OBJECTIVE
To study the system of air conditioning and refrigeration regarding to control the
climate of marine life.
OVERVIEW
VISIT ACTIVITIES.
On that particular day, we have arranged to visit the chiller plant system
of Underwater World Langkawi. With the beautiful weather day we managed to
reach destination in scheduled. We have been informed that our visit will be
guided by Mr. Zaki on earlier stage. While waiting for him, we did took some
pictures at the entrance area.
For the penguin and sea lion tank, there is temperature and RH sensor to make
sure the right temperature and humidity is achieved. The ceiling panel is made
from polyethylene. The view panel is made from
acrylic material. We have been told by En.Zaki
that the cost to set up the display tank is from
RM22000-RM23000.
All of the pictures above are describing the cooling tower plant for the
marine life support. Previously, they were using air cooled condenser to reject
heat but as time flies, the components are facing a critical situation as it fins
corrugated due to its location. Sea water is the main reason for the aluminium fin
to corrugate. Instantly, this problem can be avoided by using a certain type of
paint which will prevent this syndrome to appear. Hydrophilip is one of the paint
types that can be used by coating the aluminium fins.
The picture of corrugated aluminium fins.
After that, we move to building system chiller at the below level. This chiller is to
cater the chilled water supply for the building air conditioning system of UWL.
The chiller is manufactured by Carrier.
and chilled
water return.
We continue our visit to the last section where there is many exotic and very
large fish at this section like Garoupa, Shark, Eeel, Sting ray, Starfish and so on.
For the smaller tank there is a few species of the marines life need a specify
control climate like a sea horse and jelly fish. So the UWL have proposed the use
of the small chiller unit system to cater this small type of display view tank.
CONCLUSION.
From this visit, we all have managed to learn the system of air conditioning and
refrigeration in specify to control the climate condition of the marines life. We
have gain knowledge on how the UWL running their sea distribution system as
well. Because the chiller need to run 24 hours the energy that have been used is
costly. Its such a great idea if they could implement new idea to reduce the use
of energy such thermal energy storage and so on.
It such an informative visit for us since all of us did not have any working
experience. We highly appreciate to our lecture Mr. C.K Chang and the
maintenance officer, Mr. Zaki for all the guidance and explanation during this
visit. Thank You Very Much. Merci....Its a memorable , enjoyable, adventurous
and not to forget informative journey. (THANK YOU VERY MUCH MR. C.K. CHANG
and well all apologize for any offend for the whole exploration.....=) )