Академический Документы
Профессиональный Документы
Культура Документы
IMC567 IMC567
L H
SIT493 SIT493
PFT48
IMC568
TIME: 15:12:50
SCC7
HDW16 HDW9
BY INSTRUMENTS
HDW17
BURNER DECK
HOOK-UP: PDT-STD-004
3. INSTRUMENT TUBING TO BE FIELD ROUTED AND SUPPORTED 2 ISSUED FOR CONSTRUCTION GC DS GN 25-Mar-10 GAS ABOVE REMOTE MOUNT
AS REQUIRED.
4. MANIFOLD & MOUNTING BRACKET SUPPLIED WITH TRANSMITTER. 1 REVISED AS NOTED KRF PMB COMM 09-Feb-09 CARTAGENA EXPANSION PROJECT
0 ISSUED FOR DESIGN KRF PMB COMM 24-Aug-09
THIS DOCUMENT IS THE PROPERTY OF CHICAGO BRIDGE & IRON COMPANY ("CB&I"). IT MAY CONTAIN INFORMATION DESCRIBING TECHNOLOGY
OWNED BY CB&I AND DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS TO BE USED ONLY IN CONNECTION WITH WORK PERFORMED BY CB&I.
REPRODUCTION IN WHOLE OR IN PART FOR ANY PURPOSE OTHER THAN WORK PERFORMED BY CB&I IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN
PERMISSION OF CB&I. IT IS TO BE SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY THIRD PARTY.
FOR: Refineria de Cartagena S.A.
DRAWN: CK'D: APPD: DATE: SCALE:
NO. REVISION DRAWN CK'D APPD DATE
PMB RSB COMM 18-Aug-08 N/A PROJ NO: 166000 DWG NO: 000-DG-IC04-0030 REV: 4