S.H :- balance work of construction of boundary wall, gate, breast wall, retaining wall.
S.No. Description NO. L. W./AREA H. Qty.
1 Excavation for Structures
Excavation in foundations,
trenches etc., in earth work, lift_x000D_
upto 1.50 Metres stacking the eacavated soil
not more than _x000D_
3 metres clear from the edge of the
excavation and _x000D_
then returning the stacked soil in 15cm.
layers, when required _x000D_
in to plinths sides of foundations etc.,
consolidating each _x000D_
deposited layer by ramming and watering
_x000D_
and then disposing of all surplus excavated
earth _x000D_
as directed with in a lead of 20
metres._x000D_