OBRA: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN

OJO DE TORO EN EL CASERIO EL PROGRESO AL


PRESUPUESTO REFERENCIAL VALOR REFERENCIAL
COSTO DIRECTO S/. 3,101,623.38 VALOR CONTRATADO
GASTOS GENERALES S/. 296,269.04 FACTOR DE RELACION
UTILIDAD S/. 248,129.87 FECHA DEL PRESUPUESTO
SUB TOTAL S/. 3,646,022.29 FECHA DEL CONTRATO
IGV(18%) S/. 656,284.01 FECHA DE SOLICITUD -ADELANTO DIRECTO
PRESUPUESTO REFERENCIAL S/. 4,302,306.30 INICIO DE PLAZO CONTACTUAL
SOLICITUD ADELANTO DIRECTO DE MAT.
PAGO DEL ADELANTO DIRECTO
PAGO DEL ADELANTO DE MATERIALES
ADELANTO DE MATERIALES
ADELANTO DIRECTO

MONOMIO FACTOR PORCENTAJE SIMBOLO


1 0.296 100.00% M
32.680%
2 0.173 CA
67.320%
23.188%
3 0.089 BA
76.812%
4 0.142 100.00% M
5 0.3 100.00% I

K=0.296*(Mr/Mo)+0.173*(Car/Cao)+0.089*(Bar/Bao)+0.142*(Mr/Mo)+0.3*(Ir

IU AGOSTO 17 JULIO 18 AGOSTO 18 SEPTIEMBRE 18


03 460.39 523.98 525.48 527.89
7 620.15 670.83 672.83 671.74
17 628.23 619.6 621.6 620.58
21 465.71 474.04 476.04 476.04
39 444.64 447.4 449.4 450.26
47 580.9 600.11 602.11 602.11
48 366.02 367.15 369.15 372.23

MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %

1 MANO DE OBRA M 47 0.296 100

ACERO DE CONSTRUCCI 03 32.68


CA 0.173
2 CEMENTO PORTLAND TIPO 21 67.32
ALAMBRE Y CABLE TIPO 07 23.188
BA 0.089
3 BLOQUE Y LADRILLO 17 76.812
4 MAQUINARIA Y EQUIPO N M 48 0.142 100
INDICE GENERAL DE
PRECIOS AL I 0.3 100
5 CONSUMIDOR 39
1

MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %

1 MANO DE OBRA M 47 0.296 100

ACERO DE CONSTRUCCI 03 32.68


CA 0.173
2 CEMENTO PORTLAND TIPO 21 67.32
ALAMBRE Y CABLE TIPO 07 23.188
BA 0.089
3 BLOQUE Y LADRILLO 17 76.812
4 MAQUINARIA
INDICE Y EQUIPO
GENERAL DE N M 48 0.142 100
PRECIOS AL
I 0.3 100
5 CONSUMIDOR 39
1

MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %

1 MANO DE OBRA M 47 0.296 100

ACERO DE CONSTRUCCI 03 32.68


CA 0.173
2 CEMENTO PORTLAND TIPO 21 67.32
ALAMBRE Y CABLE TIPO 07 23.188
BA 0.089
3 BLOQUE Y LADRILLO 17 76.812
4 MAQUINARIA Y EQUIPO N M 48 0.142 100
INDICE GENERAL DE
PRECIOS AL I 0.3 100
5 CONSUMIDOR 39
1

MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %

1 MANO DE OBRA M 47 0.296 100

ACERO DE CONSTRUCCI 03 32.68


CA 0.173
2 CEMENTO PORTLAND TIPO 21 67.32
ALAMBRE Y CABLE TIPO 07 23.188
BA 0.089
3 BLOQUE Y LADRILLO 17 76.812
4 MAQUINARIA Y EQUIPO N M 48 0.142 100
INDICE GENERAL DE
PRECIOS AL I 0.3 100
5 CONSUMIDOR 39
1
MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %

1 MANO DE OBRA M 47 0.296 100

ACERO DE CONSTRUCCI 03 32.68


CA 0.173
2 CEMENTO PORTLAND TIPO 21 67.32
ALAMBRE Y CABLE TIPO 07 23.188
BA 0.089
3 BLOQUE Y LADRILLO 17 76.812
4 MAQUINARIA Y EQUIPO N M 48 0.142 100
INDICE GENERAL DE
PRECIOS AL I 0.3 100
5 CONSUMIDOR 39
1

MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %

1 MANO DE OBRA M 47 0.296 100

ACERO DE CONSTRUCCI 03 32.68


CA 0.173
2 CEMENTO PORTLAND TIPO 21 67.32
ALAMBRE Y CABLE TIPO 07 23.188
BA 0.089
3 BLOQUE Y LADRILLO 17 76.812
4 MAQUINARIA Y EQUIPO N M 48 0.142 100
INDICE GENERAL DE
PRECIOS AL I 0.3 100
5 CONSUMIDOR 39
1

MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %

1 MANO DE OBRA M 47 0.296 100

ACERO DE CONSTRUCCI 03 32.68


CA 0.173
2 CEMENTO PORTLAND TIPO 21 67.32
ALAMBRE Y CABLE TIPO 07 23.188
BA 0.089
3 BLOQUE Y LADRILLO 17 76.812
4 MAQUINARIA Y EQUIPO N M 48 0.142 100
INDICE GENERAL DE
PRECIOS AL I 0.3 100
5 CONSUMIDOR 39
1

RESUMEN DE CURVA S

DESCRIPCION EJECUTADOS PROGRAMADOS


VAL 1 12.5% 10.5%
VAL 2 23.5% 18.5%
VAL 3 18.2% 26.5%
VAL 4 33.6% 18.3%
VAL 5 12.2% 26.2%
MIENTO DEL SERVICIO EDUCATIVO EN EL NIVEL INICIAL , PRIMARIA Y SECUNDARIA , EN LA IE
ORO EN EL CASERIO EL PROGRESO ALTO ,DISTRITO DE JAYANCA - LAMBAYEQUE"
VALOR REFERENCIAL S/. 4,302,306.30 S/. 3,646,022.3 (Sin IGV)
VALOR CONTRATADO S/. 4,095,795.60 S/. 3,471,013.2 (Sin IGV)
FACTOR DE RELACION 0.95200
CHA DEL PRESUPUESTO 8/1/2017
FECHA DEL CONTRATO 7/15/2018
ALUMNO : AGUILAR VILLEGAS GIAN MA
SOLICITUD -ADELANTO DIRECTO 7/17/2018
O DE PLAZO CONTACTUAL 9/3/2018
D ADELANTO DIRECTO DE MAT. 10/2/2018
O DEL ADELANTO DIRECTO 8/29/2018
EL ADELANTO DE MATERIALES 8/29/2018
ELANTO DE MATERIALES 20%
ADELANTO DIRECTO 10%

SIMBOLO INDICE DESCRIPCION


M 47 MANO DE OBRA
03 ACERO DE CONSTRUCCION
CA
21 CEMENTO PORTLAND TIPO I
07 ALAMBRE Y CABLE TIPO TW Y THW
BA
17 BLOQUE Y LADRILLO
M 48 MAQUINARIA Y EQUIPO NACIONAL
I INDICE
39 GENERAL DE PRECIOS AL CONSUMIDOR

)+0.089*(Bar/Bao)+0.142*(Mr/Mo)+0.3*(Ir/Io)

SEPTIEMBRE 18 OCTUBRE 18 NOVIEMBRE 18 DICIEMBRE 18 ENERO 19 FEBRERO 19


527.89 531.71 539.69 542.08 537.43 536.72
671.74 674.11 686.28 680.82 673.74 667.83
620.58 620.49 622.27 624.37 622.16 624.17
476.04 476.04 476.04 476.04 476.04 463.18
450.26 450.63 451.18 452 452.29 452.87
602.11 602.11 602.11 602.11 600.24 600.4
372.23 370.7 371.13 370.72 369.95 370.25

Ag 17
Io Ir K AGOSTO 18
580.9 602.11 0.307 4

460.39 525.48
0.184
465.71 476.04
620.15 672.83
0.090
628.23 621.6
366.02 369.15 0.143

444.64 449.4 0.303


1.027
Ag 17
Io Ir K SEPTIEMBRE 18
6
580.9 602.11 0.307

460.39 527.89
0.184
465.71 476.04
620.15 671.74
0.090
628.23 620.58
366.02 372.23 0.144

444.64 450.26 0.304


1.029
Ag 17
Io Ir K OCTUBRE 18
8
580.9 602.11 0.307

460.39 531.71
0.184
465.71 476.04
620.15 674.11
0.090
628.23 620.49
366.02 370.7 0.144

444.64 450.63 0.304


1.029
Ag 17
Io Ir K NOVIEMBRE 18
9
580.9 602.11 0.307

460.39 539.69
0.185
465.71 476.04
620.15 686.28
0.091
628.23 622.27
366.02 371.13 0.144

