Академический Документы
Профессиональный Документы
Культура Документы
1 220kV GCR-C'pur G-T SECURE APMB4499 800/1 0.2 Multicore 220KV/110V 0.2 Multicore Yes
2 220kV Gadchandur G-T SECURE APMB4500 800/1 0.2 Multicore 220KV/110V 0.2 Multicore Yes Yes 1 150m 150m 600M 300m 150m - - -
3 220kV Grace metering bay G-T SECURE APMB4649 800/1 0.2 Multicore 220KV/110V 0.2 Multicore Yes
* In case of EHV Consumer & G to T Location, ABT meters are to be installed as per STU Circular & location of meter along with requirement of metering cubicle is to be worked out.
C Drawings
1. Hand drawn drawing indicating MSETCL bus with incomming lines and interface location where meter is to be installed shall be attached with this report.
2. In case of EHV Consumer, consumer end bus (MSETCL & Consumer bus shall be shown in the drawing) along with interface location shall be indicated in the
drawing.
3. Scan copy of drawing shall be attached with this report.
4. The Survy report shall be submitted in the soft copy only. No modification & mergging of cell in down in the report format.
NAME OF BIDDER/VENDOR:
Consolidated Field Survey Form/Report _ AMR System
LOI NO.
OFFICE OF CHIEF ENGINEER (AC & I) AIROLI MSETCL DATE OF SURVEY
1 33kV Manikgarh T-D SECURE-Apex R3M021-354 MAB03534 100/1 0.5 Multicore 66KV/110V 0.2 Multicore Yes
2 66kV Manikgarh T-T SECURE-Apex R3M021-354 MAB03521 400/1 0.5 Multicore 220KV/110V 0.2 Multicore Yes
3 220kV UTCL-I G-T SECURE-Apex-100 R3E MSP53940 200/1 0.2 Multicore 220KV/110V 0.5 Multicore Yes
4 220kV UTCL-II G-T SECURE-Apex-100 R3E MSP53938 200/1 0.2 Multicore 220KV/110V 0.5 Multicore Yes
5 220kV Grace G-T SECURE-Apex R3M021-354 MFM04314 600/1 0.5 Multicore 220KV/110V 0.5 Multicore Yes
6 220kV MIDC G-T SECURE-Apex R3M021-354 MFM04324 600/1 0.5 Multicore 220KV/110V 0.5 Multicore Yes
220/66kV 150MVA T-T
7 SECURE-Apex R3M021-354 MAB03527 1200/1 0.5 Multicore 66KV/110V 0.2 Multicore Yes
ICT LV
Yes 1 150m 150m 2.5 KM 300m 150m - - -
220/66kV 50MVA T-T
8 SECURE-Apex R3M021-354 MAB03528 800/1 0.5 Multicore 66KV/110V 0.2 Multicore Yes
T/F LV
9 T-D SECURE-Apex (main) R3M021-354 MAB03454 800/1 0.5 Multicore 33KV/110V 0.2 Multicore Yes
220/33kV 50MVA
T/F-I LV
10 T-D SECURE-Apex (check) R3M021-354 MAB03455 800/1 0.5 Multicore 33KV/110V 0.2 Multicore Yes
12 T-D SECURE-Apex (main) R3M021-354 MAB03524 400/1 0.5 Multicore 33KV/110V 0.2 Multicore Yes
66/33kV 25MVA
T/F LV
13 T-D SECURE-Apex (check) R3M021-354 MAB03525 400/1 0.5 Multicore 33KV/110V 0.2 Multicore Yes
* In case of EHV Consumer & G to T Location, ABT meters are to be installed as per STU Circular & location of meter along with requirement of metering cubicle is to be worked out.
C Drawings
1. Hand drawn drawing indicating MSETCL bus with incomming lines and interface location where meter is to be installed shall be attached with this report.
2. In case of EHV Consumer, consumer end bus (MSETCL & Consumer bus shall be shown in the drawing) along with interface location shall be indicated in the
drawing.
3. Scan copy of drawing shall be attached with this report.
4. The Survy report shall be submitted in the soft copy only. No modification & mergging of cell in down in the report format.