NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.

With sub consultant


Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
1 of 8

Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :

Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018

Feature : Input Checked By: Date :


MU 2/1/2018
RD of Structure 46+850
Name of Structure D1

Side L
Offtake Angle 90

NSL 700.46

Upstream / Main Canal Parameters


Bed Level BL1 ft 702.82
Full Supply Level FSL1 ft 709.82
Discharge Q1 cfs 1358.53
Full Supply Depth D1 ft 6.99

Bed Width B1 ft 55.00


Side Slope z 1.50

Lined Freeboard FBL ft 1.75


Unlined Freeboard FBB ft 2.00
Velocity V1 ft/sec 2.97

FSL FOR CAPACITY DETERMINATION 707.71


Depth %aage for Full Flow 70%

Downstream / Disty Parameters


Bed Level BL2 ft 700.14

Full Supply Level FSL2 ft 702.25


Discharge Q2 cfs 41.79

Full Supply Depth D2 ft 2.11


Bed Width B2 ft 8.00

Side Slope z 1.50


Lined Freeboard FBL ft 0.00
Unlined Freeboard FBB ft 1.75
Velocity V2 ft/sec 1.77

Velocity Head U/S ft 0.14

Velocity Head D/S ft 0.05


Total Energy Level U/S ft 709.95

Total Energy Level D/S ft 702.30


Bank Top Level U/S ft 713.57

Bank Top Level D/S ft 704.00


BL1-BL2 ft 2.68
FSL1-FSL2 ft 7.57
NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.
With sub consultant
Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
2 of 8

Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :

Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018

Feature : Crest Checked By: Date :


MU 2/1/2018

Crest Setting
BL1+D1/3 ft 705.15
BL2 ft 700.89
CL' ft 705.15
Head above crest h1' ft 2.56
Head above crest adopt h1 ft 2.56
CL- BL2 ft 5.01
Adopt C.L FSL1-h1 ft 705.15
Crest Height Adopt ht ft 2.33

Crest Width
h1 ft 2.56
FSL2-CL h2 ft -2.90
E1 ft 2.56
h2+D/S Velocity Head E2 ft -2.85
Fane Curve
Ratio E2/E1 -1.11
Flow type Free
Fane C 3.09
Q2/CH3/2 B ft 3.29
Gibson Curve
h2/h1 -1.13
C' 3.09
Q2/C'H3/2 B ft 3.29
Baffle Wall yes
Orifice Opening (height) 1.25
Orifice C 0.54
Horif 2.56
B 5.00
Water Way
No. of bays n # 1.0
No. of Peirs 0
Peir Width wp ft 0
Bay width wg ft 5.00
Pier Contraction Kp Pointed Nose 0.00
Ka Rounded Abutments 0.00
Be 5.00
Width of weir Total provided wt ft 5.00
NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.
With sub consultant
Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
3 of 8
Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :

Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018

Feature : Hydraulic Jump Calculations Checked By: Date :


MU 2/1/2018
Discharge at full head at full opening at Design FSL cfs 43.1
103%

Discharge at Full Head at Canal FSL 139% 58.1


wg/h1 1.95
Crest Length adopted Lcr ft 6.00
X-Reg/Barrage Yes

D/S glacis Slope 1V:zH 3


Throat width ft 5.00

Stilling basin width ws ft 5.00


Assume stilling basin level ft 698.28

Basin transition length Ltb ft 20.61


Width at toe d/s glacis ft 5.00

Hydraulic jump analysis by Crump Method (R.K.Sharma)


TEL1-TEL2 H.L ft 7.65

q 8.62
Critical Depth dc ft 1.32
TEL1-CL K ft 4.80

HL/dc 5.79
Rounded HL/dc 5.80

d1/dc 0.25
d2/dc 2.73

K+F/dc 8.44
Dist. Jump location below crest F ft 6.35
Depth before Jump d1 ft 0.33
Depth after Jump d2 ft 3.61

Checked By Conjugate Depth Formula


V ft/sec 26.09

Fn 8.00
d2' ft 3.58

Check d2-d2' ft 0.03


Location of Jump on glacis ft 698.80

Ef2 ft 3.63
Ef2 ft 3.70
Stilling Basin Level ft 698.28
Stilling Basin Level Adopted EL.b ft 698.28
Distance location above toe ft 0.52

NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.


With sub consultant
Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
4 of 8
Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :
Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018
Feature : Energy Dissipators Checked By: Date :
MU 2/1/2018

Depth of stilling Basin from D/s Bed ft 1.86


Depth of stilling Basin from D/s Bed Adopted ft 1.83
Rounded Fn 8.00
Basin Type I
Paterka fig-12 page 27 USBR Lj/d2 6.14
Length of jump Lj ft 22.15

Length Required Due to Blocks Placement Lb' ft 5.67


Length Required Due to Bridge Geometry 23.52

Adobted Length Lb ft 29.00


E 3.70
Chute Blocks
Height HCH ft -

Spacing SCH ft -
Width WCH ft -
No.of Chute blocks #/Bay -

End Spacing -
Total No.of Chute blocks # -

Baffle Peirs
Height HBA ft -

Spacing SBA ft -
Width WBA ft -
Top thick TBA ft -
No.of Baffle Peirs #/Bay -

End Spacing -
Total No.of Baffle Peirs # -

Dentated Sill for Alternate Basin


Height HSILL ft -

Spacing SSILL ft -
Width WSILL ft -

Top thick TSILL ft -


Width of dentated adjecent to wall ft -
Total No. of Dentates -
End Sill
Ht above Basin level HESILL ft 1.83

NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.