444.64 451.18 0.304


1.031
Ag 17
Io Ir K DICIEMBRE 18
10
580.9 602.11 0.307

460.39 542.08
0.186
465.71 476.04
620.15 680.82
0.091
628.23 624.37
366.02 370.72 0.144

444.64 452 0.305


1.033
Ag 17
Io Ir K ENERO 19
11
580.9 600.24 0.306

460.39 537.43
0.185
465.71 476.04
620.15 673.74
0.090
628.23 622.16
366.02 369.95 0.144

444.64 452.29 0.305


1.030
Ag 17
Io Ir K FEBRERO 19
12
580.9 600.4 0.306

460.39 536.72
0.182
465.71 463.18
620.15 667.83
0.090
628.23 624.17
366.02 370.25 0.144

444.64 452.87 0.306


1.028
LAR VILLEGAS GIAN MARCO
RESUMEN DE OBRA

AVANCE PROGRAMADO ACUMULADO (APA) S/. 3,646,022.29

Descripción Val01 Val02 Val03 Val 04 Val 05


Parcial S/. 382,832.34 S/. 674,514.12 S/. 966,195.91 S/. 667,222.08 S/. 955,257.84
Acumulado S/. 382,832.34 S/. 1,057,346.46 S/. 2,023,542.37 S/. 2,690,764.45 S/. 3,646,022.29

CALCULAR

1.MONTO DE ADELANTO DIRECTO Y SUS AMORTIZACIONES

ADELANTO DIRECTO 10% x Po

MONTO DE ADELANTO DIRECTO (10%) S/. 347,101.32

DESCRIPCION VAL REAL % AMORTIZACION


VAL 1 S/. 433,876.65 10% S/ 43,387.67
VAL 2 S/. 815,688.11 10% S/ 81,568.81
VAL 3 S/. 631,724.41 10% S/ 63,172.44
VAL 4 S/. 1,166,260.44 10% S/ 116,626.04
VAL 5 S/. 423,463.61 10% S/ 42,346.36
S/ 347,101.32
RESUMEN DE OBRA

AVANCE EJECUTADO ACUMULADO (ARA)

Descripción Val01 Val02 Val03 Val 04


Parcial S/. 455,752.79 S/. 856,815.24 S/. 663,576.06 S/. 1,225,063.49
Acumulado S/. 455,752.79 S/. 1,312,568.02 S/. 1,976,144.08 S/. 3,201,207.57

; Po( Presupuesto Ofertado)

(SIN IGV)

DEUDA SALDO
S/347,101.32 S/303,713.66
S/303,713.66 S/222,144.85
S/222,144.85 S/158,972.41
S/158,972.41 S/42,346.36
S/42,346.36 S/0.00
S/. 3,471,013.22

Val 05
S/. 444,814.72
S/. 3,646,022.29
CALCULAR

2.CALCULAR EL ADELANTO DE MATERIALES SOLICITADOS Y SUS AMORT

ADELANTO MATERIALES 20% x Po

MONTO DE ADELANTO DIRECTO (10%) S/. 694,202.64

IU AGOSTO 17 JULIO 18 AGOSTO 18 SEPTIEMBRE 18


03 460.39 523.98 525.48 527.89
7 620.15 670.83 672.83 671.74
17 628.23 619.6 621.6 620.58
21 465.71 474.04 476.04 476.04
39 444.64 447.4 449.4 450.26
47 580.9 600.11 602.11 602.11
48 366.02 367.15 369.15 372.23

MONOMIO DESCRIPCION SIMBOLO I.U Coef. Incidencia %


ACERO DE
CONSTRUCCIO 32.68
N 03
CA 0.173
CEMENTO
PORTLAND 67.32
2 TIPO I 21
ALAMBRE Y
CABLE TIPO TW 23.188
Y THW BA 07 0.089
BLOQUE Y 76.812
3 LADRILLO 17

AMORTIZACIONES

ITEM FECHA TIPO MATERIAL % FR Monto Solicitado


SETIEMBRE 12.5
OCTUBRE ACERO DE 23.5
1 NOVIEMBRE CONSTRUCCIO 18.2 0.952 S/163,725.33
N
ACERO DE
1 CONSTRUCCIO 0.952 S/163,725.33
N
DICIEMBRE 33.6
ENERO 12.2

