Вы находитесь на странице: 1из 4

SKEMA MODUL PROJEK SKOR A+ : TING 4

1 (i) ( 50 )( 0.8 ) + ( 30 )( 0 ) = 50 ( 0 ) + 30v2 8 (i) Student 1:


v2 = 1.33ms −1 E p = ( 55 )(10 )(10 ) = 5500 J
(ii) p = ( 50 )( 0 ) − ( 50 )( 0.8 ) P=
5500
= 458.3 Js −1
12
p = −40ms1
Student 2:
(iii) ( 0.05)( 0 ) − ( 0.05)( 0.8) E p = ( 60 )(10 )(10 ) = 6000 J
F= = −0.8 N
0.05
6000
P= = 428.57 Js −1
2 (i) F = ma 14
Student two has greatest power.
( 250000 )( 4 ) = ( 400000 ) a
a = 2.5ms −2 9 (i) F = kx
(ii) 85 = 0 + 2 ( 2.5 )( s )
2 2
F = k ( l1 − lo )
s = 1445m 20 = k (10 − lo )(1)
30 = k (14 − lo )( 2 )
3 (i) Resultant force =250 − 50 = 200N
lo = 2cm
(ii) F = ma
200 = 5a
(ii) 20 = k (10 − 2 )

a = 40ms −2 k = 2.5 Nm −1
(iii) No air resistance acting on the balloon F = 2.5 ( 8 − 2 ) = 15 N

4 (i) v = 50ms −1 10 (i) 02 = u 2 + 2 ( −10 )( 5 )


50 − 0
a= = 5ms −2 u = 10ms −1
10 (ii) 1
F = 200 × 5 = 1000 N Ek = ( 0.1)(10 ) = 5 J
2
(ii)
2
(iii) 1
5 (i) 800 − 0 EPE = kx 2
a= = 1.33ms −2 2
10 × 60
1
F = 2000 × 1.33 = 2660 N 5 = k ( 0.1)
2
(ii)
2
6 (i) v/ms
-1
k = 1000 Nm −1
4
11 (i) T
cos15° =
150
T = 144.89 N
(ii) T = 250 cos15° = 241.48 N
t/s
1
The rope will not break. The tension less
2
than 300 N
(ii) 0−4
a= = −2ms −2
2 12 (i) m = 0.1kg
(iii) 1
s = ( 4 + 0 )( 2 ) = 4m (ii) t = 0.020 s
0.1( −50 − 40 )
2 (iii)
F= = −450 N
7 (i) 360000 0.02
v= = 10ms −1
3600
13 (i) W = 50 × 10 = 500 N
(ii) 100 − 0
a= = 10ms −2 (ii) EK = EP
10
1 2
(iii) 1 mv = mgh
s = ( 0 + 100 )(10 ) = 500m 2
2
v 2 = 2 gh = 2 (10 )( 0.2 )
v = 2ms −1
(iii) 500 ( 0 − 2 )
F= = −2000 N
0.5
SKEMA MODUL PROJEK SKOR A+ : TING 4

14 (i) W = 3.0 × 8 = 24 J 23 (i) m = 0.169 (1.2 ) = 0.2028kg


(ii)
Fb = 1.2 (1.3 )(10 ) = 15.6 N
24
P= = 4.8W (ii)
5
(iii) 4.8
Efficiency = × 100% = 40% 24 (i) 100000 − 45000 = 55000Pa
12 (ii) F = ( 55000 )( 0.0025 ) = 137.5 N
(iii) 137.5
15 (i) V = 0.16m3 m= = 13.75kg
(ii) Fb = 0.16 × 1000 × 10 = 1600 N 10
(iii) 1600
m= = 160kg 25 (i) p = ( 0.18 )(1015 )(10 ) = 1827 Pa
10
(ii) p = 1.0 × 105 − 1827 = 98173Pa
16 (i) m = 0.18 × 1.2 = 0.216kg
(ii) Fb = (1.2 )(1.3 )(10 ) = 15.6 N
26 (i) patm = ( 0.76 )(13600 )(10 ) = 103360 Pa
(ii) patm = ( 0.1)(13600 )(10 ) = 13600 Pa
17 (i) Fb = ( 250 )(1080 )(10 ) = 2700000 N (iii) 0 Pa
(ii) 2700000 = V (1000 )(10 )
27 (i) W = 100000 N
V = 270m3 (ii) F = 300000 N
(iii) F = 300000 − 100000 = 200000 N
18 (i) W = 20000 N
(ii) Fb = ( 4 )(1000 )(10 ) = 40000 N 28 (i) p = 2000 Pa
Max Weight (ii) F = 2000 ( 2.5 ) = 5000 N
= 40000 − 20000 (iii) • Reduce the mass of wing
= 20000 N • Increase the surface area
m = 2000kg • The airplane move with high
velocity
19 (i) W = 2N 29 (i) F = 500 ( 40 ) = 20000 N
(ii) Fb = V  g
(ii) F = 20000 − 8000 = 12000 N
2 = V (1000 )(10 )
(iii) 12000
V = 200cm3 a= = 15ms −2
800
(iii) 2
m= = 0.2kg = 200 g
10 30 (i) F = ( 400 )( 50 ) = 20000 N
200 W = 9000 N
= = 1gcm −3 = 1000kgm −3 (ii)
200
F = 20000 − 9000 = 11000 N
F = ma
20 (i) Fb = 15000 N
11000 = 900a
(ii) Fb = ( 5 )(1020 )(10 ) = 51000 N
a = 12.2ms −2
W = 51000 − 15000 = 36000 N
31 (i) 15
21 (i) Fb = ( 4 )(1000 )(10 ) = 40000 N P= = 750 Pa
0.02
(ii) W = 2500 N (ii) Load = 750 × 0.28 = 210 N
Load = 40000 − 2500 = 37500 N (iii) A1h1 = A2 h2
22 (i) 3 ( 0.02 )( 0.21) = ( 0.28)( h )
V = = 0.00375m3 h = 1.5cm
800
(ii) Fb = ( 0.00375 )(1000 )(10 ) = 37.5 N
32 (i) 50 FB
m = 3.75kg =
2 15
X = 3.75 − 3 = 0.75kg FB = 375 N
SKEMA MODUL PROJEK SKOR A+ : TING 4

