SITE NAME GOAF

ENODEB ID 138434

AREA SLZ

CITY / PROVINCE CAMARINES SUR

MME TURISMO POOL 1

DT PERFORMED BY RIC DE DIOS

DATE DT PERFORMED March 29, 2019

APPROVED BY:

HUAWEI RF MANAGER GLOBE TELECOM RPI


[DATE] [DATE]

ALLAN GERONIMO ARLENE MAE TAVESO


DOCUMENT HISTORY

REVISION DATE DESCRIPTION APPROVED CHECKED

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 2 of 27 Version: 1.0
4G SSV ACCEPTANCE CERTIFICATE

SITE GOAF

Site Configuration:
MME Name: TURISMO POOL 1 Site Name: GOAF
Site Type: OUTDOOR Site ID: 138434

Huawei Technologies hereby certifies that the relevant parts of the Works referred to in this Conditional Acceptance Certificate
complies with the Network Rollout Procurement Agreement, in particular the Specifications and this has successfully passed the
SSV Acceptance Tests on the particular new site Basis.

The required Documentation is attached with this certificate.

Counter Signatures:

Huawei Technologies Representative Globe Telecom RF Representative

Name: Allan Geronimo Yin Xing Name: Mc Aldrin Nicolas Arlene Mae Taveso

Position: RF Manager RF Director Position: SLZ RF Engineer SLZ Regional Head

Date: Date:

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 3 of 27 Version: 1.0
EXECUTIVE SUMMARY

This document records the performance test result of new site GOAF of the Globe LTE_TDD network to verify if the newly build
site performance achieves the performance requirements. All KPIs are divided into several parts, including RRC Connection
Success Rate, ERAB Setup Success Rate, PS Call Drop Rate, Intra-Frequency Handover Success Rate, User DL/UL Peak Through-
put, Average DL/UL Throughput that are pre-defined in the LTE KPI Proposal for SSV acceptance.

The document is highly confidential and is strictly to be used only by Globe and Huawei. This SSV Acceptance Report is made
according to the agreement document describing the area and the applicable design rules and values. This document will be
submitted in Hardcopy and Softcopyincluded supporting data. Information contained in this document shall not be disclosed to
any other party unless it is expressly authorized by Globe and Huawei.

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 4 of 27 Version: 1.0
Remark:
- This page is left blank intentionally

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 5 of 27 Version: 1.0
TABLE OF CONTENTS

1 INTRODUCTION .........................................................................................................................................................................8
2 TOOLS USED ..............................................................................................................................................................................9
3 DRIVE TEST METHODOLOGY ...................................................................................................................................................10
4 CELL INFORMATION and CROSS SECTOR VERIFICATION .........................................................................................................11
5 DRIVE TEST PLOTS ...................................................................................................................................................................12
5.1 Drive Test Pre-Define Route ...................................................................................................................................................12
5.2 Drive Test Plots and Graphs ....................................................................................................................................................13
6 STATIONARY TEST SCREENSHOTS ...........................................................................................................................................19
6.1 Stationary Test Locations ........................................................................................................................................................19
6.2 Speed Test Screenshot Results ...............................................................................................................................................20
6.0 NMS / OSS KPI Summary .........................................................................................................................................................23
8 DRIVE TEST STATISTIC .............................................................................................................................................................24
8.1 Drive Test Measurements .......................................................................................................................................................24
8.2 Mobility Handover Test...........................................................................................................................................................24
8.3 Stationary Test Measurements ...............................................................................................................................................25
9 KPI OPTIMIZATION ACTIVITIES ................................................................................................................................................25
10 CONCLUSION and SUMMARY .................................................................................................................................................26
11 ABBREVIATION ........................................................................................................................................................................27

