Prepared by: Andre‐Paul C. Ampong 3
Correction due to incorrect tape length
Correction due to incorrect tape length
• When
When measuring the distance between two 
measuring the distance between two
points:
– With a tape too long, add the correction
With a tape too long add the correction
– With a tape too short, subtract the correction 
• When laying out a line of desired length:
Wh l i t li f d i d l th
– With a tape too long, subtract the correction
– With a tape too short, add the correction

Prepared by: Andre‐Paul C. Ampong 4
Correction due to incorrect tape length
Correction due to incorrect tape length

Prepared by: Andre‐Paul C. Ampong 5
Correction due to incorrect tape length
Correction due to incorrect tape length

Prepared by: Andre‐Paul C. Ampong 6
Correction due to incorrect tape length
Correction due to incorrect tape length

Prepared by: Andre‐Paul C. Ampong 7
Correction due to incorrect tape length
Correction due to incorrect tape length

Corr = TL − NL
⎛ ML ⎞
C I = Corr⎜ ⎟
⎝ NL ⎠
CL = ML ± C I

Prepared by: Andre‐Paul C. Ampong 8
Correction due to incorrect tape length
Correction due to incorrect tape length
• A
A rectangular lot was measured using a 50
rectangular lot was measured using a 50‐mm 
steel tape which was found out to be 0.025 m 
too short If the recorded length and width of
too short. If the recorded length and width of 
the lot are 180.455 m and 127.062 m, 
respectively determine the following:
respectively, determine the following:
– Actual dimensions of the lot
– Error in area introduced due to the erroneous 
Error in area introduced due to the erroneous
length of tape

Prepared by: Andre‐Paul C. Ampong 9
Correction due to incorrect tape length
Correction due to incorrect tape length
• A
A building 38 m x 45 m is to be laid out with a 
building 38 m x 45 m is to be laid out with a
50‐m long metallic tape. If during 
standardization the tape is found to be only
standardization the tape is found to be only 
49.950 m, determine the following:
– Dimensions to be laid out, using the tape, in order 
Dimensions to be laid out using the tape in order
that the building have the desired dimensions
– Using the same tape what should the diagonals 
Using the same tape what should the diagonals
read?

Prepared by: Andre‐Paul C. Ampong 10
Correction due to slope
Correction due to slope

Prepared by: Andre‐Paul C. Ampong 11
Correction due to slope
Correction due to slope
• For gentle slopes (less than 20%)
For gentle slopes (less than 20%)
2
h
Ch =
2s
• For steep slopes (between 20% and 30%
h2 h4
Ch = + 3
2 s 8s
• For very steep slopes (greater than 30%)
Ch = s (1− cos θ )
Prepared by: Andre‐Paul C. Ampong 12
Correction due to alignment
Correction due to alignment
• Considered
Considered of less importance compared to 
of less importance compared to
the other errors
• Can be calculated using slope correction 
Can be calculated using slope correction
formulas

Prepared by: Andre‐Paul C. Ampong 13
Correction due to temperature
Correction due to temperature

Ct = αL(T − Ts )

Prepared by: Andre‐Paul C. Ampong 14
Problem
• A
A steel tape known to be of standard length at 
steel tape known to be of standard length at
20oC, is used in laying out a runway 2,500.00 
m long If its coefficient of linear expansion is
m long.  If its coefficient of linear expansion is 
0.0000116/oC, determine the temperature 
correction and the correct length to be laid
correction and the correct length to be laid 
out when the temperature is 42oC.

Prepared by: Andre‐Paul C. Ampong 15
Correction due to tension
Correction due to tension

Cp =
( Pm − Ps )L
AE

Prepared by: Andre‐Paul C. Ampong 16
Problem
• A
A heavy 50
heavy 50‐m m tape having a cross
tape having a cross‐sectional
sectional 
area of 0.05 cm2 has been standardized at a 
tension of 5 5 kg If E = 2 10 x 106 kg/cm2, 
tension of 5.5 kg.  If E = 2.10 x 10
determine the elongation of the tape if a pull 
of 12 kg is applied
of 12 kg is applied.

