DRILLING LOG
Project : TUNNEL OF NANJUNG DAM WIKA - ADHI Page : 1/2
Location : INLET AT NANJUNG DAM Day/Date Start : JUNE 29th, 2019
Hole No./Code : NA - 72 Day/Date Finish : JULY 4th, 2019
Coordinate X : 779604.733 Z : 645.236 Drilling Master : KWAT
Y : 9232315.087 Drilling Machine : KOKEN D2G
Total Depth : 30.00 m Logged By : Aziz Fathiry Rahman
G.W.L :2m
Lithology Symbol

Standard Penentration Test


Type of Barrel and Bit

Letter Symbol

Undisturbed Sample
Disturbed Sample
G W L (m)
Depth (m)

Depth (m)
Casing

TCR (%)
SPT & N VALUE
Date

SPT (NUMBER OF BLOW)


Core Description RQD (%)
N/30

0 20 40 60 80 100 0 10 20 30 40 50

N1 N2 N3 N
NQ SINGLE,

1 1 1
3 m, 4 in

XUNG

0.00 - 3.00 m
COLLOVIUM SOIL, CLAYEY SAND, dark
GWL 2 brownish, greenish molded, fine sand, 2 1 9 30 39 2 2.00
DS-1
15 15 15 30
29 JUNE 2019

2.00 m poorly graded, well sorted, mostly soil 50 %, 2.45


2.50

medium dense - very dense.


3 3 3
4.5 m, 89 mm

3.00

4 SC 4 9 11 6 17 4 4.00

15 15 15 30 4.35

5 5 5
89 mm
6 m,

6 6 50 6
10
9 m, 89 mm

7 7 7 DS-2
100 7.10

8 7.00 - 13.00 m 8 4 13 17 30 8 8.00


7.60
15 15 15 30 8.45
SANDSTONE, greyish, brown molded, 100
9 SW
moderately weathered, fine sand, well 9 9
graded, poorly sorted, smooth roughness,
60
12 m, 89 mm

low - medium strength.


10 10 4 8 10 18 10 10.00
NQ SINGLE, IMPRAC

15 15 15 30 10.40
90
11 11 11
100

12 12 5 16 23 39 12 12.00
30 JUNE 2019

DS-3
15 15 15 30 12.45
15 m, 89 mm

12.45
100
13 13 13 13.00
100

14 14 11 20 30 50 14 14.00

13.00 - 21.30 m 15 15 15 30 14.45

TUFFACEOUS SAND, pinkish white, 100


15 moderately - slightly weathered, fine sand,
15 15
100
18 m, 89 mm

well graded, poorly sorted, high - extreme


16.00
16 TU high strength, rough, and seen quartz 16 11 20 10 30 16
mineral, iron oxide, silica, glass. 15 15 15 30 16.45
100
17 17 17
100
1 JULY 2019

18.00
18 18 18
NQ TRIPPLE

12 21 30 51
21 m, 89 mm

15 15 12 27 18.42
100
19 19 100
19
100
20 20 20
: Standar Penetration Test : Undisturbed Sample : Disturbed Sample : Ground Water Level ASTM D 2487-06, MOD
PT WIJAYA KARYA (Persero) Tbk - PT ADHI KARYA (Persero) Tbk
TUNNEL OF NANJUNG DAM

DRILLING LOG
Project : TUNNEL OF NANJUNG DAM WIKA - ADHI Page : 1/2
Location : INLET AT NANJUNG DAM Day/Date Start : JUNE 29th, 2019
Hole No./Code : NA - 72 Day/Date Finish : JULY 4th, 2019
Coordinate X : 779604.733 Z : 645.236 Drilling Master : KWAT
Y : 9232315.087 Drilling Machine : KOKEN D2G
Total Depth : 30.00 m Logged By : Aziz Fathiry Rahman
G.W.L :2m
Lithology Symbol

Standard Penentration Test


Type of Barrel and Bit

Letter Symbol

Undisturbed Sample
Disturbed Sample
G W L (m)
Depth (m)

Depth (m)
Casing

TCR (%)
Date

SPT & N VALUE SPT (NUMBER OF BLOW)


Core Description RQD (%)
N/30

0 20 40 60 80 100 0 10 20 30 40 50

N1 N2 N3 N Depth (m)
20.00

13.00 - 21.30 m 32 50 50
TUFFACEOUS SAND 15 10 10 20.35

TU 100
21 21 21
2 JULY 2019

100
22 21.30 - 27.00 m 22 100 22
TUFFACEOUS SAND, pinkish white, 100
slightly weathered - fresh, coarse sand, 100
23 well graded, poorly sorted, extreme high 23 100
23
strength, rough, and little seen quartz,
glass, silica and lithic fragments. 100
24 24 24
3 JULY 2019

NQ TRIPPLE, DIAMOND

100
TU
100
25 25 100 25
100
26 26 26
100
100
27 27 40
27
27.00 - 30.00 m
4 JULY 2019

DACITE, greyish, fresh, a lot tuffaceous 40


28 fragments, extremely high strength, well 28 28
DA graded, poorly sorted, and seen quartz, 80
glass, and silica mineral.
29 29 29
40
30 30 30

31 31 31

32 32 32

33 33 33

34 34 34

35 35 35

36 36 36

37 37 37

38 38 38

39 39 39

40 40 40
: Standar Penetration Test : Undisturbed Sample : Disturbed Sample : Ground Water Level ASTM D 2487-06, MOD

Вам также может понравиться