LIST OF TABLE
Table 1-A: Site Details ........................................................................................................................................................................ 8
Table 2-A: List of Tools ...................................................................................................................................................................... 9
Table 3-A: Mobility Test 1 Set-up Laptop 1 ..................................................................................................................................... 10
Table 3-B: Mobility Test 2 Set-up Laptop 1 ..................................................................................................................................... 10
Table 3-C: Stationary Test Set-up Laptop 1 ..................................................................................................................................... 10
Table 4-A: LTE Parameters and Cross Sector Checking ................................................................................................................... 11
Table 6-A: LTE OSS KPI Result .......................................................................................................................................................... 23
Table 8-A: Mobile Drive Test KPI Result .......................................................................................................................................... 24
Table 8-B: Mobile Drive Test Handover Result ................................................................................................................................ 24
Table 8-C: Stationary Test KPI Result ............................................................................................................................................... 25
Table 9-A: Physical Changes Summary ............................................................................................................................................ 25
Table 9-B: Parameter Changes Summary ........................................................................................................................................ 25

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 6 of 27 Version: 1.0
LIST OF FIGURE
Figure 1-A: Site Map .......................................................................................................................................................................... 8
Figure 5-A: Drive Test Predefined Route ....................................................................................................................................... 12
Figure 5-B: SPARROW Serving PCI ................................................................................................................................................... 13
Figure 5-C: SPARROW RSRP (dBm) .................................................................................................................................................. 14
Figure 5-D: SPARROW SINR (dB) ...................................................................................................................................................... 15
Figure 5-E: SPARROW Download Throughput (kbps) ...................................................................................................................... 16
Figure 5-F: SPARROW Event Failures –Handover ............................................................................................................................ 17
Figure 5-G: SPARROW Event Failures – CSFB Service Success ......................................................................................................... 18
Figure 6-A: Stationary Test Points ................................................................................................................................................... 19
Figure 6-B: Test Loc1 of GOAF-1 Speed Test Screenshot ................................................................................................................ 20
Figure 6-C: Test Loc2 of GOAF-2 Speed Test Screenshot ................................................................................................................ 21
Figure 6-D: Test Loc3 of GOAF-3 Speed Test Screenshot ................................................................................................................ 22

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 7 of 27 Version: 1.0
1 INTRODUCTION
Site GOAF has finished integration on March 26, 2019. BFT test is conducted on March 26, 2019.
Site GOAF integration date is officially broadcast on March 26, 2019. While SSV drive testing is conducted on March 29, 2019.

ITEMS 4G Site Information


Site Name GOAF
eNodeB ID 138434
Area SLZ
City / Province CAMARINES SUR
MME TURISMO POOL 1
Frequency Band 3
Site Configuration 2+2+2
Longitude 123.478938
Latitude 13.698186
Date SSV DT Performed March 29, 2019
Table 1-A: Site Details

Figure 1-A: Site Map

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 8 of 27 Version: 1.0
2 TOOLS USED

ITEMS Hardware/Software Version of Test Equipment


Lenovo G40® Core™ i3-4005U CPU @1.70 GHz
Laptop Computer 2.20 GHz RAM 4GB (3.16 usable)
32-bit Operating System (Windows XP/Windows 7)
GPS Receiver G-STAR4 BU-353
GENEX Probe (V300R006)
Drive Test Tool Software GENEX Probe (V300R0014)
Speed Test
Huawei E5375
GENEX Software Dongle
Huawei P1 Mobile Phone
GENEX Assistant (V300R0014)
Data Post Processing Tool
MapInfo 12.0
AC/DC Power Equipment DC-AC Power Inverter 500W
Table 2-A: List of Tools
Tools used to generate this report are:

 GENEX PROBE and Assistant(V300R006) or above


 Microsoft Office (Excel, Access, Word)
 Mapinfo 9.0 and above

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 9 of 27 Version: 1.0
3 DRIVE TEST METHODOLOGY
MOBILITY TEST 1 – LAPTOP 1
* In Mobility Test1, 1 set of testing equipment will be used for data collection.
MS Equipment Test Type Duration KPI Measured Remarks
RSRP, SINR, Av-
2GB download, From FTP
MS1 Data Card FTP Download erage DL
10s idle server10.188.173.138
Throughput
30s call, wait un-
Call Setup
MS2 P1 CSFB til UE reselect To UMTS
Fallback (MO)
back to LTE
Table 3-A: Mobility Test 1 Set-up Laptop 1

