Академический Документы
Профессиональный Документы
Культура Документы
Safety Valves
Available Left Right
Furnace Temp. (ᵒC)
ERVs in Auto
Shift Activities
CG ESP Hoppers (Levels High)
Bottom Ash De-Ashing
TIME A- B- C- D-
Nos Program Time APH Soot Blowing
Wall Blowing
APH-A: APH-B:
LRSB Nos: Blowers Operated:
Boiler Desk Engineer's Log Book
Signature
Name
Zero Meter Operator Firing Floor Operator Boiler Desk Engineer
Boiler Desk Engineer's Log Book
Safety Valves
Available Left Right
Furnace Temp. (ᵒC)
ERVs in Auto
Shift Activities
CG ESP Hoppers (Levels High)
Bottom Ash De-Ashing
TIME A- B- C- D-
Nos Program Time APH Soot Blowing
Wall Blowing
APH-A: APH-B:
LRSB Nos: Blowers Operated:
Boiler Desk Engineer's Log Book
Signature
Name
Zero Meter Operator Firing Floor Operator Boiler Desk Engineer
Boiler Desk Engineer's Log Book
Safety Valves
Available Left Right
Furnace Temp. (ᵒC)
ERVs in Auto
Shift Activities
CG ESP Hoppers (Levels High)
Bottom Ash De-Ashing
TIME A- B- C- D-
Nos Program Time APH Soot Blowing
Wall Blowing
APH-A: APH-B:
LRSB Nos: Blowers Operated:
Boiler Desk Engineer's Log Book
Signature
Name
Zero Meter Operator Firing Floor Operator Boiler Desk Engineer
UCB BOILER LOG SHEET-
C-SHIFT A-SHIFT
R LOG SHEET-1
DATE :
WB TO WB TO
TOTAL AIR FURNACE 02 IN FLUE
FURNACE DP FURNACE DP OPACITY CO NOX SO2
FLOW PRESSURE GAS
LEFT RIGHT
ATOMISING STEAM
SERVICE AIR PRESSURE HFO PRESSURE HFO TEMP INST AIR PRESSURE SEAL AIR PRESSURE
PRESSURE
MS TEMP LHS MS TEMP LHS MS TEMP RHS MS TEMP RHS MS TEMP MS TEMP MAX DIVISIONAL MAX SH
MAX LTSH
TIME BEFORE AFTER ATTEMP BEFORE AFTER BEFORE SV BEFORE SV PLATEN METAL
METAL TEMP METAL TEMP
ATTEMP ATTEMP ATTEMP (LHS) (RHS) TEMP
C- SHIFT A-SHIFT
UCB BOILER LOG SHEET-3
DATE :
CRH TEMP LHS CRH TEMP LHS CRH TEMP RHS CRH TEMP RHS HRH PRESS/ HRH PRESS/ MAX RH SH ATTEMP SH ATTEMP RH ATTEMP
BEFORE ATTEMP AFTER ATTEMP BEFORE ATTEMP AFTER ATTEMP TEMP LHS TEMP RHS METAL TEMP FLOW-LHS FLOW-RHS FLOW-LHS
DEG DEG DEG DEG KSC / DEG KSC / DEG DEG TPH TPH TPH
B-SHIFT C-SHIFT
RH ATTEMP BURNER TILT
FLOW-RHS
TPH %
ID FAN CH-1 ID FAN CH-1 ID FAN CH-2 ID FAN CH-2 FURNACE INLET DAMPER
TIME LOP IN SERVICE
CURRENT RPM CURRENT RPM PRESURE POSITION
C-SHIFT A-SHIFT
UCB BOILER LOG SHEET-4
VFD POSITION FAN INLET DISCHARGE FAN DE / NDE MOTOR DE / NDE MOTOR WINDING
TEMP PRESSURE / TEMP TEMP TEMP TEMP- 1 / 2 / 3
C-SHIFT A-SHIFT
UCB BOILER LOG SHEET-5
DATE :
MOTOR NDE
MOTOR DE /NDE TEMP MOTOR WINDING TEMP MOTOR WINDING TEMP FAN VIBRATIONS - MOTOR DE
VIBRATIONS - 1 / 2 VIBRATIONS -
-1 / 2 / 3 -4 / 5 / 6 1/2 1/2
TPH
C-SHIFT
UCB BOILER LOG SHEET-6
PA FAN- A
PA FAN- B
REMARKS:
C-SHIFT A-SHIFT
R LOG SHEET-6
DATE :
MOTOR NDE
MOTOR WINDING MOTOR WINDING FAN VIBRATIONS - 1 MOTOR DE VIBRATIONS - TOTAL PA AIR FLOW
TEMP -1 / 2 / 3 TEMP -4 / 5 / 6 /2 VIBRATIONS- 1 / 2 1/2
APH-A
APH- B
REMARKS :
C-SHIFT A-SHIFT
B BOILER LOG SHEET-7
DATE :
Deg mmWC Deg mmWC Deg mmWC Deg mmWC Deg Deg
B-SHIFT C-SHIFT
DATE :
COLD END
TEMP MAX
Deg
UCB BOILER LOG SHEET-8
BCW PUMP- A/ B / C
BCW PUMP- A/ B / C
REMARKS :
MILL-B
MILL- C
MILL-D
REMARKS:
C-SHIFT A-SHIFT
UCB BOILER LOG SHEET-9
DATE :
MILL- F
MILL- G
MILL-H
REMARKS:
C-SHIFT A-SHIFT
UCB BOILER LOG SHEET-10
DATE :
DMCW SGDMCW SGDMCW PUMP SGDMCW PUMP SGDMCW HEADER PHE-A DMCW PHE-A ACW
TIME OVERHEAD TANK PUMP CURRENT SUCTION DISCHARGE PRESSURE-1 / 2/ 3 INLET / OUTLET INLET / OUTLET
LEVEL RUNNING PRESSURE-1 / 2/ 3 PRESSURE TEMP TEMP
C- SHIFT
CB BOILER LOG SHEET-11
DATE :
mm/s mm/s