INFORMATION
SYSTEM
PRIORITIZATION OF
PROJECTS
Submitted by:-
GROUP -2 SECTION –B
ABHILASH PANIGRAHI (UM18071)
ANJAN MOHANTY (UM18078)
ANJANEYA SAHU (UM18079)
SAURABH nag (um18114)
SAWAN KUMAR ACHARY (UM18119)
INTRODUCTION
PROBLEM STATEMENT
With this we start our decision-making process using Expert Choice 2000
Our ratings are based on the general perception that people hold of the above-
mentioned zones, based on current:
o Economic Scenario
o Political Scenario
o Social Scenario
PQR has no other manufacturing facilities located elsewhere.
The factors that are considered to be influencing PQR’s prioritization decision are: -
2
1. Project Risk
2. Project cost
3. Operational Efficiency
4. Project performance
SENSTIVITY ANALYSIS
3
GRADIENT SENSITIVITY ANALYSIS
4
PROJECT PRIORITIES WITH GOAL
CONCLUSIONS
5
Having assigned our values corresponding to each of the factors and sub factors, the results
that we obtained with regards to the factors which are to be given the most importance and
those which are to be given the least importance are as follows: