 G-STAR4 BU-353
2 FDD_SSV_SLZ_GOAF_RD1L1_DL_02. Gen P8 G-STAR4 BU-353
3 FDD_SSV_SLZ_GOAF_RD1L1_DL_03. Gen P8 G-STAR4 BU-353
4 FDD_SSV_SLZ_GOAF_RD1L1_DL_04. Gen P8 G-STAR4 BU-353
5 FDD_SSV_SLZ_GOAF_RD1L1_DL_05. Gen P8 G-STAR4 BU-353
6 FDD_SSV_SLZ_GOAF_RD1L1_DL_06. Gen P8 G-STAR4 BU-353
7 FDD_SSV_SLZ_GOAF_RD1L1_DL_07. Gen P8 G-STAR4 BU-353
8~15 FDD_SSV_SLZ_GOAF_RD1L1_DL_08~175 Gen P8 G-STAR4 BU-353
Table 8-A: Drive Test Log Files Round 1 Laptop 1

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 28 of 37 Version: 1.0
9 KPI OPTIMIZATION ACTIVITIES
Change Before After
No Improvement Area Cell Name Site Name Solution Remarks
Required Setting Setting
1 Coverage Area GOAF-1 GOAFL Azimuth Repan 295 305 Improved
2 Coverage Area GOAF-2 GOAFL Azimuth Repan 90 100 Improved
3 Coverage and OSS GOAF-1 GOAFL M Tilt Uptilt 5 2 Improved
4 Coverage and OSS GOAF-3 GOAFL M Tilt Uptilt 8 2 Improved
5 Coverage and OSS GOAF-2 GOAFL M Tilt Uptilt 4 2 Improved
6 Coverage and OSS GOAF-L1 GOAFL E Tilt Uptilt 6 0 Improved
7 Coverage and OSS GOAF-L2 GOAFL E Tilt Uptilt 8 2 Improved
8 Coverage and OSS GOAF-L3 GOAFL E Tilt Uptilt 6 2 Improved
9 Coverage and OSS GOAF-R1 GOAFL E Tilt Uptilt 8 1 Improved
10 Coverage and OSS GOAF-R2 GOAFL E Tilt Uptilt 6 1 Improved
11 Coverage and OSS GOAF-R3 GOAFL E Tilt Uptilt 6 1 Improved
Table 9-A: Physical Changes Summary

Current Proposed
No Site Name Source Cell Name Target Cell Name Parameter
Value Value
1
2
3
Table 9-B: Parameter Changes Summary

10 CONCLUSION and SUMMARY


Summary of the SSV for new site GOAF is:
1. No call setup failure detected.
2. No dropped call detected.
3. No (0) handover failures detected due to poor RF condition.
4. No sector swap detected.
5. Cell parameters are defined as planned.
6. All the KPIs have reached the target KPI.

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 29 of 37 Version: 1.0
11 ABBREVIATION

KPI Key Performance Indicator


OSS Operation Support Subsystem
RRC_SR RRC Connection Success Rate
ERAB_SR ERAB Setup Success Rate
CDR Hand Over Success Rate
HOSR Intra-Frequency Handover Success Rate
RSRP Reference Signal Received Power
SINR Signal Interference plus Noise Radio
PCI Physical Cell Identifier
TAC Tracking Area Code

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 30 of 37 Version: 1.0
12 APPENDIX

12.1 As-built Antenna Photo

Figure 12-A: As-Built Antenna Photo Sector 1

Figure 12-B: Antenna Mechanical Tilt Photo Sector 1

Figure 12-C: Antenna Electrical Tilt Photo Sector 1

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 31 of 37 Version: 1.0
Figure 12-D: As-built Antenna Photo Sector 2

Figure 12-E: Antenna Mechanical Tilt Photo Sector 2

Figure 12-F: Antenna Electrical Tilt Photo Sector 2

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 32 of 37 Version: 1.0
Figure 12-G: As-built Antenna Photo Sector 3

Figure 12-H: Antenna Mechanical Tilt Photo Sector 3

Figure 12-I: Antenna Electrical Tilt Photo Sector 3

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 33 of 37 Version: 1.0
12.2 OSS KPI Graph

Site Availability Rate


100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
02/19/2018 02/20/2018 02/21/2018 02/22/2018 02/23/2018 02/24/2018 02/25/2018

Site Availability Target

Figure 12-J: Site Availability Rate Graph

RRC Connection Success Rate (Service) (BH)


100.00% 8000
7000
99.50%
6000

99.00% 5000
4000
98.50% 3000
2000
98.00%
1000
97.50% 0
02/19/2018 02/20/2018 02/21/2018 02/22/2018 02/23/2018 02/24/2018 02/25/2018

Attempt RRC Connection Success Rate (Service) (BH) Target

Figure 12-K: RRC Connection Success Rate (Service) (BH) Graph

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 34 of 37 Version: 1.0
E-RAB Setup Success Rate (BH)
100.00% 7000
99.80% 6000
99.60%
5000
99.40%
99.20% 4000
99.00% 3000
98.80%
2000
98.60%
98.40% 1000
98.20% 0
02/19/2018 02/20/2018 02/21/2018 02/22/2018 02/23/2018 02/24/2018 02/25/2018

Attempt E-RAB Setup Success Rate (BH) Target

Figure 12-L: E-RAB Setup Success Rate (BH) Graph

PS Call Drop Rate (BH)


1.60% 7000
1.40% 6000
1.20%
5000
1.00%
4000
0.80%
3000
0.60%
2000
0.40%
0.20% 1000

0.00% 0
02/19/2018 02/20/2018 02/21/2018 02/22/2018 02/23/2018 02/24/2018 02/25/2018

Attempt PS Call Drop Rate (BH) Target

Figure 12-M: PS Call Drop Rate (BH) Graph

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 35 of 37 Version: 1.0
Intra-frequency HO Success Rate (BH)
100.00% 1400

99.00% 1200

98.00% 1000

97.00% 800

96.00% 600

95.00% 400

94.00% 200

93.00% 0
02/19/2018 02/20/2018 02/21/2018 02/22/2018 02/23/2018 02/24/2018 02/25/2018

Attempt Intra-frequency HO Success Rate (BH)

Figure 12-N: Intra-frequency HO Success Rate (BH) Graph

Total Traffic Volume (BH)


14000

12000

10000

8000
MB

6000

4000

2000

0
02/19/2018 02/20/2018 02/21/2018 02/22/2018 02/23/2018 02/24/2018 02/25/2018
DL Traffic Volume (BH) UL Traffic Volume (BH)

Figure 12-O: Total Traffic Volume (BH) Graph

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 36 of 37 Version: 1.0
`

Average Throughput (BH)


16
14
12
10
Mbps

8
6
4
2
0
02/19/2018 02/20/2018 02/21/2018 02/22/2018 02/23/2018 02/24/2018 02/25/2018
Service DL Average Throughput (BH) Service UL Average Throughput (BH)

Figure 12-P: Average Throughput (BH) Graph

Prepared Mark Razel B. Mendoza / INES SITE GOAF


Checked Kenneth Isaac Namit / INES SSV Acceptance Report Last update: June 4, 2019
Page 37 of 37 Version: 1.0