SL NO Description Unit No L B H

1 Earth work in excavation M3 12 1.5 1.5 1.5


2 Earth work in filling
3 S.B.F.S
4 silver sand filling
Providing and laying cement
concrete
1:2:4 (1 Cement : 2 coarse sand :
5 4 graded stone aggregate 20 mm
nominal size)
In foundation M2 12 1.5 1.5 -
floor M2 1 15 6 -
Reinforced cement concrete
work in beams, suspended floors,
roofs having slope
up to 15° landings, balconies,
shelves, chajjas, lintels, bands,
plain window sills,
staircases and spiral stair cases
above & below plinth level up to
floor five level
1:1½:3 (1 Cement: 1½ coarse
sand(zone-III) : 3 graded stone
aggregate 20 mm
nominal size)

6
footing M3 12 1.5614157143
column M3 12 0.25 0.25 7
1:2:4 (1 Cement: 2 coarse
sand(zone-III) : 4 graded stone
aggregate 20 mm
nominal size)
slab M3 1 15 6 0.1
beam M3 1 68 0.25 0.25
tie beam M 3
1 68 0.25 0.2
chajja M3 6 1.3 0.45 0.85
lintel M 3
12 1.4 0.125 0.125
stair M3 1 5.625
Brick Work 250 m.m thk M 3
1 37.79 0.25 3
Brick Work 125 m.m thk M3 1 32.6 0.125 3
Deduct:-
D M3 1 1.5 0.25 2.1
D1 M3 2 1.2 0.125 2.1
6
6 D2 M3 2 0.9 0.125 2.1
D3 M3 1 0.75 0.125 2.1
W1 M 3
2 1.5 0.25 1.2
W1 M3 1 1.5 0.125 1.2
W2 M 3
2 0.8 0.25 1.2
W3 M3 2 0.8 0.25 0.5
Plastering work at 1:6 M 2
2 70.39 - 3
Deduct:-
D M2 1 1.5 - 2.1
D1 M2 2 1.2 - 2.1
D2 M2 2 0.9 - 2.1
7
D3 M2 1 0.75 - 2.1
W1 M2 2 1.5 - 1.2
W1 M2 1 1.5 - 1.2
W2 M2 2 0.8 - 1.2
W3 M2 2 0.8 - 0.5
8 Flush Door
D no 1
D1 no 2
D2 no 2
D3 no 1
300
Quantity TQ 750
40.5 40.5 upper 0.0625
8.1 lower 2.25
117

27
117
90

sqrt of
trapizoydal vol 0.8864157 1.2331629
a1+a2

18.736989 rectangular vol 0.675


23.9869886
5.25

29m

9 39m
4.25
3.4 step 0.01875
25.521
2.9835 0.675
0.2625 flight 4.2
5.625 landing 0.75
28.3425
12.225

0.7875
0.63
36.675625
0.4725 36.675625
0.196875
0.9
0.225
0.48
0.2
422.34

3.15
5.04
3.78
400.675
1.575
3.6
1.8
1.92
0.8