MOBILITY TEST2 – LAPTOP 1


* In Mobility Test 2, 1 set of testing equipment will be used for data collection. Scanner will serve as an optional testing equip-
ment setup.
MS Equipment Test Type Duration KPI Measured Remarks
RSRP, SINR, Av-
2GB upload, 10s To FTP
MS3 Data Card FTP Upload erage UL
idle server10.188.173.138
Throughput
MS4 Scanner Idle Idle all the time RSRP, SINR **Optional
Table 3-B: Mobility Test 2 Set-up Laptop 1

STATIONARY TEST – LAPTOP 1


* In Stationary Test, 1set of testing equipment will be used for data collection.
MS Equipment Test Type Duration KPI Measured Remarks
To Antipolo
Globe
SpeedTest
5 times SpeedTest at
Server (in case
each test location. Re- Average Ping
Average Ping
peat the test at 3 dif- RTT, User Peak
RTT in
MS5 Data Card SpeedTest ferent test locations DL Throughput,
SpeedTest fail,
evenly distributed in User Peak UL
will verify the
each sector; 1 test lo- Throughput
Average Ping
cation per sector.
RTT by perform-
ing Ping Test to
FTP Server)
Table 3-C: Stationary Test Set-up Laptop 1

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 10 of 27 Version: 1.0
4 CELL INFORMATION and CROSS SECTOR VERIFICATION

GOAF-1 GOAF -2 GOAF -3


ITEM
Before After Before After
138434 138434 138434
eNodeB ID
1 2 3
Cell ID
315 316 317
Physical Cell ID
3018 3018 3018
TAC
AZIMUTH - 330 - 40 - 240

M-TILT - 4 - 4 - 2

E-TILT - RET - RET - RET

ANTENNA HEIGHT - 20 - 20 - 20

ANTENNA TYPE - 4T4R - 4T4R - 4T4R


ANTENNA SOLUTION SCENARIO 3 SCENARIO 3 SCENARIO 3
CROSS SECTOR OK OK OK
Table 4-A: LTE Parameters and Cross Sector Checking

NOTE: L1800 Sharing Antenna.

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 11 of 27 Version: 1.0
5 DRIVE TEST PLOTS
5.1 Drive Test Pre-Define Route

Figure 5-A: Drive Test Predefined Route

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 12 of 27 Version: 1.0
5.2 Drive Test Plots and Graphs
 SPARROW LTE Plots and Graphs

Figure 5-B: SPARROW Serving PCI

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 13 of 27 Version: 1.0
Figure 5-C: SPARROW RSRP (dBm)

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 14 of 27 Version: 1.0
Figure 5-D: SPARROW SINR (dB)

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 15 of 27 Version: 1.0
Figure 5-E: SPARROW Download Throughput (kbps)

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 16 of 27 Version: 1.0
Figure 5-F: SPARROW Event Failures –Handover

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 17 of 27 Version: 1.0
Figure 5-G: SPARROW Event Failures – CSFB Service Success

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 18 of 27 Version: 1.0
6 STATIONARY TEST SCREENSHOTS
6.1 Stationary Test Locations

Test Loc Sec 1

Test Loc Sec 2

Test Loc Sec 3

Figure 6-A: Stationary Test Points

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 19 of 27 Version: 1.0
6.2 Speed Test Screenshot Results

Figure 6-B: Test Loc1 of GOAF-1 Speed Test Screenshot

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 20 of 27 Version: 1.0
Figure 6-C: Test Loc2 of GOAF-2 Speed Test Screenshot

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 21 of 27 Version: 1.0
Figure 6-D: Test Loc3 of GOAF-3 Speed Test Screenshot

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 22 of 27 Version: 1.0
6.0 NMS / OSS KPI Summary
7 Days Monitoring
LTE OSS KPI SPARROW Target KPI Unit Comment
(September 24-26, 2018)

