JOB SAFETY ANALYSIS

Project Fadhili Downstream Pipelines Project BI No. BI-10-01904

FACILITY/PLANT LOCATION: DESCRIPTION OF WORK: CONTRACTOR: REVISION: 0


Arkad Engineering
FADHILI GAS PLANT ERECTION AND DISMANTLING OF
and Construction
SCAFFOLDING JSA No: xxxx
Company
JSA PARTICIPANTS: PREPARED BY: REVIEWED BY: APPROVED BY:
(Contractor’s HSE Manager, Construction
Manager, Civil Superintendent, & relevant
discipline engineers)

_______________________ _______________________ _______________________


Dionaldo Tapispisan Mahammed Al Otaibi Saudi Aramco Proponent
HSE Supt. – Arkad E&C SAPMT Safety

DATE: August 27, 2018 DATE: August 28, 2018 DATE:

References GIs & SAES:


G.I. 2.100 Work Permit System Hazard Identification Plan (HIP) Aramco Construction Safety Manual CSC Chapter II-5 Fall Protection
5th Edition

GI 8.001 Safety Requirements for GI 6.030 Traffic Control and Vehicle ARK-P116-PPE-001 Arkad PPE
Scaffolds Safety Assessment

Page 1 of 6
S No. Sequence of Steps Potential Hazards Corrective Action/Recomendation Action By
1. Obtain Work Permit and  Scope of work not  Issuers and Receivers shall have in their possession a valid TR Site Supervisor / All
meet the T.R. Issuer on identified work permit certificate.
the site  Permits shall identify the specific work to be performed by the work
crew at a specific location.
 Work Description section of the work permit form shall be
completed.
 Hazard Identification and Control section of the work permit form
shall be completed
 Review precautions taken and restrictions imposed to control the
hazards associated with the job site and/or work activity
 Additional approvals/signatures shall be required for
renewed/extended work permits (see G.I 2.100 and section 4.7).
 Attach applicable checklists/forms to the work permit that provide
supplemental information and/or approvals for the particular work
activity.
 A joint site inspection with permit issuer and receiver shall be
conducted.
2. Site Preparation & Pre-  Personnel Injury  Site supervisor shall conduct pre-job (toolbox) safety meetings with Site Supervisor / All
task Meeting site personnel to address job-specific safety issues prior to
beginning work activity.
 Supervisor shall inspect site to detect and correct unsafe acts and
conditions.
 Supervisory personnel, safety personnel and/ or other qualified staff
shall be present at the job site while work is in progress.
 Work permits shall be used to control hazardous work activities at
all SA facilities and locations.
 Adequate number and types of fire extinguishers shall be available
at job site
 Traffic control plan shall be developed for jobsite to include parking
areas, speed control and signage.
 All personnel to wear complete PPE i.e. Safety Helmet, Safety
Shoes, Safety Glass, FRC/Coveralls and working gloves.
 All drivers shall comply with G.I- 6.030 Traffic Control and Vehicle
Safety.
3. Erection of Scaffolding  Falls  Scaffolds shall be inspected and tagged by SA certified scaffold
supervisor before its first use.
 Slips, trips  Keep floors clean and free of slip and trip.

Page 2 of 6
 Appropriate personal protection (harnesses, lanyards, anchor
 Falls from height points, rope system, etc) shall be provided and used by all
personnel.
 Falling object  Ensure the working area shall be secured and barricaded
4. Dismantling of  Dismantling shall be supervised by a certified scaffold supervisor.
Scaffolding  Falling objects  Relocation planning considerations will be considered during the
dismantling process.
 Barricades and signs shall be used as appropriate.
 Avoid dropping or throwing the components
 Provide a safe means of access and fall protection
5. Housekeeping  Health Hazard  The entire site shall be cleaned including identifying areas where Site Supervisor / All
each subcontractor is responsible for the cleaning.
 An adequate amount of trash receptacles shall be available in work
areas.
 Site supervision shall ensure that trash and debris is properly
collected and disposed of daily.
 Environmental Pollution  Trash containers shall be of durable construction and shall be Site Supervisor / All
located as needed throughout the work area. Trash containers shall
be covered, clearly marked and emptied daily.
 Plastic Bottled water or disposable cups shall be provided at site
daily.
 Storage and disposal of nonhazardous and hazardous waste in
shall be in accordance with GI 430.001 and Arkad CEWMP
 Waste shall be segregated at all times in accordance with waste
handling requirements.
 Separate trash containers, with suitable disposable plastic liners,
shall be provided for food scraps and other organic matter.
 Refuse trash and garbage shall only be disposed of at approved
sites as designated by SA or local community.
 Excavation spoils and building materials shall only be disposed of
at other approved sites as designated by SA or local municipality.

Page 3 of 6
Supervisor responsible for explaining contents of this JSA
Name: Signature: Date:

Emergency Response Preparedness:

Nearest Emergency Assembly Point


location?
Nearest Fire
Extinguishers?
Nearest
Spill Kit?
Nearest First
Aid Kit?
Method of communicating an Radio Channel Phone
Air horn? Yes: No:
emergency? No: No:

Page 4 of 6
Sign On: I confirm that the JSA has been explained and its contents are clearly understood and accepted. I also confirm that my
required qualifications to undertake this activity are current and approved. I clearly understand the controls in this JSA must be applied
as documented; otherwise work is to cease immediately and a review is to be completed and work can recommence.

Name Qualification Signature Date Employer

Page 5 of 6
Page 6 of 6