HAZOP IEC 61508/ 61511 recommends a method to determine the required reliability of The 3rd Hazard Asia Pacifi…
QRA instrumented safety functions (SIFs) and ensures that SIFs are designed and International Conference …
SIL operated correctly. A Safety Instrumented System (SIS) often includes ESD, PSD,
IChemE Second Hazards A…
Reliability HIPPS and F&G.
RAM IRC involved in the prepar…
IRC have extensive experience in implementing IEC 61508/61511 guidelines in all
FMEA Lee’s Loss Prevention in …
phases for process industry projects and can offer assistance in:
Asset Integrity Managem…
· Classification; Introduction of PSMSuiteT…
RBI
· Verification; and IRC invited to give a prese…
QHSE Management, Cons…
· Validation.
IRC involved in the transla…
the initiating event, and the development of the incident scenario, as well as the
Verification
The verification of a SIF involves reviewingthe loop design and gathering the
following information to calculate the probability of failure on demand (PFD) for the
loop:
Using PFD calculation software (aligned to IEC 61511), the loop PFD can be
determined and compared to the SIL rating initially assigned to the SIF for
verification.
Validation
The validation of a SIF is normallyperformed after the installation of the system.
Validation procedures should provide assurance that the Safety Instrumented System
(SIS) safety requirements specification has been met and that any recommendations
The extent and rigour of validation should be commensurate with the complexity of