Site Availability Rate 100% % PASSED


DL Traffic Volume (BH)
Reference Mbyte
(2000~2100)
UL Traffic Volume (BH)
Reference Mbyte
(2000~2100)
RRC Connection Success Rate (Service) (BH)
98.50% % PASSED
(2000~2100)
E-RAB Setup Success Rate (BH)
98.80% % PASSED
(2000~2100)
PS Call Drop Rate (BH)
1.50% % PASSED
(2000~2100)
Intra-frequency HO Success Rate (BH)
Reference %
(2000~2100)
Service DL Average Throughput (BH)
Reference Mbps
(2000~2100)
Service UL Average Throughput (BH)
Reference Mbps
(2000~2100)
Table 6-A: LTE OSS KPI Result

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 23 of 27 Version: 1.0
8 DRIVE TEST STATISTIC

8.1 Drive Test Measurements

SPARROW Mobile Test


Target KPI DT Result Unit Comment
Key Performance Indicator
Call Setup Fallback (MO) Reference 100.00% %
Average DL Throughput 7.5Mbps 20.698 Mbps PASSED
SINR >= -3dB Reference 100.00% %
RSRP > -115dBm Reference 100.00% %
Table 8-A: Mobile Drive Test KPI Result

8.2 Mobility Handover Test

Handover Testing LTE Test Result Comment

Sector1 => Sector2 OK PASSED


Sector1 => Sector3 OK PASSED
Sector2 => Sector3 OK PASSED
Sector2 => Sector1 OK PASSED
Sector3 => Sector1 OK PASSED
Sector3 => Sector2 OK PASSED
Table 8-B: Mobile Drive Test Handover Result

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 24 of 27 Version: 1.0
8.3 Stationary Test Measurements
PING User Peak DL Target User Peak UL Target
Sam- RSRP SINR Target
Cell Name 32bytes Result Throughput KPI Result Throughput KPI Result
ple (dBm) (dB) KPI (ms)
(ms) (Mbps) (Mbps) (Mbps) (Mbps)
GOAF-1 Test Loc1 5 -73.38 21.00 34 40 PASSED 35.69 30.0 PASSED 5.33 5.0 PASSED
GOAF-2 Test Loc2 5 -85.00 19.00 19 40 PASSED 41.38 30.0 PASSED 5.40 5.0 PASSED
GOAF-3 Test Loc3 5 -87.38 21.00 24 40 PASSED 31.93 30.0 PASSED 5.18 5.0 PASSED
Table 8-C: Stationary Test KPI Result

9 KPI OPTIMIZATION ACTIVITIES


Change Before After
No Improvement Area Cell Name Site Name Solution Remarks
Required Setting Setting
1
2
3
4
5
Table 9-A: Physical Changes Summary

Current Proposed
No Site Name Source Cell Name Target Cell Name Parameter
Value Value
1
2
3
4
5
Table 9-B: Parameter Changes Summary

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 25 of 27 Version: 1.0
10 CONCLUSION and SUMMARY
Summary of the SSV for new site GOAF is:
1. No call setup failure detected.
2. No dropped call detected.
3. No handover failures detected.
4. No sector swap detected.
5. Cell parameters are defined as planned.
6. ALL the KPIs have reached the target KPI.

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 26 of 27 Version: 1.0
11 ABBREVIATION

KPI Key Performance Indicator


OSS Operation Support Subsystem
RRC_SR RRC Connection Success Rate
ERAB_SR ERAB Setup Success Rate
CDR Call Drop Rate
HOSR Intra-Frequency Handover Success Rate
RSRP Reference Signal Received Power
SINR Signal to Interference plus Noise Ratio
PCI Physical Cell Identifier
TAC Tracking Area Code

ERICK LESTER RECTO D. MAPA


Prepared SITE: GOAF
/ INES
Checked / INES SSV Acceptance Report Last update: April 2, 2019
Page 27 of 27 Version: 1.0