With sub consultant
Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
5 of 8
Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :
Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018
Feature : Exit Gradient Checked By: Date :
MU 2/1/2018
Top thick TESILL ft 1.00
Distance from Glacis Toe
LBA ft -
LSILL ft -
End Sill 24.34
Total Head across for shutdown HS ft 11.53
D/S Glacis slope z 3.00
H-Reg Width Wider Wh ft 5.00
U/S Floor Length L ft 20.00
U/S Glacis Length L1 ft 4.66
Crest Length L2 ft 6.00
D/S Glacis L3 ft 20.61
Basin Length L4 ft 29.00
Total Str. Length Lt ft 80.27
Outlet transition impervious floor length Ltp ft
Impervious floor length Lt+Ltp=Lf ft 80.27
U/S Cutoff of X-Reg in parent channel from top C1 ft
U/S Cutoff of HR from top C1 ft 6.36

D/S Cutoff of HR from top C2 ft 12.50

D/S Cutoff C2' ft 12.50


D/S Cutoff provided from bottom C2' ft 7.83
Depth of Scour below Bed
Silt Factor 0.70
U/S ds1 ft 3.00
D/S ds2 ft 4.00
Exit Gradient 'F.O.S >= 6 safe 6.59
Inverted Filter Length 2*ds2 ft 10.00
No. of Blocks 4.00
Inverted Filter Length Provided L6 ft 10.67
D/S stone apron
Thick ft 1.50
Length ft 18.67
Length adopted L7 ft 30.00
NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.
With sub consultant
Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
6 of 8
Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :

Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018

Feature : Uplift Pressure and Thickness Checked By: Date :


MU 2/1/2018

Max.W.L
H

1
2

RD 46+850

Disty Taking off L

U/S Floor L ft 20.00

U/S Glacis L1 ft 4.66

Crest L2 ft 6.00

D/S Glacis L3 ft 20.61

Cistern L4 ft 29.00

Total floor Length b ft 80.27

U/S FSL ft 709.82

U/S BL BL1 ft 702.82

Cistern Level EL.b ft 698.28

D/s BL BL2 ft 700.14

Crest Level ft 705.15

Pond Level ft 709.82

Head Across ft 11.53

BL1 - El.b Y1 ft 4.54

BL2 - El.b Y2 ft 1.86

BL1 - BL2 Y3 ft 2.68

XR u/s floor cut off ft 0.00

Cutoff without XR ft 6.36

U/S Cutoff from top d1 ft 6.36

D/S Cutoff from top d2 ft 12.50


b ft 80.27

d1 ft 6.36

NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.


With sub consultant
Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
7 of 8

Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :

Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018

Feature : Uplift Pressure and Thickness Checked By: Date :


MU 2/1/2018

l 6.83

Percentage Pressure

Calculated

FE1 % 100

FD1 % 82.56

FC1 % 75.01

Correction

Cm % 0.84

Ct % 0.89

FC1 % 76.74

Floor Thickness

Calculated TC1 ft -3.30

Provided TC1 ft 1.00

Pressure 0.37

Thick calculated ft -5.85

Thick Provided at Crest TC1' ft 1.50

b1 ft 51.27

b2 ft 29.00

d2 ft 0

Pressure 5.74

Max. unbalanced static Head ft 5.74

d1 ft 0.33

d2 ft 3.61

HL ft 7.65

Head due to dynamic action 4.72

Floor Thickness at Toe


Calculated TE2 ft 4.51

Provided TE2 ft 4.75

Provided TC2 ft 4.75

NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LTD.


With sub consultant
Integrated Consulting Services & Technical Resource Services

No. Rev.
CALCULATION SHEET
8 of 8

Project : Detailed Design of Jalalpur Irrigation Project Designed By: Date :

Component : Hydraulic Design of Disty Head Regulator AR 2/1/2018

Feature : Uplift Pressure and Thickness Checked By: Date :


MU 2/1/2018

Cutoff No.3

b ft 80.27

d2 ft 12.50

l 3.75

Percentage Pressure

Calculated

FE3 % 34.55

FD3 % 23.80

Corrected Pressure at E3

D 9.89

b' 29.00

Cm 2.73

Ct 0.65

Corrected

FE3 % 31.17

Floor Thickness at End Cistern

Calculated TE3 ft 2.83

Provided TE3 ft 2.83