Вы находитесь на странице: 1из 2

MEMORANDUM OF AGREEMENT

KNOW ALL MEN BY THESE PRESENTS:

This agreement (hereinafter referred to as "MEMORANDUM OF AGREEMENT") is made and


executed by and between;

The First Party (hereinafter referred to as "NEGOTIATOR")

__________________________________________________, having his/her address at


_______________________________________________________________________

__________________________________________________, having his/her address at


_______________________________________________________________________

__________________________________________________, having his/her address at


_______________________________________________________________________

AND

The Second Party (hereinafter referred to as "CONTRACTOR")

_______________________________________________, having its registered office in


_________________________________________________________________________________
____________________________________________________________

and relates to the construction of the 50MW Solar Power Project in Capas, Tarlac which is
developed by Greenergy Solutions Inc. (hereinafter referred to as "PROPONENT") under and
pursuant to the Work Contract herewith made by and between CONTRACTOR and PROPONENT.

It is hereby understood and agreed that a commission of 3% of the total project cost is payable by
CONTRACTOR to the NEGOTIATOR in consideration of the Negotiator’s efforts and cooperation
in assisting with the conclusion and execution of the Work Contract.

It is hereby further agreed that payment of the commission shall be made according to the following
schedule (which may be revised in accordance with payment term of the Memorandum of
Agreement) by either cheque or telegraphic transfer to such bank account as the Negotiator may
designate from time to time:

1) The 1% of the COMMISSION shall be paid after the CONTRACTOR has signed the Work
Contract with the PROPONENT.

2) The 2% of the COMMISSION shall be paid after the CONTRACTOR has received down
payment of the Contract Price from the PROPONENT.

This MEMORANDUM OF AGREEMENT only becomes effective upon signing by both parties.ive.

IN WITNESS WHEREOF, the parties hereunto affix their signatures on this day of 15 th of
December, 2018 at _______________________________.

_________________________ _________________________
First Party (Representative) Second Party
ID No. ID No.

WITNESSES:

________________________________ __________________________________

________________________________ __________________________________

1
ACKNOWLEDGEMENT

REPUBLIC OF THE PHILIPPINES)


___________________ ) S.S.

BEFORE ME, a Notary Public for and in ____________________________ , this


________ day of ____________, 2018 personally appeared the following persons who exhibited to
me their identifications;

_______________________________ ID no. _________________________________

_______________________________ ID no. _________________________________

known to me the same persons who executed the foregoing Agreement. In the presence of their
instrumental witnesses, and they acknowledged to me that the same is their own free and voluntary
act and deed.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed my notarial seal on the
date and place above written.

Doc. No. __________


Page No. __________
Book No. _________
Series of 2018

Вам также может понравиться