NOW COMES Beaver Wood Energy Pownal, LLC (“BWE”), and files this
Petition, pursuant to 30 V.S.A. § 248 and Public Service Board (the “Board”) Rule 5.400,
requesting that the Board issue a Certificate of Public Good for the Beaver Wood Energy
Pownal Biomass Facility (the “Project”) and requests the expedited of scheduling of a
pre-hearing conference to address BWE’s request for permission to initiate certain limited
construction activity in December of 2010 as set forth in the Motion for Preliminary
of Vermont with an office located at 230 West Street, Rutland, Vermont 05701. Its
2. BWE has developed a project plan to build and operate a 29.5 MW biomass
electric generation facility and fully integrated wood pellet manufacturing plant on certain
leased premises consisting of 45 acres of land located north of the old Green Mountain
3. The Board has granted a Certificate of Public Good to EOS Ventures to develop a
6. The combined facilities will have a payroll of $3.4 million for 45 employees plus
an annual spending of $9.9 million for contractors. The facilities will be purchasing
$18.2 million annually in forest products from loggers working within a 50 mile radius of
the Project.
7. The construction of the Project is expected to lead to the creation of about 960
jobs in Vermont. Operation of the facility is expected to create over 140 new jobs with a
payroll of over $8 million statewide from 2013 forward. State tax revenues are expected
to increase by over $2.3 million annually with the ongoing operations of the Project.
8. The Project’s contribution to the Pownal Grand List will significantly reduce
plants. The use of a higher temperature and pressure boiler steam cycle combined with the
use of multiple heaters will make this Plant among the most efficient of its type.
10. The integration of the pellet plant with the biomass generator makes the Project
more energy efficient than other biomass facilities. The use of the power boiler flue gas to
provide drying energy to the pellet dryer is very unique and advanced technology. This
energy that would normally be discharged up the chimney is instead used to dry the high
11. Another synergy resulting from the integration of the two facilities is the use of the
_____
bark that is removed from the logs to make pellets as fuel for the power boiler. As a result,
this bark does not become a waste product. The air emissions from the Project will be the
12. Currently, the schedule contemplates receipt of all required approvals, including a
2011, with construction completed by the end of 2013. In addition, BWE is seeking
December of 2010. The rationale underlying this request is explained in the Motion for
13. BWE currently proposes to connect to the CVPS transmission system by way of a
new 45kV line with an interconnection point on CVPS’s transmission system in Pownal.
BWE expects to receive a final feasibility study from ISO NE in the very near future.
Once the feasibility study is completed, work will begin on a System Impact Study. BWE
has consulted with CVPS and VELCO with respect to the proposed interconnection and to
date no concerns have been raised as to any negative impacts on system reliability or
stability associated with the proposed interconnection. BWE will finance the construction
14. BWE submits this petition seeking authorization pursuant to 30 V.S.A. § 248 to
construct and operate the Project in accordance with the plans and evidence submitted
herewith.
15. In support of this petition, BWE submits testimony and exhibits that address each of
C. Hold technical hearings as the Board determines in the early Spring of 2011;
E. Take such other action as may be required for the expeditious review of this
Petition.