ITEM FECHA TIPO MATERIAL % FR Monto Solicitado


SETIEMBRE 12.5
OCTUBRE CEMENTO 23.5
2 NOVIEMBRE PORTLAND 18.2 0.952 S/302,047.67
TIPO I
DICIEMBRE 33.6
ENERO 12.2

ITEM FECHA TIPO MATERIAL % FR Monto Solicitado


SETIEMBRE 12.5
OCTUBRE ALAMBRE Y 23.5
3 NOVIEMBRE CABLE TIPO TW 18.2 0.952 S/56,809.28
Y THW
DICIEMBRE 33.6
ENERO 12.2

ITEM FECHA TIPO MATERIAL % FR Monto Solicitado


SETIEMBRE 12.5
OCTUBRE 23.5
BLOQUE Y
4 NOVIEMBRE 18.2 0.952 S/171,620.36
LADRILLO
DICIEMBRE 33.6
ENERO 12.2
Se solicita
; Po( Presupuesto Ofertado) 10/2/2018

(SIN IGV) Ima ( Ag2018)

SEPTIEMBRE 18 OCTUBRE 18 NOVIEMBRE 18 DICIEMBRE 18 ENERO 19 FEBRERO 19


527.89 531.71 539.69 542.08 537.43 536.72
671.74 674.11 686.28 680.82 673.74 667.83
620.58 620.49 622.27 624.37 622.16 624.17
476.04 476.04 476.04 476.04 476.04 463.18
450.26 450.63 451.18 452 452.29 452.87
602.11 602.11 602.11 602.11 600.24 600.4
372.23 370.7 371.13 370.72 369.95 370.25

Ag 17 AGOSTO 18 4

Io Ia Coe*%* Ia/Io Po Monto Máximo FACTOR

0.065 S/223,982.83
460.39 525.48

0.119 S/413,213.37
465.71 476.04 S/3,471,013.22 0.73

0.022 S/77,717.38
620.15 672.83

0.068 S/234,783.56
628.23 621.6
S/949,697.14

Es mayor de lo que puedo solicitar , por lo tanto utilizaremos un Factor


para solicitar el adelanto de manera proporcional

AMORTIZACIO AMORTIZACIO
IMO (AGOSTO 17)
IMA (AGOSTO 17) N (S /IGV) DEUDA SALDO N (C /IGV)
460.39 525.48 S/20,465.67 S/163,725.33 S/143,259.66 S/24,149.49
460.39 525.48 S/38,475.45 S/143,259.66 S/104,784.21 S/45,401.03
460.39 525.48 S/29,798.01 S/104,784.21 S/74,986.20 S/35,161.65
460.39 525.48 S/55,011.71 S/74,986.20 S/19,974.49 S/64,913.82
460.39 525.48 S/19,974.49 S/19,974.49 S/0.00 S/23,569.90

AMORTIZACIO AMORTIZACIO
IMO (AGOSTO 17)
IMA (AGOSTO 17) N (S /IGV) DEUDA SALDO N (C /IGV)
460.39 525.48 S/37,755.96 S/302,047.67 S/264,291.71 S/44,552.03
460.39 525.48 S/70,981.20 S/264,291.71 S/193,310.51 S/83,757.82
460.39 525.48 S/54,972.68 S/193,310.51 S/138,337.83 S/64,867.76
460.39 525.48 S/101,488.02 S/138,337.83 S/36,849.82 S/119,755.86
460.39 525.48 S/36,849.82 S/36,849.82 S/0.00 S/43,482.78

AMORTIZACIO AMORTIZACIO
IMO (AGOSTO 17)
IMA (AGOSTO 17) N (S /IGV) DEUDA SALDO N (C /IGV)
460.39 525.48 S/7,101.16 S/56,809.28 S/49,708.12 S/8,379.37
460.39 525.48 S/13,350.18 S/49,708.12 S/36,357.94 S/15,753.21
460.39 525.48 S/10,339.29 S/36,357.94 S/26,018.65 S/12,200.36
460.39 525.48 S/19,087.92 S/26,018.65 S/6,930.73 S/22,523.74
460.39 525.48 S/6,930.73 S/6,930.73 S/0.00 S/8,178.26

AMORTIZACIO AMORTIZACIO
IMO (AGOSTO 17)
IMA (AGOSTO 17) N (S /IGV) DEUDA SALDO N (C /IGV)
460.39 525.48 S/21,452.55 S/171,620.36 S/150,167.82 S/25,314.00
460.39 525.48 S/40,330.79 S/150,167.82 S/109,837.03 S/47,590.33
460.39 525.48 S/31,234.91 S/109,837.03 S/78,602.13 S/36,857.19
460.39 525.48 S/57,664.44 S/78,602.13 S/20,937.68 S/68,044.04
460.39 525.48 S/20,937.68 S/20,937.68 S/0.00 S/24,706.47
Monto Máximo(S / Monto Máximo (c
IGV) IGV)

