GROUP
SUBMISSION OF
SHOP
PROTECTIVE FOSTER WHEELER ENERGY LTD 83C1 (READING)
COATINGS FOR CORPORATE STANDARD PAGE 1 OF 3
APPROVAL ENGINEERING REV 1
CONTENTS
1. PURPOSE ............................................................................................................................... 2
2. SCOPE.................................................................................................................................... 2
3. REFERENCE AND GUIDELINES............................................................................................ 3
The following document has been substantially revised therefore changes are not
highlighted.
SUBMISSION OF
SHOP
PROTECTIVE FOSTER WHEELER ENERGY LTD 83C1 (READING)
COATINGS FOR CORPORATE STANDARD PAGE 2 OF 3
APPROVAL ENGINEERING REV 1
1. PURPOSE
1.1 This standard describes the procedure by which Suppliers shall submit information
and details of shop coating work for review and approval by Foster Wheeler
Energy Limited (FWEL) and the Owner.
2. SCOPE
2.1 The Supplier shall submit with the initial quotation a general description of the
painting operations which have been included for in the quotation. As a minimum
requirement, the following information shall be provided in the description;
• Limits/extent of coating.
• Type and brand name of coating(s) to be used.
• Compliance with FWEL Engineering Stdandar 83A1 (READING).
• List of any deviations from FWEL Eng Std. 83A1 (READING).
NOTE: If no deviations from the FWEL enquiry documents are stated in the
quotation it will be deemed that all the requirements of these
documents have been included for in the quotation.
2.2 The quotation shall confirm the receipt of FWEL Eng Std. 83A1 (Reading).
2.3 FWEL comments arising from the Suppliers quotation shall be discussed at a pre-
order meeting.
2.4 Following order placement, the vendor shall provide a procedure giving details of
the painting work to be carried out (see 3.0).
2.5 FWEL/OWNER. shall review and comment on the work procedure using the
following Codes:-
SUBMISSION OF
SHOP
PROTECTIVE FOSTER WHEELER ENERGY LTD 83C1 (READING)
COATINGS FOR CORPORATE STANDARD PAGE 3 OF 3
APPROVAL ENGINEERING REV 1