Prepared by: Andre‐Paul C. Ampong 17
Correction due to sag
Correction due to sag

ω L 2 3
Cs = 2
24P

Prepared by: Andre‐Paul C. Ampong 18
Problem
• A
A 30
30‐mm tape is supported only at the ends and 
tape is supported only at the ends and
under a steady pull of 8 kg.  If the tape weighs 
0 91 kg determine the sag correction and the
0.91 kg, determine the sag correction and the 
correct distance between the ends of the 
tape.
tape

Prepared by: Andre‐Paul C. Ampong 19
Correction due to wind
Correction due to wind
• Error
Error due to wind is similar in effect to error 
due to wind is similar in effect to error
due to sag
• May be avoided by not conducting survey on a 
May be avoided by not conducting survey on a
windy day

Prepared by: Andre‐Paul C. Ampong 20
Combined corrections (problem)
Combined corrections (problem)
• A line was measured to be 2582.35 m using a 30‐m 
g
steel tape supported throughout its length under a pull 
of 4 kg.  The mean temperature during the 
measurement is 35oC.  The tape used has a cross‐
measurement is 35 C The tape used has a cross
sectional area of 0.03 square centimeters and has a 
standard length at 20oC under a pull of 5 kg.  The 
modulus of elasticity of the tape is 2 x 10
d l f l f h 6 kg/cm
k / 2 and 
d
the coefficient of thermal expansion is 0.0000116/oC.
– Determine the error due to temperature change
Determine the error due to temperature change
– Determine the error due to tension
– Determine the corrected length of the line

Prepared by: Andre‐Paul C. Ampong 21
More problems
More problems 
• A
A slope distance of 465.82m is measured 
slope distance of 465 82m is measured
between two points with a slope angle of 12o
35’. What is the corresponding horizontal 
35 What is the corresponding horizontal
distance between the points?
• A line measured with a 30‐m steel tape was 
A line measured with a 30 m steel tape was
recorded as 325.70m. If the tape is found 
30 05m long during standardization what is
30.05m long, during standardization, what is 
the correct length of the line?

Prepared by: Andre‐Paul C. Ampong 22
More problems
More problems 
• A rectangular building 250.00m by 130.00m is to be 
g g y
laid out with a 30‐m long steel tape. If during 
standardization the tape is found to be 30.03m, what 
should be the correct length and width to be laid out?
should be the correct length and width to be laid out?
• A line measured with a 50‐m long steel tape was 
determined to be 645.22m when the average  g
temperature during taping was 15.75oC. If the tape is 
of standard length at 20oC and the coefficient of 
thermal expansion of steel is 0 0000116/1oC, what is 
thermal expansion of steel is 0.0000116/1 C what is
the correct length of the measured line?

Prepared by: Andre‐Paul C. Ampong 23
More problems
More problems 
• A steel tape with a cross‐sectional area of 0.03cm
p 2 is 

30.00m long under a pull of 5kg when supported 
throughout. It is used in measuring a line 875.63m long 
under a steady pull of 10kg Assuming E = 2 0 x 106
under a steady pull of 10kg. Assuming E = 2.0 x 10
kg/cm2, what is the elongation of the tape due to 
increase in tension? What is the correct length of the 
measured line?
dl
• A 30‐m steel tape weighs 1.05kg and is supported at its 
end points and at the 10‐m and 25‐m marks If a pull of
end points and at the 10‐m and 25‐m marks. If a pull of 
6.0kg is applied to the ends of the tape, what is the 
correction due to sag for a full tape length?

Prepared by: Andre‐Paul C. Ampong 24
Homework
• Using
Using a 25
a 25‐mm tape, a square lot was measured 
tape a square lot was measured
and found to have an area of 1 hectare.  If the 
total error in area is 4 004 square meter short
total error in area is 4.004 square meter short, 
what is the error in each tape length?

Prepared by: Andre‐Paul C. Ampong 25
Homework
• A
A rectangular lot has a correct area of two 
rectangular lot has a correct area of two
hectares.  Its length is twice its width.  It the 
lengths of the sides were measured with a 50‐
lengths of the sides were measured with a 50
m tape that is 0.02 m too long, compute the 
error in the area of the lot in square meter
error in the area of the lot in square meter.