S/163,725.33 S/193,195.88

S/302,047.67 S/356,416.26

S/56,809.28 S/67,034.95

S/171,620.36 S/202,512.03

S/694,202.64 S/819,159.12

or lo tanto utilizaremos un Factor


manera proporcional
RESUMEN DE LOS K REALES

AGOS.18 SETI.18 OCTU.18 NOV.18 DIC.18


K
1.027 1.029 1.029 1.031 1.033

VERIFICACIÓN DEL ESTADO DE OBRA

ACUMULADOS
AVANCE DE OBRA
N° FECHA A.P.A A.R.A
OCTUBRE 1 SETIEMBRE 382,832.34 455,752.79
NOVIEMBRE 2 OCTUBRE 1,057,346.46 1,312,568.02
Se presenta en DICIEMBRE 3 NOVIEMBRE 2,023,542.37 1,976,144.08
ENERO 4 DICIEMBRE 2,690,764.45 3,201,207.57
FEBRERO 5 ENERO 3,646,022.29 3,646,022.29

3.REAJUSTES VALORIZADOS
PARCIALES* FR
N° FECHA Vprogramado Vreal K-1
OCTUBRE 1 SETIEMBRE 364,456.39 433,876.65 0.027
NOVIEMBRE 2 OCTUBRE 642,137.45 815,688.11 0.029
DICIEMBRE 3 NOVIEMBRE 919,818.50 631,724.41 0.029
ENERO 4 DICIEMBRE 635,195.42 1,166,260.44 0.031
FEBRERO 5 ENERO 909,405.46 423,463.61 0.033

4.REAJUSTES REALES DE LIQUIDACIÓN DE OBRA


POR EL AUTOR SALINAS
PARCIALES* FR
N° FECHA Vprogramado Vreal K-1
Kset 1 SETIEMBRE 364,456.39 433,876.65 0.029
Koct 2 OCTUBRE 642,137.45 815,688.11 0.029
Knov 3 NOVIEMBRE 919,818.50 631,724.41 0.031
Kdic 4 DICIEMBRE 635,195.42 1,166,260.44 0.033
Kene 5 ENERO 909,405.46 423,463.61 0.030
USANDO EL K A LA FECHA DE
PARCIALES* FR
N° FECHA Vprogramado Vreal K-1
Koct 1 SETIEMBRE 364,456.39 433,876.65 0.029
Knov 2 OCTUBRE 642,137.45 815,688.11 0.031
Kdic 3 NOVIEMBRE 919,818.50 631,724.41 0.033
Kene 4 DICIEMBRE 635,195.42 1,166,260.44 0.030
Kfeb 5 ENERO 909,405.46 423,463.61 0.028
ENE.18 FEB.18

1.030 1.028

DOS
OBRA
ESTADO Kr
ADELANTADA 1.027
ADELANTADA 1.029
ATRASADA 1.029
ADELANTADA 1.031
TERMINO 1.033

PARCIALES* FR
Rprog Rreal Rreconocido (Sin IGV) Rreconocido(Con IGV)
9,840.32 11,714.67 11,714.67 13,823.31
18,621.99 23,654.96 23,654.96 27,912.85
26,674.74 18,320.01 18,320.01 21,617.61
19,691.06 36,154.07 36,154.07 42,661.81
30,010.38 13,974.30 30,010.38 35,412.25
104,838.48 119,854.09 141,427.82

Como la obra está adelantada su reconocido debe ser mayor


que el reintegro programado

POR EL AUTOR SALINAS


PARCIALES* FR
Rprog Rreal Rreconocido (Sin IGV) Rreconocido(Con IGV)
10,569.24 12,582.42 12,582.42 14,847.26
18,621.99 23,654.96 23,654.96 27,912.85
28,514.37 19,583.46 19,583.46 23,108.48
20,961.45 38,486.59 38,486.59 45,414.18
27,282.16 12,703.91 27,282.16 32,192.95
105,949.21 121,589.59 143,475.72

Como la obra está adelantada su reconocido debe ser mayor


que el reintegro programado
USANDO EL K A LA FECHA DE PAGO
PARCIALES* FR
Rprog Rreal Rreconocido (Sin IGV) Rreconocido(Con IGV)
10,569.24 12,582.42 12,582.42 14,847.26
19,906.26 25,286.33 25,286.33 29,837.87
30,354.01 20,846.91 20,846.91 24,599.35
19,055.86 34,987.81 34,987.81 41,285.62
25,463.35 11,856.98 25,463.35 30,046.76
105,348.72 119,166.83 140,616.85

Como la obra está adelantada su reconocido debe ser mayor


que el reintegro programado