Академический Документы
Профессиональный Документы
Культура Документы
HV BATTERY
HV002–01
COMPONENTS
4.0 (41, 35 in.·lbf)
Lower Quarter
Ventilator
18 (185, 13)
18 (185, 13)
x6
RH Battery
Bracket
Blower Motor
Control Connector
18 (185, 13)
x5
18 (185, 13)
x6
HV Battery
LH Battery Bracket
8.0 (80, 71 in.·lbf)
Busbar Module
Service Plug
Battery Hose
6.0 (61, 53 in.·lbf)
SMR
SMR Cover
38 (390, 28)
38 (390, 28)
HV Battery
Battery Module Thermistor
Busbar Module
Battery Carrier
DISASSEMBLY
1. REMOVE BATTERY MODULE SET BOLT
Turn the battery assembly upside down, remove the 76 battery
module bolts.
NOTICE:
When turning it over, prevent the flange from being de-
formed.
HINT:
When not removing a battery module, skip the operation of step
1.
B11963
B11964
B11965
B12006
(b) Remove the 2 nuts, and disconnect the power cable from
the front busbar module.
(c) Remove the SMR cover from the SMR.
(d) Remove 2 bolts, and disconnect the power cable for
SMR.
B11966
5. REMOVE SMR
(a) Using the service plug, turn the interlock counterclock-
wise to unlock.
NOTICE:
When the interlock is damaged, be sure to replace it with
new one.
(b) Remove the 3 bolts and SMR.
B11967
B11968
B11969
B11970
B11971
B11972
REASSEMBLY
1. INSTALL BATTERY MODULE
Install the 38 battery modules to the battery carrier.
HINT:
Packs containing 2 battery module each are arranged in
the order of 1 to 19 from the ECU side.
Starting from the positive terminal of the battery module
on the battery ECU side, install 38 battery modules by al-
ternately connecting the positive and negative terminals
to the vehicle front side.
B11973
B11974
B11970
B11968
(e) Connect the power cable for SMR with the 2 nuts.
Torque: 6.0 N·m (61 kgf·cm, 53 in.·lbf)
(f) Install the front RH and LH busbar module protectors.
B11966
B12006
B11965
B11964
INSTALLATION
1. INSTALL HV BATTERY
(a) Set the HV battery to the body.
(b) Connect the battery hose to the body.
CAUTION:
Since alkaline electrolyte may be got on the hose end,
carry out the operation with considera care.
B11992
B11962
B11961
(c) Install the battery carrier catch bracket with the 3 nuts.
Torque: 8.0 N·m (80 kgf·cm, 71 in.·lbf)
NOTICE:
When installing a cover, never fail to pass the interlock but-
ton.
4. INSTALL DUCT (See page HV–32)
5. CONNECT CONNECTOR
(a) Connect the 2 connectors to the battery ECU.
B11960 (b) Connect the connector to the SMR.
(c) Connect the connector to the service plug assembly.
2001 PRIUS (RM778U)
HV–13
HYBRID VEHICLE CONTROL – HV BATTERY