GOAF
4G ACCEPTANCE REPORT
ENODEB ID 138434
AREA SLZ
APPROVED BY:
SITE GOAF
Site Configuration:
MME Name: TURISMO POOL 1 Site Name: GOAF
Site Type: OUTDOOR Site ID: 138434
Huawei Technologies hereby certifies that the relevant parts of the Works referred to in this Conditional Acceptance Certificate
complies with the Network Rollout Procurement Agreement, in particular the Specifications and this has successfully passed the
SSV Acceptance Tests on the particular new site Basis.
Counter Signatures:
Name: Allan Geronimo Yin Xing Name: Mc Aldrin Nicolas Arlene Mae Taveso
Date: Date:
This document records the performance test result of new site GOAF of the Globe LTE_TDD network to verify if the newly build
site performance achieves the performance requirements. All KPIs are divided into several parts, including RRC Connection
Success Rate, ERAB Setup Success Rate, PS Call Drop Rate, Intra-Frequency Handover Success Rate, User DL/UL Peak Through-
put, Average DL/UL Throughput that are pre-defined in the LTE KPI Proposal for SSV acceptance.
The document is highly confidential and is strictly to be used only by Globe and Huawei. This SSV Acceptance Report is made
according to the agreement document describing the area and the applicable design rules and values. This document will be
submitted in Hardcopy and Softcopyincluded supporting data. Information contained in this document shall not be disclosed to
any other party unless it is expressly authorized by Globe and Huawei.
1 INTRODUCTION .........................................................................................................................................................................8
2 TOOLS USED ..............................................................................................................................................................................9
3 DRIVE TEST METHODOLOGY ...................................................................................................................................................10
4 CELL INFORMATION and CROSS SECTOR VERIFICATION .........................................................................................................11
5 DRIVE TEST PLOTS ...................................................................................................................................................................12
5.1 Drive Test Pre-Define Route ...................................................................................................................................................12
5.2 Drive Test Plots and Graphs ....................................................................................................................................................13
6 STATIONARY TEST SCREENSHOTS ...........................................................................................................................................19
6.1 Stationary Test Locations ........................................................................................................................................................19
6.2 Speed Test Screenshot Results ...............................................................................................................................................20
6.0 NMS / OSS KPI Summary .........................................................................................................................................................23
8 DRIVE TEST STATISTIC .............................................................................................................................................................24
8.1 Drive Test Measurements .......................................................................................................................................................24
8.2 Mobility Handover Test...........................................................................................................................................................24
8.3 Stationary Test Measurements ...............................................................................................................................................25
9 KPI OPTIMIZATION ACTIVITIES ................................................................................................................................................25
10 CONCLUSION and SUMMARY .................................................................................................................................................26
11 ABBREVIATION ........................................................................................................................................................................27
LIST OF TABLE
Table 1-A: Site Details ........................................................................................................................................................................ 8
Table 2-A: List of Tools ...................................................................................................................................................................... 9
Table 3-A: Mobility Test 1 Set-up Laptop 1 ..................................................................................................................................... 10
Table 3-B: Mobility Test 2 Set-up Laptop 1 ..................................................................................................................................... 10
Table 3-C: Stationary Test Set-up Laptop 1 ..................................................................................................................................... 10
Table 4-A: LTE Parameters and Cross Sector Checking ................................................................................................................... 11
Table 6-A: LTE OSS KPI Result .......................................................................................................................................................... 23
Table 8-A: Mobile Drive Test KPI Result .......................................................................................................................................... 24
Table 8-B: Mobile Drive Test Handover Result ................................................................................................................................ 24
Table 8-C: Stationary Test KPI Result ............................................................................................................................................... 25
Table 9-A: Physical Changes Summary ............................................................................................................................................ 25
Table 9-B: Parameter Changes Summary ........................................................................................................................................ 25
M-TILT - 4 - 4 - 2
ANTENNA HEIGHT - 20 - 20 - 20
Current Proposed
No Site Name Source Cell Name Target Cell Name Parameter
Value Value
1
2
3
4
5
Table 9-B: Parameter Changes Summary