(ii) AA hA = AB hB (ii) ( 0.1k )( 4.8 − 3.6 )( 60 ) = 0.05 ( c )( 218 − 78 )


( 2 )( 21) = 15hB c = 1028.6 Jkg −1 °C −1
hB = 2.8cm
42 (i) 1 1 1
= +
33 (i) F2 4000 5 v 4
=
200 50 v = 5.06cm
F2 = 16000 N (ii) hi v
=
(ii) 4000 + 500 F2 + 5000 ho u
=
50 200 5.06 × 100
hi = = 1.265cm
F2 = 13000 N 400
(iii) Diminished, Inverted, Real
34 (i) 50 FB
= 43 (i) 1 1 1
2 15 = +
10 30 v
FB = 375 N
v = 15cm
(ii) AA hA = AB hB (ii) v 15
M = = = 0.5
( 2 )( 21) = 15hB u 30
hB = 2.8cm
44 (i) 1 1 1
= +
35 (i) W = 600 N f 500 43.5
(ii) 600 f = 40cm
A= = 1.2m 2
500 (ii) 1 1 1
= +
40 800 v
36 (i) Q = ( 2 )( 4200 )( 50 − 30 ) = 168kJ v = 42.1cm
(ii) 168kJ = ( 0.5 )( c )( 90 − 50 )
45 (i) hi v 45 9
c = 8400 Jkg −1 °C = = =
ho u 5 1
37 (i) m1c11 = m2 c2 2 u : v = 9 :1
u = 90cm
( 0.2 )( 405)( − 30 ) = ( 0.3)( 4200 )( 90 −  ) (ii) 1 1 1
 = 86.4°C = +
f 90 10
(ii) -cancel
f = 9cm
38 (i) Q = ( 0.5 )( 450 )(10 ) = 2250 J P=
1
= 11.11D
0.09
(ii) Q = 10 ( 2250 ) = 2250 J
46 (i) 1
39 (i) Pt = mc P= = 10 D
0.10
( 48)( 5 × 60 ) = ( 0.5 )( c )( 40 ) (ii) 1 1 1
= +
c = 720 Jkg −1 °C −1 10 20 v
(ii) ( 0.5)( 720 )(80 −  ) = (1)( 4200 )( − 25) v = 20cm
(iii) v 20
 = 29.34°C M = = =1
u 20
40 (i) ( 0.2k )( 4.6 − 2 )( 60 ) = 0.5L
47 (i) 1
L = 62400 Jkg −1 f = = 0.2m = 20cm
5
(ii) ( 0.2k )( 6.8 − 4.6 )( 60 ) = ( 0.5 )( c )( 222 − 82 ) (ii) 1 1 1
= +
c = 377 Jkg −1 °C −1 20 30 v
v = 60cm
41 (i) ( 0.1k )( 3.6 − 1.0 )( 60 ) = ( 0.05 ) L (iii)
M =
60
=2
L = 312000 Jkg −1 30
SKEMA MODUL PROJEK SKOR A+ : TING 4

48 (i) 1 1 1
= +
10 2 v
v = −4cm
(ii) 4
M = =2
2

49 (i) r = 30°
(ii)  = 30 + 15 = 45°

50 (i) 60
M = =3
20
(ii) 1 1 1
= +
f 60 20
f = 15cm
(iii) 1
P= = 6.67 D
0.15

51 (i) Glass :
1
1.50 =
sin c
c = 41.81°
Diamond :
1
2.42 =
sin c
c = 24.4°
(ii)

Вам также может понравиться